Professional Documents
Culture Documents
Well:
RIO NAPO
SACHA 473H
Rig:
PDVSA -79
SACHA
10521
Planned Time
Drilling:
41
AFE Days
Spud Date:
Actual date:
20-Jul-14 @ 17:00
25-Aug-14 @ 06:00
30-Aug-14 @ 15:11
Release Date:
25-Aug-14 @ 06:00
35.54
Casing/Liner
Time vs Depth
Operational Progress
1000
REAL
1000
PROPUESTA
2000
-3
3000
-2
-1
3
2000
NPT Dias
9.67
4000
NPT PDVSA (0.5Hr): 23-Julio de 2014, Saca dos paradas, coloca botella
de circulacin, cambia O-ring del manguerote.
5000
0.96
0.29
1.0
2.0
No Planed
3.0
4.0
5.0
6.0
7.0
8.0
9.0 10.0
4000
Casing 13 3/8"
@ 6264 ft
TVD (ft)
Depth (feet)
0.0
3000
6000
NPT PDVSA (1Hr): 02-Agosto de 2014, Repara bomba #1 y Bomba # 3.
7000
6000
8000
9000
5000
Casing 9 5/8"
@ 10074 ft
7000
10000
8000
11000
Real Time
12000
Clean Time
Liner 7"
@ 10644 ft
Planned Time
26
10
12
14
16
18
20
22
9000
Hoyo de 6 1/8"
@ 11427ft
24
26
28
30
32
34
36
38
40
42
44
20
10000
-200
800
1800
2800
Time [ Days ]
Total Time
days
35.54
Productive Time
days
25.56
% Productive Time
71.92%
No productive Time
days
10.92
% No Productive Time
30.72%
days
35.25
Tipo Horizontal
11427
Plan TD