You are on page 1of 9

1

VALORIZA
PROYECTO

: "FORTALECIMIENTO DE LA CAPACIDAD RESOLUTIVA DEL HOSPITAL DE MOYOBAMBA, SEGUNDO NIVEL DE ATENCIN, PROVINCIA DE

CLIENTE
INSPECTOR
CONTRATISTA

: GOBIERNO REGIONAL DE SAN MARTN - PROYECTO ESPECIAL ALTO MAYO


: ING. LUIS ESPINOZA PEAHERRERA
: CONSORCIO HOSPITALARIO MOYOBAMBA

FORMULA

: OE-5.1 INSTALACIONES MECANICAS

ITEM

DESCRIPCION

5.7

INSTALACION DE GASES ANESTESICOS - AIRE ACONDICIONADO

5.7.2

REDES DE DISTRIBUCION

5.7.2.1
5.7.2.2
5.7.2.3

Tubera cobre tipo K 1"


Tubera cobre tipo K 3/4"
Tubera cobre tipo K 1/2"

5.7.3

ACCESORIOS DE REDES

5.7.3.1
5.7.3.3
5.7.3.4

Codo de cobre tipo K 1"


Codo de cobre tipo K 1/2"
Tee de cobre tipo K 1"
Tee de cobre tipo K 1/2" (PARTIDA NUEVA)

5.7.4

VALVULAS

5.7.4.1
5.7.4.2

Vlvula esfrica de bronce 1"


Vlvula esfrica de bronce 1/2"

5.8

INSTALACIONES DE OXIGENO

5.8.2

REDES DE DISTRIBUCION

5.8.2.1

Tubera cobre tipo K 1 1/2"

UND

ml
ml
ml
und
und
und
und
und
und

ml

1 de 9

5.8.2.2
5.8.2.3
5.8.2.4

Tubera cobre tipo K 1 1/4"


Tubera cobre tipo K 1"
Tubera cobre tipo K 3/4"

5.8.3

ACCESORIOS DE REDES

5.8.3.1

Codo de cobre tipo K 1 1/2"


Codo de cobre tipo K 1 1/4"
Codo de cobre tipo K 1"
Codo de cobre tipo K 3/4"
Tee de cobre tipo K 1"
Tee de cobre tipo K 3/4"
Tee de cobre tipo K 1/2"
Reduccin de cobre de 1" a 3/4"
Reduccin de cobre de 3/4" a 1/2"
Reduccin de cobre de 1 1/2" a 3/4" (PARTIDA NUEVA)
Reduccin de cobre de 1 1/2" a 1" (PARTIDA NUEVA)
Reduccin de cobre de 1 1/4" a 1" (PARTIDA NUEVA)
Reduccin de cobre de 1 1/4" a 1/2" (PARTIDA NUEVA)

5.8.3.2
5.8.3.3
5.8.3.7
5.8.3.8
5.8.3.9
5.8.3.10
5.8.3.12

5.8.4

VALVULAS

5.8.4.2
5.8.4.3
5.8.4.4

Vlvula esfrica de bronce 1"


Vlvula esfrica de bronce 3/4"
Vlvula esfrica de bronce 1/2"

5.9

INSTALACIONES DE VACIO

5.9.2

REDES DE DISTRIBUCION

5.9.2.2
5.9.2.4
5.9.2.5

Tubera cobre tipo K 1 1/2"


Tubera cobre tipo K 1"
Tubera cobre tipo K 3/4"

5.9.3

ACCESORIOS DE REDES

5.9.3.1
5.9.3.2
5.9.3.3
5.9.3.4
5.9.3.5
5.9.3.8
5.9.3.11
5.9.3.12
5.9.3.16

Codo de cobre tipo K 2"


Codo de cobre tipo K 1 1/2"
Codo de cobre tipo K 1 1/4"
Codo de cobre tipo K 1"
Codo de cobre tipo K 3/4"
Tee de cobre tipo K 1 1/2"
Tee de cobre tipo K 3/4"
Tee de cobre tipo K 1/2"
Reduccin de cobre de 3/4" a 1/2"

ml
ml
ml
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und
und

ml
ml
ml
und
und
und
und
und
und
und
und
und

2 de 9

Reduccin de cobre de 2" a 1 1/2" (PARTIDA NUEVA)


