EME Memorandum Circular No, 2014 - OOS”
SUBJECT: Guidelines for Coverage Screening and Standardized Requirements
lunder the Philippine Environmental Impact Statement system
(PEISS) amending relevant portions of MC 2007-002
WHEREAS, Article Il of Department of Bavisonment and Natural Resources (DENR)
Administrative Order No, 90, series of 2003, provides for “strengthening. the
Implementation of the Phiippine Eavionmental Impact Statement (£19) system”
‘under Presidential Deere No, 15863,
WHEREAS, DENR Memorandum Circular No, 2010-14 provides for “standardization of
sequirements in the implementation ofthe EIS system
WHEREAS, Section 2.1 and Annex 2-18 to Annex 2-Ic of the Revised Procedural
Manual fot DAO 2003-0 covered by EME Memorandum Circular No. 2007-002
provides guidelines on “Sereening for coverage and other application requirements
Under the Philppane EIS system",
WHEREAS, there is s need to amend/update the aforementioned guidelines to cover
[ctivities oF undertakings, which based on EMEVs experience need tobe included,
NOW, THEREFORE, this Olfice with the end in view of achieving the foregoing
‘objectives hereby issues this Memorandum Circular and adopts the accompanying
‘Guidelines for Coverage Screening and Standardsied Requirements under the PISS,
Section 1. Soreening to determine coverage under the Philippine EIS
‘System (amending Section 2.1 of the Revised Procedural Manual for
Ao 2003-30),
very proposed projector undortaking which is projected 10 have significant adverse
impact tothe quality ofthe environment is covered by the Philipine EIS system, This
‘maludes proposed iajor expansion, rehabiliauon, and/or modicalson of existing
projects as well as resumption of projects that have stopped operations fora prolonged
eri.
according to the following categories
1.1.1, Category A - projects or undertakings which are clasiied a3 environmentally
friteal projects {ECPs) under Presidential Proclamation No. 2146 (1981),
Proclamation No, 803 1996), and any other projects that may later be declared
fas such by the President of the Philippines. Proponents of these projects
fmmplemented ‘rom 1982 onwards are. required to sccure a Erwironmental
Compliance Certifeate (2CC)
1.12. Category B ~ projects oF undertakings which are not clasifed as BCP under
Category A, but which are kewise deemed to sgniicantlyaflet the quality of
the envizonment by vitue of being lated in an Environmentally Critical Area
(BCA) as declared ‘onder Proclamation No. 2146 and. according. to. the
parameters set forth in the attached guidelines. Proponents of these projects
[EXplemented ftom 1982 onwards ace Mbewise routed to secure an BCC
Protct the environment. rote life1.1.9, Category C - projects or undertakings not fling under Category A or B which
sre intended to direcily enhance the quality of the environment o diectly
laddress existing enizonmental problems
14. Category D — projects or undertakings that are deemed unlikely to cause
significant adverse impact on the quality ofthe environment according to the
parameters set forth in the Screening Guidelines, These projects are not
Eovered by the Philippine EIS system and are not required to secure an ECC
However, such non-coverage shall not be constiied te ah exemption from
compliance with other ‘environmental laws and. goverment permiting
1.2, To expediently screen proposed projects/undertakings that may be covered by
{he EIS aytem, thus required to secure BOC, a ready matric for deternining the
fategory i which proposed projects fall is attached as Annax A of the PEISS
Coverage ‘Screening Guidelines, revising Annex 2-1b of the 2007 Revised
Procedural Maal for DAO 2003-20 and the thresholds aa apeiid in pages 18
20 ofthe BIA DRR/CCA Technical Guidelines implemented whder MC 2011-005
1.3, Proposed major expansion, rehabilitation, and/or_modifcation of existing
projects, including proposed resumption of projects that have stopped operations
{or move than five (3) yeas, shall be entegorzed according tothe parameters set
forth in Annex B ofthe Sereening Guidelines
1.4, Projects which may be classified in diferent categories shall be cansidered under
the eategory with the most stringent requirements,
1.5, The EMB shall implement a web-based system for increased transparency in
screening project for coverage under the Philippine EIS System
Section 2. Standardized Requirements
2A All ECC applications shall be accompanied by an Environmental Impact
[ssesament ELA) Report inthe form of an Environmental Impact Statement (E13)
{an Initial Environmental Examination (ISE) Checklist Report, an Environmental
Perormance Report and Management Pian (EPRMP), Programmatic EIS or
Programmatic EPRMP.
2.2 Certificate of Non-Coverage (CNC) applications shall be accompanied by a pro-
forma project description se prescribed in Annex Cof the attached guidelines
2.3. The following is a summary ofthe documentary requirements for proponents 23
well a5 the processing and deciding authority based on the category. type and
L. SESE [pope oF ito one
[evemons] e8_towmona
Enonanay a Bama] coma |p, > cml
Asateue peeeer| Cae | enemrar worse
sens a nme
Bie lem GEESE | owrammesceis | Sa
(eicarPrecte ee reyBe care a a
Pdgespended, | sie Priect | eomatm Check anors he oped
com | emits ane
cotamdar | sain oceatmnan: |Oncein te oon
ene St i ey
Svea ea
“a
roca 0a |
| ee ora
bona opel ory
heres [ett
| swvencenatecin | Pee Ot
ate
wee |
24 Proponents of Category D projects shal not be required to submit any document
to the EMB.. Propments of these projects may, however, sil opt to secure 8
Certleate of Non- Coverage [ENC) from the BMB. A pro-forma project description
fs prescribed in Annex C of the attached guidelines shall be accomplished and
Submitted forthe CNC application,
25 Proponents af projecte whieh are intended to directly enhance the quality ofthe
‘cnvironment or directly adress existing enviconmental problems shall subrat a
Project Description (PD) to the EMB Regional Office having jurisdiction over the
‘area where the proposed project will be located folowing Ube format attacaed
‘Annex Cof the atached Guidelines t confirm that i falls within Category
2.6 The isuance of an ECC or CNC shall not, in any manner, exempt the proponent
ftom securing other government permite and clearances required by other laws
nor shall it be construed as resolving issues within the mandate of other
fovernment agencies,
2.7 ECC applications forthe proposed expansion, rehabilitation, or modification of an
cxisting project/undertaking, including, proposed. resumption of projects that
have stopped operations fora prolonged period, shall be reviewed in the Ofice
that originally issued the BCC. ‘Provided that, fr projects orginal classed a5
Category B but are reclassified as Category A based on the total/revised
‘pacity shal be reviewed at tbe EME Central fcr.
Section 3, Repealing Clause
‘All provisions inthe MC 2007-002 or the Revised Procedural Manual of DAO 2003-30
fn other fsunnces inconsistent herewith are deemed repealed, superseded and/or
‘modified accordingly
If any provision ofthis Memorandum Circular is declared unconstitutenal or invalid
by a competent court, other sections or provisions hereof which are not afected
thereby shall continuc to be in fll force an in effect an if the provisiona/accons 40
‘cancelled had never been inconporated herein
arty. su "F. CUNA, CESO TV