By

Ir. Dr. Gue See Sew


http://www.gnpgeo.com.my

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

CONTENTS
SOIL NAIL
INTRODUCTION
DESIGN CONCEPT
MODES OF FAILURES
CONSTRUCTION SEQUENCE
TESTING

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

Soil Nail Slope Failure

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

Steel plate

CORRECT
Main reinforcement
at back of steel plate

Soil face
Shotcrete facing

Main reinforcement

Steel plate

INCORRECT
Main reinforcement
in front of steel plate

Soil face

Main reinforcement
Shotcrete facing

FACE FAILURE
G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

INTRODUCTION
ADVANTAGES
Minimum Loss of Land
Minimum Temporary Shoring
Minimum Earthwork

**More suitable for cut ground.

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

SLOPE CHASING
Required
Space

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

INTRODUCTION
DISADVANTAGES
Nail Encroachment

Lot Boundary

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

DESIGN CONCEPT
Common design reference
BS8006 : Code of practice for Strengthened/
reinforcement soils and other fills (1995)
Federal Highway Administration (FHWA) :
Manual for Design & Construction Monitoring
of Soil Nail Walls (1998)
Department of Transport (DoT) : Design
Manual for Roads and Bridges, Vol. 4,
Section 1, Part 4, HA68/94 (1994)
G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

F RE
E LE

NGT
H

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

FIXE

DL

ENG
TH

DESIGN CONCEPT- FRICTION


Ultimate Unit Friction
fsu=4~6 NSPT

Ultimate Friction for Each Nail


fsuAsL

As = Surface Area of Nail


L = Length of Nail

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

DESIGN CONCEPT- GROUT-STEEL BOND STRESS


Ultimate Bond Stress
1,000kPa

Conditions of Contact
Surface
Clean & Plain Bar/Wire

1,500kPa

Clean & Crimped Wire

2,000kPa

Clean Deform Bar

3,000kPa

Locally Noded Strand

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

DESIGN CONCEPT- STEEL


BS8110 (Ultimate) : TN = 0.87 fy As
FHWA (Allowable) : TN = 0.55 fy As
Steel Elements/Connection : BS5950
Reinforced Concrete
: BS8110

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

MODE OF FAILURES
Three Modes of External Stability

SLIDING

TOPPLING

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

BEARING CAPACITY

a) Face Failure

Failure Mode
Face Failure and Active Zone
Sliding Off Front of Nails

b) Pullout Failure

Failure Mode
Nails Pull Out of Resistant Zone

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

c) Nail Tendon Failure

Failure Mode
Tensile Failure of Tendon

MINIMUM FOS: 1.40

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

CONSTRUCTION
Maximum
2.0m

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

DRILLING- Down the Hole Hammer

Backheads

Spring
Wearsleeve

Chuck
Valve

Internal
Cylinder

Distributor

Piston

Piston
Retainer
Ring

Bit
Retainder
Ring

Bit

DTH Piston : Direct impact on bit & less loss of


impact energy
Penetration Rate Air Pressure
Compressed Air : Power Source & Flushing Medium
G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

DRILLING- TRICONE BIT

79mm NW
Casing Advancer
75mm Tricone
Drillbit

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

DRILLING BIT TUNGSTEN CARBIDE

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

SOIL NAIL

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

SOIL NAIL SPECIFICATION


Galvanized thickness of 85m (Minimum)
To be checked with Magnetic Gauge
2 coats of zink coater (6 hours apart)
should be applied after threading and to
scratched surfaces
G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

SOIL NAIL- CENTRALIZER

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

SOIL NAIL- CENTRALIZER


Minimum size = Hole diameter 12mm
Minimum of grade D PVC pipe
Must not collapse under weight of nail
Maximum 4m c/c spacing
G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

GROUT MIX
Specify NON-SHRINKAGE grout
W/C ratio = 0.45
Grout Mix =

Cement : A/Shrinkage Agent


: Water
50kg
:0.5kg (or as specified) : 22.5kg

Grout Strength (28 days)= 30MPa


( 7 days)= 21MPa (70%)
G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

GROUTING METHOD
Low pressure pump
To be grouted on the same day as drilling
Tremie bottom up with grout pipe installed
till the end of nail.
Overspill for 30 seconds
G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

