You are on page 1of 257

SOLUTIONS FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

LETTER OF THE CHAIRMAN

At ECISGROUP we believe in the continual improvement of our performance


and in customer satisfaction.

Our vision is to become the market leader by providing Engineered Systems to


the Oil&Gas upstream and downstream, Petrochemical and Power Generation
Industries to enhance their performance, productivity and efficiency.

Our facilities in the Milan area, at the heart of Italy’s Industrial district, are
equipped with the newest and most sophisticated devices for complete design,
fabrication and in house testing.

Our staff are all well qualified, experienced and trained to perform at the
best level, according to customers requirements and to all the international
standards and codes.

We are committed to our Health, Safety, Environmental and Quality Systems,


which are certified by International standards and applied effectively through
all levels of our organization, thus ensuring a top level performance.

At ECISGROUP we take care to meet all our customers’ requirements, aiming


at their complete satisfaction.

We consider customers as our strength and our employees as assets, hence


obtaining an increasing level of performance and a renowned name.

Fortunato Branda
SOLUTIONS FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

YOUR GOBAL PARTNER FOR OIL&GAS, POWER AND


PETROCHEMICAL SOLUTIONS

ECISGROUP, having almost half- of - a-century worldwide experience, is special-


ized in supplying “Turn Key Engineered Solutions” for Oil&Gas, Petrochemical and
Power plants.
Our highly qualified team can meet customers’ requirements in an excellent way
supplying you with Engineering Procurement and Construction in conformy with
the International Quality ISO 9001: 2000, Health and Safety standards as well as
with the Environment Protection requirements.
We also assist our clients with commissioning, training, start-up and after sales
services for all the equipments we supply.

ECISGROUP its is structured in three business units:

MULTIDISCIPLINARY ENGINEERING DIVISION


This division is specialized in engineering consulting services for instrumentation,
process control, automation and telecommunications. It provides hardware and
software for supervisory systems (SCADA), DCS and PLC systems, Emergency
Shut Down (ESD) systems, Burner Management Systems (BMS), Fire and Gas
(F&G) and Safety PLC (TÜV certified systems)

PROCUREMENT
Specialized services like: PROCUREMENT ENGINEERING, PICKING AND PACKING,
LOGISTIC.
The search for and procurement of materials is made both on the domestic and
international markets through a network of ISO certified suppliers.

CONSTRUCTION
Our excellence is to supply Turn Key systems such as: Analyzer Shelter, CEMS,
Sampling Point, Pneumatic Hydraulic -Wellhead Control Panel, Fuel Gas System
(ESD, Filtering Skid, Gas Heater Skid, Gas Reduction Skid, Dehydration, Gas Meter-
ing Skid, Gas Analysis), Chemical Injection Skid, Corrosion Inhibitor Package, N2
Production Skid, Membrane and PSA Early Production Facilities (Well Test Pro-
duction, I°and II° Test Separator, Oil Stabilizer, Slug Catcher).
Thanks to the flexible and interacting structure and to the continuous exchange
of information inside the company, we can handle projects from concept to com-
pletion with a total responsibility covering all the various phases of a project from
basic to detailed engineering, Turn Key supply, training and after sale services.

ECISGROUP is a 360° solution for the development of your Oil&Gas, Power and
Petrochemical projects.

We are where you are.

Yours Faithfully,

ECISGROUP S.p.A.
Fortunato Branda
CE O
COMPANY PROFILE
Since 1980 CHEMIT has developed customized solutions and specialized
services like Concurrent Engineering, Procurement Engineering, Picking
& Packing and Logistics & Customer Care. CHEMIT Business Unit supplies High
Quality products such as: Instrument Mechanical Bulk Materials, Electrical Bulk
Materials for hazardous areas, Instrument Valves for severe service, Piping Valves
& Flanges Saving Solutions.

Since 1990 ECIS has provided tailor-made engineered solutions from


early production up to installation, commissioning and start-up, after
sales services and maintenance.
Our excellence is supplying turn-key solutions such as: Analyzer Shelters,
Environmental Monitoring Systems (CEMS); Sampling systems; Pneumo - Electro-
Hydraulic Wellhead Control Panels; Fuel Gas Systems: Intel ESD - Initial Filters -
Metering - Reduction - Final Filters - Outlet ESD, Gas Fired Reboiler.
Chemicals Injection Skids: DI-Ethylene Glycol (DEG), TRI-Ethylene Glycol (TEG) Skid,
N Production Skids: Membrane & PSA, Early Production, I° and II° Test Separator,
Oil Stabilizer, Slug Catcher.

Since 1999 E&C has provided consulting services for Instrumentation,


Automation, Electrical and Telecommunication engineering.
Recently E&C has added the Process and Piping engineering thus becoming a
Multidisciplinary Engineering Business Unit. E&C supplies Hardware and software
for supervisory systems (SCADA), DCS and PLC Systems, Emergency Shut Down
(ESD) Systems Burner Management Systems (BMS), Fire and Gas (F&G) and
Safety PLC (TÜV certified systems).

In 2007, after several years of cooperation between CHEMIT, ECIS and


E&C and a commonly shared business experience at international level,
the Management decided to accept a new challenge for the developing market:
to incorporate the three companies in a new holding structure, under the name
ECISGROUP. The group combines the human resources and professional skills
of all three ISO UNI EN 9001:2000 certified Business Units. Our supply covers
a wide range of products and services for the Oil&Gas (Onshore and Offshore),
Petrochemical and Energy Markets ensuring maximum Customer satisfaction
and high technological standards.

In 2008, another goal was achieved: ECISGROUP has changed its legal
status into ECISGROUP S.p.A. - a private Company Limited by Shares.
As our group is a dynamic one, a new target has been set: internationalization,
focusing on the GCC countries, Mediterranean area and Eurasia. Our group’s
continuous development has led us into being the ideal Global Partner of
Engineering, Procurement and Construction for the Oil&Gas, Petrochemical and
Energy plants.
MULTIDISCIPLINARY
ENGINEERING DIVISION
For over 20 years, ECISGROUP Engineering Division has provided Customers
with qualified engineering services and has powered the development of advanced
technology solutions in Control & Safety Systems, Instrumentation, Process Simu-
lation, Multivariable Control and Optimization Technologies for plant management.

Along with the group’s increasing needs, ECISGROUP Engineering Division with the
implementation of Electrical, Process and Piping engineering depts., has grown
to become a full Multidisciplinary Engineering Business Unit with over 125.000
Man-Hours/Year Multidisciplinary Engineering Staff

MECHANICAL
PROCESS 13%
14%
CIVIL
7%

AUTOMATION
17%
INSTRUMENTATION
19%

ELECTRICAL TELECOMMUNICATION
25% 5%
PROCESS ENGINEERING
ACTIVITIES DESCRIPTION:
• Feasibility study (i.e. process debottlenecking, yield improvement, energy
savings, etc)
• Development of Process Design Packages (PDP) and Front End Design
Engineering
• Process simulations
• Development of Material and Energy Balances, Process Flow Sheets, P&ID’s
• Process Equipment Sizing, Preparation of Equipment Data Sheets, Item Lists,
Duty/Supply specifications
• Process Control and Emergency Shut Down philosophies
• Selection and Development of Advanced and Complex Controls, Multivariable
Process Controls, process optimization applications
• Auxiliary engineering systems, utilities, blowdown networks, flareS, off-sites
• Plant Operating Manuals Development relative to Licensors’ Operating
Guidelines
• End User Field support (Operators’ Training, Troubleshooting)

TOOLS OF DEVELOPMENT FOR PROCESS ENGINEERING:


• Simulation: Hysys, PRO II
• Heat Transfer Equipment sizing: TASC, HTRI
• Specialized Calculation Spreadsheets for systems / equipment sizing
MECHANICAL & PIPING ENGINEERING
ACTIVITIES DESCRIPTION:
• General arrangement study
• Equipment layout with plans and sections
• P&I
• Line list
• General plot plans
• Key plans
• Layout in the plant area
• Layout outside the plant area
• Isometric drawings
• Pipe and/or fittings of particular making, with material list
• Stress analysis
• Auxiliary piping support design, support list, material support list
• Steam trap specifications and relevant material list
• Nozzle orientation and elevation
• Ladders and walkways construction design and relevant material list
• General plan specification for equipment (compressor, pump, turbine,
skip hoist, wagon, bridge etc.)
• Equipment list

TOOLS OF DEVELOPMENT FOR MECHANICAL


AND PIPING ENGINEERING:
• Microstation
• Autocad
• Pds
CIVIL ENGINEERING
ACTIVITIES DESCRIPTION:
• Road plot plan and detailed design using Customer’s standard where necessary
• Foundations (tunnel, sewerage etc.) plot plan and detailed design using
Customer’s standard where necessary
• General plot plan of foundation
• Detailed plan foundation
• One line diagram of building and metallic structure pipe racks, framework
device, etc.
• Offers of detailed drawing for average and light steel structures (ladders,
walkways, platform, etc.) where not contemplated by Customer’s standard
• Basic design for reinforced concrete work with static and dynamic stress
• Construction drawing for reinforced concrete work
• Approximate building project (plans, sections, front elevation etc..) with
approximate metric computation for contracts
• Executive design and construction plan of all reinforced concrete and other
buildings
• Executive design of reinforced concrete foundation plinth, single - line diagram
of steel building and executive plan for civil work for completion of steel buildings
• Executive plan of usual and special paving, antacid covering with technical
specification
• Executive design for heating and air conditioning plants, sanitary facilities,
electrical installations, false ceiling etc for the complete realization of work
• Material purchase note for civil work, not covered by Customer’s price list with
possible specifications
• Preliminary metric computation execution for contract purposes and final for
each civil works of the plan covered by Customer’s price list
• Preliminary and final material list with relevant estimation in compliance with
Customer’s price list
• Static control (not geometric) and possible calculation check of the documents
developed by Vendors
• General plot plan with indication of all the civil works
• Document to be enclosed with documentation subset to competent Authorities
authorization
TOOLS OF DEVELOPMENT FOR CIVIL ACTIVITIES:
• Autocad
• Microstation
• Sap 2000
• Primus
INSTRUMENTATION &
ANALYSIS ENGINEERING
INSTRUMENTATION:
• Project instrumentation general standards including plant packages
• P&ID’s detailed itemization by means of ISA/ANSI standard symbols or Client
standard
• Instrumentation specification development based on process data
• Material Requisition /Supply Specification/ Purchase Order preparation
• Vendor Offer technical alignment; economical alignment and purchase if required
• Instrumentation vendors follow up: documentation check/comment/approval,
instrumentation test

INSTRUMENT FIELD INSTALLATION AND MOUNTING:


• Electrical/instrumentation interconnection signals table
• Overall instrumentation electrical power supply engineering
• Marshalling & Control cabinets design
• Interconnection design, safety grounding design for control cabinets and
instrumentation devices
• Typical drawings for electrical installation, process installation, pneumatic
installation
• Field /control room electrical connection schemes
• Single wire loop diagrams and Two–wire loop diagram
• Cable and Multicore cable list. Cable coils schedule
• Instrument and Junction Box positioning layout
• Instrument air distribution layout

ANALYSIS ENGINEERING:
• Analyser House dimensional study drawings with analysers, power, interlock,
HVAC cabinets, Material Requisition, Bid evaluation
• Gas Chromatographs and process analysers specification and data sheet.
• Primary and secondary sampling system with fast loops design and drawing for
gas chromatograph and continuous analysers
• Analyser vendors follow up, Factory Acceptance Test (FAT)

TOOLS OF DEVELOPMENT FOR INSTRUMENTATION &


ANALYSIS ENGINEERING:
• InTools, Excel, Autocad, Microstation
TELECOMMUNICATIONS ENGINEERING
DESCRIPTION OF ACTIVITIES:
• Definition of the general requirements of the telecommunication systems;
definition of basic design criteria
• Estimate of quantities and costs of materials to be purchased and installed
• Project programming and planning activity, review of the project time schedule,
of materials supply and of identification of the critical items
• Definition of the project vendor list
• Definition of general inspection and testing criteria
• Definition of the information required and development of technical specifications
for telecommunication systems
• Definition of the positioning of the main equipment (e.g. telephone exchanges,
transmission equipment, PA/GA systems, etc.)
• Definition of the main routes of the telecommunication cables
• Preparation of documents for purchasing and inspection
• Issue of material requisitions
• Issue of the technical assessment of bids
• Review of suppliers’ documentation
• Preparation of installation drawings (“For Construction”)
• Preparation of the necessary documents for contracting the erection works
• Project activities close-out

TOOLS OF DEVELOPMENT FOR


TELECOMMUNICATION ENGINEERING:
• Autocad, Microstation
• Calculation Spread-Sheets
ELECTRICAL ENGINEERING
DESCRIPTION OF ACTIVITIES:
• System analysis study and calculations for Load Flow, Short Circuit, Cable
Sizing, Protection Coordination, Earthing and Lightning protection, Lighting system
• General Electrical design Specification, Earthing and lightning specifications
• Electrical general single line diagrams, protection and metering system
diagrams
• Single line diagrams for high voltage (HV) switchyards, and medium (MV) and
low voltage (LV) Switchboard Single line diagrams for:
• Logic and schematic control diagrams for switchyards and switchboards
• Data sheets and Material requisitions (MR) for HV switchyards MV and
LV switchboards, Motor Control Centers (MCC), auxiliary distribution boards,
Emergency Diesel Generator Set, Uninterruptible Power Supply (UPS) systems
• Switchyard and substation Layouts
• Cable routing, power and distribution layouts
• Lighting layouts and distribution
• Cable sizing specification and MR
• Earthing system layout and distribution
• Specifications and MR for field power devices, lighting fixtures and distribution
boards, earthing and bulk materials
• Electrical Power, earthing and lighting installation details
• Electrical equipment purchasing development, technical tabulations and
evaluation
• Electrical equipment vendor follow-up and Factory Acceptance Test (FAT)
• Electrical erection specification, Site Acceptance Tests (SAT) specification and
recording forms

TOOLS OF DEVELOPMENT FOR ELECTRICAL ENGINEERING:


• Electrical Systems calculation and sizing: ETAP
• Specialised Calculation Spreadsheets
• Autocad, Microstation
AUTOMATION &
ADVANCED PROCESS CONTROL
DESCRIPTION OF ACTIVITIES:
• Development of General Design Specification for plant automation systems:
DCS (conventional architecture, Profibus, Fieldbus), ESD/protection systems,
process equipment monitoring systems (VMS, BMS), local control stations/
panels
• Control and ESD systems technical evaluation and specification for bid enquiry
• Technical evaluation and alignment Vendor quotations. Interfacing with Vendors
• Automation Design activities:
A ESD protection systems for plant and equipment/machine
- ESD narratives
- Cause and Effect matrix development
- ESD logic diagrams
- ESD integration with protection and monitoring sub systems (e.g. VMS, BMS)
- ESD systems functional safety and SIL evaluation
A Control Systems
- Plant regulatory controls functional specification and relevant requirements
- “Control loop narratives” for complex control logic
- Control system integration with sub-systems and package control systems
A System Engineering
- System I/O Database (ESD, DCS,etc). Loop diagram development
- Database of serial/LAN connections between sub-systems & packages
- Man–Machine interface (MMI) development, graphic pages, reports
- Two Wire Loop Diagram
• Advanced and Multi - Variable Model Based Predictive Control process
control engineering
• Real Time Optimization applications for plants, process units and sections.
• Plant Information Systems engineering

TOOLS OF DEVELOPMENT FOR AUTOMATION ENGINEERING:


• Autocad, Microstation
• Access
• Calculation Spread-Sheets
CONTROL & SAFETY
SYSTEM DIVISION
For over 20 years, the CONTROL & SAFETY SYSTEM Division of ECISGROUP
has supplied Customers with qualified project management for systems,
complete from design and development through to FAT, SAT and start-up,
followed by training, documentation and after-sales support.
The Control & Safety System Division of ECISGROUP is a business unit with
capability to integrate, configure and commission safety and process control
applications. With more than 130,000 I/O delivered and 75 systems covered
by a maintenance program with 24hr call-out for emergency intervention, we
develop:

- Project management
- Safety applications - design & construction
- Process control applications - design & construction
- System migration & revamping
- System integration
- On call maintenance programs (24hr call-out)

Our experience is the guarantee of a successful project maximizing efficiency


and reliability.

