DAFTAR HARGA BAHAN DAN UPAH

NO

UPAH
(Rp)
3

KEAHLIAN

2
1
2
3
4

Pekerja
Mandor
Tukang
Kepala Tukang

40,000.00
45,000.00
50,000.00
60,000.00

BAHAN
NO

JENIS BAHAN

SATUAN

2
Tanah Urug
Pasir
Batu Dasar
Semen
Kerikil
Besi Beton
Kawat Bengrat
Kayu Mal Kls. III
Paku
Batu Bata
Keramik 30 x 30
Keramik 20 x25
Keramik 20 x 20
Keramik 10 x20
Paku seng
Tripleks
Paku Tripleks
Kayu Cempaka 8/12 dan 5/10 c
Cat Tembok
Cat Mengkilat

3
M
M
M
Sak
M
Kg
Kg
M
Kg
Bh
Bh
Bh
Bh
Bh
kg
lbr
Kg
M
Kg
Kg

JENIS BAHAN

SATUAN

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

NO
1

HARGA SATUAN
(Rp)
4
17,500.00
60,000.00
60,000.00
37,500.00
120,500.00
6,000.00
9,000.00
650,000.00
9,800.00
450.00
1,100.00
2,931.82
2,391.28
1,900.00
14,500.00
37,500.00
10,500.00
1,350,000.00
17,000.00
25,000.00

HARGA SATUAN
(Rp)
4

21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59

Minyak Cat
Vernis Politur
Kabel NYM 3 X 2,5 mm
Pipa Listrik
Lot klem PVC 1/2 "
T. Dos PVC 1/2"
Bok PVC 1/2"
Isolatip
Box Sekring MCB 2A
Lampu
Lampu TL 10 Watt
Lampu Pijar 25 Watt
Stop Kontak 225 V
Saklar Tunggal 225 V
Saklar Ganda 225V
Pipa PVC 2 "
Pipa PVC 4 "
Pipa Galvanis 1/2 "
Pipa Galvanis 3/4 "
Seng Gelombang Alumanium
Seng Plat Alumanium
Kunci 1 slaag
Kunci 2 slaag
Espanyoli tanam
Engsel pintu 3x4
Engsel jendela 2x3
Tarikan jendela
Hak angin
Wastafel TOTO
Closed Duduk TOTO
Closed Jongkok
Mata Kran 1/2 "
Stop Kran 3/4 "
Pasangan Floor Drain Kuningan
Shower Cebo
Kipas Angin Besar ( VERNEKEL )
Kipas Angin Kecil ( PLASTIK )
Lambersering
Teakwood

Ltr
Ltr
M
Ujung
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M
M
M
M
Lbr
Lbr
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
lbr
Lbr

9,000.00
15,500.00
5,000.00
3,000.00
400.00
350.00
300.00
6,000.00
350,000.00
18,500.00
5,000.00
7,500.00
50,000.00
15,000.00
35,000.00
15,000.00
35,000.00
10,500.00
15,000.00
48,500.00
40,000.00
50,000.00
84,000.00
35,000.00
7,000.00
5,000.00
5,000.00
5,000.00
650,000.00
1,550,000.00
155,000.00
35,000.00
50,000.00
25,000.00
135,000.00
1,000,500
245,000
32,500.00
88,500.00

40,000.00
45,000.00
50,000.00
60,000.00

DAFTAR ANALISA
A.
1
0.220
0.022
0.120
0.085
0.180
0.018

PEKERJAAN REHAB RUANG KADIS


PEKERJAAN PARTISI
M2 PASANG RANGKA PARTISI

KG

Tukang
Kepala tukang
Pekerja
Mandor
Paku biasa

@
@
@
@
@

M3

Balok kayu 5/10

Biaya umum dan keuntungan

1
0.100
0.010
0.070
0.004
0.030
0.375

0.220
0.022
0.120
0.085
0.180
0.018

KG

Tukang
Kepala tukang
Pekerja
Mandor
Paku tripleks

@
@
@
@
@

Lbr

Teakwood

0.100
0.010

=
=
=
=
=
=
Rp.
### =
( A + B1 )
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

11,000.00
1,320.00
4,800.00
3,825.00
1,764.00
22,709.00
24,300.00
47,009.00
4,700.90
51,709.90

Rp.
Rp.
Rp.
Rp.
Rp.

