00) Fast Installation Guide


ZXMW PR10 S400&S500 (V2.00)
Fast Installation Guide
ZTE CORPORATION


Microwave Product Support Dept.
Internal Use Only


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
ZTE CORPORATION
Address:
NO. 55
Hi-tech Road South
ShenZhen
P.R.China
518057
http://dms.zte.com.cn Website:
ZXMW PR10 S400&S500 (V2.00) Fast Installation Guide
LEGAL INFORMATION
By accepting this certain document of ZTE CORPORATIN you agree to the following terms. If you do not
agree to the following terms, please notice that you are not allowed to use this document.
Copyright 20 1 1 ZTE CORPORATION. Any rights not expressly granted herein are reserved. This
document contains proprietary information of ZTE CORPORATION. Any reproduction, transfer, distribution,
use or disclosure of this document or any portion of this document, in any form by any means, without the
prior written consent of ZTE CORPORATION is prohibited.
and are registered trademarks of ZTE CORPORATION. ZTEs company name, logo and product
names referenced herein are either trademarks or registered trademarks of ZTE CORPORATION. Other
product and company names mentioned herein may be trademarks or trade names of their respective
owners. Without the prior written consent of ZTE CORPORATION or the third party owner thereof, anyones
access to this document should not be construed as granting, by implication, estopped or otherwise, any
license or right to use any marks appearing in the document.
The design of this product complies with requirements of environmental protection and personal security.
This product shall be stored, used or discarded in accordance with product manual, relevant contract or
laws and regulations in relevant country (countries).
This document is provided as is and as available. Information contained in this document is subject to
continuous update without further notice due to improvement and update of ZTE CORPORATIONs products
and technologies.
http://TSM.Aftersales@zte.com.cn Email:


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
Revision History
Product Version Document Version Serial Number Reason for Revision
V2.00 R1.0 None First published
V2.00 R1.1 None
Modify the reviewed
problems
Date
Document
Version
Prepared by Reviewed by
2010-7-15 R1.0 Zhang Juan Wang Yi, Xue Bin, Wang Jue
2010-8-20 R1.1 Zhang Juan Alwin Joshua
Author
Approved by
Guo Chaohong
Guo Chaohong
ZXMW PR10 S400&S500 (V2.00) Fast Installation Guide
V2.00 R1.2 None
Modify the reviewed
problems
2010-8-20 R1.2 Zhang Juan Song Wei Guo Chaohong


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
Applicable to:
installation engineers
Proposal: Before reading this document, it is recommended to understand the following knowledge
and skills
SEQ Knowledge and skills Reference material
1
Know engineering installation basics of
communication equipment
None
2 Know safety precautions during installation None
Follow-up document: After read this document, you may need the following information
SEQ Reference material Information
1
ZXMW PR10 S400&S500(V2.00)
Microwave Project Commissioning Guide
This manual specifies the commissioning regulations of ZXMW
PR10 S400&S500 product, guarantee and improve installation
quality, unifies the commissioning procedure, as well as
regulates and guides the on-site commissioning by
commissioning personnel.
2
ZXMW PR10 S400&S500(V2.00)
Microwave Acceptance Test Manual
This manual describes the precondition and safety
points,General test conditions and instruments and Test
items including test information and test procedures.
ZXMW PR10 S400&S500 (V2.00) Fast Installation Guide
-I-
Content
1 Precautions.1
2 Tools and Auxiliary Material2
2-1 Tools 2
2-2 Equipment Modules 4
2-3 Project Auxiliary Material 5
3 Interface. 6
3-1 ODU & Hybrid Coupler Interface6
3-2 IDU Interface..7
4 Installation Modes of Outdoor Unit Equipment.. 8
4-1 Direct Installation...... 8
4-2 Remote Installation... 9
5 Changing the polarization direction of the antenna. .. 10
6 Installing 11-38GHz ODU. .. .11
6-1 1+0 Direct Installation11
6-2 1+1 Direct Installation12
6-3 1+0 Remote Installation .. .. 14
6-4 1+1 Remote Installation ..15


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
ZXMW PR10 S400&S500 (V2.00) Fast Installation Guide
7 Installing 7-8GHz ODU..20
7-2 1+0 Remote Installation .. .. 21
7-3 1+1 Remote Installation .. . 22
7-1 Installing the ODU Installation Bracket 20
-II-
Content
8 Installing ODU Cables.23
8-1 Installing the ODU PGND Cable .23
8-3 Installing the IF Cable - Making Waterproof Curves.25
8-4 Grounding the IF Cable - Grounding Points ...26
8-5 Grounding the IF Cable - Installing the Grounding Clip.27
9 Installing the Indoor Unit Equipment ....28
9-1 Installation Flow of Indoor Unit Equipment ... ... ....28
9-2 Installing the Rack........ .. ...29


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
Appendix.......37
A-1 Terminating the IF Cable with Connectors... .......37
A-2Waterproofing Outdoor Connectors. ..... ......... .38
9-3 Installing the IDU.....................30
9-4 Installing the I/O Board..............31
9-5 Installing the DDF Distribution Box................32
10-1 Installing Power Cables...............33
10-2 Installing IF Cables.....................34
10-3 Installing 75 E1 Cables.................35
10-4 Installing 120 E1 Cables.......................36
ZXMW PR10 S400&S500 (V2.00) Fast Installation Guide
8-2 Installing the IF Cable . 24
10 Installing the Indoor Unit Equipment Cables......33
1 Precautions
Note
Danger
Danger
Danger
Hoisting Heavy Objects
When heavy objects are hoisted, do not stand or walk under the boom or the objects.
Caution
Microwave
Strong radio frequency can harm the human body. Do not stay too close to the antenna in the emitting direction of the
antenna when the microwave communication equipment is working. Before installing or maintaining an antenna on the
iron tower or the mast installed with more than one antenna, avoid the strong radiation from the other antennas.
Caution
IF Cable
Before installing or removing an IF cable, turn off the ODU power switch.
-1-
Working at Heights
When working at heights, prevent objects from falling down.
Thunderstorm
High voltage and AC operations, or operations on an iron tower and a mast on a thunderstorm day are prohibited.
This document aims a t providing simple and distinctive guidelines for hardware installation. For details on the
installation operation steps, refer to the Installation Guide delivered in the form of CD-ROM along with the equipment.
1-1 Precautions


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
-2-
2-1 Tools
2 Tools and Auxiliary Material
Crowbar: to open boxes Hammer: To open boxes Flat screwdriver: to open boxes
Side cutting pliers: to cut cables and
cable ties Do not damage cables
during operation.
Cross screwdriver: to fasten bolts. Do
not damage equipments during
operation.
Wrenches: to fix poles and antennas
on the tower
Adjustable wrench: to fix poles and
antennas on the tower.
Long nose pliers: to make feeder cable
connectors. Do not damage feeder
cable.
Flat nose pliers: to make cables. Do
not damage cables.
Files: to trim the cable core when
assembling cable connectors
Wire stripping pliers: to strip and cut
Wires.
Crimping pliers: to crimp and
assemble cable connectors. Pay
attention to crimping force and do not
damage connectors.
Allen wrench: to fasten allen bolts on
equipments
Cutter: to make cable connectors. Do
not damage the cable core during
operation.
Multimeter: to measure voltage and
resistance and test short or open of
connectors. Please pay attention to
polarities.
Manual winch: to lift equipments
Safety belt: to be used while working
on the tower. Make sure the locking
ring is firm and stable.
Safety helmet: to be used in outdoor
operation and while working on the
tower


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
-3-
2-1 Tools
2 Tools and Auxiliary Material
Pulley and ropes (lifting rope and pilot
rope): to lift equipments including
pole, antenna, hybrid, ODU and IF
cable.
Wrench: to lift equipments. Confirm
the spindle is not loose to prevent
accidents during lifting.
Interphone: to be used during antenna
alignment. Check the performance
and battery before alignment.
Compass: to measure azimuth during
antenna installation. Please keep away
from magnetic filed such as tower.
Soldering iron and soldering tin: to
solder cable connectors. Preheat the
iron for 2~3 minutes before soldering.
Impact dill: to drill holes. Decide hole
position before drilling
Spirit level: to check vertical and
horizontal error such as in rack
installation and antenna polarization
adjustment.
Antistatic gloves and antistatic wrist
strap: to be used during indoor
installation.
Cleaner: to clear the sites after
installation


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
Pole ZXMW PR10 S400 IDU

Antenna ZXMW PR10 S500 IDU
7GHz8GHz ODU 13GHz38GHz ODU
7/8GHz Hybrid 13GHz38GHz Hybrid
-4-
2-2 Equipment Modules
2 Tools and Auxiliary Material


