You are on page 1of 2

Features of Hardeni Electricification Project

Head Gross 12 m House Hold 35


Net 11.4 m Transmission(m) 0
Flow 34 1/s
Power 2.0 Kw Distribution(m) 0
Penstock 18 m Service cable(m) 700

Quotation for the Low head 2Kw Petric set Khola Petric set
S.N Particular Quantity Unit Rate
(NRs)
Amount(NRs) In Dollars Remark
1 180mm
HDP Pipe
end piece
with
gasket ,
flange and
nut and
bolts

2 Set 5200 10400 121.4953271
2 Low head
2Kw
Peltric set
with spur
valve
including
excitation
capacitor
bank With
load
controller
with
ballast
load
1 Set 175000 175000 2044.392523
3 Low wat
MCB 0.5
amp
3 Set 400 14000 163.5514019
4 Trash
rack
1 Set 3500 3500 40.88785047
5 Bellmouth 1 Set 8500 8500 99.29906542
6 Earthing
set
5 Set 3800 19000 221.9626168 approx
7 Lighting
arrestor
4 Nos 1400 5600 65.42056075 approx
8 Main
Switch
1 Set 1550 1550 18.10747664
9 Tools set 1 Set 3600 3600 42.05607477
10 Short
metal
pipe with
bend
1 Set 10000 10000 116.8224299
11 Sub
Total
251150 2933.995327
12 VAT 13 % 32649 381.4135514
13 Total 283799.50 3315.41472

Other costs
Cement- 87000($1009.39)
Wire 3000($34.8068)
Operator cost -60000($696.1364)
Total Net Cost: $5055.748 (Updated)
Date: Feb 10, 2013
Exchange rate ($1 = NRs. 85.6)