Process: DCS - PLC - SCADA - RTU - BOP - BMS - HVAC



Safety: ESD - SIS - F&G - BPS - ICSS - HIPPS

M A I N B U S I N E S S A R E A S

OIL&GAS PETROCHEMICAL POWER PHARMACEUTICAL WATER TREATMENT

35% 33% 22% 6% 4%


PROJECT MANAGEMENT
TYPICAL ACTIVITIES:
- Project progress and cost control
- Resource workload and activities plan definition
- Coordination with procurement group for purchase of equipment
and material
- Coordination with customer for clear understanding of project requirements
- FAT supervision

Man
hours/year
INVENSYS I/A 9.000
EMERSON (DELTAV + OVATION) 6.000
MOORE 3.000
YOKOGAWA 3.000
HONEYWELL 2.000
ABB (AC800 + TENORE) 2.000
L&N - ALSTOM 2.000

HIMA 9.000
SIEMENS 8.000
TRICONEX 7.000
GE 7.000
SCHNEIDER 5.000
RTP 4.000
A&B 2.000

F&G SYSTEMS (NOTIFIER/GM/ ...) 5.000

WIN CC 6.000
WITZCON 5.000
CITEC 5.000
iFIX 4.000
WONDERWARE/INTOUCH 3.000

OPC - IEC870 - F.BUS - P.BUS 4.000


TOOLS OF DEVELOPMENT FOR PROJECT MANAGEMENT:
- Gantt chart
- Network diagram
- Calculation spread sheets

PROCESS CONTROL APPLICATIONS


DESIGN & CONSTRUCTION
ECISGROUP has hundreds of man-years experience in the design and
construction of control systems. Although specific specialization has been in
projects for power stations and oil and gas processing plant, including refineries
and oil well equipment, ECISGROUP has attained deep understanding of the
software and hardware of all major manufacturers, giving the company the
knowledge and versatility for any project in the automation field.

TYPICAL ACTIVITIES:
- System architecture and functional design specification development
- System interconnection and cable list definition
- Typical wiring, I/O assignment and loop wiring development
- Power consumption and heat dissipation calculation
- Hardware design, engineering drawing and construction
A Power distribution panels
A Interposing relay panels
A System & marshalling cabinets
- Software development and implementation
A Engineering control specification review
A Simple and complex control loops
A Sequential logic
- Man-machine interface, graphic and reports development
- Alarm system and sequence of event implementation
- Communication gateway development
- Multivariable Control Systems and Real Time Optimization
- Third party systems integration into central control solution
- Custom programming in Visual Basic, C, Excel and Access
- Control network design and implementation
- Operator manual and training documentation development
- FAT, SAT, commissioning and start-up

TOOLS OF DEVELOPMENT FOR PROCESS CONTROL APPLICATIONS:


- AutoCAD/Access/Calculation spread - sheets

HMI SOFTWARE SUPPLIERS:


- Citect/Cimplicity/I - Fix/Win CC/Wonderware/Wizcon

COMMUNICATION PROTOCOLS FOR SYSTEM INTEGRATION:


- OPC/Foundation Fieldbus/Profibus/Modbus

SAFETY APPLICATIONS DESIGN


& CONSTRUCTION
ECISGROUP has been a major supplier of SIL certified safety systems for the
power industry and oil and gas industries for over 10 years. The company has
qualified personnel in this discipline.The management took the decision to
follow a program to certify the company for Functional Safety Management
that has been verified by TÜV.

TYPICAL ACTIVITIES:
- HAZOP analysis, LOPA analysis
- System safety analysis and calculations for SIL conformity
- ESD (Emergency Shut Down), F&G (Fire and Gas), BPS (Boiler Protection
Systems), ICSS (Integrated Control and Safety Systems), and HIPPS (High
Integrity Pressure Protection Systems)
- System architecture and functional design specification development.
- Hardware design, engineering drawing and construction
A Typical wiring, I/O assignment and loop wiring development
A Power distribution panels
A Local control panels
A Auxiliary consoles
A System & marshalling cabinets
A Power consumption and heat dissipation calculation
- Software development and implementation
A Engineering safety specification review
A Safety logic implementation
A First - out logic development
A Cause & effect tables
- Integration with DCS/ICSS
- HIPPS systems
- FAT, SAT, commissioning and start-up
- System certification for SIL

TOOLS OF DEVELOPMENT FOR SAFETY APPLICATIONS:


- AutoCAD / Access / Calculation spread-sheets

SUPPLIER OF IEC 61511 & IEC 61508 CERTIFIED SYSTEMS:


NETWORK SYSTEM INTEGRATION
Universal standards such as OPC, Ethernet and Modbus have made system
integration between products of different suppliers much easier than in the
past. Now the customer can select the most suitable equipment for his ap-
plication regardless of existing equipment to which it must be interfaced.
Nevertheless, the integration should be performed by experts if the end result
is to be practical and reliable.

Today’s plants require a common interface for DCS, ESD, F&G and SCADA
systems that enable complex plant to be managed safely with a minimum
number of operators, assisted with the right tools and expert programming to
ensure that the information is filtered to give the priority to the most urgent
tasks without omitting the details that enable the production to be optimize
efficiently.

The choice of a competent system integrator with experience in multiple


systems and disciplines is the customer’s guarantee that the work will be
completed efficiently, in good time, and the finished system will be reliable in use
for many years of successful operation without the loss of data or production
time.

While having particular expertise in the Oil&Gas and Power sectors,


ECISGROUP has experienced hardware, software and safety system engineers
that are equipped to tackle the most diverse projects in any process industry.
The ECISGROUP premises, on the outskirts of Milan, has an ample staging
area for the combined IFAT (Integrated Factory Acceptance Test) with excellent
facilities.

TYPICAL ACTIVITIES:
- Third party systems integration into central control solution
- Custom programming in Visual Basic, C, Excel and Access
- Control network design and implementation
- Man - machine interface, graphic and reports development
- Alarm system and sequence of event implementation
- Communication gateway development
- Operator manual and training documentation development

TOOLS OF DEVELOPMENT FOR SYSTEM INTEGRATION:


- AutoCAD / Access / Calculation spread - sheets

COMMUNICATION PROTOCOLS FOR SYSTEM INTEGRATION:

- OPC - Modbus
- Fieldbus - GSM for GE Mark VI
- Profibus - IEC 60870 - 5 - 104
SYSTEM MIGRATION & REVAMPING
Although the design of new plant continues to be an important sector of work,
there is a growing market for the revamping of older plant.
Many sites are still using control systems that are over 20 years old, and for
which spare parts are becoming costly or unobtainable.
These older systems are often unable to cope with the extra demands of
modern management systems that requires detailed production data in real
time, or the enhanced level of safety and reliability demanded by current
standards. Revamping of existing systems requires extensive planning, based
on acquired experience, to ensure that plant production is maintained during
the changeover or that downtime is minimized by completing the site activities
for the changeover during routine maintenance shutdowns.

TYPICAL ACTIVITIES:
- Reverse engineering - recovering all plant control data and logics from
existing systems. This ensures that the new system will have identical
characteristics and the plant will operate from day 1 without
need for retuning control loops or adjusting processes setpoints, timings
or alarm points etc.
- Existing control process and safety system upgrade
- System migration into new technological platforms
- FAT, SAT, commissioning and start-up
MAINTENANCE SERVICES
ECISGROUP has, from the beginning, offered a complete after-sales service
and assistance for systems delivered. The company also offers its services
and experience for multiple platforms for service contracts for all automation
equipment.

ECISGROUP runs a 24hour a day service, every day of the year for critical
plant that requires round - the - clock support.
Modern equipment is very reliable, and built in redundancy can guarantee
plant operation even when there are multiple equipment failures. However, to
maintain this level of availability, regular maintenance is required to check that
redundant units are all working and that the any faulty units are replaced in
good time, as well as ensuring that the systems are kept clean and protective
systems are in good working order.
Good maintenance can also prolong the working the working life of older
equipment.

Manufacturers will promote the upgrade and replacement of obsolete systems


and not without reason. New systems offer greater speed and reliability and
more facilities for the operators. However, when the process equipment is
also aging, the market for the end product is diminishing or the raw material
becoming scarce, it is not economic to close down the plant for a revamping.
Even older electronic equipment has been shown to be very serviceable and
reliable when treated correctly, and well maintained.
ECISGROUP is successfully maintaining systems that are over 20 years old
and the reliability has dramatically improved with regular maintenance visits.
At the end of the day, when the unit finally breaks down and there are no
more spare parts available, the unit can be replaced promptly, with limited
expenditure, with modern equipment that operates in parallel with the legacy
equipment until the plant is decommissioned.
TYPICAL ACTIVITIES:
- On-call availability 24h/day & 365days/year.
- Spare parts stock available in our headquarters.
- Exchange repair solution contracts
- Remote control diagnostic and on-call assistance.

TOOLS OF DEVELOPMENT FOR


ON -CALL MAINTENANCE PROGRAM
- Development software for Citect, Emerson, Foxboro, GE, Fanuc, HIMA,
Rockwell, RTP, Schneider, Siemens, Siemens - Moore, Triconex, Wizcon,
Wonderware.
CONTROL &
SAFETY SYSTEM
DIVISION
References
R EFERENCES: AUTOMATION DIVISION

CUSTOMER END USER PROJECT DESCRIPTION YEAR

IES MANTOVA 2009


SUPPLY OF NEW DCS, ESD CERTIFIED TÜV SIL.3 IEC
REFINERY,
61508 (SRU3 - TGCU) 2010
ITALY

TURKEMBASHI TURKEMBASHI 2009


SUPPLY OF NEW DCS, ESD CERTIFIED TÜV SIL.3 IEC
REFINERY REFINERY,
61508 (SRU3 - TGCU) 2010
TURKMENISTAN

KT - MODERNIZATION 2007
PROGRAM, 7 COMPRESSOR CONTROL & MONITORING SYSTEMS 2008
MAZEIKIAI 2009

AIRUP ACS/
INSTRUMENT 2007
MARSHALLING CABINETS AND ESMS PB & LAMP
RELIABILITY UPGRADE 2008
PANELS
PROJECT, 2009
BELGIUM
ESSO BELGIE NV
GISSI/SCANDALE/
MODUGNO SUPPLY, INSTALLATION AND 2007
SORGENIA COMBINED POWER COMMISSIONING OF 2008
PLANT, N°6 ESD SYSTEM SIL.3 IEC 61508 2009
ITALY

IES MANTOVA 2007


REFINERY, DCS & BMS SYSTEMS FOR REFINERY POWER STATION 2008
ITALY 2009

FUSINA (VE)
SUPPLY, INSTALLATION AND
THERMOELECTRIC
COMMISSIONING OF 2009
POWER PLANT
N°2 ESD SYSTEM SIL.3 IEC 61508
ITALY

EGYPT, COMBINED SUPPLY, INSTALLATION COMMISSIONING &


EL KUREIMATH 2008
POWER PLANT START - UP OF BOP PLC SYSTEM

CIMIMONTUBI

BULLDOZING OPERATION:
IES MANTOVA
REVAMPING OF OBSOLETE CONTROL SYSTEM -
REFINERY, 2008
SUPPLY OF NEW DCS, ESD CERTIFIED TUV SIL.3 IEC
ITALY
61508 (WHITE AREA)

TEVEROLA POWER 2007


DCS, ESD, SYSTEM SUPPLY - ENGINEERING,
PLANT,
COMMISSIONING & START - UP 2008
ITALY

OFF SHORE PLATFORM


BARBARA C/G/H/T/T2, REVAMPING AND SUPPLY OF SCADA SYSTEM 2007
ITALY
ENI E&P ENI E&P

EGYPT, COMBINED SUPPLY, INSTALLATION COMMISSIONING &


CEPC / CAIRO NORTH 2006
POWER PLANT START - UP OF BOP PLC SYSTEM

CIMIMONTUBI
R EFERENCES: AUTOMATION DIVISION

CUSTOMER END USER PROJECT DESCRIPTION YEAR

COMBINED CYCLE
ESD SYSTEMS & DCS OVATION SW IMPLEMENTATION,
PLANT 2006
COMBINED CYCLE PLANT, FERRARA
FERRARA

LOMELLINA POWER
PLANT, INSTALLATION AND COMMISSIONING OF DCS SYSTEM 2006
ITALY

POWER PLANT INSTALLATION AND COMMISSIONING


2006
HEATING OF DCS SYSTEM
CREMONA

TERMINI IMERESE,
SUPPLY, INSTALLATION AND
COMBINED POWER
COMMISSIONING OF 2006
PLANT
N°1 ESD SYSTEM SIL.3 IEC 61508
ITALY

BAPCO BAHRAIN DESULPHURIZATION PLANT - ESD INTEGRATION 2006

INCINERATOR,
MODIFICATION ON DCS SYSTEM YOKOGAWA 2005
ITALY

LEGNANO

AUGUSTA REFINERY,
PRESSURIZATED LOCAL PANELS 2005
ITALY

RECEIVING GAS 2003


GREENSTREAM B.V. DCS, ESD (TUV SIL.3 IEC 61508), FIRE & GAS
TERMINAL GELA, 2004
SYSTEMAND FIELD EQUIPMENT
ITALY 2005
GAS & POWER

POWER PLANT
SULCIS CAGLIARI, SYSTEM SUPPLY ENGINEERING & COMMISSIONING 2004
ITALY

POWER PLANT
MYCRO MOORE TECHNICAL ASSISTANCE 2004
HEATING
CREMONA

TRECATE REFINERY,
PRESSURIZATED LOCAL PANELS 2004
ITALY

SESTO S.G. POWER COMMISSIONING AND START - UP


PLANT ON ABB DCS CONFIGURATION 2003
ITALY AND F.A.T.
R EFERENCES: AUTOMATION DIVISION

CUSTOMER END USER PROJECT DESCRIPTION YEAR

PIETRAFITTA
THERMOELECTRIC DCS, ESD, F&GAS SYSTEM SUPPLY - ENGINEERING, 2002
POWER PLANT, COMMISSIONING & START - UP 2003
ITALY

TERMINI IMERESE,
SUPPLY, INSTALLATION AND
COMBINED
COMMISSIONING OF 2002
POWER PLANT
N°1 ESD SYSTEM SIL.3 IEC 61508
ITALY

THERMOELECTRIC
POWER PLANT -
SUPPLY, INSTALLATION AND
MANTOVA,
COMMISSIONING OF 2002
BRINDISI, RAVENNA,
N°14 ESD SYSTEM SIL.3 IEC 61508
FERRERA E.,
ITALY

OSTIGLIA
SUPPLY, INSTALLATION AND
THERMOELECTRIC
COMMISSIONING OF 2002
POWER PLANT,
N°2 ESD SYSTEM SIL.3 IEC 61508
ITALY

TARANTO - STEP
CONFIGURATION, INTEGRATION, COMMISSIONING
# 1 & 2, 2002
DCS + ESD CERTIFIED TUV SIL 3 IEC 61508
ITALY

PLATFORM OFF SHORE SUPPLY, CONFIGURATION AND COMMISSIONING FOR


DAVIDE 7, F&G + ESD INTEGRATED SYSTEM CERTIFIED SIL.3 IEC 2002
ITALY 61508
ENI E&P
PORTO CORSINI
THERMO ELECTRIC SUPPLY, INSTALLATION AND
POWER PLANT GR3, COMMISSIONING OF 2001
GR4 , N°2 ESD SYSTEM SIL.3 IEC 61508
ITALY

LA CASELLA THERMO SUPPLY, CONFIGURATION AND


ELECTRIC POWER COMMISSIONING OF N° 4 PLANT
2001
PLANT GR.1, GR.2, EMERGENCY SHUT DOWN
GR.3, GR4, (S.E.P. SYSTEMS) CERTIFIED TUV CL6

INCINERATOR, SUPPLY, CONFIGURATION INSTALLATION AND 2000


ITALY COMMISSIONING OF DCS/ESD/BMS 2001

CCT

Sharjah Electricity and LAYYAH POWER


Water Authority PLANT SHARJAH, BOILER PROTECTION AND BMS CERTIFIED TÜV 2000
Complex Al Layyah Area UAE

PACOL PEP DETAL


CONDEA SUPPLY, INSTALLATION AND COMMISSIONING OF
AUGUSTA, 2000
N°1 ESD SYSTEM SIL.3 IEC 61508
ITALY

AGUSTA HEAT
CONDEA SUPPLY, INSTALLATION AND COMMISSIONING OF
RECOVER SYSTEM, 2000
N°1 ESD SYSTEM SIL.3 IEC 61508
ITALY
R EFERENCES: AUTOMATION DIVISION

CUSTOMER END USER PROJECT DESCRIPTION YEAR

ORTONA, EMILIO SUPPLY, CONFIGURATION AND COMMISSIONING FOR


PLATFORM, F&G + ESD INTEGRATED SYSTEM CERTIFIED SIL.3 IEC 2000
ITALY 61508

RAVENNA / OFF-SHORE SUPPLY, CONFIGURATION AND COMMISSIONING FOR


ENI E&P BARBARA T2, F&G + ESD INTEGRATED SYSTEM CERTIFIED SIL.3 IEC 2000
ITALY 61508

RAVENNA, ANNALISA,
INTERMARE SARDA SUPPLY, CONFIGURATION AND COMMISSIONING
OFF-SHORE, 1999
FOR FIRE, AND GAS MONITORING SYSTEM
ITALY