SCHEMATICS

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

Steel plate

CORRECT
Main reinforcement
at back of steel plate

Soil face
Shotcrete facing

Main reinforcement

Steel plate

INCORRECT
Main reinforcement
in front of steel plate

Soil face

Main reinforcement
Shotcrete facing

FACE FAILURE
G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

HORIZONTAL DRAIN
Inserted deeper within the slope
(Weepholes likely to get clogged)
Wrapped around with geotextile (TS20)
Waterstop to be wrapped with geotextile
and secured with steel wire
G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

HORIZONTAL DRAIN

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

FACING
Three types of facing
Pad Facing
Used when soil is not susceptible to surface
erosion
Presence of obstruction

Shotcrete
For soils which are prone to erosion

Grid Beam
Used when soil is not susceptible to surface
erosion
G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

PAD FACING

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

SHOTCRETE FACING

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

GRID BEAM FACING

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

PULLOUT TEST

To measure and confirm fixed end friction


of soil nail

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

PULLOUT TESTS
Preliminary Pull Out Test
Sacrificial test of additional point

Working Pull Out Test


Nail is stress only to working load

Instrumented
With strain gauge
G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

PULLOUT TEST

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

By
Ir. Dr. Gue See Sew
http://www.gnpgeo.com.my

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

CONTENTS
Introduction
Types of Failures
Options
- Netting

- Shotcreting

- Scaling

- Rock Bolt

Design Concept of Rock Bolt


G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

INTRODUCTION

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

INTRODUCTION

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

INTRODUCTION
Used to stabilize weak rock mass.
Acts in the same manner as soil nail.

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

TYPES OF FAILURES - SLIDING


SINGLE BLOCK/SINGLE PLANE SLIDING

SINGLE BLOCK/STEPPED PLANE SLIDING

MULTIPLE BLOCKS/MULTIPLE PLANE SLIDING

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

SLIDING FAILURE

Planar Failure

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

TYPES OF FAILURES - WEDGE


SINGLE WEDGE
/TWO INTERSECTING PLANES

SINGLE WEDGE
/MULTIPLE INTERSECTING PLANES

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

WEDGE FAILURE

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

TYPES OF FAILURES - TOPPLING


Toppling failure in hard rock which can form columnar
structure separated by steeply dipping discontinuities

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

TOPPLING FAILURE

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

STEREOGRAPHIC PLOT ANALYSIS

Toppling
Failure Zone
Wedge Failure
Zone

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

OPTIONS
Shotcreting
To prevent loose rocks from falling

Scaling
To chisel off small loose rocks

Rock Bolt
To stabilize large rock mass

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

NETTING

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

SCALING

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

SHOTCRETING

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

ROCK BOLT

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

Ff

Fg

Fgy

Fgx

Fgx = F f
mg sin ' = mg cos '
sin ' = cos '
sin '
=
cos '
= tan '
G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

ROCK BOLT
GROUT

FAILURE PLANE
G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

SCHEMATICS

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

COMPONENTS OF ROCK BOLT


T40 Galvanized Steel Bars

Galvanized Steel Plates


G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

ROCK BOLT SPECIFICATION


Galvanized thickness of 85m (Minimum)
To be checked with Magnetic Gauge
2 coats of zink coater (6 hours apart)
should be applied after threading and to
scratched surfaces
G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

CENTRALIZER

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

ROCK BOLT CENTRALIZER


Minimum size = Hole diameter 12mm
Minimum of grade D PVC pipe
Must not collapse under weight of nail
Maximum 4m c/c spacing
G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

THINGS TO CHECK - SHOTCRETE


Ensure sufficient:
Properly protected weepholes
Lapping of BRC wire mesh
Cover of BRC & rock surface

Ensure shotcreting is done TOP DOWN

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

CONCLUSION
100% Check and Review Design
Site Supervision

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)

G&P Geotechnics Sdn Bhd (www.gnpgroup.com.my)