You are on page 1of 4

TABLA DE DISTRIBUCION DE ESTRUCTURAS Y EQUIPOS

PROYECTO

LINEA DE TRANSMISION ESTACION DE BOMBEO ALTO QOSQO

TRAMO
FECHA
Nro

vano

PosteAisladoresGrapas de Aluminio
Grapas
15 Alin
Anclaje
suspensionde F.G.

Dist

EST

acum

ATV5a

ATV5B ATV5C

ATV

ATV4

AST

400 Ce r m Silic

56-2 RPP" 525-70

Es t r uc t ur a de
der i v ac i on 1

211. 00

Pernos ojo
6"

Retenidas

11" 14" simp contCu


16
mm2
solid
rielo

para secc Base Palom Tab TD


Cable cable
THW
70
mm2

1 3

1
2

25-70

Tue
Gril rca
Ancl Susp let ojo
5/8" 5/8
"
10/ 10/
70 70

N2XSY
35
mm2

AAAC

35

18

Pt a

15kV
Cabz.
Term.
Unip
ext.

15kV
rrayosfus TrafoSecc Med
Cabz. Ti e
Term. r r a
Unip
int.
12kV 15 kVMo n o p Mo n o

194

70/
416- 50 25

Cu
16120/
6- 35

211. 00

1
3

16. 00

227. 00

79. 00

306. 00

70. 60

376. 60

76. 00

452. 60

19. 30

471. 90

SE

18. 50

490. 40

1 3

1 3
1

16. 00

79. 00
70. 60

76. 00

1 3

19. 30

62

3
4

Tot al

Co n e c t o r e s

BT Al - Al
Al
16-

12

15 15

15

274

260.9

3 6

1
6

OBSERVACI ONES

18

170

18

18

23

206

51

257

11
260

18
175
18
211
51
262
273
20
835

795

10

780

820

273.333333
819
822

822

257
5.5
3I
3
15.5
17.05
51.15
55
220

782.7
821.835
39.135

1000

114.9
21
12

23.4
31.8
30.23
38.6
5.5
8
26.4
163.93
18
18
199.93