CLARA COMPLEX PROJECT


ROSETTI MARINO (OFF SHORE PLATFORM SUPPLY, INSTALLATION AND COMMISSIONING OF
INTERMARE SARDA CALPURNIA, CLARA EST, N° 3 ESD SYSTEM SIL. 3 IEC 61508 + RTU 1999
SASP OFF - SHORE CLARA NORD), INTEGRATED
ITALY
ENI E&P
ENGINEERING
DIVISION
References
R EFERENCES: ENGINEERING DIVISION

CUSTOMER END USER PROJECT DESCRIPTION YEAR

RIZZICONI POWER
ANSALDO ENERGIA PLANT ELECTRICAL ENGINEERING 2007/2008
ITALY

AB MAZEIKIU NAFTA FIELD INSTRUMENTATION AND AUTOMATION


FOSTER WHEELER
- OIL REFINERY ENGINEERING ACTIVITIES AT REFINERY SITE AND 2007/2008
ITALIANA
LITHUANIA HOME OFFICES

EBOCHA OIL & GAS SECONDMENT OF 1 PROCESS ENGINEER TO HELP IN


SAIPEM ENERGY
PLANT FEED ACTIVITIES FOR THE UPGRADING OF 1 OIL/GAS 2007/2008
SERVICES
NIGERIA SEPARATION AND GAS COMPRESSION STATION

DETAILED PROCESS SIMULATION AND FUNCTIONAL


SAMBURGSKY
REVIEW OF AN EXISTING OIL/GAS SEPAR + TREATM
SAIPEM ENERGY NATURAL
CENTRE, INSTRUMENTATION AND TELECOM SYSTEMS 2007/2008
SERVICES GAS PLANT
ASSESMENT INCLUDING TECHNICAL VIABILITY
RUSSIA
ASSESSMENT REPORT TO MGMT

BOROUGE
TECNIMONT 2 EXPANSIO PROJECT COMPLETE PLANT ANALYSIS SYSTEM ENGINEERING 2007/2008
SAUDI ARABIA

AL WAHA PDH/PP
DCS, ESD, F&G, TELECOM ENGINEERING.
TECNIMONT PROJECT AL JUBAIL 2007/2008
ASSISTANCE TO FAT
SAUDI ARABIA

ANALYSER SYSTEMS F&G TELECOM SYSTEMS


AROMATICS PLANT
TECNIMONT EVALUATION, VENDOR F.UP, FAT 2007/2008
KUWAIT
INSTRUMENTATION ENGINEERING

HDPE - NAO
TECNIMONT MESAIEED EPC - INSTRUMENTATION DETAILED ENGINEERING 2007/2008
QATAR

EXXONMOBIL - DETAILED UTOMATION SYSTEM ENGINEERING


FOSTER WHEELER
ANTWERP ACTIVITIES, REFINERY-WIDE ADVANCED CONTROL 2005/2009
ITALIANA
BELGIUM REVAMPING ACTVITIES C/O SITE

RIVA DEL GARDA


ABB ENERGY
POWER PLANT - ELECTRICAL ENGINEERING 2008
AUTOMATION
ITALY

APRILIA POWER
ANSALDO ENERGIA PLANT ELECTRICAL ENGINEERING 2008
ITALY

LIVADIA POWER
ANSALDO ENERGIA PLANT ELECTRICAL ENGINEERING 2008
GRECIA
R EFERENCES: ENGINEERING DIVISION

CUSTOMER END USER PROJECT DESCRIPTION YEAR

TURANO LODIGIANO
ANSALDO ENERGIA POWER PLANT ELECTRICAL ENGINEERING 2008
ITALY

SAN SEVERO POWER


ANSALDO ENERGIA PLANT ELECTRICAL ENGINEERING 2008
ITALY

THISVI POWER
ANSALDO ENERGIA PLANT ELECTRICAL ENGINEERING 2008
GRECIA

CONGO POWER
ANSALDO ENERGIA PLANT ELECTRICAL ENGINEERING 2008
CONGO

VADO LIGURE POWER


ANSALDO ENERGIA PLANT ELECTRICAL ENGINEERING 2008
ITALY

MULTIDISCIPLINE PROJECTMANAGEMENT CONSULT-


FOSTER WHEELER AZAWIYA REFINERY
ING FOR REFINERY WIDE RE-INSTRUMENTATION AND 2008
ITALIANA LIBYA
CONTROL ROOM REVAMPING

FOSTER WHEELER EL PALITO


INSTRUMENTATION ENGINEERING 2008
ITALIANA VENEZUELA

ESSO BELGIE - AIRUP


FOSTER WHEELER INSTRUMENTATION ENGINEERING, ELECTRICAL
PROJECT 2008
ITALIANA ENGINEERING
BELGIUM

TURKMENBASHI
FOSTER WHEELER DCU & SDA
VALVES AND INSTRUMENTATION ENGINEERING 2008
ITALIANA PROJECT (TDSP)
TURKMENISTAN

INTOOLS ACTIVITY, INSTRUMENTATION ENGINEERING


FOSTER WHEELER RGD - PROJECT
AND CONTROL SYSTEM FAT FOR REFINERY 2008
ITALIANA BAHREIN
REVAMPIMG AND EXPANSION

BAHIA LAS MINAS


SADELMI REPOWERING PROJECT PANAMA 2008
PANAMA

ENGINEERING ON CONTROL
TANECO
TECNIMONT TATNEFT SYSTEMS,INSTRUMENTATION & PROCESS ANALYSER 2008
RUSSIA
SYSTEMS, HAZOP, SIL
R EFERENCES: ENGINEERING DIVISION

CUSTOMER END USER PROJECT DESCRIPTION YEAR

LD5 STENUNGSUND ENGINEERING SERVICES - TELECOM & PACKAGE


TECNIMONT 2008
SWEDEN CONTROL SYSTEMS DESIGN

MONCALIERI POWER
ANSALDO ENERGIA PLANT ELECTRICAL ENGINEERING 2007
ITALY

FOSTER WHEELER MANTOVA REFINERY, INSTRUMENTATION FIELD ENGINEERING & DRAFTING


2007
ITALIANA ITALY ACTIVITIES

SECONDMENT OF A 2 PROCESS ENGINEER’S TEAM TO


AZUZUAMA OIL &
SAIPEM ENERGY DEVELOP FEED ACTIVITIES FOR THE UPGRADING OF 2
GAS PLANT 2007
SERVICES OIL/GAS SEPARATION AND GAS COMPRESSION
NIGERIA
STATIONS

EL GAMIL GAS
SAIPEM ENERGY BASIC DESIGN OF THE EXISTING GAS TREATMENT
COMPLEX 2007
SERVICES FACILITIES REVAMPING
EPGYT

SAIPEM ENERGY BORDOLANO


INSTRUMENTATION ENGINEERING 2007
SERVICES ITALY

TASNEE HDPE/LDPE
TECNIMONT PROJECT AL JUBAIL TELECOMMUNICATION SYSTEMS ENGINEERING 2007
SAUDI ARABIA

PP NIZHNEKAMSK
TECNIMONT BASIC ENGINEEERING ISTRUMENTATION 2007
RUSSIA

FOSTER WHEELER SAHARA - BASELL


PROJECT MANAGEMENT CONSULTING ACTIVITEIS 2006
ITALIANA QATAR

KHURAIS
PLANT WATER
SNAMPROGETTI INJECTION PUMPS COMPLETE PLANT ANALYSIS SYSTEM ENGINEERING 2006
AND UTILITIES
SAUDI ARABIA

QURAYYAH (EBP),
SNAMPROGETTI DETAILED AUTOMATION ENGINEERING 2006
UAE

SAMIR UPGRADE
SNAMPROGETTI SAMIR PROJECT DETAILED ENGINEERING ACTIVITIES 2006
MAROCCO
R EFERENCES: ENGINEERING DIVISION

CUSTOMER END USER PROJECT DESCRIPTION YEAR

ESCRAVOS GAS
INSTRUMENTATION ENGINEERING
SNAMPROGETTI TO LIQUID PLANT, 2005
ASSISTANCE TO FAT
NIGERIA

KHURSANIYA ,
SNAMPROGETTI AUTOMATION ENGINEERING 2005
SAUDI ARABIA

RAS LAFFAN
SNAMPROGETTI TRAIN 5, AUTOMATION ENGINEERING 2005
QATAR

SNAMPROGETTI SUD CHINA AUTOMATION & INSTRUMENTATION ENGINEERING 2005

SIMERI CRICHI
DETAILED INSTRUMENTATION AND AUTOMATIONE
TECNIMONT POWER PLANT 2005
NGINEERING ACTIVITIES
ITALY

CHIEVO (VR), ELECTRICAL ENGINEERING FOR HYIDROELECTRIC


ENEL TORINO 2004
ITALY GROUPS AND ELECTRIC SUBSTATION

FOSTER WHEELER TEVEROLA POWER


INSTRUMENT AND AUTOMATION ENGINEERING 2004
ITALIANA PLANT, ITALY

PE4 SCHWECHAT
COMPLETE PLANT ANALYSIS SYSTEM ENGINEERING
TECNIMONT PLANT 2004
ASSISTANCE TO FAT
AUSTRIA

TURBIGO PLANT,
TECNIMONT INSTRUMENTATION ENGINEERING 2004
ITALY

SESTO S.G.
THERMOELECTRIC INSTRUMENTATION ENGINEERING DEVELOPMENT FOR
F. TOSI MECCANICA 2003
POWER PLANT, TURBINE
ITALY

ACERRA POLIESTER
SNAMPROGETTI PLANT F&G – DETAILED ENGINEERING DEVELOPMENT 2002
ITALY

QATIF GOSP 1
SNAMPROGETTI COMPLEX, INSTRUMENTATION ENGINEERING 2002
SAUDI ARABIA
R EFERENCES: ENGINEERING DIVISION

CUSTOMER END USER PROJECT DESCRIPTION YEAR

MANTOVA POWER
INSTRUMENTATION AND AUTOMATION PLANT DETAIL
SNAMPROGETTI PLANT 2001
SIDE ENGINEERING
ITALY

NANHAI PETRO
CSPC
CHEMICAL
TECNIMONT PETROCHEMICAL COMPLETE PLANTS ANALYSIS SYSTEM ENGINEERING 2000
PROJECT
PROJECT
CHINA

PARONA/PAVIA
FOSTER WHEELER RESOURCE INSTRUMENTATION AND AUTOMATION ENGINEERING
1999
ITALIANA RECOVERY PLANT, DEVELOPMENT: SPECIALISTIC AND PLANT DETAIL SIDE
ITALY
LOMELLINA ENEGIA
HIPPS
High Integrity Pressure Protection Systems

HIGH INTEGRITY PRESSURE PROTECTION SYSTEMS


The installation of HIPPS systems is rapidly gaining acceptance over the
traditional pressure safety valves (PSV) or rupture discs as the preferred meth-
od for the primary protection of plant against overpressure.

Major advantages of HIPPS are:


• no or less capital cost for relief system (PSV, piping, flare, land space, etc.)
• reduced piping pressure ratings
• compliance with environmental constraints against discharge to flare

These advantages are especially significant for the debottlenecking of an exist-


ing plant, where the flare system has been already setup for the lower original
production capacity.

The introduction of a HIPPS system is subject to international technical refer-


ence standards, such as API codes and ASME, that do not allow indiscriminate
use of HIPPS systems to replace safety valves, but require a fully documented
assessment to justify the choice of the HIPPS system.

The choice of a HIPPS system, the design details and concepts, the con-
struction and the startup are subject to precise requirements of congruence
and continuity with the evaluation of the safety and reliability of the process
(HAZOP and SIL) all components and the whole system are subject to require-
ments of functional safety and integrity (normally with a SIL 3 rating).
The assessment is carried out in accordance with IEC61508 and IEC61511
standards.
The the process analysis may require a dynamic simulation of the HIPPS system
behaviour.
ECISGROUP is a global service provider of HIPPS systems with decades of expe-
rience in the construction of high integrity safety automation systems (with over
100 SIL certified shutdown systems supplied) and the construction of packaged
equipment for the process industry and for the wellheads.

COMPANY CERTIFICATION OF
FUNCTIONAL SAFETY MANAGEMENT
Company certification of Functional Safety Management has been assessed by
TÜV Rheinland.
The certification ensures:
• Functional safety is a company target
• Clear organisation and responsabilities for safety
• Safety Planning
• Methodologies for measuring performance and conformity to safety
requirements
• Methodologies to treat non - conformities
• Assessment of competence
for each role
INTERNATIONAL STANDARDS
CONCERNING HIPPS
1) Standards defining HIPPS vs. pressure relief devices
API RP 520:
Sizing, Selection and Installation of Pressure Relieving Devices

API RP 521:
Pressure Relieving and Depressuring Systems

ASME BPV:
Code Div. VII section1,2 - Code Case 2211

EN -12186
Gas Supply Systems - Gas Pressure Regulating Stations

2) Standards ensuring HIPPS functional safety requirements


IEC 61511:
Safety Instrumented Systems for the process industry sector

IEC 61508:
Functional safety of Electrical - Electronic - Programmable Electronic
Safety related systems

ANSI/ISA S84.01:
Application of Safety Instrumented Systems for the Process Industries

3) Other applicable standars


API RP 14C
ASME SEC VIII D1
ASME SEC VIII D2
ASME SECTION VIII
ASME B31.3
ASME B31.4
ASME B31.8

QATALUM /
AL
SNC LAVALIN INTERNATION
r
Mesaieed Industrial City, Qata
d of:
FUEL GAS SYSTEM compose
Sep arat or Skid , Filtr ation & Metering
Liqu id
ate Tank Skid , Gas Heater
Skid, Condens
n Skid , Con trol Panel
Skid, Pressure Reductio
Shelter
OUR GLOBAL SOLUTION PROVIDER
APPROACH:

TARGET CUSTOM SELECTION


RELIABILITY OF COMPONENTS

Selection of each HIPPS component is performed to meet the real


target reliability requirements:
• Custom Detailed Design:
- Sensors
- Solver & Logics
- Actuators & Valves
- Partial Stroking system if required
- Dynamic Modeling
• Planning of Integration, Construction, Validation, Commissioning
• SIL certification by architecture and reliability analysis
• Custom cut global (or partial) Scope of Supply
APPLICATIONS:
OIL&GAS DOWNSTREAM
Column Top Header Overload Avoidance

OIL&GAS UPSTREAM
Vessel Overpressure Protection
PETROCHEMICAL
Polymerization Reactor (CSTR) Temperature Runaway Prevention

HIPPS - DESIGN STEPS


- HIPPS vs. relief motivation/justification - Hazard analysis of overpressure
scenarios and equipment / controls failures.
- HAZOP
- Develop feasible HIPPS configurations or HIPPS + relief combinations
- Functional and integrity requirements. Required speed of closure, LOPA,
acceptable RISK, ALARP
- Quantified risk analysis for proposed protection system configuration to
establish probability of failure on demand.
- Selection of HIPPS options that meet the target reliability requirements
- DETAILED DESIGN
Sensors, Solver, Actuators, Valves, Power Supply, actuation Air/Oil
systems, Bypass, Overall configuration
- Dynamic Modeling of transient
- Performance of other layers of protection (e.g. such as ESD)
- HIPPS valve re-opening procedure
- Valve Leakage - Restart/Bypass considerations Relief valve provision
- Performance standards. Safety Requirement Specification to define the
basis and assumptions made for design, functional, performance and
testing requirements for the HIPPS
- Commissioning
- Certification of Architecture and reliability analysis

Lifecycle as per IEC 61511 standard

Hazzard and Risk Assessment

Allocation of Safety Function


to Protection Layers

ANALYSIS
Safety Requirements
Specifications for the SIS

IMPLEMENTATION
Design and Design and
Engineering of Safety Development of Other
Instrumented System Means of Risk Reduction

Installation, Commissioning
and Validation

Operation and Maintenance


OPERATION

Modification

Decommissioning

V E R I F I C A T I O N
PROCUREMENT DIVISION
The Supply Chain develops solutions for the optimization of the project manage-
ment cycle thanks to a skilled and highly qualified staff, whose activities include:

PRELIMINARY COST EVALUATION


• the pre-evaluation of the technical specification according to the mainly used
European and American standards
• the development of the Bills of Materials according to Bidding Vendors List
• the issuance of preliminary RFQ’s or in-house estimate
• the commercial evaluation of the received quotations

PROCUREMENT
It is important to point out first that the Procurement is carried out according to
the company procedures and in accordance with the ISO 9001 standards, while
for those jobs where the Procurement is done on the Customer’s behalf, procure-
ment procedures dedicated to the specific job are agreed with the Customer and
issued accordingly.
• the preparation of Vendors List during the Bid Phase
• the issuance of enquiries in accordance with internal procedures and technical
requirements
• the economical evaluation of received quotations, after the technical evaluation
phase and Vendors shortlist
• the negotiation with Vendors and issuance of recommendation
• the issuance of purchase orders to the approved and selected Vendors
• the sourcing and procurement of materials both on the domestic and
international markets through a network of ISO certified suppliers

