Material Approval
Submittal
(MAS Form)
Contract:
MAS Ref:
Location of use on
project:
Technical details:
BSI Kitemark License HDPE Pipes & Fittings according conforming to BS EN 1519
Standards
Attachments to support the materials submittal:
1
Compliance statement with Project Specifications, Remark Please refer to pages 001 011
QCS 2010, and Worley Parsons Specification
s:
2
Material Technical data sheet
Remark Please refer to pages 012 038
s:
4
Material Test Certificate
Remark Please refer to pages 039 069
s:
5
Previous approval of the proposed material from
Remark Please refer to pages 070 076
other projects
s:
6
Catalogue
Remark Please refer to pages 077 096
s:
7
Supplier local registration
Remark Please refer to pages 097 100
s:
8
Letter from the Manufacturer : Country of origin
Remark Please refer to pages 101 102
certificate
s:
9
Warranties / Guarantees
Remark Please refer to pages 103 104
s:
10
Storage, Transport & Handling requirements
Remark Please refer to pages 105 108
s:
11
Letter from the Manufacturer : Resistance to
Remark Please refer to pages 109 114
Chemicals
s:
12
Kitemark Certificate
Remark Please refer to pages 115 119
s:
13
Design Query from the Designer
Remark Please refer to pages 120 121
s:
14
Employers Approval on the Pre-Qualification
Remark Please refer to pages 122 124
s:
15
ISO Certificates
Remark Please refer to pages 125 127
s:
Disclaimer
We understand that approval of the material(s) submitted herein is only intended to determine general
conformance with the intent of the project contract documents. By submitting these materials for approval,
we confirm we have performed all necessary on-site dimensional and building utility requirement
NPP00100-ACM-PRO-1201-MAS
Revision 0 24 March 2014
Page 1 of 2
Material Approval
Submittal
(MAS Form)
coordination, and if approval is granted, will further coordinate the information contained within with all
other concerned contractors employed by the NPPSC.
Action:
Prepare
d by /
Submitt
ed by:
Checke
d by:
Reviewe
d by:
Name:
Amjad
Rawashd
eh
MEP
Project
Manager
Muhame
d
Mustafa
Technical
Manager
Glisson
George
QA/QC
Manager
27.04.201
6
27.04.201
6
27.04.201
6
Reviewe
d&
Approve
d by
Design
Consulta
nt:
Design
Consultant stamp
Approve
d by:
Company
stamp
Alain
Zailah
Project
Director
Signat
ure:
Date:
Status B
(reviewed as noted)
Status C
Status D
(cancelled)
(insert CSRC reference that refers to the details of the review outcome)
Reviewed by:
Date returned
to Contractor:
NPP00100-ACM-PRO-1201-MAS
Revision 0 24 March 2014
Signat
ure:
Dat
e:
Copies
distributed to:
Page 2 of 2