You are on page 1of 3
Republi ofthe Philippines Department of Environment and Natural Resources ENVIRONMENTAL MANAGEMENT BUREAU. ENR Campus Vee rian, ae C8 “opener 2.7 eh Ena! eeaens ant ul 07 lente an uoh ip EME Memorandum Circular No, 2014 - OOS” SUBJECT: Guidelines for Coverage Screening and Standardized Requirements lunder the Philippine Environmental Impact Statement system (PEISS) amending relevant portions of MC 2007-002 WHEREAS, Article Il of Department of Bavisonment and Natural Resources (DENR) Administrative Order No, 90, series of 2003, provides for “strengthening. the Implementation of the Phiippine Eavionmental Impact Statement (£19) system” ‘under Presidential Deere No, 15863, WHEREAS, DENR Memorandum Circular No, 2010-14 provides for “standardization of sequirements in the implementation ofthe EIS system WHEREAS, Section 2.1 and Annex 2-18 to Annex 2-Ic of the Revised Procedural Manual fot DAO 2003-0 covered by EME Memorandum Circular No. 2007-002 provides guidelines on “Sereening for coverage and other application requirements Under the Philppane EIS system", WHEREAS, there is s need to amend/update the aforementioned guidelines to cover [ctivities oF undertakings, which based on EMEVs experience need tobe included, NOW, THEREFORE, this Olfice with the end in view of achieving the foregoing ‘objectives hereby issues this Memorandum Circular and adopts the accompanying ‘Guidelines for Coverage Screening and Standardsied Requirements under the PISS, Section 1. Soreening to determine coverage under the Philippine EIS ‘System (amending Section 2.1 of the Revised Procedural Manual for Ao 2003-30), very proposed projector undortaking which is projected 10 have significant adverse impact tothe quality ofthe environment is covered by the Philipine EIS system, This ‘maludes proposed iajor expansion, rehabiliauon, and/or modicalson of existing projects as well as resumption of projects that have stopped operations fora prolonged eri. according to the following categories 1.1.1, Category A - projects or undertakings which are clasiied a3 environmentally friteal projects {ECPs) under Presidential Proclamation No. 2146 (1981), Proclamation No, 803 1996), and any other projects that may later be declared fas such by the President of the Philippines. Proponents of these projects fmmplemented ‘rom 1982 onwards are. required to sccure a Erwironmental Compliance Certifeate (2CC) 1.12. Category B ~ projects oF undertakings which are not clasifed as BCP under Category A, but which are kewise deemed to sgniicantlyaflet the quality of the envizonment by vitue of being lated in an Environmentally Critical Area (BCA) as declared ‘onder Proclamation No. 2146 and. according. to. the parameters set forth in the attached guidelines. Proponents of these projects [EXplemented ftom 1982 onwards ace Mbewise routed to secure an BCC Protct the environment. rote life 1.1.9, Category C - projects or undertakings not fling under Category A or B which sre intended to direcily enhance the quality of the environment o diectly laddress existing enizonmental problems 14. Category D — projects or undertakings that are deemed unlikely to cause significant adverse impact on the quality ofthe environment according to the parameters set forth in the Screening Guidelines, These projects are not Eovered by the Philippine EIS system and are not required to secure an ECC However, such non-coverage shall not be constiied te ah exemption from compliance with other ‘environmental laws and. goverment permiting 1.2, To expediently screen proposed projects/undertakings that may be covered by {he EIS aytem, thus required to secure BOC, a ready matric for deternining the fategory i which proposed projects fall is attached as Annax A of the PEISS Coverage ‘Screening Guidelines, revising Annex 2-1b of the 2007 Revised Procedural Maal for DAO 2003-20 and the thresholds aa apeiid in pages 18 20 ofthe BIA DRR/CCA Technical Guidelines implemented whder MC 2011-005 1.3, Proposed major expansion, rehabilitation, and/or_modifcation of existing projects, including proposed resumption of projects that have stopped operations {or move than five (3) yeas, shall be entegorzed according tothe parameters set forth in Annex B ofthe Sereening Guidelines 1.4, Projects which may be classified in diferent categories shall be cansidered under the eategory with the most stringent requirements, 1.5, The EMB shall implement a web-based system for increased transparency in screening project for coverage under the Philippine EIS System Section 2. Standardized Requirements 2A All ECC applications shall be accompanied by an Environmental Impact [ssesament ELA) Report inthe form of an Environmental Impact Statement (E13) {an Initial Environmental Examination (ISE) Checklist Report, an Environmental Perormance Report and Management Pian (EPRMP), Programmatic EIS or Programmatic EPRMP. 2.2 Certificate of Non-Coverage (CNC) applications shall be accompanied by a pro- forma project description se prescribed in Annex Cof the attached guidelines 2.3. The following is a summary ofthe documentary requirements for proponents 23 well a5 the processing and deciding authority based on the category. type and L. SESE [pope oF ito one [evemons] e8_towmona Enonanay a Bama] coma |p, > cml Asateue peeeer| Cae | enemrar worse sens a nme Bie lem GEESE | owrammesceis | Sa (eicarPrecte ee rey Be care a a Pdgespended, | sie Priect | eomatm Check anors he oped com | emits ane cotamdar | sain oceatmnan: |Oncein te oon ene St i ey Svea ea “a roca 0a | | ee ora bona opel ory heres [ett | swvencenatecin | Pee Ot ate wee | 24 Proponents of Category D projects shal not be required to submit any document to the EMB.. Propments of these projects may, however, sil opt to secure 8 Certleate of Non- Coverage [ENC) from the BMB. A pro-forma project description fs prescribed in Annex C of the attached guidelines shall be accomplished and Submitted forthe CNC application, 25 Proponents af projecte whieh are intended to directly enhance the quality ofthe ‘cnvironment or directly adress existing enviconmental problems shall subrat a Project Description (PD) to the EMB Regional Office having jurisdiction over the ‘area where the proposed project will be located folowing Ube format attacaed ‘Annex Cof the atached Guidelines t confirm that i falls within Category 2.6 The isuance of an ECC or CNC shall not, in any manner, exempt the proponent ftom securing other government permite and clearances required by other laws nor shall it be construed as resolving issues within the mandate of other fovernment agencies, 2.7 ECC applications forthe proposed expansion, rehabilitation, or modification of an cxisting project/undertaking, including, proposed. resumption of projects that have stopped operations fora prolonged period, shall be reviewed in the Ofice that originally issued the BCC. ‘Provided that, fr projects orginal classed a5 Category B but are reclassified as Category A based on the total/revised ‘pacity shal be reviewed at tbe EME Central fcr. Section 3, Repealing Clause ‘All provisions inthe MC 2007-002 or the Revised Procedural Manual of DAO 2003-30 fn other fsunnces inconsistent herewith are deemed repealed, superseded and/or ‘modified accordingly If any provision ofthis Memorandum Circular is declared unconstitutenal or invalid by a competent court, other sections or provisions hereof which are not afected thereby shall continuc to be in fll force an in effect an if the provisiona/accons 40 ‘cancelled had never been inconporated herein arty. su "F. CUNA, CESO TV

You might also like