Perry Equipment Corporation

AN ISO 9001:2000 CERTIFIED COMPANY


P.O. Box 640
Wolters Industrial Park
Mineral Wells, Texas 76068
Fax: (940) 325-4622
Ph: (940) 325-2575

PROJECT DOCUMENT

Document Title: Specification Data Sheet


Sales Order No.: F076353
Job No.: 213686
Model No.: 75H-21-336-30-1480-WP
PECO ICN: 01-105258
Customer: PROSERTEC SRL
Customer P.O. No.: PSTSC-PO-020-06-0
Item / Tag No.:
Equipment Description: FILTER SEPARATOR
Project:
GENERAL NOTES

REV

DATE

2/8/06

BY

JMG

PAGE 1 OF 3 REF. (DOC 4.4.084 Rev. 1)

DESCRIPTIONS

First issue

PERRY EQUIPMENT CORP.


MINERAL WELLS, TEXAS
U.S.A
SPECIFICATION
DATA SHEET

CUSTOMER: PROSERTEC SRL


S.O. NO.: F076353
QTY. REQD: 3
ITEM /TAG NO:

CONNECTIONS
SERVICE
INLET
OUTLET
DPI
LIQUID OUT (LCV)
LEVEL GAUGE
LLC
MANUAL DRAIN
TEMPERATURE INDICATOR
RELIEF VALVE
VENT
PRESSURE INDICATOR
LEVEL SWITCH
SUPPLY GAS

NO.

SIZE
(NPS)

FLANGE /
COUPLING

FLANGE
TYPE

FLANGE
RATING

FLANGE
FACING

1
1
2
2
4
2
2
1
1
1
1
4
1

12
12

2
1
2
2
1
1
1

1
1

FLG
FLG
CPLG
FLG
CPLG
CPLG
FLG
CPLG
CPLG
CPLG
CPLG
CPLG
CPLG

WN
WN

600#

RF

WN

COUPLING RATING
1 & LESS 6000#
1 & UP 3000#
COUPLINGS ARE
NPT UNLESS
NOTED OTHERWISE

FLG FINISH

WN

STD PER
ASME/ANSI B16.5

DESIGN DATA/CONDITIONS
PRESSURE, PSIG: 1,480 (SEE NOTE #1)
TEMPERATURE, OF 100
CORROSION ALLOWANCE, in.: 0.0
O
MDMT, F 20
DESIGN/FABRICATION/INSPECTION/ TESTING IN ACCORDANCE WITH ASME CODE SEC. VIII DIV. 1 2004 ED. A05

SURFACE PREPARATION
POWER BRUSH CLEAN (SSPC-SP 3):

INT

NEAR WHITE BLAST(SSPC-SP-10):


ANCHOR PROFILE: 2 - 3 MILS

EXT

COATINGS REQUIREMENTS (MANUFACTURER OF COATINGS)


COAT
PRIMER
INTERMEDIATE
TOPCOAT

INTERNAL
LPS-3 CORROSION INHIBITOR
N/A
N/A

EXTERNAL
CARBOZINC 11

DFT (mils)
2.5-3

COLOR
GREEN

SHIPPING INFORMATION
FLANGE PROTECTORS: STEEL
THREADED OPENINGS: STEEL HEX PLUGS
SHIPPING PREPARATION: PECO STANDARD
NO. OF QA DATA BOOKS: 6 (SEE PURCHASE ORDER FOR ADDITIONAL REQUIREMENTS) ESTIMATED SHIPPING WT. (lbs): 9,042

NOTES
1. DESIGNED WITH 2.5 PSIG EXT. PRESSURE BUT NOT CODE STAMPED AS SUCH.
2. MAWP IS LIMITED BY THE PECO QUICK OPENING CLOSURE (QOCA).
3. ALL AUXILIARY EQUIPMENT AND PIPING MUST BE REMOVED FOR SHIPMENT.
4. AS-BUILT DRAWINGS ARE REQUIRED.

PAGE 2 OF 3 REF.(DOC 4.4.084 Rev. 1)

PERRY EQUIPMENT CORP.


MINERAL WELLS, TEXAS
U.S.A
SPECIFICATION
DATA SHEET

CUSTOMER: PROSERTEC SRL


S.O. NO.: F076353
QTY. REQD: 3
ITEM /TAG NO:

MATERIALS WITH MTRS PER ASME CODE REQUIREMENTS


ITEM
PIPE

PRESSURE BEARING

ATTACHMENT

SA-106-B SEE NOTE 2

A-53/106-B SEE NOTE 2

INTERNALS / DEMISTER TYPE & MATERIALS


316 S/S VANE; C/S BOXING, BAFFLES, RISERS & ESP

PLATE
SA-516-70 SEE NOTE 1
A-36/516-70 SEE NOTE 1
STRUCTURAL
N/A
A-36/516-70 SEE NOTE 1
FLANGES
SA-105/350-LF2-CL1 SEE NOTE 2
COUPLINGS
SA-105/350-LF2-CL1 SEE NOTE 2
FORGING
SA-105/350-LF2-CL1 SEE NOTE 2
FITTINGS
SA234WPB SEE NOTE 2
STUDS
SA-193-B7 NUTS
SA-194-2-H SEE NOTE 3
NOTE 1: PLATE FOR SHELL& HEAD SHALL BE NORMALIZED BUT IS EXEMPT FROM IMPACT TESTING PER TABLE UCS-66 / UG-84.
REPADS GREATER THAN 1 THICK ARE NORMALIZED BUT ARE EXEMPT FROM IMPACT TESTING PER TABLE UCS-66 / UG-84
PLATE FOR CLOSURE PRESSURE PARTS SHALL BE NORMALIZED IF > 1.00 THICK & IMPACT TESTED AS REQUIRED PER TABLE UCS66 / UG-84
NOTE 2: FLANGES/FORGINGS ARE EXEMPT FROM IMPACT TESTING PER TABLE UG-84.3. PIPE/COUPLINGS/SADDLE PLATE ARE
EXEMPT FROM IMPACT TESTING PER UG-20(f).
NOTE 3: BOLTING IS EXEMPT FROM IMPACT TESTING PER FIG. UCS-66 GENERAL NOTE (a).
TEST VALUES FOR MATERIALS REQUIRING IMPACT TESTING: N/A
PRODUCTION WELD IMPACT TEST REQUIRED: NO
CLOSURE
TYPE: QOCA

MATERIALS: SA-105/350-LF2-CL1/516-70 SEE NOTES 1-3 ABOVE

ELEMENTS

PCHG-336

NAMEPLATE

S/S- SHOW PO# & TAG#

LIFTING LUGS (2)

YES

GROUND LUGS

FLANGE GASKETS
NO

INSULATION RINGS

GASKET: BUNA
FLEXITALIC CGI

NO

INSPECTION AND TESTING


RADIOGRAPHIC TESTING (RT): RT-1 100% ALL BUTT WELDS
HEAT TREATMENT: NO
HYDROSTATIC TEST:@ 1,924PSIG FOR 4 HOURS.
ULTRASONIC TESTING (UT): NO
MAGNETIC PARTICLE TESTING (MT): NO
LIQUID PENETRANT TESTING (PT): NO
HARDNESS TESTING (HDT): NO
WPS/PQR APPL . REQD: NO
WELD MAPS REQUIRED: NO
INSPECTIONS BY:
PECO
ASME(IBM & RE)

NATIONAL BOARD NO:


YES
(SEE PURCHASE ORDER FOR POSSIBLE ADDITIONAL REQUIREMENTS)

NOTES

PAGE 3 OF 3 REF.(4.4.084 Rev. 1)