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
1+0 only 16E1+Ethernet IDU
1+0 only 16E1 IDU
1+0 Expandable 16E1 IDU
1+0 Expandable 16E1+Ethernet IDU
1+0 Expandable 32E1 IDU
1+1 Protected 16E1 IDU
1+1 Protected 16E1+Ethernet IDU
1+1 Protected 32E1 IDU
-5-
2-3 Project Auxiliary Material
2 Tools and Auxiliary Material
Ground Cable IF Cable DB44 Connector

Power Supply Cable
Waterproof insulation tape PVC tape
Tie N Type Connector L Type Connector


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
75 E1 Cable 75 E1 Cable Connector 120 E1 Cable
-6-
3 Interface
3-1 ODU & Hybrid Coupler Interface


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
7GHz ~ 8GHz ODU Interface
11GHz ~ 38GHz ODU Interface
11GHz~38GHz Hybrid Coupler Interface
Functions of ODU Interface
Interface Type
BNC Connector
Function
AGC level monitoring
Grounding cable interface System grounding
Coaxial type-N Connector Connected to IDU
11GHz~38GHz Hybrid Coupler Interface
BNC Connector
Coaxial type-N
Connector
Grounding Cable Interface
Grounding
Cable Interface
Coaxial type-N
Connector BNC
Connector
Antenna
Interface
Main Spur Track Interface
Auxiliary
Spur Track
Interface
Antenna
Interface
Waveguide
Interface
-7-
3 Interface
3-2 IDU Interface
ZXMW PR10 S400 IDU Interface
ZXMW PR10 S500 IDU Interface
All Rights reserved, No Spreading abroad without Permission of ZTE


Microwave Product Support Dept.
Internal Use Only
EOW Call Button
System
Status LED
Modem
Status LED
EOW
Interface
DSC
Interface
NMS LA
Interface
NMS LAN
Interface
System
Reset Button
ODU
Status LED
IF
Interface EDI
Interface
Traffic
Interface
Power
Connector
Interface
Power
On/Off
Fuse
Ethernet
Interface
IF
Interface
ODU
Status LED
MU
Status LED
Ground
Fuse
Power
On/Off
Power
Connector
Interface
Traffic
Interface
Ethernet
Interface
EOW
Interface
DSC
Interface
NMS LA
Interface
NMS LAN
Interface
System
Reset Button
Alarm/Maint
Status LED
EDI
Interface
EOW Call
Button
-8-
4-1 Direct Installation
4 Installation Modes of Outdoor
Unit Equipment
1+0 Unprotected only for 11 to 38GHz ODU 1+1 Protected only for 11 to 38GHz ODU


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
-9-
4-2 Remote Installation


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
4 Installation Modes of Outdoor
Unit Equipment
1+0 Unprotected Remote Installation (for 11
38GHz ODU)
1+0 Unprotected Remote Installation (for 7
8GHz ODU)
1+1 Protected Remote Installation (for 11
38GHz ODU)
1+1 Protected Remote Installation (for 78GHz
ODU)
-10-
5-1 Changing the polarization direction of the antenna
5 Changing the polarization
direction of the antenna
The antennas are available in multiple types. This procedure for changing the antenna polarization direction
is provided for reference only. In actual installation, follow the instructions packed with the antenna.
Changing the polarization direction of the antenna
Single-polarized antenna-vertically polarized Single-polarized antenna-horizontally polarized
CAUTION
1 Loosen the fastening screws to allow the feeder boom to rotate freely.
2
3
Rotate the feeder boom 90 degrees to the left or right.
Tighten the fixing screws and apply glue around the screws.


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
1
2
Fastening Screw
Feeder Boom
-11-
6-1 1+0 Direct Installation
6 Installing 11-38GHz ODU
The following describes the procedure for installing the ODU on the antenna. The procedure for installing
the ODU on the ODU adapter is similar.
Applying the appropriate lubricant
Installing the ODU on the antenna