LOGISTICS & CUSTOMER CARE


• the expediting of orders to sub-suppliers
• the handling of import-export procedures
• the professional follow up of the whole order
• the connection of our computer network to the Customers operating systems
to be able to provide a real-time job progressing
• the carrying out of expediting activities according to the Customers procedures
and reports throughout the whole order development cycle
• the performance of quality checks and visual inspections on the goods received
from the sub-suppliers under the supervision of our inspectors reporting to our
Quality Control Manager
• the storage of the goods in our warehouse and depots
• the computerized inventory control
• the material handling, sorting, palletizing & labelling
• the co-ordination of the inspection activities with the Customers appointed
Third Parties
• the review of the Vendors certificates and preparation of all the Customers
contractual documentation: certification dossiers, manufacturing data report
books, operation & maintenance manuals
• the transportation scheduling and daily shipment of goods to the final
destination by all major international carriers
BULK MATERIAL FOR BOP
Instrument Mechanical Bulk Materials
- High Pressure Valves, Fittings and Tubing
- Instrument Valves and Manifolds
- Ball and Needle Valves
- Double Block & Bleed Valves
- Monoflange Valves

Electrical Bulk Materials for hazardous area


- Cable Glands and Electrical Fittings IEC/NEC
- Junction Boxes IEC/NEC
- Plugs and Sockets IEC/NEC
- Control Stations IEC/NEC
- Fluorescent and Floodlight Lighting IEC/NEC
- Metal / Fiber Glass Cable Trays & Ladders
- Trefoil Cable Cleats
- Multi Cable Transit Systems

Piping Valves & Flanges Saving Solutions


High Performance Metal to Metal Valves & Flanges:
- Dual Plate Check Valves
- Twinsafe® Double Block & Bleed Ball Valves
- Triple-offset Butterfly Valves
- Double Isolate Triple-offset Butterfly Valves

Instrument Valves for severe service


- Choke and Control Valves
- Subsea Ball, Needle, Gate, Check & Relief Valves
- Triple-offset Control Butterfly Valves
PROCUREMENT
DIVISION
References
R EFERENCES: PROCUREMENT DIVISION

CUSTOMER VENDOR PLANT DESCRIPTION YEAR

KHURAIS WATER
INJECTION
SAIPEM VARIOUS
PROJECT
INSTRUMENT SUNSHADES 2009
SAUDI ARABIA

SAIPEM COMERCIO
MARITIMO SOCIEDADE
ENGRO PROJECT
LDA/ENGRO VARIOUS
PAKISTAN
INSTRUMENT BULK MATERIALS 2009
CHEMICAL
PAKISTAN

TECHNIP ITALY/ CORINTH REFINERY


MOTOR OIL HELLAS
VARIOUS
GREECE
SAMPLING SYSTEMS 2009

SNAMPROGETTI/ ARAMCO KHURAIS


ARAMCO KHURAIS VARIOUS GOSP INSTRUMENT SUNSHADES 2009
GOSP SAUDI ARABIA

MAAMOURA
INTERMARE SARDA VARIOUS PLATFORM INSTRUMENT BULK MATERIALS 2008
TUNISIA

ETILENE RAGUSA
CATALYTIC SENSOR FOR COMBUSTIBLE GAS,
SNAMPROGETTI SUD VARIOUS GELA,
ROTAMETERS AND SAMPLING SYSTEMS
2008
ITALY

ANCONA REFINERY COMPRESSION FITTINGS AND


API
ITALY PREINSULATED TUBING
2008

LLDP NIZHNEKAMSK
TECNIMONT VARIOUS
RUSSIA
INSTRUMENT BULK MATERIALS 2008

Q - CHEM II
TECNIMONT
QATAR
PREINSULATED TUBING AND SEAMLESS TUBING 2008

OMV GAS GmbH


TECHIMP IMPIANTI VARIOUS
AUSTRIA
INSTRUMENT ENCLOSURES 2008

KASHAGAN FIELD
DEVELOPMENT
SIIRTEC NIGI
PROJECT
PREINSULATED TUBING 2008
KAZAKHSTAN

KCC PROJECT
SAIPEM/ARAMCO
SAUDI ARABIA
INSTRUMENT BULK MATERIALS 2008
R EFERENCES: PROCUREMENT DIVISION

CUSTOMER VENDOR PLANT DESCRIPTION YEAR

SAMIR 2 PROJECT
YOKOGAWA ITALIA
MOROCCO
MANIFOLDS AND KIDNEY FLANGES 2008

SANNAZZARO
SNAMPROGETTI
FANO/ENI R&M
VARIOUS REFINERY SAMPLING SYSTEMS 2008
ITALY

FCCU
DEBOTTLENECKING
FOSTER WHEELER
ITALIANA
VARIOUS REACTOR - LIGHT END FIELD INSTRUMENTS 2008
TRECATE REFINERY
ITALY

GE O&G HIGH PRESSURE VALVES, FITTINGS,


SLICO
NUOVO PIGNONE COMPRESSION FITTINGS AND TUBING
2008

SAIPEM COMERCIO
MARITIMO SOCIEDADE/ ENGRO PROJECT
ENGRO CHEMICAL
VARIOUS
PAKISTAN
INSTRUMENT BULK MATERIALS 2008
PAKISTAN

MANTOVA REFINERY
SIIRTEC NIGI VARIOUS
ITALY
MANIFOLDS, VALVES, POTS 2008

HDPE
TECNIMONT VARIOUS MUNCHSMUNSTER NYLON TUBING 2008
GERMANY

DARQUAIN OIL FIELD


2ND STAGE
ENI IRAN VARIOUS DEVELOPMENT PIPING BULK MATERIALS 2008
PROJECT
IRAN

DARQUAIN OIL FIELD


2ND STAGE
ENI IRAN VARIOUS DEVELOPMENT GASKETS AND FLANGES 2007
PROJECT
IRAN

KHURAIS CRUDE
SAIPEM VARIOUS CONTRACT INSTRUMENT BULK MATERIALS 2007
SAUDI ARABIA

KHURAIS WATER
SNAMPROGETTI/ INJECTION
SAUDI ARABIAN VARIOUS FACILITIES AND TUBING AND PIPE 2007
OIL COMPANY UTILITIES
SAUDI ARABIA

REFINERY GAS
FOSTER WHEELER DESULPHURIZATION
ITALIANA
VARIOUS
PROJECT
SOLENOID VALVE CABINET 2007
BAHRAIN
R EFERENCES: PROCUREMENT DIVISION

CUSTOMER VENDOR PLANT DESCRIPTION YEAR

GAS TREAT &


COMPRESSION
SNAMPROGETTI VARIOUS FACILITIES (GTC) INSTRUMENT BULK MATERIAL 2007
HAWIYAH
SAUDI ARABIA

SECONDARY
SNAMPROGETTI
UPGRADING
CANADA/ VARIOUS
ALBERTA
VALVES AND MANIFOLDS 2007
SNC LAVALIN
CANADA

KHURSANIYAH
SNAMPROGETTI VARIOUS PROJECT INSTRUMENT BULK MATERIALS 2007
SAUDI ARABIA

ERG NUOVE NUOVE CENTRALI


CENTRALI
VARIOUS
ITALY
INSTRUMENT BULK MATERIALS 2007

LDPE NIZHNEKAMSK
TECNIMONT VARIOUS EPCM INSTRUMENT BULK MATERIALS 2007
RUSSIA

QATOFIN LDPE
SNAMPROGETTI VARIOUS PROJECT VALVES AND FILTERS 2007
QATAR

KHURAIS WATER
INJECTION
SAIPEM/
SAUDI ARAMCO
VARIOUS FACILITIES AND INSTRUMENT BULK MATERIALS 2007
UTILITIES
SAUDI ARABIA

QURAYYAH
SNAMPROGETTI VARIOUS
SAUDI ARABIA
INSTRUMENT BULK MATERIALS 2007

KHURSANIYA
PRODUCTION
SNAMPROGETTI VARIOUS
FACILITIES
SEAMLESS TUBING 2007
SAUDI ARABIA

TKOC OL2K EG2


FWI/THE KUWAIT PROJECT
OLEFINS COMPANY
VARIOUS
SHUAIBA
INSTRUMENT BULK MATERIALS 2007
KUWAIT

QATOFIN LDPE
SNAMPROGETTI VARIOUS PROJECT INSTRUMENT BULK MATERIALS 2007
QATAR

GASCO PRJ 5229


SNAMPROGETTI VARIOUS RUWAIS INSTRUMENT BULK MATERIALS 2007
U.A.E.
R EFERENCES: PROCUREMENT DIVISION

CUSTOMER VENDOR PLANT DESCRIPTION YEAR

HDPE RABIGH
TECNIMONT VARIOUS
SAUDI ARABIA
ELECTRICAL BULK MATERIALS 2007

TKOC OL2K EG2


FWI/THE KUWAIT PROJECT
OLEFINS COMPANY
VARIOUS
SHUAIBA
ELECTRICAL BULK MATERIALS 2007
KUWAIT

QURAYYAH SEA
SNAMPROGETTI VARIOUS WATER PLANT INSTRUMENT BULK MATERIALS 2007
SAUDI ARABIA

NIZHNEKAMSK
TECNIMONT VARIOUS
RUSSIA
INSTRUMENT BULK MATERIALS 2007

HD/LDPE AL JUBAIL
TECNIMONT VARIOUS EPC TASNEE STAINLESS STEEL FABRICATED COMPONENTS 2007
SAUDI ARABIA

KASHAGAN FIELD
GE O&G NUOVO DEVELOPMENT
PIGNONE
VARIOUS
PROJECT
SAMPLE POINTS 2007
KAZAKHSTAN

MAERSK HALFDAN
PHASE 3
INTERMARE SARDA DEVELOPMENT INSTRUMENT BULK MATERIALS 2006
PROJECT
DENMARK

KASHAGAN FIELD
DEVELOPMENT INSTRUMENT PROTECTION BOXES &
NUOVO PIGNONE
PROJECT WINTERIZING ENCLOSURES
2006
KAZAKHSTAN

FACILITIES UPGRADE
& RELOCATION OF
SIIRTEC NIGI U/G PROCESS INSTRUMENT BULK MATERIALS 2006
PIPING FOR CGS
VARIOUS KUWAIT

KHURSANIYAH
INSTRUMENT & ELECTRICAL BULK MATERIALS &
SNAMPROGETTI PROJECT
DUAL PLATE CHECK VALVES
2006
SAUDI ARABIA
VARIOUS

EPPE / LLDPE
TECNIMONT VARIOUS RABIGH PROJECT TUBING 2006
SAUDI ARABIA

REVAMPING
STEAM TRACING TUBING BUNDLES AND
API RAFFINERIA BITUMEN PLANTS
COMPRESSION FITTINGS
2005
ITALY
VARIOUS
R EFERENCES: PROCUREMENT DIVISION

CUSTOMER VENDOR PLANT DESCRIPTION YEAR

TOGLIATTIAZOT
METHANOL M-M METHANOL
CASALE PLANT
INSTRUMENT BULK MATERIALS 2005
RUSSIA
VARIOUS

KASHAGAN FIELD
DEV. PROJ.
PRE-INSULATED TUBING, JUNCTION BOXES,
SIIRTEC NIGI DEHYDRATION
LUMINAIRES
2005
PLANT
VARIOUS KAZAKHSTAN

ADCO BU HASA
FACILITY DEV.
SNAMPROGETTI
PROJECT
INSTRUMENT AND ELECTRICAL BULK MATERIALS 2005
U.A.E.
VARIOUS

UNIVERSITA’ DI UNIVERSITA’ DI
SALERNO VARIOUS SALERNO CO2 SUPERCRITICAL EXTRACTION PILOT PLANT 2005
ITALY ITALY

BELAYIM TEMSAH T-4


INSTRUMENT BULK MATERIALS AND
PETROLEUM PROJECT
LOOSE INSTRUMENTS
2004
COMPANY EGYPT
VARIOUS

TRECATE REFINERY
INSTRUMENT BULK MATERIALS,
ESSO / SARPOM AUTO OIL 2 PROJECT
MULTI-TUBING AND CABINET COOLERS
2004
ITALY
VARIOUS

INSTRUMENT AND ELECTRICAL BULK MATERIALS,


NANHAI PROJECT
TECNIMONT
CHINA
ELECTRICALLY TRACED MULTI - TUBING, CONTROL 2004
PANELS, CONCURRENT ENGINEERING
VARIOUS

INAGIP IKA
A - B & IDA
ROSETTI MARINO
A- B - C - PLATFORMS
CHOKE VALVES 2004
CROATIA

AGIP GAS BV
SNAMPROGETTI INSTRUMENT BULK MATERIALS AND
LUMMUS GA
MELLITAH PROJECT
DUAL PLATE CHECK VALVES
2004
LYBIA
VARIOUS

NORTH PORT SAID


BELAYIM
CONCESSION DEV. OFFSHORE INSTRUMENT BULK MATERIALS AND
PETROLEUM VARIOUS
PROJECT LOOSE INSTRUMENTS
2003
COMPANY
EGYPT

TAMOIL REFINERY
FOSTER WHEELER DU SUD OUEST MULTI-TUBING, PROTECTION BOXES AND
ITALIANA COLLOMBEY ELECTRICAL HEATING SYSTEM
2003
SWITZERLAND

SAUDI ARAMCO
SNAMPROGETTI QATIF GOSP-1 DUAL PLATE CHECK VALVES 2003
SAUDI ARABIA
R EFERENCES: PROCUREMENT DIVISION

CUSTOMER VENDOR PLANT DESCRIPTION YEAR

SABIC ACETIC ACID


TECHNIP ITALY PROJECT YAMBU INSTRUMENT & PIPING BULK MATERIALS 2003
SAUDI ARABIA
VARIOUS

NSP1 PI WESSELING INSTRUMENT BULK MATERIALS, MULTI - TUBING AND


TECNIMONT
GERMANY PROTECTION BOXES
2003

VARIOUS

VAL D’AGRI - OIL


RECOVERY CENTRE INSTRUMENT BULK MATERIALS AND
ENI DIV. AGIP VARIOUS
VIGGIANO PROTECTION BOXES
2002
ITALY

POWER PLANTS
FERRERA
ENIPOWER VARIOUS ERBOGNONE, INSTRUMENT BULK MATERIALS 2002
MANTOVA, RAVENNA
ITALY

PHARMACEUTICAL
WYETH LEDERLE CARDINAL PLANT CATANIA ELECTROPOLISHED TUBING AND FITTINGS 2002
ITALY

SAUDI ARAMCO
KHUFF
SNAMPROGETTI CONDENSATE INSTRUMENT BULK MATERIALS 2002
FRACTIONAL PROJ.
VARIOUS SAUDI ARABIA

CHEMIPETROL
POLYPROPYLENE
FOSTER WHEELER
ITALIANA
PLANT PP2 MULTI - TUBING BUNDLE SYSTEMS 2002
LITVINOV
CZECH REPUBLIC

ASHRAFI FIELD DEV.


