You are on page 1of 2

WORK PLAN

PHASE I
Simulation of a single area system and verifying the result
with and without PI controller
Simulation of a multi area system with PI controller and
Fuzzy logic controller and comparing their effect on Load
frequency control
Adding wind power generators to the standard IEEE 39 bus
System (New England power system model)
Analysis of any two different generator configuration and
their impacts on the developed Intelligent LFC
WORK DONE
Literature survey of various paper related to the project has
been done
Simulation of a single area system with controller and
verifying the result with and without PI controller
PHASE II
Development of FESS system for integration of wind power.
Comparison of BESS and FESS system for Wind power
integration.

PROJECT GUIDE
PROJECT CO-ORDINATOR

PROJECT CO-GUIDE