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
Vertical polarization Horizontal polarization
UP
Plate marked with V
UP
Plate marked with H
ODU
Hole for guide PIN
O Ring
Fasten the four M6 screws to fix ODU on the
antenna bracket
4
3
Align the flange of ODU with that of the
antenna
1
Keep the polarization indicator on the ODU
pointing to the polarization direction of the antenna.
2
Insert guide pin on the hole of the bracket to set the
position of screws
ODU
Antenna
ODU Flange
Antenna Flange
Note
Note
Screws
Screws
Guide PIN
Remove the
protective caps.
Apply the appropriate quantity of lubricant on the
gasket of the feed boom and the surface of the
waveguide near the gasket.
-12-
6-2 1+1 Direct Installation
6 Installing 11-38GHz ODU
Note
The following describes the procedure for installing the hybrid coupler on the antenna.
CAUTION
The hybrid couplers are available in multiple types. This procedure for installing the hybrid coupler is provided for
reference only. In actual installation, follow the instructions packed with the hybrid coupler.
By default, the hybrid coupler applies vertical polarization. If horizontal polarization is required, change the
polarization direction of the hybrid coupler.
According to the request change Hybrid Coupler polarization to Horizontal polarization


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
Vertical polarization
Horizontal polarization
Guide Pin
Hybrid Coupler
Screw
Antenna Connection Unit
1
Loosen the two screws on the polarization chip,
and rotate the antenna connection unit
2
Adjust the polarization direction, and then fasten the screws
Install Hybrid Coupler on the Antenan
1
Use M5 screws to install the bracket and the
handle on the hybrid coupler.
2
Check the polarization direction, and use M6 screws to install the
Hybrid coupler on the antenna.
M6 Screw
Hybrid Coupler
Short Plate
Antenna
Guide PIN
O Ring
Flat Washer
Bracket
Hybrid
Coupler
Bracket
Handle
M5 Head Cap Screw
M5x12(10ea)
-13-
6-2 1+1 Direct Installation (continued)
6 Installing 11-38GHz ODU
Installing the ODU on the hybrid coupler
2


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
1
ODU Port
Move the short plate
O Ring
Insert the O-Ring into the two ODU ports on the Hybrid coupler and move the short plate
Install the two ODUs on the combiner respectively, and fix each ODU with four screws
O Ring
ODU
O Ring
ODU
-14-
6-3 1+0 Remote Installation
6 Installing 11-38GHz ODU


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
1
2
3
Install the ODU adapter at an appropriate position on the antenna pole
Mounting Plate Assembly
Assemblys jaws
Rods(4)
Take out the flexible waveguide
Use the flexible waveguide to connect the waveguide interface at the antenna with that at the ODU adapter
Remove tap and connect waveguide here
Twistable Flexible
Waveguide
Note
By default, ODU is vertically polarized. The polarization direction of ODU must be consistent with that of the
antenna, otherwise, the polarization direction should be adjusted. For operation details refer to 1 1+0 Direct
Installation
Before installation, The antenna is installed.
Installing the flexible waveguide
Frequency band
Maximum twist
degree
Minimum E-bend
radius
Minimum H-bend
radius
7/8 GHz 249 76 mm 152 mm
11 GHz 280 64 mm 127 mm
13 GHz 330 64 mm 115 mm
15 GHz 405 52 mm 102 mm
18/23/26/32/38 GHz 465 38 mm 76 mm
The flexible waveguide can be bent only within its maximum twist
angle and at the larger area side. The E-bend radius and H-bend radius
cannot be smaller than the minimum bending radius.
In the case of separate installation, the antenna must provide the
standard flange interface. If the existing interface is not a flange
interface, convert the interface type according to the antenna
instruction.
CAUTION
Keep the direction of the waveguide cavity of
the flexible waveguide consistent with that of
the adapter, and fix the flexible waveguide in a
proper position.
-15-
6-4 1+1 Remote Installation
6 Installing 11-38GHz ODU


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
1
Assemble the bracket and handle to the hybrid coupler
2
Assemble parts of pole mounting bracket used to mount the hybrid coupler
M5 Head Cap Screw
Mount Arm
Truss
Mount
Holder
M12x200 Screw
3 Screw the Mount Arm and the Truss with the M6 25 Screw, Flat Washer (2), Spring Washer (1), Nut, at four positions.
Mount Arm
Truss
Truss
Mount Arm
M6x25 Screw, Nut,Flat
Washer x 2Spring Washer
-16-
6-4 1+1 Remote Installation (continued)
6 Installing 11-38GHz ODU


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
4 Determine centre off set
5
Fit the guide pin of the hybrid coupler to the Guide Pin Hole of the Mount Arm, Install the HYB onto the
bracket with the M6 35 Screw, Flat Washer (2), Nut (2), at four positions,
Note
When either Main or Standby ODU is removed, attach the short plate over the ODU port. Tightening torque is 3.0
Nm 10%.