AGIBA VARIOUS PROJECT INSTRUMENT AND ELECTRICAL BULK MATERIALS 2001
EGYPT

DUKHAN FIELD GAS


INSTRUMENT BULK MATERIALS AND
SNAMPROGETTI LIFT PROJECT
MONOBLOCK VALVES
2001
QATAR
VARIOUS

QCPC NGL 4
PROJECT MESAIEED
SNAMPROGETTI
PLANT
TWINSAFE DOUBLE BLOCK & BLEED VALVES 2001
QATAR

DUNASTYR
POLYSTYRENE
MANUFACTURING
SNAMPROGETTI SUD VARIOUS
CO.
IN - LINE INSTRUMENTS AND BULK MATERIALS 2001
SZAZHALOMBATTA
HUNGARY

BELAYIM TEMSAH GAS FIELD


PETROLEUM VARIOUS DEV. PROJECT OFFSHORE & ONSHORE LOOSE INSTRUMENTS 2000
COMPANY EGYPT
R EFERENCES: PROCUREMENT DIVISION

CUSTOMER VENDOR PLANT DESCRIPTION YEAR

VAL D’AGRI - OIL


RECOVERY CENTRE
ENI DIV. AGIP VARIOUS
VIGGIANO
MISCELLANEOUS INSTRUMENTS 2000
ITALY

ISLA REFINERY
K.T.I./
TECHNIP ITALY
NETHERLANDS PRE - INSULATED PIPES 2000
ANTILLES
VARIOUS

FOUKANDA AND
SAIPEM - INTERMARE INSTRUMENT BULK MATERIALS AND
SARDA
MWAFI PLATFORMS
ACCESS FITTINGS FOR SANDPROBES
2000
CONGO
VARIOUS

BOROUGE
BALL VALVES, FITTINGS AND
POLYETHYLENE
TECNIMONT
PROJECT
TUBING, PRE - INSULATED AND 2000
PRETRACED TUBING BUNDLES
U.A.E.
VARIOUS

ENPPI FOR
BALTIM EAST GAS
BELAYIM
PETROLEUM
PROJECT INSTRUMENT AND ELECTRICAL BULK MATERIALS 1999
EGYPT
COMPANY
VARIOUS

SARLUX PROJECT
LURGI SARROCH INSTRUMENT BULK MATERIALS 1999
ITALY
VARIOUS

PAVIA II EXPANSION
MERCK SHARP &
DOHME
PROJECT PRESSURIZED AND NOT PRESSURIZED ENCLOSURES 1999
ITALY

JOSÈ FIRST FERTILIZER


PROJECT
SNAMPROGETTI VARIOUS JOSÈ - ESTADO INSTRUMENT BULK MATERIALS 1999
ANZOATEGUI
VENEZUELA

KEMYA PROJECT HIGH PRESSURE VALVES TUBING, FITTINGS AND


TECNIMONT
SAUDI ARABIA SPARE PARTS
1999

NORTH PORT SAID


BELAYIM CONCESSION PORT
PETROLEUM VARIOUS FOUAD SOUTH EAST INSTRUMENT BULK MATERIALS 1998
COMPANY 1&2 PROJECTS
EGYPT
COMBUSTION
ENGINEERING API
FALCONARA INTEGRATED
ABB VARIOUS
GASIFICATION
INSTRUMENT AND ELECTRICAL BULK MATERIALS 1998
COMBINED CYCLE
ITALY

ADNOC ASAB GAS


TRIANGLE DEVELOPMENT
SNAMPROGETTI
CONTROLS PROJECT
SAFETY VALVES 1998
U.A.E.
R EFERENCES: PROCUREMENT DIVISION

CUSTOMER VENDOR PLANT DESCRIPTION YEAR

LNG UPSTREAM
SNAMPROGETTI FACILITIES PROJECT SLIM LINE VALVES, DOUBLE BLOCK & BLEED AND
FRANCE BARIK & SAIH RAWL BLEED VALVES
1998
OMAN

PETROCHEMIA PURGING AND FLUSHING SYSTEMS,


SNAMPROGETTI VARIOUS PLOCK S.A. INSTRUMENT PROTECTION AND 1998
POLAND HEATING BOXES WITH MANIFOLDS

PETROCHEMIA
INSTRUMENT PROTECTION AND
SNAMPROGETTI PLOCK S.A.
HEATING BOXES WITH MANIFOLDS
1997
POLAND
CONDOR TECH

ADCO SAHIL FIELD


DEVELOPMENT
SNAMPROGETTI
PROJECT
INSTRUMENT BULK MATERIALS 1997
U.A.E.
VARIOUS

REVAMPING
VISBREAKER
SNAMPROGETTI VARIOUS VACUUM SECTION INSTRUMENT BULK MATERIALS 1997
1600
ITALY

AMOCO CHEMICAL
TECHNIPETROL PROJECT PREINSULATED TUBING BUNDLES 1997
BELGIUM

CHINA
PETROCHEMICAL
HIGH PRESSURE FITTINGS, TUBING, VALVES AND
TECHNIPETROL INT. QILU 140 K T/A
PRESSURE GAUGES
1997
LDPE PLANT
VARIOUS CHINA

MEDINA YAMBU
ANSALDO DP SYSTEMS PLANT INSTRUMENT PROTECTION & HEATING BOXES 1996
SAUDI ARABIA

MILAZZO REFINERY
ENI DIV. AGIP VARIOUS
ITALY
INSTRUMENT PROTECTION & HEATING BOXES 1996

PETROCHEMIA
SNAMPROGETTI VARIOUS PLOCK S.A. INSTRUMENT PROTECTION & HEATING BOXES 1996
POLAND

SINOPEC
TECHNIPETROL
CHINA
INSTRUMENT BULK MATERIALS 1996

VARIOUS

PTA PLANT
TECNIMONT YAMBU IND. INSTRUMENT BULK MATERIALS 1996
SAUDI ARABIA
VARIOUS
R EFERENCES: PROCUREMENT DIVISION

CUSTOMER VENDOR PLANT DESCRIPTION YEAR

MINISTRY OF
ELECTRICITY &
ABB SAE SADELMI WATER-POWER AND INSTRUMENT BULK MATERIALS 1995
DESALINATION PLANT
VARIOUS Q ATAR

DUBAI ELECTRICITY
& WATER
ABB SAE SADELMI
AUTHORITY
INSTRUMENT BULK MATERIALS 1995
U.A.E.
VARIOUS

JACOROSSI M.E.W.
ANSALDO
KUWAIT
INSTRUMENT BULK MATERIALS 1995

PEMEX / HDR
COMPLEX MIGUEL
PURGING AND FLUSHING SYSTEMS,
SNAMPROGETTI VARIOUS HIDALGO REFINERY
INSTRUMENT BULK MATERIALS
1995
TULA
MEXICO

TUPRAS - IZMIT
THERMOSTATIC VALVES, LABORATORIES AND
SNAMPROGETTI VARIOUS REFINERY
TEST BENCHES, INSTRUMENT BULK MATERIALS
1995
TURKEY

BIR REBAA NORTH


AGIP AFRICA
ALGERIA
HIGH PRESSURE FITTINGS, TUBING AND MANIFOLDS 1994

VARIOUS

SALINE WATER
CONVERSION
SNAMPROGETTI
YAMBU MEDINA -
INSTRUMENT BULK MATERIALS 1994
SAUDI ARABIA
VARIOUS

NIOC BANDAR
SNAMPROGETTI ABBAS PROJECT INSTRUMENT AND ELECTRICAL BULK MATERIALS 1994
IRAN
VARIOUS

WILAYA
D’OUARGLIA -
SNAMPROGETTI
BIR REBAA
INSTRUMENT BULK MATERIALS 1994
ALGERIA

ECOPETROL
TECHNIPETROL
COLOMBIA
INSTRUMENT BULK MATERIALS 1994

NIGERIAN AGIP OIL PORT HARCOURT


COMPANY NIGERIA
INSTRUMENT BULK MATERIALS 1993

VARIOUS

PETROCHEMICAL
PLANT
SNAMPROGETTI
PORTO TORRES
INSTRUMENT AND ELECTRICAL BULK MATERIALS 1993
ITALY
VARIOUS
R EFERENCES: PROCUREMENT DIVISION

CUSTOMER VENDOR PLANT DESCRIPTION YEAR

EVA RESIN PLANT


HIGH PRESSURE FITTINGS, TUBING AND
SNAMPROGETTI BEIJING
VALVES AND ELECTRICAL BULK MATERIALS
1993
CHINA
VARIOUS

TUPRAS - IZMIR
SNAMPROGETTI VARIOUS ALIAGA REFINERY INSTRUMENT BULK MATERIALS 1993
TURKEY

ETHYLENE PLANT
TECHNIPETROL
CHINA
INSTRUMENT BULK MATERIALS 1993

VARIOUS

UMM AL NAR
FLOW CONTROL SYSTEMS, ENGINEERING AND
ADNOC VARIOUS PROJECT ABU DHABI
TESTING
1992
U.A.E.

AGIP AMELIA “B”


COMPRESSION FTTINGS, TUBING AND
BELLELI PLATFORM
20.000 PSI VALVES
1992
ITALY

NAM SHELL
BELLELI PROJECT INSTRUMENT BULK MATERIALS 1992
ITALY

TRANS - TUNISINE
SNAMPROGETTI PIPELINE INSTRUMENT AND ELECTRICAL BULK MATERIALS 1992
TUNISIA
VARIOUS

ETHYLENE PLANT
TECHNIPETROL BRINDISI INSTRUMENT BULK MATERIALS 1992
ITALY
VARIOUS
CONSTRUCTION & PMC
Since its foundation in the early nineties our Construction Business Unit has
combined the knowledge and experiences of its engineers in order to meet the
market demand in the Oil&Gas, Upstream and Downstream Petrochemical and
Power Generation fields.

Our Construction Business Unit, thanks to its dynamic and flexible structure, has
been able to spread out its skills in the main direction of the industrial process,
thus developing its four main departments:
ANALYSIS, PNEUMO - HYDRAULIC SYSTEMS, AUTOMATION & SAFETY
CONTROL SYSTEMS, SKIDS, PACKAGES & PROJECT MANAGEMENT
CONSULTING - PMC.

ANALYSIS
- Analyzer Shelters - Liquid & Gas Laboratory Sampling
- Sampling Conditioning Systems - Waste Water Analysis Systems
- Emission Monitoring Systems - Water & Steam Sampling
- Stack Gas Analyzer Systems - Process Analyzers

PNEUMO - HYDRAULIC SYSTEMS


- Wellhead Control Panels
- Electro - Pneumatic Control Panels
- Hydraulic Power Units

AUTOMATION & SAFETY CONTROL SYSTEMS.


- Project Management - Network System Integration
- Process Control Applications - System Migration & Revamping
Design & Construction - On-Cal Maintenance Program
- Safety Applications Design
& Construction
SKIDS
- Fuel Gas Treatment Skids - Chemicals Injection Corrosion Skids
(Heating, Filtration, Reducing, - Methanol/Glycol Injection Skids
Metering, Analysis) - Gas Reducing Stations
- Gas Odorizer Skids - Gas Metering Skids
- Meter Provers - Gas Treatment Skids
- Launching and Receiving Traps - Water Treatment Skids
- Manifold Skids

PACKAGES
- Instrument and Service Air Packages - Trucks and Rail Tankers Loading
- Water Treatment Packages Systems
- Diesel Oil Packages - Fire Fighting Packages
- Hydrogen Production Packages - Early Production Facilities (Manifold,
- Nitrogen Production Packages: Well test Production, 1° and 2° test
Membrane & PSA Separators, Oil Stabilizer, Slug Catcher)

PROJECT MANAGEMENT CONSULTING - PMC


Activities Description:
ECISGROUP’s project manager is based in Client/Client’s Contractor as Client
Representative, responsible for monitoring and controlling duties as following:

- Development/review/approval of - Co - ordination with Contractors for


project procedures, methods, etc. clear understanding of project
- Review/approval of Contractor requirements
engineering documents - Co-ordination with procurement
- Review/approval and HAZOP of group for purchase of relevant
subcontractor/vendor engineering equipment and materials
documents - SIL assessment
- Engineering, interface requirements - Technical Bid evaluation
among different EPC contracts - FAT and Supervision of Commissioning
ANALYSIS
- Analyzer Shelters
- Analyzer Cabinets
- Analyzer System Packages
- Water&Steam Sampling and
Analysis Systems
- Continous Emission Monitoring Systems CEMS
- Sample Conditioning Systems
for Process Analyzers
- Liquid&Gas Laboratory
Sampling Systems
- Waste Water Analysis
Systems
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

[Internal view]
Client : AGIP RAFFINAZIONE SANNAZZARO

Project: SOUR WATER, NH3 MONITORING - [Italy] C O N S T R U C T I O N


Supply : ANALYZER CABINET [Dimensions: 5 x 2,5 x 2,7 mt.]

Year: 2001
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : FOSTER WHEELER ITALIANA

Project: RAFF. DU SUD-OVEST S.A. - [Saudi Arabia] C O N S T R U C T I O N


Supply : WATER ANALYZER SYSTEM [Dimensions: 1,8 x 2,1 x 0,6 mt.]

Year: 2001
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

ANALYZER SHELTER, [internal view]


Dimensions: 6 x 2,5 x 2,7 mt.

SAMPLING SYSTEM AT TWO STREAMS


Dimensions: 45 x 65 x 20 cm

Client : SNAMPROGETTI

Project: MTBE AL JUBAIL - [Saudi Arabia] C O N S T R U C T I O N


Supply : ANALYZER SHELTER [Dimensions: 6 x 2,5 x 2,7 mt.]

Year: 1995
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : TECNIMONT - TASNEE PETROCHEMICALS

Project: HDPE 400 KT–Y JUBAIL - [Saudi Arabia] C O N S T R U C T I O N


Supply : N°3 ANALYZER SHELTER [Dimensions: 10 x 2,5 x 2,7 mt. - Weigh: 50.000 Kg]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : TECNIMONT - TASNEE PETROCHEMICALS

Project: HDPE 400 KT–Y JUBAIL - [Saudi Arabia] C O N S T R U C T I O N


Supply : N°3 ANALYZER SHELTER [Dimensions: 10 x 2,5 x 2,7 mt. - Weigh: 50.000 Kg]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : TECNIMONT - TASNEE PETROCHEMICALS

Project: HDPE 400 KT–Y JUBAIL - [Saudi Arabia] C O N S T R U C T I O N


Supply : N°3 ANALYZER SHELTER [Dimensions: 10 x 2,5 x 2,7 mt. - Weigh: 50.000 Kg]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : TECNIMONT - TASNEE PETROCHEMICALS

Project: HDPE 400 KT–Y JUBAIL - [Saudi Arabia] C O N S T R U C T I O N


Supply : N°3 ANALYZER SHELTER [Dimensions: 10 x 2,5 x 2,7 mt. - Weigh: 50.000 Kg]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : ENEL POWER - P.TO CORSINI

Project: HIGH PRESSURE BOILER SAMPLING AND ANALYSIS SYSTEM - [Italy] C O N S T R U C T I O N


Supply : STEAM AND HOT WATER SAMPLING FOR POWER GENERATION
Local Panels [Dimensions: 10 x 7 x 3 mt.]

Year: 2001
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : ENEL POWER - P.TO CORSINI

Project: HIGH PRESSURE BOILER SAMPLING AND ANALYSIS SYSTEM - [Italy] C O N S T R U C T I O N


Supply : STEAM AND HOT WATER SAMPLING FOR POWER GENERATION (Local Panels) [Dimensions: 10 x 7 x 3 mt.]

Year: 2001
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : ENEL POWER - P.TO CORSINI

Project: HIGH PRESSURE BOILER SAMPLING AND ANALYSIS SYSTEM - [Italy] C O N S T R U C T I O N


Supply : STEAM AND HOT WATER SAMPLING FOR POWER GENERATION (Local Panels) [Dimensions: 10 x 7 x 3 mt.]

Year: 2001
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : ENEL POWER - P.TO CORSINI

Project: HIGH PRESSURE BOILER SAMPLING AND ANALYSIS SYSTEM - [Italy] C O N S T R U C T I O N


Supply : STEAM AND HOT WATER SAMPLING FOR POWER GENERATION (Local Panels) [Dimensions: 10 x 7 x 3 mt.]

Year: 2001
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : ENEL POWER - P.TO CORSINI

Project: HIGH PRESSURE BOILER SAMPLING AND ANALYSIS SYSTEM - [Italy] C O N S T R U C T I O N


Supply : STEAM AND HOT WATER SAMPLING FOR POWER GENERATION (Local Panels) [Dimensions: 10 x 7 x 3 mt.]

Year: 2001
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : TECHINT / ENI R&M

Project: HYDROGEN PRODUCTION HMU - [Taranto / Italy] C O N S T R U C T I O N


Supply : “TURN KEY JOB” SUPPLY OF 2 ANALYZER SHELTERS & ANALYZERS [Dimensions: 2,5 x 2,5 x 2,7 mt.]

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

[Internal view]
Client : TECHINT / ENI R&M

Project: HYDROGEN PRODUCTION HMU - [Taranto / Italy] C O N S T R U C T I O N


Supply : “TURN KEY JOB” SUPPLY OF 2 ANALYZER SHELTERS & ANALYZERS [Dimensions: 2,5 x 2,5 x 2,7 mt.]

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

[Internal view]
Client : TECHINT / ENI R&M

Project: HYDROGEN PRODUCTION HMU - [Taranto / Italy] C O N S T R U C T I O N


Supply : “TURN KEY JOB” SUPPLY OF 2 ANALYZER SHELTERS & ANALYZERS [Dimensions: 2,5 x 2,5 x 2,7 mt.]