Reduccin de cobre de 2" a 1" (PARTIDA NUEVA)
Reduccin de cobre de 1 1/2" a 1 1/4" (PARTIDA NUEVA)
Reduccin de cobre de 1 1/2" a 3/4" (PARTIDA NUEVA)
Reduccin de cobre de 1 1/2" a 1/2" (PARTIDA NUEVA)
Reduccin de cobre de 1" a 3/4" (PARTIDA NUEVA)
5.9.4

VALVULAS

5.9.4.6

Vlvula esfrica de bronce 1/2"

5.10

INSTALACIONES DE AIRE MEDICINAL

5.10.2

REDES DE DISTRIBUCION

5.10.2.5

Tubera cobre tipo K 1/2"

5.10.3

ACCESORIOS DE REDES

5.10.3.2

5.10.3.8

Codo de cobre tipo K 1"


Codo de cobre tipo K 3/4" (PARTIDA NUEVA)
Tee de cobre tipo K 1 1/2"
Reduccin de cobre de 1 1/2" a 1" (PARTIDA NUEVA)
Reduccin de cobre de 1 1/2" a 1/2" (PARTIDA NUEVA)
Reduccin de cobre de 1" a 1/2" (PARTIDA NUEVA)
Reduccin de cobre de 1" a 3/4"

5.10.4

VALVULAS

5.10.4.4

Vlvula esfrica de bronce 1/2"

5.10.3.4

COSTO DIRECTO
GASTOS GENERALES
UTILIDADES
SUB TOTAL
I.G.V.
TOTAL PRESUPUESTO
MONTO CONTRATO (INC. IGV)
FACTOR DE RELACION
VALORIZACION CONTRACTUAL
AVANCE FISICO

und
und
und
und
und
und
und

ml
und
und
und
und
und
und
und
und

14.91%
10.00%
18.00%

79,473.84
1.000000

3 de 9

VALORIZACIONES DE ADICIONALES - INSTALACIONES MECANICAS


#REF!

NIVEL DE ATENCIN, PROVINCIA DE MOYOBAMBA-SAN MARTN"

S/. 91,691,599.78

CONTRATO :

(Inc. IGV)

VALORIZACION N 04 DEL ADICIONAL N 25


PRESUPUESTO
METRADO

PRECIO UNITARIO

AVANCE
PARCIAL

METRADO

ACUMULADO ANTERIOR
VAL. (S/.)

133.54
0.80
109.62

77.40
60.01
37.60

10,336.00
48.01
4,121.71

106.81
0.46
94.33

8,267.09
27.60
3,546.81

10.00
14.00
10.00
9.00

13.14
10.01
18.87
10.35

131.40
140.14
188.70
93.15

8.50
11.30
9.50
7.05

111.69
113.11
179.27
72.97

4.00
13.00

131.53
90.85

526.12
1,181.05

2.80
10.85

368.28
985.72

6.61

112.67

744.75

5.61

632.08

4 de 9

7.09
4.05
11.18

97.95
77.40
60.01

694.47
313.47
670.91

6.09
2.82
9.23

596.52
218.27
553.89

6.00
4.00
24.00
48.00
8.00
18.00
54.00
10.00
18.00
5.00
2.00
1.00
1.00

21.81
17.96
13.14
10.63
18.87
12.20
10.18
8.75
8.04
27.77
24.84
21.94
13.18

130.86
71.84
315.36
510.24
150.96
219.60
549.72
87.50
144.72
138.85
49.68
21.94
13.18

5.40
3.60
21.00
43.60
7.00
16.20
44.30
9.00
15.10
3.25
1.70
0.75
0.75

117.77
64.66
275.94
463.47
132.09
197.64
450.97
78.75
121.40
90.25
42.23
16.46
9.89