50,000
60,000
40,000
45,000
9,000

=
=
=
=
=
=
Rp.
88,500 =
( A + B1 )
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,000.00
600.00
2,800.00
157.50
270.00
8,827.50
33,187.50
42,015.00
4,201.50
46,216.50

Rp.
Rp.
Rp.
Rp.
Rp.

50,000
60,000
40,000
45,000
9,800

=
=
=
=
=
=
Rp.
### =
( A + B1 )
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

11,000.00
1,320.00
4,800.00
3,825.00
1,764.00
22,709.00
24,300.00
47,009.00
4,700.90
51,709.90

Rp.
Rp.

50,000 =
60,000 =

Rp.
Rp.

5,000.00
600.00

PEKERJAAN PLAFON
M2 PASANG RANGKA PLAFOND

KG

Tukang
Kepala tukang
Pekerja
Mandor
Paku biasa

@
@
@
@
@

M3

Balok kayu 5/10

Biaya umum dan keuntungan

50,000
60,000
40,000
45,000
9,800

M2 PASANG PARTISI TEAKWOOD

Biaya umum dan keuntungan

B.
1

Rp.
Rp.
Rp.
Rp.
Rp.

M2 PASANG PLAFOND TEAKWOOD


Tukang
Kepala tukang

@
@

0.070
0.004
0.030
0.375

KG

Pekerja
Mandor
Paku tripleks

@
@
@

Lbr

Teakwood

Biaya umum dan keuntungan

1
0.100
0.010
0.070
0.004
0.030
3.125

0.020
0.002
0.020
0.001
1.050
0.050

40,000 =
45,000 =
10,500 =
=
Rp.
88,500 =
( A + B1 )
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,800.00
157.50
315.00
8,872.50
33,187.50
42,060.00
4,206.00
46,266.00

Rp.
Rp.
Rp.
Rp.
Rp.

50,000
60,000
40,000
45,000
10,500

=
=
=
=
=
=
Rp.
32,500 =
( A + B1 )
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,000.00
600.00
2,800.00
157.50
315.00
8,872.50
101,562.50
110,435.00
11,043.50
121,478.50

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

50,000
60,000
40,000
45,000
6,500
9,800

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,000.00
120.00
800.00
45.00
6,825.00
490.00
9,280.00
928.00
10,208.00

M2 PASANG PLAFOND LAMBERSERING

KG

Tukang
Kepala tukang
Pekerja
Mandor
Paku tripleks

@
@
@
@
@

Lbr

Lambersering

Biaya umum dan keuntungan


1

Rp.
Rp.
Rp.

M' PAS. LIST PLAFOND Sp 3

M'
KG

Tukang
Kepala tukang
Pekerja
Mandor
List profil Sp3
Paku biasa

@
@
@
@
@
@

=
=
=
=
=
=
=

Biaya umum dan keuntungan


=
C.
1

PEKERJAAN PINTU
M3 PEK.KOSEN PINTU

15.000
2.000
4.500
0.240
1.100

M3

Tukang
Kepala tukang
Pekerja
Mandor

@
@
@
@

Balok kayu

Biaya umum dan keuntungan

1
1.000
0.010
0.400
0.020
0.150
0.300
0.020
2.000

Rp.
Rp.
Rp.
Rp.