Hybrid
Coupler
Hybrid
Coupler top
M6x35 Screw, Nut x 2,Flat
Washer x 2
-17-
6-4 1+1 Remote Installation (continued)
6 Installing 11-38GHz ODU


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
6 Install the hybrid coupler to the mounting pole using the M12x 200 Screw, Flat Washer, Nut
7 Adjust direction of the Bracket for Waveguide Port of the hybrid coupler orientation.

Pole Diameter:
50 to 115mm
Mount Holder
M12x200 Screw, Nut x 2,
Flat Washer x 2
Pole
Mount Holder
M12x200 Screw, Nut x 2,
Flat Washer x 2
Waveguide Port
Double Nut tightening Determination of the
attachment direction.
After the installing direction of the
waveguide has been decided, tighten double
nuts.
Hybrid Coupler
-18-
6-4 1+1 Remote Installation (continued)
6 Installing 11-38GHz ODU


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
8 Confirm the ODU Type, which is Master or Slave.
9 Install the ODU onto the hybrid coupler.
Note
The ODU should be attached by turning the plate marked V up position for both Main ODU and Standby ODU.
CAUTION
The same type must be installed onto the hybrid coupler
-19-
6-4 1+1 Remote Installation (continued)
6 Installing 11-38GHz ODU


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
10
Connect the flexible waveguide (WG) to the ODU and fix the waveguide to the ODU with four (4) bolts.
Before connecting the WG to the antenna, confirm which polarization is applied to the Master and Slave ODU.
Note
Waveguide Port
Waveguide
Hybrid Coupler
O Ring
-20-
7-1 Installing the ODU Installation Bracket
7 Installing 7-8GHz ODU
Note
This operation is required only when the radio site needs to be configured with the lightning arrester.


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
1 Confirm there is no part missing.
2 Put the ODU installation bracket on the pole.
3 Tighten the fixing screws
4 The fixed ODU Installation Bracket as shown in the following figure.
-21-
7-2 1+0 Remote Installation
7 Installing 7-8GHz ODU
Note
Before Installing the ODU, you must conform the following is ok:
The antenna is installed
The ODU is hoisted to the installation platform, and is in good condition.
The ODU's type is consistent with that in the plan.


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
1
2
Put the ODU on the bracket as shown in the following figure.
Tighten the four screws
Note
Put the sign V of ODU on the vertical position, and H
on the horizontal position
3
Use the flexible waveguide to connect the waveguide interface at the antenna with that at the ODU adapter
ODU
Bracket
Coaxial Cable
Tighten Bolts(M5)
-22-
7-3 1+1 Remote Installation
7 Installing 7-8GHz ODU
Note
Before Installing the ODU, you must conform the following is ok:
The antenna is installed
The ODU is hoisted to the installation platform, and is in good condition.
The ODU's type is consistent with that in the plan.


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
1
2
Put the ODU on the bracket as shown in the following figure.
Tighten the four screws
Note
Put the sign V of ODU on the vertical position, and H
on the horizontal position
3
Use the flexible waveguide to connect the waveguide interface at the antenna with that at the ODU adapter
Bolt
Hybrid
Coupler
N Type
Antenan
ODU1
ODU2
Coaxial
Cable
Pole
Bracket
Coaxial Cable
Tighten Bolts(M5)
ODU
-23-
8-1 Installing the ODU PGND Cable
8 Installing ODU Cables
ODU PGND Cable


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
Remove the antirust
coating and oxide layer
before connecting ODU
grounding cable to the
tower grounding point.
Make waterproof and
antirust treatment to the
grounding point after
connecting.
Connect the grounding
cable to the nearest
grounding point to ODU
of tower or grounding
copper busbar.
Tower grounding point
-24-
8-2 Installing the IF Cable
8 Installing ODU Cables
CAUTION
Bind the IF cable first to prevent its type-N connector from being pulled.
Take waterproof measures (waterproof curves) for the part of the IF cable below the ODU and the part of
the IF cable outside the IDU room.

The feeder must have a waterproof
arch before entering an equipment
room.