3.00
1.00
11.00

131.53
109.59
90.85

394.59
109.59
999.35

1.35
0.45
9.95

177.57
49.32
903.96

52.95
9.99
175.04

121.44
77.40
60.01

6,430.25
773.23
10,504.15

43.83
8.50
128.77

5,322.72
657.90
7,727.49

1.00
11.00
3.00
14.00
42.00
9.00
22.00
54.00
25.00

47.66
21.81
17.96
13.14
10.63
34.27
12.20
10.18
8.04

47.66
239.91
53.88
183.96
446.46
308.43
268.40
549.72
201.00

0.85
9.00
2.00
11.30
37.90
8.05
20.90
42.30
21.25

40.51
196.29
35.92
148.48
402.88
275.87
254.98
430.61
170.85

5 de 9

1.00
1.00
3.00
13.00
4.00
1.00

38.26
38.26
24.83
27.76
27.77
8.75

38.26
38.26
74.49
360.88
111.08
8.75

0.75
0.75
1.70
9.85
2.60
0.75

28.70
28.70
42.21
273.44
72.20
6.56

12.00

90.85

1,090.20

10.40

944.84

197.65

37.60

7,431.64

149.44

5,618.94

5.00
11.00
1.00
1.00
1.00
1.00
2.00

13.14
10.63
36.51
24.84
27.77
8.55
8.75

65.70
116.93
36.51
24.84
27.77
8.55
17.50

3.50
7.90
0.75
0.75
0.75
1.40

45.99
83.98
27.38
18.63
20.83
11.97
-

15.00

90.85

1,362.75

12.75

1,158.34

53,919.01
8,039.80
5,391.90
67,350.71
12,123.13
79,473.84

42,912.86
6,398.69
4,291.29
53,602.84
9,648.51
63,251.35

79,473.84
100.00%

63,251.35
79.59%

6 de 9

NICAS

PLAZO DE EJECUCIN CONTRACTUAL DE OBRA

FECHA DE INICIO :
FECHA DE CULMINACIN :

834 DIAS NATURALES

19-May-12
30-Aug-14

AVANCE
METRADO

ACTUAL
VAL. (S/.)

1.50
2.70
0.50
1.95

SALDO

ACUMULADO
METRADO
VAL. (S/.)

METRADO

VAL. (S/.)

106.81
0.46
94.33

8,267.09
27.60
3,546.81

10.00
14.00
10.00
9.00

131.40
140.14
188.70
93.15

2.80
10.85

368.28
985.72

1.20
2.15

157.84
195.33

30.00%
16.54%

5.61

632.08

1.00

112.67

15.13%

19.71
27.03
9.44
20.18

26.73
0.34
15.29

2,068.90
20.40
574.90
-

20.02%
42.49%
13.95%
0.00%
0.00%
0.00%
0.00%

7 de 9

0.60
0.40
3.00
4.40
1.00
1.80
9.70
1.00
2.90
1.75
0.30
0.25
0.25

0.15
2.00
1.00
2.70
4.10
0.95
1.10
11.70
3.75

6.09
2.82
9.23

596.52
218.27
553.89

1.00
1.23
1.95

6.00
4.00
24.00
48.00
8.00
18.00
54.00
10.00
18.00
5.00
2.00
1.00
1.00

130.86
71.84
315.36
510.24
150.96
219.60
549.72
87.50
144.72
138.85
49.68
21.94
13.18

1.35
0.45
9.95

177.57
49.32
903.96

1.65
0.55
1.05

217.02
60.27
95.39

55.00%
55.00%
9.55%

43.83
8.50
128.77

5,322.72
657.90
7,727.49

9.12
1.49
46.27

1,107.53
115.33
2,776.66

17.22%
14.92%
26.43%

1.00
11.00
3.00
14.00
42.00
9.00
22.00
54.00
25.00

47.66
239.91
53.88
183.96
446.46
308.43
268.40
549.72
201.00

13.09
7.18
39.42
46.77
18.87
21.96
98.75
8.75
23.32
48.60
7.45
5.49
3.30

7.15
43.62
17.96
35.48
43.58
32.56
13.42
119.11
30.15

97.95
95.20
117.02
-

14.10%
30.37%
17.44%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

8 de 9

0.25
0.25
1.30
3.15
1.40
0.25

9.57
9.57
32.28
87.44
38.88
2.19

1.00
1.00
3.00
13.00
4.00
1.00

38.26
38.26
74.49
360.88
111.08
8.75

10.40

944.84

1.60

145.36

13.33%

149.44

5,618.94

48.21

1,812.70

24.39%

3.50
7.90
0.75
0.75
0.75
1.40
-

45.99
83.98
27.38
18.63
20.83
11.97
-

1.50
3.10
0.25
0.25
0.25

19.71
32.95
9.13
6.21
6.94

30.00%
28.18%
25.01%
25.00%
24.99%

-0.40

-3.42

-40.00%

2.00

17.50

100.00%

12.75

1,158.34

2.25

204.41

15.00%

942.23
140.49
94.22
1,176.94
211.85
1,388.79

43,855.09
6,539.18
4,385.53
54,779.80
9,860.36
64,640.16

10,063.90
1,500.62
1,006.39
12,570.91
2,262.76
14,833.67

1,388.79
1.75%

64,640.16
81.34%

14,833.67
18.66%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

9 de 9