Professional Documents
Culture Documents
• GOAL
Octob S- P Ineffec At the • Established • To gain trust and MET
er 13 “budla tive end of Rapport. cooperation. patient
2009. y mag- H airway 8 hour • Provide • Provide a will
ginha cleara span of bedside comfortable able to
wa nce care, care.
• To prevent
adequate
respiratory
excursion
• To prevent fatigue.
• GOAL MET
Octob “O/S- P Risk At the • Established • To gain trust patient will
er 13 impair for end of Rapport. and able to
2009. ed H able 8 hour cooperation. perform
vision blood span of • Provide • Provide a procedures of
3pm- Y
glucos care bedside comfortable home
11pm edem e the care. surrounding
S glucose
a on relate patient • Insulin monitoring
upper I d to will absorption correctly.
body lack of able to can vary
• Administer • Perform
O diabet mainta from day-day insulin
swolle antidiabetic
es and in in healthy administratio
n L Drugs.
medic glucos sites and is n correctly as
injecti • Check