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : TECHINT / EMETHANEX

Project: EMETHANEX - DAMIETTA - [Egypt] C O N S T R U C T I O N


Supply : ANALYZER SHELTER FOR ASU ANALYZER SYSTEM [Dimensions: 4 x 2,5 x 2,7 mt]

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : TECHINT / EMETHANEX

Project: EMETHANEX - DAMIETTA - [Egypt] C O N S T R U C T I O N


Supply : ANALYZER SHELTER FOR ASU ANALYZER SYSTEM [Dimensions: 4 x 2,5 x 2,7 mt]

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

[Internal view]
Client : TECHINT / EMETHANEX

Project: EMETHANEX - DAMIETTA - [Egypt] C O N S T R U C T I O N


Supply : ANALYZER SHELTER FOR ASU ANALYZER SYSTEM [Dimensions: 4 x 2,5 x 2,7 mt]

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : TECHINT / EMETHANEX

Project: EMETHANEX - DAMIETTA - [Egypt] C O N S T R U C T I O N


Supply : ANALYZER SHELTER FOR MASS SPECTOMETER ANALYZER SYSTEM [Dimensions: 3,5 x 2,5 x 2,7 mt]

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : TECHINT / EMETHANEX

Project: EMETHANEX - DAMIETTA - [Egypt] C O N S T R U C T I O N


Supply : ANALYZER SHELTER FOR MASS SPECTOMETER ANALYZER SYSTEM [Dimensions: 3,5 x 2,5 x 2,7 mt]

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

[Internal view]
Client : TECHINT / EMETHANEX

Project: EMETHANEX - DAMIETTA - [Egypt] C O N S T R U C T I O N


Supply : ANALYZER SHELTER FOR MASS SPECTOMETER ANALYZER SYSTEM [Dimensions: 3,5 x 2,5 x 2,7 mt]

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : EMERSON PROCESS MANAGEMENT SPA for TAKREE/TECHNIP

Project: ULG LSGO PROJECT - [UAE Ruwais Abu Dhabi] C O N S T R U C T I O N


Supply : ANALYZER SAMPLE CONDITIONING SYSTEM

Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : TECNIMONT / BOROUGE

Project: POLYETHYLENE - [Abu Dhabi - UAE] C O N S T R U C T I O N


Supply : “TURN KEY JOB” SUPPLY OF 2 NEW ANALYZERS SHELTERS [Dimensions: 11 x 3,5 x 3,2 mt - 13 x 3,5 x 3,2 mt]

Year: 2001
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

[Internal view]
Client : TECNIMONT / BOROUGE

Project: POLYETHYLENE - [Abu Dhabi - UAE] C O N S T R U C T I O N


Supply : “TURN KEY JOB” SUPPLY OF 2 NEW ANALYZERS SHELTERS [Dimensions: 11 x 3,5 x 3,2 mt - 13 x 3,5 x 3,2 mt]

Year: 2001
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : SNAMPROGETTI / QATOFIN

Project: QATOFIN LLDPE PLANT - [Qatar] C O N S T R U C T I O N


Supply : PROCESS GAS ANALYZER SHELTER [Dimensions: 9 x 2,5 x 2,7 mt - Weight: 45.000 Kg]

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : SNAMPROGETTI / QATOFIN

Project: QATOFIN LLDPE PLANT - [Qatar] C O N S T R U C T I O N


Supply : PROCESS GAS ANALYZER SHELTER [Dimensions: 9 x 2,5 x 2,7 mt - Weight: 45.000 Kg]

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : SNAMPROGETTI / QATOFIN

Project: QATOFIN LLDPE PLANT - [Qatar] C O N S T R U C T I O N


Supply : PROCESS GAS ANALYZER SHELTER [Dimensions: 9 x 2,5 x 2,7 mt - Weight: 45.000 Kg]

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

[Internal view]
Client : SNAMPROGETTI / QATOFIN

Project: QATOFIN LLDPE PLANT - [Qatar] C O N S T R U C T I O N


Supply : PROCESS GAS ANALYZER SHELTER [Dimensions: 9 x 2,5 x 2,7 mt - Weight: 45.000 Kg]

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : SNAMPROGETTI/ENIPOWER

Project: CENTRALE A CICLO COMBINATO di Ravenna - [Italy] C O N S T R U C T I O N


Supply : “TURN KEY JOB“ SUPPLY OF ANALYZER SHELTER FOR BTU MEASUREMENT OF NATURAL GAS [Dimensions: 5,8 x 3 x 2,7 mt - Weight: 6.100 Kg]

Year: 2003
CONSTRUCTION
DIVISION
Analysis

References
R EFERENCES: ANALYSIS

CUSTOMER END USER PROJECT DESCRIPTION YEAR

“TURN KEY JOB”


ALSTOM POWER RIMINI PROJECT 2009
Supply of 1 Nitrogen Blanketing System”.

IMPIANTO DI
CORE TERMOVALORIZ- Revamping Analysis System 2009
ZAZIONE RSU

Hydrocarbon L.E.L. Detector infrared


MTY LLDPE PLANT
SAIPEM QATAR complete with sampling system
MESAIEED 2009
BRANCH Dimensions 1,2 x 0,8 x 2,1 m
QATAR
Weight : 150 Kg

RAFFINERIA DI
SARLUX Emissions Analyzers Shelter 2009
SARROCH

1 MASS SPECTROMETER ANALYZER SHELTER /


EMETHANEX 1 AIR SEPARATION UNIT ANALYZER SHELTER
TECHINT 2008
Damietta Dimensions 4 x 2,5 x 2,7 m each
Weight : 5.500 Kg each

SAIPEM
ENGRO NOX Analysis Local Cabinet + O2 Analysis Local Rack
COMERCIO
AMMONIA - UREA + 13 Local Racks for PH, Free Chlorine Conductivity 2008
MARITIMO
PLANT Analysis complete with Sample Conditioning System.
SOCIEDADE LDA

REFINERY GAS
“TURN KEY JOB”
FWI DESULPHURAZA- 2008
Supply of 1 Conductivity Analyzer
TIONBAHRAIN

HYDROGEN “TURN KEY JOB”


TECHINT 2008
PRODUCTION HMU Supply of 1 ProcessAnalyzer Shelter with Analyzers

ENI R & M

“TURN KEY JOB”


HYDROGEN
TECHINT Supply of 1 Continuos Emissions Monitoring System 2008
PRODUCTION HMU
Analyzer Shelter with Analyzers
ENI R & M

HDPE 400 KT-Y “TURN KEY JOB”


TECNIMONT JUBAIL Supply of 1 Analyzers Shelter 2008
SAUDI ARABIA Dimensions 3 x 2,5 x 2,7 m - Weight: 13.000 kg

HDPE 400 KT-Y “TURN KEY JOB”


TECNIMONT JUBAIL Supply of 3 Analyzers Shelters 2007
SAUDI ARABIA Dimensions 10 x 2,5 x 2,7 m - Weight: 50.000 kg

“TURN KEY JOB”. Supply of 1 Analyzer Shelter &


1 Metering Skid & 1 Filtering Skid.
EDISON COLLALTO PLANT Analyzer Dimensions: 3 x 2,5 x 2,7 m Weight: 15.000 kg 2007
Metering Skid Dim.: 19 x 3,7 x 2 m Weight: 25.000 kg
Filtering Skid Dim.: 9,7 x 3,2 x 3m Weight: 24.000 kg
R EFERENCES: ANALYSIS

CUSTOMER END USER PROJECT DESCRIPTION YEAR

30245 FORLI’ “TURN KEY JOB”


ALSTOM 2007
PROJECT Supply of 1 Nitrogen Blanketing System”.

30245 FERRARA “TURN KEY JOB”


ALSTOM 2007
PROJECT Supply of 1 Nitrogen Blanketing System

“TURN KEY JOB”


MTY LLDPE PLANT -
Supply of 1 Analyzer Shelter
SNAMPROGETTI MESAIEED 2007
Dimensions : 9 x 2,5 x 2,7 m
QATAR
Weight: 45.000 kg

HYDROCRACKING
SNAMPROGETTI “TURN KEY JOB”
RHU - TARANTO 2007
SUD Supply of 30 Sampling Systems
RAFFINERY
ENI R & M

“TURN KEY JOB”


REFINERY GAS
FOSTER Supply of 2 Green Field Analyzers
DESULPHURAZA- 2006
WHEELER Dimensions: 1 x 0,8 x 2,1 m
TIONBAHRAIN
Weight: 500 kg

“TURN KEY JOB”


SNAMPROGETTI AUTO - OIL 2 Supply of analyzer shelter and FTIR 2005
analyser for sampling analysis

“TURN KEY JOB”


F.W.I. AUTO - OIL 2 2004
Supply of analyzer package for sampling analysis

“TURN KEY JOB”


SNAMPROGETTI RIO POLIMEROS 2003
Supply of Laboratory Sampling Systems

CENTRALE A CICLO
“TURN KEY JOB”
SNAMPROGETTI COMBINATO DI
Supply of analyzer shelter for BTU 2003
/ENIPOWER FERRARA
measurement of natural gas and syngas analysis
ERBOGNONE

CENTRALE A CICLO “TURN KEY JOB”


SNAMPROGETTI
COMBINATO DI Supply of analyzer shelter for BTU 2003
/ENIPOWER
RAVENNA measurement of natural gas

CENTRALE A CICLO “TURN KEY JOB”


SNAMPROGETTI
COMBINATO DI Supply of analyzer shelter for BTU 2003
/ENIPOWER
BRINDISI measurement of natural gas

CENTRALE A CICLO “TURN KEY JOB”


SNAMPROGETTI
COMBINATO DI Supply of analyzer shelter for BTU 2003
/ENIPOWER
MANTOVA measurement of natural gas
R EFERENCES: ANALYSIS

CUSTOMER END USER PROJECT DESCRIPTION YEAR

HIGH PRESSURE
“TURN KEY JOB”
BOILER SAMPLING
ENELPOWER Supply of 11 sampling streams equipped with sample 2003
AND ANALYS
treatment analysers.
SYSTEM
SULCIS

HIGH PRESSURE
“TURN KEY JOB”
BOILER SAMPLING
ENELPOWER Supply of 32 sampling streams equipped with sample 2003
AND ANALYS
treatment, analysers and one new shelter.
SYSTEM
TERMINI - IMERESE

HIGH PRESSURE
“TURN KEY JOB”
BOILER SAMPLING
ENELPOWER Supply of 32 sampling streams equipped with sample 2002
AND ANALYS
treatment, analysers and one new shelter.
SYSTEM
PRIOLO - GARGALLO

HIGH PRESSURE “TURN KEY JOB”


BOILER SAMPLING Supply of 28 sampling streams equipped with sample
ENELPOWER 2001
AND ANALYS treatment , analysers and one new shelter.
SYSTEM (ext dim. 10 x 7x 3m)
PORTO CORSINI

F.W.I. ISOMERIZATION Revamping sampling streams selection 2001

Revamping existing analyser shelter with new gas


F.W.I. ISOMERIZATION 2001
chromatograph

“TURN KEY JOB”. Supply of two new analyzers shelters


(ext. dim. 11 x 3,5 x 3,2m and 13 x 3,5 x 3,2m) with:
TECNIMONT POLYETHYLENE 20 “GCs”; / 27 “Moisture analyzers in field sampling sys- 2001
tems” / 20 “O2 ppm analyzers in field sampling systems”;
/ 7 “O2 Thermoparamagnetic in field sampling systems”.

Supply of new analyzers shelters


(ext. dim. 5,5 x 2,5 x 2,7m) with installation of:
SNAMPROGETTI HYPROX - q.ty 2 “GCs”; 2001
- q.ty 4 “O2 Thermoparamagnetic analyzers”;
FERRARA - q.ty 1 Colorimeter analyzer.

Supply of new analyzers shelters


SNAMPROGETTI GAS TO LIQUID
(ext. dim. 5 x 2,5 x 2,7m) with installation of: 2001
SUD DEMOSTRATION
SANNAZZARO - q.ty 4 “GCs”;
DE BURGONDI (PV)

Moisture Analyser and Analyser Data Communication


TECNIMONT POLYETHYLENE 2001
Cabinets

Supply of new two analyzers shelters


FERTINITRO C.E.C. (ext. dim. 7 x 2,6 x 2,7m) with installation of:
- q.ty 10 “Infrared analyzers” (safekeeping);
SNAMPROGETTI JOSE’ EDO. A. FERTILIZER - q.ty 1 “Thermal Conductivity analyzer” (safekeeping);
1999
(VENEZUELA) - q.ty 4 “O2 analyzers in Flue Gas” (safekeeping);
- q.ty 4 “GCs” (safekeeping).

“TURN KEY JOB”. Supply of five new analyzers shelters


(ext. dim. 5 x 3,2 x 3,4m, 5,5 x 3,2 x 3,4m,
SNAMPROGETTI AGD 6 x 3,2 x 3,4m, for q.ty 2 and 8 x 5 x 3,4m) with: 1999
q.ty 4 “GCs”; q.ty 2 “RVP analyzers”;
q ty 2 “TOC analyzers”;
R EFERENCES: ANALYSIS

CUSTOMER END USER PROJECT DESCRIPTION YEAR

“TURN KEY JOB”. Revamping analyzers shelters at


site with installation of new “GC” and “H2S analyzers”.
F.W.I. COGE 1998
Supply of one new analyzer shelter (ext. dim. 4 x 2,5 x
2,7m) with: q.ty 1 Environment analysis system.

Supply of new one analyzer shelter


TECHINT BTH (ext. dim. 2,5 x 2,5 x 2,7m) with installation of: 1998
- q.ty 1 “GC” (safekeeping).

Supply of new one analyzers shelter


ENICHEM CLA/CS3 (ext. dim. 5 x 2,5 x 2,7m) with installation of: 1998
- q.ty 3 “GCs” (safekeeping).
PRIOLO (SR)

Supply of new one analyzers shelter


GDANSKA REF. IMERIZATION & (ext. dim. 4 x 2,5 x 2,7m) with installation of:
TECHNIP ITALY 1998
GDANSKA (POLAND) REFORMER - q.ty 2 “GCs” (safekeeping);
- q.ty 2 “H2” analyzer (safekeeping).

Supply of new one analyzers shelter


(ext. dim. 5 x 2,5 x 2,7m) with installation of:
SNAMPROGETTI VACUUM 1998
q.ty 1 “GC”; q.ty 1 “TOC analyzer”;
q.ty 1“Vacuum distillar”; q ty 1“Wobbe Index analyzer”
(POLAND)

Supply of new six analyzers shelters (ext. dim. 5 x 2,5 x


2,7m for q.ty 2, 2,5 x 2,5 x 2,7m for q.ty 3 and 8 x 3 x
TECHNIP ITALY ETHYLENE 1997
2,7m) with installation of: q.ty 12 “GCs” (safekeeping);
q.ty 2 O2 analysis control board (safekeeping).
P.TO MARGHERA (VE)

“TURN KEY JOB”.


Supply of one new analyzers shelter
F.W.I. A.M.B.R. 1997
(ext. dim. 5 x 2,5 x 2,7m) with:
- q.ty 2 “GCs”.
AUGUSTA (SR)

Supply of one new analyzers shelter


ENICHEM OLE/ARO CR23 (ext. dim. 5 x 2,5 x 2,7m) with installation of: 1997
- q.ty 5 “GCs” (safekeeping).
PRIOLO (SR)

Supply of one new analyzers shelter


ENICHEM PROPILENE OXIDE (ext. dim. 6 x 2,5 x 2,7m) with installation of: 1996
- q.ty 5 “GCs” (safekeeping).
PRIOLO (SR)

Supply of one new analyzers shelter


(ext. dim. 13 x 3 x 2,9m) with installation of:
HARTMANN &
POLYETHYLENE - q.ty 6 “GCs” (safekeeping); 1996
BRAUN
- q.ty 2 H2 analyzers (safekeeping);
BRINDISI (BR) - q.ty 6 O2 analyzers (safekeeping);

Supply of new analysis system composed by looses


materials needed to connect at “GCs”, “IR analyzers”,
SNAMPROGETTI HYDROCRACKER “O2/combustible in flue gas analyzers”, “Density 1996
analyzers”, “Moisture analyzers”, “pH analyzer”, “SO2/
O2 in flue gas analyzer” and “H2S/SO2 air demand”.
TULA (MEXICO)

Supply of two new analyzers shelters


HARTMANN & POLYMER. & (ext. dim. 5 x 2,5 x 2,7m and 2,5 x 2,5 x 2,7m)
1996
BRAUN MONOMERS with installation of:
- q.ty 8 “GCs” (safekeeping)
HOLLAND
R EFERENCES: ANALYSIS

CUSTOMER END USER PROJECT DESCRIPTION YEAR

“TURN KEY JOB”. Supply of one new analyzers shelter


(ext. dim. 3,5 x 2,5 x 2,7m) with:
F.W.I. ISOMERIZ. 1996
- q.ty 1 “GC”;
LIVORNO (LI) - q.ty 1 “H2 analyzer”

Supply of one new analyzers shelter


(ext. dim. 5,5 x 2,5 x 2,7m) with installation of:
SNAMPROGETTI HYDROCRACKER 1996
- q.ty 1 “GC” (safekeeping);
- q.ty 1 “Flue gas monitoring system” (safekeeping).
(POLAND)

“TURN KEY JOB”. Revamping of one analyzers shelter at


site with supply of new analyzers shelter and installation of:
q.ty 1 “CO anal.” (safekeeping); q.ty 2 “O2 anal.” (safekeep-
SARPOM FCCU 1995
ing); q.ty 1 “GC” (safekeeping).
The above analyzers were dismantling by the old shelter.
All these activities was performed with the plant running.

“TURN KEY JOB”.


SOLVENTS & Revamping of three analyzers shelter at site with
SARPOM 1995
REFORMER installation of new “CFPP analyzer” and “Distillar
analyzer”.

