INTRODUCTION
This Technical Bulletin introduces variations from BS EN 12845 to make the specification
suitable for use. The Technical Bulletin includes LPC Rules amendments which have
been drawn up by the Active Steering Group of RISCAuthority, either as modifications to
the CEN 2009 amendments or as changes to the content of BS EN 12845.
TB229.2
GENERAL
A brief description of the change is given under each heading.
Revised or new text is shown in italic bold underlined font.
To aid understanding of some changes, deleted text has been depicted using
strikethrough text.
Where changes have been introduced by this Technical Bulletin to the proposed
amendments, the details of the change and, where appropriate, reasons for the change
have been given.
Table notes have the status of recommendations whilst Table footnotes are
requirements.
TB229.3
TB229.3.1
Table TB229.T1 Limitations and protection requirements for different storage configurations BS EN Table 2
(amended)
Storage
configuration
Layout limitations
ST1
None
(2, a)
Table TB229.T1 Limitations and protection requirements for different storage configurations BS EN Table 2
(amended)
Storage
configuration
Layout limitations
ST2
None
(a)
ST3
None
(a)
(1, a)
(1)
(1, a)
(1, a)
ST4
ST5
ST6
Note 1: When the ceiling is more than 4m above the highest level of stored goods, intermediate levels of in-rack
sprinklers should be used.
Note 2: Storage blocks should be separated by aisles no less than 2,4m wide.
Note 3: Note 2: Storage should be confined to blocks not exceeding 150m2 in plan area for C I and C II.
a
TB229.3.2
BS EN Table 4
Description of change:
LPC Rules requirements change table note to footnote (b) and insert footnote (a)
concerning alternate systems.
Table TB229.T2 Design criteria for HHS with roof or ceiling protection only (Replacing BS EN Table 4)
Storage
configuration
Design
density
mm/min
Area of
operation (wet
or pre-action
system(2, a, b))
m
Category I
Category II
Category III
Category IV
5,3
6,5
7,6
4,1
5,0
5,9
6,7
7,5
2,9
3,5
4,1
4,7
5,2
1,6
2,0
2,3
2,7
3,0
7,5
10,0
12,5
15,0
17,5
260
5,7
6,3
6,7
7,2
3,3
3,6
3,8
4,1
4,4
20,0
22,5
25,0
27,5
30,0
300
2,2
2,6
3,2
3,7
4,1
1,6
2,0
2,3
2,7
3,0
7,5
10,0
12,5
15,0
17,5
260
4,4
4,8
5,3
5,6
6,0
3,3
3,6
3,8
4,1
4,4
20,0
22,5
25,0
27,5
30,0
300
2,2
2,6
3,2
1,6
2,0
2,3
2,7
3,0
7,5
10,0
12,5
15,0
17,5
260
ST1 Free
standing or
block stacking
3,4
4,2
5,0
5,6
6,0
4,7
5,7
6,8
3,4
4,2
5,0
4,7
5,7
Note 1: The vertical distance from the floor to the sprinkler deflectors, minus 1m, or the highest value shown in the
table, whichever is the lower.
Note 2: Dry and alternate systems should be avoided on High Hazard storage especially with the more combustible
products (the higher categories) and the higher storage.
a
LPC Rules requirements Alternate systems are no longer permitted.
b
LPC Rules requirements Should it nonetheless be necessary to install a dry system, the area of operation
should be increased by 25%.
TB229.3.3
BS EN Table 5
Description of change:
Table TB229.T3 Design criteria for roof or ceiling sprinklers with in-rack sprinklers
(Replacing BS EN Table 5)
Storage
configuration
ST4 Palletized
racks
Area of
operation (wet
or pre-action
system(2))
m
Category II
Category III
Category IV
3,4
2,2
2,6
3,2
3,5
1,6
2,0
2,3
2,7
7,5
10,0
12,5
15,0
260
3,4
2,2
2,6
3,2
1,6
2,0
2,3
2,7
7,5
10,0
12,5
15,0
260
3,5
Design
density
mm/min
3,5
Note 1: The vertical distance from the highest level of in-rack sprinklers to the top of the storage.
Note 2: Dry and alternate systems should be avoided on High Hazard storage especially with the more combustible
products (the higher categories) and the higher storage.
a
LPC Rules requirement Should it nonetheless be necessary to install a dry system, the area of operation
shall be increased by 25%.
TB229.3.4
BS EN Clause 8.5.2
Description of changes:
TB229.3.5
BS EN Table 11
Description of change:
Table TB229.T4 Minimum effective capacity of reduced capacity tanks (Replacing BS EN Table 11 )
Hazard class
LH Wet or pre-action
Table TB229.T4 Minimum effective capacity of reduced capacity tanks (Replacing BS EN Table 11 )
Hazard class
10
20
30
50
70
but in no case less than 10% of the full capacity
LPC Rules Requirement:
2/3 of the value specified in BS EN Table 10 or
BS EN 9.3.2.3
or
the value specified in BS EN Table 10 or BS EN
9.3.2.3 less the infill flow rate, in l/min, multiplied by
0,09, whichever is the greater
See footnote(a)
TB229.3.6
BS EN Clause 9.6.4
Description of change:
a)
b)
the supply shall be capable of supplying the sum of the simultaneous maximum
calculated flows from each system. The flows shall be corrected up to the
pressure required by the most demanding system;
c)
the duration of the supply shall be no less than that required for the most
demanding system;
d)
duplicate pipe connections shall be installed between the water supplies and the
systems.
TB229.3.6
The sprinkler system pumps and water source shall be separate from any hydrant
system pumps and water source.
TB229.3.7
BS EN Table 17
Description of change:
Table TB229.T5 Maximum size of wet pipe and pre-action installations (Replacing BS EN Table 17)
Hazard class
LH
10 000m2
12 000m2
except as allowed in annexes D and F
9 000m2
9000m2
1 000 sprinklers
2 000 sprinklers
TB229.3.8
BS EN Clause 13.4.4
Description of change:
TB229.3.9
BS EN Clause 9.3.5
Description of change:
Clarification of Figure 4
Note. The drawings show the pipe end with a vortex inhibitor. Where a vortex inhibitor is
fitted depth measurements are taken from the underside of the upper flange. Horizontal
separation, from the wall is measured from the periphery of the vortex inhibitor to the
wall. When there is no vortex inhibitor depth measurements are taken from the lowest
edge of the pipe and horizontal separation from the wall is measured from the nearest
point on the pipe surface at the pipe end to the wall.
BS EN Clause 9.6.4, Figure 4, drawing 1 without sump.
Where:
A - Minimum dimension from the suction pipe to the low water level
B - Minimum dimension from the suction pipe to the bottom of the sump
d - Nominal diameter of the suction pipe.
N - Normal water level
X Low water level
effective capacity
TB229.3.10
BS EN Clause G.8.5
Description of change: