PRECEDING

DURATIONS
(DAYS)

A. Barracks Construction

_____

5,090.99

B. Electric and Water Supply Tapping

_____

23,237.50

C. Laying Out

_____

1,607.68

D. Excavation of Column Footing

A, B, C

9,295.00

E. Excavation of Wall Footing

A, B, C

13,942.50

D, E

23,237.50

19,059.16

7,411.89

G, H

13,235.53

34,199.70

I, J

31,426.85

34,125.55

17,069.16

29,006.72

20,151.29

10,668.22

28,363.40

31,514.88

25,211.91

T. Preparation / Assembly of Slab Rebars

28,187.17

U. Assembly of Formworks for Slabs

37,906.88

ACTIVITY

F. Pouring / Compaction / Leveling of


Base Course (Gravel Fill)
G. Preparation / Assembly of Column
Footing Rebars
H. Preparation / Assembly of Wall
Footing Rebars
I. Assembly of Footing Formworks
J. Preparation / Assembly of
Flooring Rebars
K. Pouring of Concrete for Footing
and Flooring
L. Preparation / Assembly of
1st Column Rebars
M. Preparation / Assembly of CHB Rebars,
putting of CHB and mortar for Exterior
Wall
N. Assembly of Formworks for 1st
Floor Column
O. Pouring of Concrete for 1st
Floor Columns
P. Preparation / Assembly of CHB Rebars,
putting of CHB and mortar for Interior Wall
Q. Preparation / Assembly of Second
Floor Beams
R. Assembly of Formworks for Second
Floor Beams
S. Pouring of Concrete for Second
Floor Beams

COST

PRECEDING

DURATIONS
(DAYS)

S, U

31,103.08

34,125.55

29,006.72

V, X

22,181.61

10,335.89

4,429.67

P , AA

25,603.73

28,363.40

AC

25,211.91

AE. Pouring of Concrete for Roof Beams

AD

25,211.91

AF. Fabrication / Assembly of Trusses

AE

26,411.67

AF

35,340.06

AB

29,748.33

AI. Asembly of Ceiling

AG

15,162.56

AJ. Fabrication and Assembly of Jambs

AI

12,394.20

AK. Plumbing Works

AH

38,110.57

AL. Electrical Works

AI

29,214.08

AM. Plastering of Exterior Walls

AK , AL

9,907.63

AN. Assembly of Doors and Windows

AJ , AM

111,547.80

AM

5,334.88

AN , AO

4,320.30

ACTIVITY
V. Pouring of Concrete for Slabs
W. Preparation / Assembly of Rebars
for Second Floor Columns
X. Assembly of Formworks for
Second Floor Columns
Y. Pouring of Concrete for Second
Floor Columns
Z. Preparation / Assembly of Materials
for Stair
AA. Pouring of Concrete for Stairs
AB. Preparation / Assembly of CHB
Rebars,
putting of CHB for 2nd Floor Walls
AC. Preparation / Assembly of Rebars
for Roof Beams
AD. Assembly of Formworks for
Roof Beams

AG. Assembly of Roofing Sheets,


Flashing, Gutter
AH. Placement of plumbing Fixtures
and Tile Works

AO. Painting of Walls


AP. Clearing of Project Site

COST

997,015.00