Supply of one new analyzers shelter


TECNIMONT POLYPROPILENE (ext. dim. 5 x 2,5 x 2,7m) with installation of: 1995
- q.ty 4 “GCs” (safekeeping).
FERRARA (FE)

IBN ZAHR “TURN KEY JOB”. Supply of one new analyzers shelter
SNAMPROGETTI AL JUBAIL MTBE III (ext. dim. 6 x 2,5 x 2,7m) with installation of: 1995
(S. ARABIA) - q.ty 5 “GCs” (safekeeping).

“TURN KEY JOB”. Supply of new analysis system


composed by sample conditioning systems and looses
SNAMPROGETTI POLYETHYLENE 1995
materials needed to connect at “GCs”,
“Moisture and Oxygen analyzers”.
PUYANG (P.R. CHINA)

“TURN KEY JOB”. Supply of new analysis system


composed by sample conditioning systems and looses
SNAMPROGETTI POLYETHYLENE 1994
materials needed to connect at “GCs”,
ZHONG -YOUAN “Moisture and Oxygen analyzers”.
(P.R. CHINA)

“TURN KEY JOB”


HARTMANN & Supply of one new analyzers shelter
POLYETHYLENE 1994
BRAUN (ext. dim. 4 x 2,5 x 2,7m) with installation of:
- q.ty 4 “GCs” (safekeeping).
MAOMING (P.R. CHINA)

“TURN KEY JOB” Supply of one new analyzers shelter


HARTMANN &
STYRENE (ext. dim. 4 x 2,5 x 2,7m) with installation of: 1994
BRAUN
- q.ty 2 “GCs” (safekeeping).
MAOMING (P.R. CHINA)

“TURN KEY JOB”


SPLITTER Supply of one new analyzers shelter
TECHINT 1993
PROPANE (ext. dim. 2,5 x 2,5 x 2,7m) with installation of:
- q.ty 1 “GC” (safekeeping).

“TURN KEY JOB”


SARPOM SOLVENTS Revamping analyzers shelter at site with installation of 1992
new “Distillar analyzer”.
PNEUMO
HYDRAULIC
SYSTEMS
- Pneumatic Local Control Panels
- Hydraulic Power Units
- Well Head Control Panels
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : ENI EMS

Project: DAVIDE PLATFORM - [Italy] C O N S T R U C T I O N


Supply : ELECTRO - PNEUMATIC PANELS FOR 3 WELLHEAD [Dimensions: 2,15 x 0,7 x 1,8 mt. - Weight: 350 Kg]

Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

[Internal view]
Client : ENI EMS

Project: DAVIDE PLATFORM - [Italy] C O N S T R U C T I O N


Supply : ELECTRO - PNEUMATIC PANELS FOR 3 WELLHEAD [Dimensions: 2,15 x 0,7 x 1,8 mt. - Weight: 350 Kg]

Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : TECHNIP & CHIYODA JV - QATAR GAS

Project: QATAR GAS 3 & 4 ONSHORE PROJECT - [Qatar] C O N S T R U C T I O N


Supply : N°2 WELLHEAD CONTROL PANEL FOR 1 WELL [Dimensions: 1,8 x 1,5 x 2,4 mt. - Weight: 1.300 Kg]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

[Internal view]
Client : TECHNIP & CHIYODA JV - QATAR GAS

Project: QATAR GAS 3 & 4 ONSHORE PROJECT - [Qatar] C O N S T R U C T I O N


Supply : N°2 WELLHEAD CONTROL PANEL FOR 1 WELL [Dimensions: 1,8 x 1,5 x 2,4 mt. - Weight: 1.300 Kg]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : QATAR - CHIYODA

Project: RAS LAFFAN LNG EXPOTION - [Qatar] C O N S T R U C T I O N


Supply : WELLHEAD CONTROL PANEL FOR 2 + 1 WELLS [Dimensions: 3,7 x 1,5 x 2,4 mt. - Weight: 2.700 Kg, 400 Barg Supply]

Year: 2003
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

[Internal view]

Client : QATAR - CHIYODA

Project: RAS LAFFAN LNG EXPOTION - [Qatar] C O N S T R U C T I O N


Supply : WELLHEAD CONTROL PANEL FOR 2 + 1 WELLS [Dimensions: 3,7 x 1,5 x 2,4 mt. - Weight: 2.700 Kg, 400 Barg Supply]

Year: 2003
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : ENPPI / NOSPCO

Project: ONS FIELD DEV. EGYPT - [Egypt] C O N S T R U C T I O N


Supply : SOLAR WELL HEAD CONTROL PANEL FOR 7 WELLS (24 V dc) [Dimensions: 4 x 1,5 x 2 mt. - Weight: 3.500 Kg, 400 Barg Supply]

Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

[Internal view]

Client : ENPPI / NOSPCO

Project: ONS FIELD DEV. EGYPT - [Egypt] C O N S T R U C T I O N


Supply : SOLAR WELL HEAD CONTROL PANEL FOR 7 WELLS (24 V dc) [Dimensions: 4 x 1,5 x 2 mt. - Weight: 3.500 Kg, 400 Barg Supply]

Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : CHYODA / SNAMPROGETTI

Project: RAS LAFFAN EXPANSION PROJECT - [Qatar] C O N S T R U C T I O N


Supply : N°2 WELL HEAD CONTROL PANEL [Dimensions: 3,7 x 1,5 x 2,4 mt. - Weight: 2700 Kg]

Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

[Internal view]

Client : CHYODA / SNAMPROGETTI

Project: RAS LAFFAN EXPANSION PROJECT - [Qatar] C O N S T R U C T I O N


Supply : N°2 WELL HEAD CONTROL PANEL [Dimensions: 3,7 x 1,5 x 2,4 mt. - Weight: 2700 Kg]

Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : JV TECHNIP FRANCE & CHIYODA - QATAR GAS

Project: QATARGAS II DEVELOPMENT PROJECT - [Qatar] C O N S T R U C T I O N


Supply : N°2 WHCP FOR CONTROL N°1 WELLHEAD [Dimensions: 4,1 x 2,1 x 2,4 mt. - Weight: 3.500 Kg, 400 Barg pressure design]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

[Internal view]

Client : JV TECHNIP FRANCE & CHIYODA - QATAR GAS

Project: QATARGAS II DEVELOPMENT PROJECT - [Qatar] C O N S T R U C T I O N


Supply : N°2 WHCP FOR CONTROL N°1 WELLHEAD [Dimensions: 4,1 x 2,1 x 2,4 mt. - Weight: 3.500 Kg, 400 Barg pressure design]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : GUPCO

Project: HA’PY PROJECT - [Egypt] C O N S T R U C T I O N


Supply : WELL HEAD CONTROL PANEL FOR 6+3 WELLS [Dimensions: 4,25 x 1,6 x 2 mt. - Weight: 4.500 Kg]

Year: 1999
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

[Internal view]

Client : GUPCO

Project: HA’PY PROJECT - [Egypt] C O N S T R U C T I O N


Supply : WELL HEAD CONTROL PANEL FOR 6+3 WELLS [Dimensions: 4,25 x 1,6 x 2 mt. - Weight: 4.500 Kg]

Year: 1999
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : JV TECHNIP FRANCE & CHIYODA RAS GAS

Project: RAS GAS ON-SHORE EXPANTION PROJECT PHASE 2 - [Qatar] C O N S T R U C T I O N


Supply : N°1 WHCP FOR CONTROL - N°4 WELL HEAD [Dimensions: 4,25 x 1,6 x 2,4 mt. - Weight: 5.500 Kg]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

[Internal view]

Client : JV TECHNIP FRANCE & CHIYODA RAS GAS

Project: RAS GAS ON-SHORE EXPANTION PROJECT PHASE 2 - [Qatar] C O N S T R U C T I O N


Supply : N°1 WHCP FOR CONTROL - N°4 WELL HEAD [Dimensions: 4,25 x 1,6 x 2,4 mt. - Weight: 5.500 Kg]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : ENPPI /PETROBEL

Project: DENIS “A“ GAS DEVELOPMENT PROJECT EGYPT - [Egypt] C O N S T R U C T I O N


Supply : HYDRAULIC CONTROL UNITS FOR 6 WELLS + 19 NON WELLS VALVES [Dimensions: 7 x 1,5 x 2 mt. - Weight: 6.500 Kg, 690 Barg pressure design]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

[Internal view]

Client : ENPPI /PETROBEL

Project: DENIS “A“ GAS DEVELOPMENT PROJECT EGYPT - [Egypt] C O N S T R U C T I O N


Supply : HYDRAULIC CONTROL UNITS FOR 6 WELLS + 19 NON WELLS VALVES [Dimensions: 7 x 1,5 x 2 mt. - Weight: 6.500 Kg, 690 Barg pressure design]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : PETROBEL / EGYPT

Project: TEMSAH PLATFORM - [Egypt] C O N S T R U C T I O N


Supply : HYDRAULIC CONTROL UNITS FOR 8+4 WELLS & 18 NON WELLS VALVES [Dimensions: 9 x 1,5 x 2 mt. - Weight: 8.500 Kg, 1.000 Barg Working pressure]

Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

[Internal view]

Client : PETROBEL / EGYPT

Project: TEMSAH PLATFORM - [Egypt] C O N S T R U C T I O N


Supply : HYDRAULIC CONTROL UNITS FOR 8+4 WELLS & 18 NON WELLS VALVES [Dimensions: 9 x 1,5 x 2 mt. - Weight: 8.500 Kg, 1.000 Barg Working pressure]

Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : PETROBEL / EGYPT

Project: TEMSAH N.W. PLATFORM - [Egypt] C O N S T R U C T I O N


Supply : HYDRAULIC CONTROL UNITS FOR 8+4 WELLS & 18 NON WELLS VALVES [Dimensions: 9 x 1,5 x 2 mt. - Weight: 8.500 Kg, 690 Barg Working pressure]

Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

[Internal view]

Client : PETROBEL / EGYPT

Project: TEMSAH N.W. PLATFORM - [Egypt] C O N S T R U C T I O N


Supply : HYDRAULIC CONTROL UNITS FOR 8+4 WELLS & 18 NON WELLS VALVES [Dimensions: 9 x 1,5 x 2 mt. - Weight: 8.500 Kg, 690 Barg Working pressure]

Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : SUDELETTRA - ENI POWER

Project: CANDELA GAS POVERO - [Italy] C O N S T R U C T I O N


Supply : PNEUMO HYDRAULIC WELLHEAD CONTROL PANELS FOR 8 WELLS [Dimensions: 3,9 x 2,1 x 2,6 mt. - Weight: 2.250 Kg]

Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

[Internal view]

Client : SUDELETTRA - ENI POWER

Project: CANDELA GAS POVERO - [Italy] C O N S T R U C T I O N


Supply : PNEUMO HYDRAULIC WELLHEAD CONTROL PANELS FOR 8 WELLS [Dimensions: 3,9 x 2,1 x 2,6 mt. - Weight: 2.250 Kg]

Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : AGIBA PETROLEUM CO.

Project: ASRAFI FILED PLATFORM - [Egypt] C O N S T R U C T I O N


Supply : REVAMPING OF A PNEUMO-HYDRAULIC CONTROL UNIT. SUPPLY OF A NEW ONE MODULE FOR CONTROLLER OF: 4 WHCP

Year: 1996
CONSTRUCTION
DIVISION
Pneumo-Hydraulic
Systems & WHCP

References
R EFERENCES: WHCP

CUSTOMER END USER PROJECT DESCRIPTION YEAR

“TURN KEY JOB”


KARACHAGANAK.
KPO Supply of 9 hydraulic panels for old production designed 2006/2009
KAZAKHSTAN
to controll well-heads

INTERMARE ANNAMARIA B “TURN KEY JOB”


2008
SARDA PROJECT Supply of 5 local control panel

DENIS - 05 “A” GAS “TURN KEY JOB”


VETCO GREY DEVELOPMENT Supply of 1 electropneumatic-hydraulic wellhead control 2008
PROJECT panel unit designed to controll 4 wellheads

“TURN KEY JOB”


QATARGAS 3 & 4
TECHNIP & Supply of 2 electropneumatic-hydraulic wellhead control
ONSHORE PROJECT. 2007
CHIYODA JV panels each unit to 1 well and 1 Single
QATAR
portable Shut-Down Panel

“TURN KEY JOB”


TECHNIP & QATARGAS 2 LNG
Supply of 2 electropneumatic-hydraulic wellhead control 2007
CHIYODA JV ONSHORE
panels each unit to 1 well

RAS GAS 3
TECHNIP & “TURN KEY JOB”
ONSHORE 2007
CHIYODA JV Supply of 2 Wellhead control panels each unit to 1 well
EXPANSION

DENIS-05 “A” GAS “TURN KEY JOB”


ENPPI DEVELOPMENT Supply of 6 pneumatic-hydraulic control units designed 2007
PROJECT to controll well-heads

ONS FIELD DEV. “TURN KEY JOB”


ENPPI NOSPCO 2006
EGYPT Supply of 1 wellhead control designed to controll 7 wells

“TURN KEY JOB”


CANDELA GAS
SUDELETTRA Supply of 2 new pneumo-hydraulic wellhead panels 2006
POVERO
designed to controll well-heads

CANDELA GAS “TURN KEY JOB”


SUDELETTRA POVERO. Supply of 4 new pneumatic control panel designed to 2006
ITALIA control actuators

“TURN KEY JOB”


ENI GROUP DAVIDE PLATFORM Supply of new electropneumatic control panel to 2005
designed to control valves on the weelhead

“TURN KEY JOB”


TEMSAH NORTH
ENPPI Supply of new pneumo-hydraulic control units designed 2005
WEST PROJECT
to control well-heads Q.ty n. 8 control units
R EFERENCES: WHCP

CUSTOMER END USER PROJECT DESCRIPTION YEAR

“TURN KEY JOB”


QATAR RAS LAFFAN
Supply of 2 new pneumo-hydraulic control units
SNAMPROGETTI ONSHORE 2004
designed to control well-heads Q.ty n. 2 control
EXPANSION
units

TEMSAH-4 “TURN KEY JOB”


ENPPI PLATFORM Supply of new pneumo-hydraulic control units designed 2004
PROJECT to control well-heads Q.ty n. 8 control units

ENI DIV. CLUSTER


“TURN KEY JOB”
Exploration & CALDAROSE RETE 2004
Supply of 1 Pneumohydraulic control unit
Production MONTE ALPI
D.E.& P.

QATAR RAS LAFFAN “TURN KEY JOB”


SNAMPROGETTI ONSHORE Supply of new pneumo-hydraulic control unit designed 2002
EXPANSION to control well-heads q.ty n. 3 control units

“TURN KEY JOB”


OIL FIELDS
ENI DIV. AGIP Supply of new pneumo-hydraulic control units designed 2002
VAL D’AGRI (ITALY)
to control well-heads. q.ty n. 10 control units.

“TURN KEY JOB”


EDISON GAS SARAGO MARE 2 Supply of new pneumo-hydraulic control unit designed 2001
to control well-heads q.ty n.1 control unit.
(PESCARA) ITALY

GAS STATION “TURN KEY JOB”


ENI S.p.A.
SETTALA (MI) Supply of new pneumo-hydraulic control unit designed 2001
STOGIT DIVISION
ITALY to control 7 well-heads. q.ty n.2 control units.