50,000
60,000
40,000
45,000

=
=
=
=
=
Rp.
### =
( A + B1 ) =
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

750,000.00
120,000.00
180,000.00
10,800.00
1,060,800.00
1,485,000.00
2,545,800.00
254,580.00
2,800,380.00

50,000
60,000
40,000
45,000
9,800
22,500

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

50,000.00
600.00
16,000.00
900.00
1,470.00
6,750.00
75,720.00
26,460.00
75,000.00

M2 PEK. PINTU TRIPLEKS

KG
Ltr

Tukang
Kepala tukang
Pekerja
Mandor
Paku biasa
Lem aibon

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

M3
Lbr

Balok kayu
Tripleks

@
@

Rp.
Rp.

=
=
=
=
=
=
=
### =
37,500 =

Biaya umum dan keuntungan

1
0.500
0.050
1.000

(A+B+B2+=
=

Rp.
Rp.
Rp.

177,180.00
17,718.00
194,898.00

50,000 =
60,000 =
84,000 =

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

25,000.00
3,000.00
84,000.00
112,000.00
11,200.00
123,200.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,000.00
720.00
7,000.00
13,720.00
1,372.00
15,092.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

8,250.00
17,500.00
10,500.00
1,680.00
10,400.00
1,440.00
49,770.00
4,977.00
54,747.00

BH PAS.KUNCI TANAM 2 SLAG

BH

Tukang
Kepala tukang
Kunci tanam

@
@
@

Rp.
Rp.
Rp.

Biaya umum dan keuntungan

1
0.120
0.012
1.000

BH PAS.ENGSEL

BH

Tukang
Kepala tukang
Kunci tanam

@
@
@

Rp.
Rp.
Rp.

50,000 =
60,000 =
7,000 =

Biaya umum dan keuntungan

D.
1
7.500
1.000
0.210
0.028
0.260
0.032

PEKERJAAN PEMELIHARAAN
M2 Pas. Kramik lantai
BH
Tegel
M2
Spesi
Tukang
Kepala tukang
Pekerja
Mandor

LANTAI
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,100
17,500
50,000
60,000
40,000
45,000

=
=
=
=
=
=
=

Biaya umum dan keuntungan


=
A.

PEKERJAAN REHAB RUANG WAKADIS


PEKERJAAN PLAFON

M2 PASANG RANGKA PLAFOND

0.220
0.022
0.120
0.085
0.180
0.018

KG

Tukang
Kepala tukang
Pekerja
Mandor
Paku biasa

@
@
@
@
@

M3

Balok kayu 5/10

Biaya umum dan keuntungan

1
0.100
0.010
0.070
0.004
0.030

Rp.
Rp.
Rp.
Rp.
Rp.

50,000
60,000
40,000
45,000
9,800

=
=
=
=
=
=
Rp.
### =
( A + B1 )
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

11,000.00
1,320.00
4,800.00
3,825.00
1,764.00
22,709.00
24,300.00
47,009.00
4,700.90
51,709.90

Rp.
Rp.
Rp.
Rp.
Rp.

50,000
60,000
40,000
45,000
10,500

Rp.
Rp.
Rp.
Rp.
Rp.

5,000.00
600.00
2,800.00
157.50
315.00

M2 PASANG PLAFOND TEAKWOOD

KG

Tukang
Kepala tukang
Pekerja
Mandor
Paku tripleks

@
@
@
@
@

=
=
=
=
=

0.375

Lbr

Teakwood

=
88,500 =
( A + B1 )
=

Rp.
Rp.
Rp.
Rp.
Rp.

8,872.50
33,187.50
42,060.00
4,206.00
46,266.00

Rp.
Rp.
Rp.
Rp.
Rp.

50,000
60,000
40,000
45,000
10,500

=
=
=
=
=
=
Rp.
32,500 =
( A + B1 )
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,000.00
600.00
2,800.00
157.50
315.00
8,872.50
101,562.50
110,435.00
11,043.50
121,478.50

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

50,000
60,000
40,000
45,000
7,000
9,800

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,000.00
120.00
800.00
45.00
7,350.00
490.00
9,805.00
980.50
10,785.50

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,500.00
300.00
2,800.00
6,460.00
12,060.00
1,206.00
13,266.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,000.00
1,200.00
8,000.00
540.00
4,500.00
7,540.00
4,590.00
2,250.00
720.00
39,340.00
3,934.00
43,274.00

Rp.

