Professional Documents
Culture Documents
DESCRIPCION
30 DIAS
UND
CUADRILLA CANTIDAD
PU (S/.)
PARCIAL (S/.)
MANO DE OBRA
TOPOGRAFO
H.H
1.00
240.00
19.18
4,603.20
NIVELADOR TOPOGRAFICO
H.H
1.00
120.00
14.75
1,770.00
AYUDANTE TOPOGRAFIA
H.H
2.00
240.00
11.58
5,558.40
AYUDANTE NIVELADOR
H.H
1.00
120.00
11.58
1,389.60
H.H
2.00
60.00
11.58
1,389.60
M3
3.00
324.23
972.58
KG
680
#N/A
#N/A
PINTURA ESMALTE
GL
2.50
#N/A
#N/A
PLN
2.00
#N/A
#N/A
P2
32.00
3.85
123.26
KG
0.50
3.41
1.70
PINTURA ESMALTE
GL
1.00
#N/A
#N/A
5%
EQUIPO
HERRAMIENTAS MANUALES
14,710.80
735.54
ESTACION TOTAL
H.M
1.00
240.00
#N/A
#N/A
NIVEL TOPOGRAFICO
H.M
1.00
120.00
#N/A
#N/A
#N/A
32.62
#N/A
UND
CANTIDADES
POR Km.
TOPOGRAFO
NIVELADOR TOPOGRAFICO
AYUDANTE TOPOGRAFIA
AYUDANTE NIVELADOR
PEON (INSTALAR TABLILLAS)
H.H
H.H
H.H
H.H
H.H
240.00
120.00
480.00
120.00
120.00
7.3574
3.6787
14.7149
3.6787
3.6787
M3
KG
GL
3.00
680.00
2.50
0.0920
20.8461
0.0766
PLN
P2
KG
GL
2.00
32.00
0.50
1.00
0.0613
0.9810
0.0153
0.0307
H.M
H.M
240.00
120.00
MANO DE OBRA
EQUIPO
HERRAMIENTAS MANUALES
ESTACION TOTAL
NIVEL TOPOGRAFICO
5%
7.3574
3.6787
ESTUDIO DE PREINVERSION A NIVEL DE PERFIL Y ESTUDIO DEFINITIVO PARA LA REHABILITACION DE LA CARRETERA: DV. LAS VEGAS - TARMA