MARCH 2, 2010
2 BUILDING STRONG®
WHAT IS A FEASIBILITY COST SHARE
AGREEMENT (FCSA)?
• Legal document binding USACE and the City to
undertake a Feasibility Study and Integrated
Environmental Impact Statement (EIS) for the Dallas
Floodway
• Provides cost sharing and other responsibilities of
both parties
• Identifies studies and plan of action for completion of
EIS
3 BUILDING STRONG®
WHAT IS AN ENVIRONMENTAL IMPACT
STATEMENT (EIS)?
• Required by National Environmental Policy Act
(NEPA) for projects that have federal funding
and may have environmental, economic or
social impacts
• Typically includes studies for hydraulics,
geology, economics, historic and cultural
resources, wildlife and vegetation
• Also includes 35% design level of project
components
• Completion of this document is required to
receive approval to construct the project
4 BUILDING STRONG®
BACKGROUND
• 1945 / 1950 – Dallas Floodway Project Authorized
• 1960 – US Army Corps of Engineers (USACE) Construction Completed
• 1996 – Feasibility Study Initiated
o Level of Protection decreased from 800-year to 300-500 year
o Basin-wide modeling completed
o Economic database developed
o Regional Corridor Development Certificate (CDC) process developed
o Preliminary work completed on flood damage reduction, ecosystem restoration and recreation
components
o Efforts continued in conjunction with Dallas Floodway Extension study, development of City’s
Balanced Vision Plan and Interior Drainage Plan, and preliminary work on Trinity Parkway
5 BUILDING STRONG®
Water Resources Development Act 2007
(Section 5141)
6 BUILDING STRONG®
Dallas
DallasFloodway
Floodway––Balanced Vision
Feasibility StudyPlan
7 BUILDING STRONG®
8 BUILDING STRONG®
Feasibility Cost Share Agreement
9 BUILDING STRONG®
Major Study Elements
• Local Features
o Trinity Parkway, Bridges, Santa Fe Trestle Trail, etc.
10 BUILDING STRONG®
Feasibility Study Costs
• Total study costs estimated at $38.4 million
o 50/50 cost share – Federal and City
11 BUILDING STRONG®
USACE Funding Process
• President’s Budget request comes out in
February for the next fiscal year
• Congress is scheduled to approve budgets
by October of the current fiscal year
• If appropriations bill is not approved at that
time, temporary funding is provided
through a continuing resolution until final
bill is approved
• Continuing resolution typically limits the
amount of funding available
12 BUILDING STRONG®
Funding Needs for USACE
• Needed for FY 10 (ending 9/30/10) $4.70 M
• Needed for FY 11 thru 3/2011* $2.05 M
• USACE funding FY 10 ($1.30 M)
• USACE funding FY 11** ($0.70 M)
• TOTAL FUNDING NEEDS $4.75 M
FOR USACE thru 3/2011
* In the event that the appropriations bill is not passed by the start of October 2010,
the City proposes to provide funds to maintain schedule
** Included in President’s Budget; however, there is an opportunity for additional
funding through Congressional appropriations bills that could increase this amount
13 BUILDING STRONG®
How does the City get credited for
advance contributions?
• WRDA 2007 language allows the City to receive credit
toward future design and construction phases of the
project for any City contributions over 50% cost share
during the Feasibility Study
• When the Dallas Floodway project begins design
and/or construction phases, agreements between City
and USACE will incorporate this credit, thereby
reducing the City’s future funding requirements
14 BUILDING STRONG®
Staff Recommendation
15 BUILDING STRONG®
Dallas Floodway – Feasibility Study
QUESTIONS?
16 BUILDING STRONG®