Biaya umum dan keuntungan

1
0.100
0.010
0.070
0.004
0.030
3.125

M2 PASANG PLAFOND LAMBERSERING

KG

Tukang
Kepala tukang
Pekerja
Mandor
Paku tripleks

@
@
@
@
@

Lbr

Lambersering

Biaya umum dan keuntungan


1
0.020
0.002
0.020
0.001
1.050
0.050

M' PAS. LIST PLAFOND Sp 3

M'
KG

Tukang
Kepala tukang
Pekerja
Mandor
List profil Sp3
Paku biasa

@
@
@
@
@
@

=
=
=
=
=
=
=

Biaya umum dan keuntungan


=

1
0.050
0.005
0.070
0.380

PEKERJAAN PENGECATAN
RUANG KADIS, WAKADIS, dan KaTU
M2 MENGECAT TEMBOK / PLAFOND 3X

KG

Tukang
Kepala tukang
Pekerja
Cat tembok

@
@
@
@

Rp.
Rp.
Rp.
Rp.

50,000
60,000
40,000
17,000

Biaya umum dan keuntungan


1
0.200
0.020
0.200
0.012
0.180
0.290
0.510
0.150
0.090

M2 MEMENIE 1X SAMPAI MENGECAT 2X

KG
KG
Ltr
KG
KG

Tukang
Kepala tukang
Pekerja
Mandor
Cat menie
Cat warna
Minyak cat
Dumpul kayu
Plamur kayu

@
@
@
@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Biaya umum dan keuntungan

=
=
=
=

M2 MEMENIE 1X SAMPAI MENGECAT 2X

50,000
60,000
40,000
45,000
25,000
26,000
9,000
15,000
8,000

=
=
=
=
=
=
=
=
=
=

0.200
0.020
0.200
0.010
0.230

KG

Tukang
Kepala tukang
Pekerja
Mandor
Politur Fernis

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

50,000
60,000
40,000
45,000
15,500

Biaya umum dan keuntungan

1
0.300
0.030
0.300
0.030
1.000

0.300
0.030
0.300
0.030
1.000

TTK

Tukang
Kepala tukang
Pekerja
Mandor
Instalasi Listrik

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

50,000
60,000
40,000
45,000
37,500

0.300
0.030
0.300
0.030
1.000

=
=
=
=
=
=

10,000.00
1,200.00
8,000.00
450.00
3,565.00
23,215.00
2,321.50
25,536.50

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,000.00
1,800.00
12,000.00
1,350.00
37,500.00
67,650.00
6,765.00
74,415.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,000.00
1,800.00
12,000.00
1,350.00
18,500.00
48,650.00
4,865.00
53,515.00

BH LAMPU

BH

Tukang
Kepala tukang
Pekerja
Mandor
Lampu

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

50,000
60,000
40,000
45,000
18,500

Biaya umum dan keuntungan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN INSTALASI LISTRIK


TTK INSTALASI LISTRIK

Biaya umum dan keuntungan

=
=
=
=
=

=
=
=
=
=
=

PEKERJAAN INSTALASI AIR dan PEMELIHARAAN KM/WC


TTK INSTALASI AIR

TTK

Tukang
Kepala tukang
Pekerja
Mandor
Instalasi Air

Biaya umum dan keuntungan

@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.

50,000
60,000
40,000
45,000
155,000

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,000.00
1,800.00
12,000.00
1,350.00
155,000.00
185,150.00
18,515.00
203,665.00

DAFTAR

HARGA

SATUAN

No

Jenis Pekerjaan

Volume / Satuan

II
A.

PEKERJAAN PERSIAPAN
1 Pas. Papan Proyek
2 Pembersihan Lokasi
3 Los kerja / Direksikeet
PEKERJAAN REHAB RUANG KADIS
PEKERJAAN PARTISI
1 Bongkaran partisi lama
2 Pas rangka partisi
3 Pas.partisi teakwood

B.

ls
ls
Unit

1.00 M2
1.00 M2

1
2
3
4
5

PEKERJAAN PLAFON
Bongkaran plafon lama
Pas. Rangka plafon
Pas. Plafon teakwood
Pas. Plafon lambersering
Pas. Listprofil

1.00
1.00
1.00
1.00

M2
M2
M2
M'

1
2
3
4

PEKERJAAN PINTU
Kosen
Pas. Daun pintu
Kunci
Engsel

1.00
1.00
1.00
1.00

M3
M2
bh
bh

C.

D.

PEKERJAAN PEMELIHARAAN LANTAI


1 Bongkaran lantai lama
2 Pas.Tegel lantai

III
1
2
3
4
5

No

PEKERJAAN REHAB RUANG WAKADIS


PEKERJAAN PLAFON
Bongkaran plafon lama
Pas. Rangka plafon
1.00 M2
Pas. Plafon teakwood
1.00 M2
Pas. Plafon lambersering
1.00 M2
Pas. Listprofil
1.00 M'

Jenis Pekerjaan

A
IV
1
2
3
4

1.00 M2

Volume / Satuan

B
PEKERJAAN PENGECATAN
RUANG KADIS, WAKADIS, dan Ka.TU
Cat dinding
Cat plafond
Cat Kosen
Cat daun pintu

1.00
1.00
1.00
1.00

M2
M2
M2
M2

JADI

VI

VII

7 Cat list profil

1.00 M'

PEKERJAAN INSTALASI LISTRIK


1 Instalasi Listrik
2 Pas. Lampu

1.00 ttk
1.00 bh

PEKERJAAN INSTALASI AIR dan


PEMELIHARAAN WC/KM
1 Pas.Instalasi air
2 Pemeliharaan Km/Wc

1.00 Titik
1.00 Unit

PEKERJAAN AKHIR
1 Pembersihan Akhir

UAN

JADI
Harga satuan
(Rp)
D

500,000.00

ls
51,709.90
46,216.50

ls
51,709.90
46,216.50
121,487.50
10,208.00

2,800,380.00
194,898.00
127,050.00
15,092.00

ls
54,747.00

ls
51,709.90
46,216.50
121,050.00
10,208.00

Harga satuan
(Rp)
D

13,266.00
13,266.00
43,274.00
43,274.00

25,536.50

74,415.00
53,515.00

203,665.00
ls

ls

RENCANA ANGGARAN BIAYA


Proyek

: Perbaikan Ruang Kadis, Wakadis,Ka TU

Lokasi

: Dinas Kesehatan Provinsi Sulawesi Utara

Tahun Anggaran : 2006


No

Jenis Pekerjaan

II
A.

PEKERJAAN PERSIAPAN
1 Pas. Papan Proyek
2 Pembersihan Lokasi
3 Los kerja / Direksikeet

ls
ls
Unit

PEKERJAAN REHAB RUANG KADIS


PEKERJAAN PARTISI
1 Bongkaran partisi lama
2 Pas rangka partisi
166.70 M2
3 Pas.partisi teakwood
166.70 M2

B.
1
2
3
4
5

PEKERJAAN PLAFON
Bongkaran plafon lama
Pas. Rangka plafon
Pas. Plafon teakwood
Pas. Plafon lambersering
Pas. Listprofil

1
2
3
4

PEKERJAAN PINTU
Kosen
Pas. Daun pintu
Kunci
Engsel

Harga satuan
(Rp)
D

Jumlah (Rp)
E

500,000.00

250,000.00
700,000.00
650,000.00
1,600,000.00

ls
51,709.90
46,216.50

950,000.00
8,620,040.33
7,704,290.55
17,274,330.88
1,050,000.00
10,797,027.12
5,989,658.40
9,621,810.00
852,368.00
28,310,863.52

208.80
129.60
79.20
83.50

M
M2
M2
M'

ls
51,709.90
46,216.50
121,487.50
10,208.00

0.18
6.72
2.00
6.00

M3
M2
bh
bh

2,800,380.00
194,898.00
127,050.00
15,092.00

504,068.40
1,309,714.56
254,100.00
90,552.00
2,158,434.96

PEKERJAAN PEMELIHARAAN LANTAI


1 Bongkaran lantai lama
2 Pas.Tegel lantai
3.50 M2

ls
54,747.00

250,000.00
191,614.50
441,614.50

950,000.00
7,808,194.90
4,547,703.60
6,367,230.00
983,030.40
20,656,158.90

2,823,004.80
4,773,106.80
190,405.60
290,801.28
4,596,570.00
12,673,888.48

C.

D.

Volume /
Satuan
C

III

1
2
3
4
5

PEKERJAAN REHAB RUANG WAKADIS


PEKERJAAN PLAFON
Bongkaran plafon lama
Pas. Rangka plafon
151.00
Pas. Plafon teakwood
98.40
Pas. Plafon lambersering
52.60
Pas. Listprofil
96.30

M
M2
M2
M'

ls
51,709.90
46,216.50
121,050.00
10,208.00

1
2
3
4
5

PEKERJAAN PENGECATAN
RUANG KADIS, WAKADIS, dan Ka.TU
Cat dinding
212.80 M2
Cat plafond
359.80 M2
Cat Kosen
4.40 M2
Cat daun pintu
6.72 M2
Cat list profil
180.00 M'

13,266.00
13,266.00
43,274.00
43,274.00
25,536.50

IV

VI

VII

PEKERJAAN INSTALASI LISTRIK


1 Instalasi Listrik
2 Pas. Lampu
PEKERJAAN INSTALASI AIR dan
PEMELIHARAAN WC/KM
1 Pas.Instalasi air
2 Pemeliharaan Km/Wc
PEKERJAAN AKHIR
1 Pembersihan Akhir

14.00 ttk
12.00 bh

4.00 Titik
2.00 Unit

74,415.00
53,515.00

1,041,810.00
642,180.00
1,683,990.00

203,665.00
ls

814,660.00
750,000.00
1,564,660.00

ls

1,650,000.00
1,650,000.00

REKAPITULASI
No
I
II
A.
B.
C.
D.
III
IV
V
VI
VII

Jenis Pekerjaan

Jumlah Harga ( Rp )

PEKERJAAN PERSIAPAN
1,600,000.00
PEKERJAAN REHAB RUANG KADIS
PEKERJAAN PARTISI
17,274,330.88
PEKERJAAN PLAFON
28,310,863.52
PEKERJAAN PINTU
2,158,434.96
PEKERJAAN PEMELIHARAAN LANTAI
441,614.50
PEKERJAAN REHAB RUANG WAKADIS
PEKERJAAN PLAFON
20,656,158.90
PEKERJAAN PENGECATAN
RUANG KADIS, WAKADIS, dan Ka.TU
12,673,888.48
PEKERJAAN INSTALASI LISTRIK
1,683,990.00
PEKERJAAN INSTALASI AIR dan PEMEL. KM/WC
1,564,660.00
PEKERJAAN AKHIR
1,650,000.00
JUMLAH
88,013,941.24
PPN + JAB
11,881,882.07
TOTAL
99,895,823.31
DIBULATKAN
99,800,000.00
SEMBILAN PULUH SEMBILAN JUTA DELAPAN RATUS RIBU RUPIAH

Mengetahui,
CV. ARKASIH ABADI

Manado, 20 September 2006


PIMPINAN TEKNIK

ERNA A. TANAWALO
DIREKTRIS

THAMBRIN WAGIU

13.5
100

129
79
208

208.80
151.00
359.8

1,600,000.00
17,274,330.88
28,301,863.52
2,158,434.96
441,614.50
20,656,158.90
12,673,888.48
1,638,990.00
1,564,660.00
1,650,000.00
87,959,941.24

100,000,000.00
(0.20)