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
Reserve IF cable of proper length
(5m~10m recommended) at the ODU
end. Make it into a circle and fix on
tower.
Tie the cable every 1.0m~1.5m.
IF cables shall be lined and tied closely
together. Distance between ties should
be constant.
Do waterproof treatment to the ODU IF
cable connector.
When winding tape, the upper layer
should cover 2/3 of the layer under it.
-25-
8-3 Installing the IF Cable - Making Waterproof Curves
8 Installing ODU Cables



IDU
IF Cable
Waterproof arch
ODU
Waterproof arch
Note
Coil the IF cable into a circle with a diameter of 0.6 m and bind it onto the mast after the IF cable passes the
waterproof curve under the ODU for future adjustment of the antenna position.


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
-26-
8-4 Grounding the IF Cable - Grounding Points
8 Installing ODU Cables
1. The place about one meter away from the IF interface of the ODU
2. The place about 0.5 to 1 meter away from the cable entry of equipment room or outdoor cabinet
3. The place on the roof edge about one meter away from the turning point of the wiring ladder
4. The middle point of the cable (when the cable is longer than 60 meters)
5. The place on the roof edge about one meter away from the turning point of the wiring ladder (when the horizontal portion
of the cable on the roof-top is longer than 30 meters)
6. The middle point of the horizontal portion of the cable (when the horizontal portion on the roof-top is longer than 60
meters)
CAUTION
The grounding point depends on the installation mode and the length of the IF cable. Generally, the IF cable should be grounded
to a minimum of three points. When the IF cable is longer than 60 meters, add a grounding point for every extra 30 meters.
Antenna should be located in protective area of lightning arrester, and the area is a 45 arc area from the top of lightning
arrester. (This area may be 30 from the top according to technical agreement or project design requirements).
Lightening protection angle should meet the below requirements:
For plain area: 45
For mountain or lightening area: 30


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE

ODU
IDU
1
6
5
2
IDU
ODU
1
2
3
4
45
45
-27-
8-5 Grounding the IF Cable - Installing the Grounding Clip
8 Installing ODU Cables
Selecting the installation position of the grounding clip and stripping off the cable sheath
Fixing the grounding clip and waterproofing it
The angle resulting from the grounding wire of the clip and the IF cable should not be larger than 15
degrees. When the IF cable is vertically routed, the grounding wire of the clip should be led
downwards.


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
-28-
9-1 Installation Flow of Indoor Unit Equipment
9 Installing the Indoor Unit Equipment


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
Installing the Rack
Start
Referring to P29
Installing the IDU
Referring to P30
Installing the I/O Board
End
Installing the DDF Distribution Box
Installing the Cables
Referring to P31
Referring to P32
Referring to P33~P36
-29-
9-2 Installing the Rack
9 Installing the Indoor Unit Equipment
Step 1: Confirm the rack
installation position


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE

0.8m
1.2m
1.0m
Confirm the rack position
according to the plan view of the
equipment room.
Installation procedure Picture Inspection
Step 2: Fix the rack
Fix the rack according to the
installation requirements.
Step 3: Check the stability
of the rack.
None
Vertical error of racks (cable
racks, power cabinets) should
not exceed 1 of the racks
height.
Step 4: Install rack
grounding cable.
Ground the rack to the indoor
grounding busbar.
Grounding cable shall be larger
than 16mm
2
.
Grounding Bar
Grounding in Rack
-30-
9-3 Installing the IDU
9 Installing the Indoor Unit Equipment
Step 1: Take out IDU from
the antistatic bag.


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
Check if there is any damage in
appearance and if there is any
missing part.
Installation procedure Picture Inspection
Step 2: Confirm the
installation position of
IDU on the rack. Install
floating nuts to the
corresponding holes on
the rack.
2 floating nuts are needed at
each side. Corresponding nuts
of each side shall be horizontal.
Step 3: Install IDU
There must be 1U space
between 2 equipments (IDU
and IDU, IDU and I/O board).
Step 4: Install IDU
grounding cable
Connect the cable properly to
the nearest grounding point.
2. Floating nuts
1. Installation holes
-31-
9-4 Installing the I/O Board
9 Installing the Indoor Unit Equipment


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
Installation procedure Picture Inspection
Step 1: Confirm the
installation position of
IDU on the rack. Install
floating nuts to the
corresponding holes on
the rack.
2 floating nuts are needed at
each side. Corresponding nuts
of each side shall be horizontal.
Step 2: Fix the I/O board to
the rack and tighten the
bolts.
There must be 1U space
between 2 equipments (IDU
and IDU, IDU and I/O board).
Step 3: Install protective
grounding cable
None
Connect properly to the
grounding point nearest to the I/
O board.
2. Floating nuts
1. Installation holes
-32-
9-5 Installing the DDF Distribution Box
9 Installing the Indoor Unit Equipment


