Lighting (GF-REV2):

123456789101112131415161718-

How to cross the gutter? Provide detail


Provide wall mounted pull box
Provide detail for lighting pole, foundation and fixation, cable entry, connection, etc.
Change the symbol of the boxes inside the gas room to be explosion proof boxes
Check feasibility, too many bends
Connection not feasible, linear led lighting at low level for counter. To be coordinated with ID
drawings
Provide detail for linear led lighting at low level for wood covering. Coordinate with ID drawings
Location of light fittings and the lighting controls of lift pits shall be coordinated with lift supplier
Very congested conduits, subject to structural engineer approval in case conduits are
embedded. Otherwise the conduits (in case exposed) shall be coordinated with other trades
Wiring for motion detector shall be as per approved motion detector manufacturer (typical)
Install the box outside the gas room
At which level the lighting fixture is installed in the stairs
Check coverage of motion detector. Motion detector shall not be obstructed by lighting fixtures,
cable trays, ducts, etc (typical)
Provide detail for suspended motion detectors
Location of lighting fixtures shall be coordinated with the cable ladders, lighting shall not be
obstructed by cable ladders, bus duct etc
Electrical shop drawings shall follow the latest architectural layout
Location of the lighting fixtures shall be coordinated with the exact location of transformers, MV
switchgear and busduct
Preference to not have a false ceiling in the EDP room

Notes:
Contractor is deemed to have coordinated with other trades before proceeding with the work on site.
All embedded conduits and boxes in concrete shall be approved by the structural consultant.
Contractors shall follow the latest architectural shop drawings and false ceiling layout.
Submit composite drawing low level and high level for information and record.
Contractor to submit panelboards schedules showing the assigned circuits, taking into consideration
the maximum load on every circuit, Maximum cable length, Breaker curve type (D, C or B) and voltage
drop calculations.
Any deficiency or lack in the first fix provision found at any time is to be considered the contractor sole
responsibility and remedy at his own expenditure to the approval of the consultant.
All pull boxes shall be accessible.
Location of light fitting inside lift shafts shall coordinated with lifts supplier.
In decorative areas the pull boxes under false ceilings are not recommended unless they are approved
by interior designer.
The routing and Type of the digital lighting bus as well as the coverage of the motion and presence
detector shall be in line with the supplier requirements.
Location of switches to be coordinated with doors opening. Avoid the installation of switch behind the
door when it is opened.
The routing and Type of the digital lighting bus as well as the coverage of the motion and presence
detector shall be in line with the supplier requirements.

Cable tray (Basement REV2)


1- Tags shall be assigned for each branch of low current cable tray indicating the number and type
of low current cable.
2- Provide detail for the type of accessories for cables to pass the beam through sleeves.
3- Enough free space should be provided near the cable tray in order to facilitate the cable
installation (Provide Section)
4- Provide detail for cables passing through openings.
5- Provide Supports and section Details
6- Provide Shaft Details & Section
7- Specify the accessories used. Revise and resubmit this detail separately. (Ceiling mounted cable
trays/ladder support)
Notes
Contractor is deemed to have coordinated with other trades before proceeding with the work on site.
All openings & sleeves for cable trays in concrete shall be approved by the structural consultant.
Contractors shall follow the latest architectural shop drawings and latest design layouts.
Submit composite drawing for information and record.
Tags shall be assigned for each branch of low current cable tray indicating the number and type of low
current cable
. Provide low current cable tray width calculation.
. Cable tray layout shall be also approved by IST for the Low current cable trays
. Width of cable trays shall be verified after completing the fault current, voltage drop discrimination,
etc... Studies using an approved software program
. Distance between Low Current Cable Tray and Power Cable tray shall be minimum 50cm as per Latest
IST request.

Cable tray (GF REV2)


1- Tags shall be assigned for each branch of low current cable tray indicating the number and type
of low current cable.
2- Provide detail for cables passing through openings.
3- Provide Shaft Detail
4- Provide detail showing the cable and cable tray transition from Horizontal to Vertical routing
5- Provide necessary conduits and cable trays as per IST requirements for the Fiber Optic
connection between EKO 1 and EKO 2. (Refer to IST requirements/ attached sheet)
Notes:
Contractor is deemed to have coordinated with other trades before proceeding with the work on site.
All openings & sleeves for cable trays in concrete shall be approved by the structural consultant.
Contractors shall follow the latest architectural shop drawings and latest design layouts.
Submit composite drawing for information and record.
Tags shall be assigned for each branch of low current cable tray indicating the number and type of low
current cable
. Provide low current cable tray width calculation.

. Cable tray layout shall be also approved by IST for the Low current cable trays
. Width of cable trays shall be verified after completing the fault current, voltage drop, discrimination,
etc... Studies using an approved software program
. Distance between Low Current Cable Tray and Power Cable tray shall be minimum 50cm as per Latest
IST request.
Lighting (L6 - REV1):
1- Needed Dimensions are missed
2- Cable trunk sizing calculation shall be submitted. Provide sections
3- Submit Typical details showing the accessories (with reference number) used for routing
deviation as well as for supporting (cable trays)
4- Provide detail showing the connection to the Trunk
5- Electrical layouts of the Operating room shall be submitted separately for review and approval
after coordination with all other trades and after taking into consideration the approved medical
equipment requirements
6- Location of the Junction box shall be coordinated with the beam.
7- provide detail for GI conduits when crossing the beam
8- exact location and wiring (between handset and push button) shall be coordinated with
approved medical equipment requirements (typical)
9- provide height of wall mounted luminaires (typical)
10- dimension missing exact location for the scialytic outlet to be coordinated with the approved
medical equipment requirements
11- 240V outlet and LED driver shall be outside the shower. (Typical)
12- wiring for motion detector shall be as per approved motion detector manufacturer (typical)
13- Cable trunk sizing calculation shall be submitted. Provide sections (typical)
14- cannot be exposed conduit in stairs
Notes
Contractor is deemed to have coordinated with other trades before proceeding with the work on site.
All embedded conduits and boxes in concrete shall be approved by the structural consultant.
Contractors shall follow the latest architectural shop drawings and false ceiling layout.
Submit composite drawing low level and high level for information and record.
Contractor to submit panelboards schedules showing the assigned circuits, taking into consideration
the maximum load on every circuit, Maximum cable length, Breaker curve type (D, C or B) and voltage
drop calculations.
Any deficiency or lack in the first fix provision found at any time is to be considered the contractor sole
responsibility and remedy at his own expenditure to the approval of the consultant.
All pull boxes shall be accessible.
Location of light fitting inside lift shafts shall coordinated with lifts supplier.
In decorative areas the pull boxes under false ceilings are not recommended unless they are approved
by interior designer.
The routing and Type of the digital lighting bus as well as the coverage of the motion and presence
detector shall be in line with the supplier requirements.
Location of switches to be coordinated with doors opening. Avoid the installation of switch behind the
door when it is opened.

The routing and Type of the digital lighting bus as well as the coverage of the motion and presence
detector shall be in line with the supplier requirements.
LV trunking shall be reflected and shown on cable routing shop drawings.