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
Installation procedure Picture Inspection
Step 1: Install the DDF
distribution box to the
rack.
None None.
Step 2: Install grounding
cable for DDF distribution
box.
Connect the grounding cable
properly to the grounding point
nearest to the box.
-33-
10-1 Installing Power Cables
10 Installing the Indoor Unit
Equipment Cables


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
Installation procedure Picture Inspection
Step 1: Strip the power
cable for 5mm~7mm at
the end without connecter.
Do not damage wire core when
stripping.
Step 2: Connect the
stripped wire into the
power distribution box
and fasten the bolts.
Test the power supply polarity
with a multimeter before
installation to avoid reverse.
Shut down power before
installing or taking off IDU
power cable,connect to fuse of
7A~10A. If there is no such fuse
in power cabinet, connect to the
smallest one on the cabinet.
When connecting the power
cable, connect -48V and GND
wire separately at 2 ends of the
connector bar.
Step 3: Check the power
supply voltage
None
Nominal voltage for ZXMW
PR10 is -48V. Acceptable
voltage range is -58V~-40V
Step 4: Line cables along
the rack to IDU.
None
Line power cables straightly
along the inner side of the rack.
Line power cables, signal
cables and grounding cables
separately.
Step 5: Plug the connector
into the IDU power port
and fasten the bolts.
Fix the connector tight.
-34-
10-2 Installing IF Cables
10 Installing the Indoor Unit
Equipment Cables


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
Installation procedure Picture Inspection
Step 1: Line indoor IF
cables
Line IF cables to the designed
position according to the
requirements.
Step 2: Fix IF cables
Check the IF cable connectors
when installing IF cables
indoor. The cable should go
down straightly first and bend
smoothly after 50mm.
-35-
10-3 Installing 75 E1 Cables
10 Installing the Indoor Unit
Equipment Cables


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
Installation procedure Picture Inspection
Step 1: Plug the DB44
connector to E1 port on
IDU panel.
Equipment default resistance is
120. If the connection is 75
mode, switch the resistance in
the IDU.
Step 2: Lay the cables
Lay the power supply cable,
signal cable and grounding
cable separately according to
the specifications.
Step 3: Make E1 cable
connectors
Measure the distance between
DDF and I/O board and cut
proper length of cable.
After E1 connectors are made,
test with a multimeter.
Step 4: Fix E1 cables
Fix the cables with ties after
laying the cables. Cut the
redundant part of ties flat and
neat.
Stick labels according to
Microwave Equipments Label
Specifications.
-36-
10-4 Installing 120 E1 Cables
10 Installing the Indoor Unit
Equipment Cables


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
Installation procedure Picture Inspection
Step 1:Plug DB44
connector to the E1 port of
IDU. Lay the cables along
the rack to the DDF
distribution box.
Lay the power supply cable,
signal cable and grounding
cable separately according to
the specifications.
Step 2: Plug the cable into
DDF distribution box
according to the wire
sequence.
Plug the wire into the DDF
distribution box only with a clamping
pincer.
Stick labels according to
Microwave Equipments Label
Specifications.
-37-
A-1 Terminating the IF Cable with Connectors
Appendix
Stripping off the cable sheath
16mm
Gliding the lock nut and clamp 1 over the cable
Folding back the braided shield to cover clamp 1, and
binding the braided shield by using clamp 2
Lock nut
Clamp 1 Clamp 2
Cutting the redundant part
of the shielding layer
Stripping off the dielectric insulating layer Stripping off the dielectric insulating layer
6mm
Filing the core wire head into
an arc shape
Installing the body of the connector


Body of the connector
Fixing the connector
Rotating to tighten the
lock nut

15Nm


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE
-38-
A-2 Waterproofing Outdoor Connectors
Appendix
Wrapping a layer of PVC tape
PVC tape
Wrapping three layers of waterproof
insulation tape
Waterproof insulation tape
Wrapping three layers of PVC tape over the
waterproof insulation tape
Using the outdoor bundling strap to bind the PVC
tape tight at both ends


Microwave Product Support Dept.
Internal Use Only
All Rights reserved, No Spreading abroad without Permission of ZTE