PLATFORMS Pneumatic Local Control Panels for


COSMI 2001
PCMS 1 PCC actuated valves q.ty n.4 pneum. control panels

Pneumatic Local Control Panels for Pipeline valves


LCM PIPELINE 2001
actuators q.ty n. 3 pneum. local control panels

“TURN KEY JOB”


ENI S.p.A. PLATFORM
Supply of new one pneumo-hydraulic control unit design 2000
DIVISIONE AGIP BARBARA F.
for controller of: q.ty n.12 well-heads.
RAVENNA

“TURN KEY JOB”


HA’PY PROJ. GAS
GUPCO Supply of new one pneumo-hydraulic control unit design 1999
TREATMENT
for controller of: q.ty n.12 well-heads.
RAS EL BAR (EGYPT)

AGIBA ASRAFI FILED Revamping of a pneumo-hydraulic control unit. Supply of


1996
PETROLEUM CO. PLATFORM a new one module for controller of: q.ty n.4 well-heads
SKIDS & PACKAGES
- Fuel Gas Train Treatment Skids
(ESD, Filtration, Metering, Analysis, Heater, Reducing)
- Gas Pressure Reducing Stations & Final Filtering for Gas Turbine
- Gas Pressure Reducing Stations for Auxiliary Boilers
- Gas Odorizer Systems
- Meter Provers
- Launching and Receiving Traps
- Manifold Skids
- Chemicals Injection Skids (Corrosion Inhibitor, Scale Inhibitor -
Demulsifier, Pour Paint Depressant, Antifoam, Methanol, Glycol,
DRAG Reducing Agent)
- Chemical Dosing Systems for Water-Steam Cycle and Water
(Raw Water treatment, Make-up Water Tower, Desalization,
Potabilization, Waste, Biological)
- Chemical Dosing Systems for Cooling Water Towers
(Biocide, Biodispersant Sodiunm, Hypochlorite, Sulphuri acid,
Oxygen Scavenger)
- Early Production Facilities (Manifold, Well Test Production,
HP & LP Test Separator, Slug Catcher, Oil Stabilizer)
- TEG - MEG Packages
- Dehydration Systems Packages
- Nitrogen Production Packages: Membrane & PSA
- Instrument and Service Air Packages
- Trucks and Rail Tankers Arm Loading Systems
- Hydrogen Production Packages
- Diesel Power Generation Packages
- Water Treatment Packages
- Fire Fighting Packages
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : ENI DIV. E&P

Project: VAL D’AGRI ITALY - [Italy] C O N S T R U C T I O N


Supply : CHEMICAL INJECTION SKIDS [Dimensions: 3,2 x 2,4 x 2 mt. - Weight: 3.000 Kg]

Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : ENI DIV. E&P

Project: VAL D’AGRI ITALY - [Italy] C O N S T R U C T I O N


Supply : CHEMICAL INJECTION SKIDS [Dimensions: 3,2 x 2,4 x 2 mt. - Weight: 3.000 Kg]

Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : KPO

Project: KARACHAGANAK FIELD KAZAKHISTAN - [Kazakhistan] C O N S T R U C T I O N


Supply : SPENT CAUSTIC NEUTRALIZATION SKID [Dimensions: 2,5 x 1 x 2,8 mt. - Weight: 550 Kg]

Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : KPO

Project: KARACHAGANAK FIELD KAZAKHISTAN - [Kazakhistan] C O N S T R U C T I O N


Supply : SPENT CAUSTIC NEUTRALIZATION SKID [Dimensions: 2,5 x 1 x 2,8 mt. - Weight: 550 Kg]

Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : EGYPT - PETROBEL

Project: DARFEEL PLATFORM - [Egypt] C O N S T R U C T I O N


Supply : CHEMICAL INJECTION SKID [Dimensions: 6,5 x 2,5 x 3 mt. - Weight: 4.000 Kg]

Year: 1998
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : EGYPT - PETROBEL

Project: DARFEEL PLATFORM - [Egypt] C O N S T R U C T I O N


Supply : CHEMICAL INJECTION SKID [Dimensions: 6,5 x 2,5 x 3 mt. - Weight: 4.000 Kg]

Year: 1998
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : EDISON

Project: COLLALTO PROJECT - [Italy] C O N S T R U C T I O N


Supply : 7 MEG DOSING SYSTEM [Dimensions: 4,2 x 2,75 x 4 mt. - Weight: 8.800 Kg]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : EDISON

Project: COLLALTO PROJECT - [Italy] C O N S T R U C T I O N


Supply : 7 MEG DOSING SYSTEM [Dimensions: 4,2 x 2,75 x 4 mt. - Weight: 8.800 Kg]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : TECHNIP ITALY/PKN ORLEN

Project: HDS VII PLANT POLAND - [Poland] C O N S T R U C T I O N


Supply : N°2 CHEMICAL DOSING SYSTEMS [Dimensions: 3 x 2 x 3,64 mt. - Weight: 2.200 Kg]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : TECHNIP ITALY/PKN ORLEN

Project: HDS VII PLANT POLAND - [Poland] C O N S T R U C T I O N


Supply : N°2 CHEMICAL DOSING SYSTEMS [Dimensions: 3 x 2 x 3,64 mt. - Weight: 2.200 Kg]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : ENPPI - GUPCO

Project: HA’PY PRODUCTION INCREASED 3RD PROJECT - [Egypt] C O N S T R U C T I O N


Supply : GLYCOL INJECTION PACKAGE [Dimensions: 9 x 2,6 x 2,8 mt. - Weight: 9.000 Kg]

Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : ENPPI - GUPCO

Project: HA’PY PRODUCTION INCREASED 3RD PROJECT - [Egypt] C O N S T R U C T I O N


Supply : GLYCOL INJECTION PACKAGE [Dimensions: 9 x 2,6 x 2,8 mt. - Weight: 9.000 Kg]

Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : KBR - BP

Project: SAQQARA FIELD DEVELOPMENT PROJECT EGYPT - [Egypt] C O N S T R U C T I O N


Supply : CHEMICAL INJECTION SYSTEM [Dimensions: 14 x 3,5 x 4 mt. - Weight: 23.000 Kg]

Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : KBR - BP

Project: SAQQARA FIELD DEVELOPMENT PROJECT EGYPT - [Egypt] C O N S T R U C T I O N


Supply : CHEMICAL INJECTION SYSTEM [Dimensions: 14 x 3,5 x 4 mt. - Weight: 23.000 Kg]

Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : PETROBEL EGYPT

Project: EL GAMIL PLANT UPGRADING PROJECT - [Egypt] C O N S T R U C T I O N


Supply : SWEET GLYCOL INJECTION PUMP SKID - DENISE LTS AREA [Dimensions: 13,2 x 3,2 mt. - Weight: 31.000 Kg]

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : PETROBEL EGYPT

Project: EL GAMIL PLANT UPGRADING PROJECT - [Egypt] C O N S T R U C T I O N


Supply : SWEET GLYCOL INJECTION PUMP SKID - DENISE LTS AREA [Dimensions: 13,2 x 3,2 mt. - Weight: 31.000 Kg]

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : PETROBEL EGYPT

Project: EL GAMIL PLANT UPGRADING PROJECT - [Egypt] C O N S T R U C T I O N


Supply : SWEET GLYCOL INJECTION PUMP SKID - PORT FOUAD LTS AREA [Dimensions: 19,65 x 3,2 mt. - Weight: 37.000 Kg]

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : ENPPI / PETROBEL - EGYPT

Project: TEMSAH - 4 PLATFORM - [Egypt] C O N S T R U C T I O N


Supply : CHEMICAL INJECTION SKIDS [Dimensions: 2,7 x 2,4 x 4,1 mt. - Weight: 2.000 Kg]

Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : SONATRACH AGIP

Project: RECUPERATION DES GAS DE TORCHE A ROM - [Algeria] C O N S T R U C T I O N


Supply : DIESEL FIRE PUMP SKID & ELECTRICAL FIRE PUMP SKID

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : EGYPT / PETROBEL

Project: TEMSAH PROJECT - EL GAMIL PLANT - [Egypt] C O N S T R U C T I O N


Supply : FUEL GAS SKID [Dimensions: 8 x 3,2 x 4,3 mt. - Weight: 17.000 Kg]

Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : ENPPI / PETROBEL

Project: TEMSAH - 4 PLATFORM - [Egypt] C O N S T R U C T I O N


Supply : INSTRUMENT AND SERVICE GAS SKID [Dimensions: 7 x 3,2 x 5,2 mt. - Weight: 7.500 Kg]

Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : ENPPI / PETROBEL

Project: TEMSAH - 4 PLATFORM - [Egypt] C O N S T R U C T I O N


Supply : INSTRUMENT AND SERVICE GAS SKID [Dimensions: 7 x 3,2 x 5,2 mt. - Weight: 7.500 Kg]

Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : EGYPT / PETROBEL

Project: TEMSAH N.W. GAS PLATFORM - [Egypt] C O N S T R U C T I O N


Supply : INSTRUMENT AND SERVICE GAS SKID [Dimensions: 7 x 3,2 x 5,2 mt. - Weight: 13.300 Kg]

Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : EGYPT / PETROBEL

Project: TEMSAH N.W. GAS PLATFORM - [Egypt] C O N S T R U C T I O N


Supply : INSTRUMENT AND SERVICE GAS SKID [Dimensions: 7 x 3,2 x 5,2 mt. - Weight: 13.300 Kg]

Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : NUOVO PIGNONE

Project: WEST EST GAS PIPELINE PROJECT CHINA - [China] C O N S T R U C T I O N


Supply : FUEL GAS CONDITIONING SKID [Dimensions: 1,8 x 4,2 x 3 mt. - Weight: 3.520 Kg]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : GE - NUOVO PIGNONE / YARA

Project: GAS TURBINE FOR POWER PLANT 3 - SLUISKIL - [China] C O N S T R U C T I O N


Supply : “TURN KEY JOB” SUPPLY OF 1 FUEL GAS SYSTEM [Dimensions: 5 x 3 x 4 mt. - Weight: 12.000 Kg]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : GE - NUOVO PIGNONE / YARA

Project: GAS TURBINE FOR POWER PLANT 3 - SLUISKIL - [China] C O N S T R U C T I O N


Supply : “TURN KEY JOB” SUPPLY OF 1 FUEL GAS SYSTEM [Dimensions: 5 x 3 x 4 mt. - Weight: 12.000 Kg]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : NUOVO PIGNONE / WGTE II

Project: WEST EAST GAS PIPELINE DEVELOPMENT PROJECT CHINA - [China] C O N S T R U C T I O N


Supply : FUEL GAS CONDITIONING SKIDS [Dimensions: 1,8 x 4,2 x 3 mt. - Weight: 3.520 Kg]

Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : NUOVO PIGNONE / WGTE II

Project: WEST EAST GAS PIPELINE DEVELOPMENT PROJECT CHINA - [China] C O N S T R U C T I O N


Supply : N°16 FUEL GAS CONDITIONING SKIDS [Dimensions: 1,8 x 4,2 x 3 mt. - Weight: 3.520 Kg]

Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : NUOVO PIGNONE - LG/OIEC/IOEC - NIOC

Project: SOUTH PARS - ASSALUYEH - [Iran] C O N S T R U C T I O N


Supply : FUEL GAS SKIDS [Dimensions: 6,8 x 2,5 x 4 mt. - Weight: 15.000 Kg]

Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : NUOVO PIGNONE - LG/OIEC/IOEC - NIOC

Project: SOUTH PARS - ASSALUYEH - [Iran] C O N S T R U C T I O N


Supply : FUEL GAS SKIDS [Dimensions: 6,8 x 2,5 x 4 mt. - Weight: 15.000 Kg]

Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : ENPPI / NOSPCO

Project: ONS FIELD DEV. EGYPT - [Egypt] C O N S T R U C T I O N


Supply : N°1 FUEL GAS CONDITIONING PACKAGE [Dimensions: 2,8 x 6 x 4 mt. - Weight: 7.000 Kg]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : ENPPI / NOSPCO

Project: ONS FIELD DEV. EGYPT - [Egypt] C O N S T R U C T I O N


Supply : N°1 FUEL GAS CONDITIONING PACKAGE [Dimensions: 2,8 x 6 x 4 mt. - Weight: 7.000 Kg]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : GE OIL&GAS / NUOVO PIGNONE

Project: QATARGAS III - [Qatar] C O N S T R U C T I O N


Supply : N°2 FUEL GAS SCRUBBER SKIDS [Dimensions: 3,2 x 2,3 x 3,6 mt. - Weight: 4.500 Kg]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : GE OIL&GAS / NUOVO PIGNONE

Project: QATARGAS III - [Qatar] C O N S T R U C T I O N


Supply : N°2 FUEL GAS SCRUBBER SKIDS [Dimensions: 3,2 x 2,3 x 3,6 mt. - Weight: 4.500 Kg]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : NUOVO PIGNONE - CB&I

Project: COVE POINT USA - [U.S.A.] C O N S T R U C T I O N


Supply : N°2 FUEL GAS TREATMENT SKIDS [Dimensions: 2,6 x 1,7 x 3,8 mt. - Weight: 3.500 Kg]

Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : NUOVO PIGNONE - CB&I

Project: COVE POINT USA - [U.S.A.] C O N S T R U C T I O N


Supply : N°2 FUEL GAS TREATMENT SKIDS [Dimensions: 2,6 x 1,7 x 3,8 mt. - Weight: 3.500 Kg]

Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : GE / NUOVO PIGNONE - QSGTL

Project: SHELL PEARL GTL - [Qatar] C O N S T R U C T I O N


Supply : N°2 FUEL GAS SCRUBBER SKIDS [Dimensions: 3,2 x 2,1 x 3,8 mt. - Weight: 3.000 Kg]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : NUOVO PIGNONE / BRUNEI

Project: BLNG POWER PROJECT - [Brunei] C O N S T R U C T I O N


Supply : N°1 FUEL GAS SCRUBBER SKIDS [Dimensions: 3 x 1,6 x 4,1 mt. - Weight: 3.600 Kg]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : NUOVO PIGNONE - LG/OIEC/IOEC - NIOC

Project: SOUTH PARS - ASSALUYEH - [Iran] C O N S T R U C T I O N


Supply : FUEL GAS SKIDS [Dimensions: 6,8 x 2,5 x 4 mt. - Weight: 15.000 Kg]

Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : NUOVO PIGNONE /RASHID PETROLEUM COMPANY

Project: ROSETTA EDKU - [Egypt] C O N S T R U C T I O N


Supply : FUEL GAS TREATMENT SKID [Dimensions: 4,2 x 2,6 x 4,2 mt. - Weight: 6.500 Kg]

Year: 2002
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : NUOVO PIGNONE / SONATRACH

Project: HASSI R’MEL - [Algery] C O N S T R U C T I O N


Supply : FUEL GAS SKIDS [Dimensions: 3 x 12 x 4,3 mt. - Weight: 28.000 Kg]

Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : GE / NUOVO PIGNONE

Project: WEST EAST PIPELINE FLOW INCREASEAD PROJECT - [China] C O N S T R U C T I O N


Supply : SUPPLY OF 6 FUEL GAS CONDITIONING SKIDS [Dimensions: 3,2 x 2,3 x 3,6 mt. - Weight: 4.500 Kg]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : GE NUOVO PIGNONE / GASCO

Project: ASAB DEVELOPMENT PHASE II - [U.A.E.] C O N S T R U C T I O N


Supply : N°1 SEAL GAS SKID [Dimensions: 1,2 x 3,5 x 2,6 mt. - Weight: 2.000 Kg]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : GE NUOVO PIGNONE / GASCO

Project: ASAB DEVELOPMENT PHASE II - [U.A.E.] C O N S T R U C T I O N


Supply : N°1 SEAL GAS SKID [Dimensions: 1,2 x 3,5 x 2,6 mt. - Weight: 2.000 Kg]

Year: 2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : GE OIL&GAS NUOVO PIGNONE / QATARGAS

Project: QATARGAS 2 LNG TRAIN 4&5 - QATARGAS 3 LNG TRAIN 6 - QATARGAS 4 LNG TRAIN 7 - [Qatar] C O N S T R U C T I O N
Supply : N°12 SEAL GAS SKIDS for CENTRIFUGAL COMPRESSORS [Dimensions: 2,3 x 9,4 x 4 mt. - Weight: 6.000 Kg]

Year: 2005/2006/2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : GE OIL&GAS NUOVO PIGNONE / QATARGAS

Project: QATARGAS 2 LNG TRAIN 4&5 - QATARGAS 3 LNG TRAIN 6 - QATARGAS 4 LNG TRAIN 7 - [Qatar] C O N S T R U C T I O N
Supply : N°12 SEAL GAS SKIDS for CENTRIFUGAL COMPRESSORS [Dimensions: 2,3 x 9,4 x 4 mt. - Weight: 6.000 Kg]

Year: 2005/2006/2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : GE OIL&GAS NUOVO PIGNONE / QATARGAS

Project: QATARGAS 2 LNG TRAIN 4&5 - QATARGAS 3 LNG TRAIN 6 - QATARGAS 4 LNG TRAIN 7 - [Qatar] C O N S T R U C T I O N
Supply : N°12 SEAL GAS SKIDS for CENTRIFUGAL COMPRESSORS [Dimensions: 2,3 x 9,4 x 4 mt. - Weight: 6.000 Kg]

Year: 2005/2006/2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : GE OIL&GAS NUOVO PIGNONE / QATARGAS

Project: QATARGAS 2 LNG TRAIN 4&5 - QATARGAS 3 LNG TRAIN 6 - QATARGAS 4 LNG TRAIN 7 - [Qatar] C O N S T R U C T I O N
Supply : N°12 SEAL GAS SKIDS for CENTRIFUGAL COMPRESSORS [Dimensions: 2,3 x 9,4 x 4 mt. - Weight: 6.000 Kg]

Year: 2005/2006/2007
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : GUPCO / EGYPT

Project: HA’PY PROJECT GAS TREATMENT - [Egypt] C O N S T R U C T I O N


Supply : GAS METERING SYSTEM SKID [Dimensions: 10,7 x 5 x 3,3 mt. - Weight: 32.000 Kg]

Year: 1999
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : EGYPT / PETROBEL

Project: TEMSAH PROJECT / EL GAMIL PLANT - [Egypt] C O N S T R U C T I O N


Supply : GAS METERING SKID [Dimensions: 13 x 5,1 x 4,5 mt. - Weight: 56.000 Kg]

Year: 2005
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : ENPPI EGYPT for PDVSA GAS

Project: PAGMI PROJECT PHASE 1 - [Venezuela] C O N S T R U C T I O N


Supply : CUSTODY TRANSFER METERING SYSTEM [Dimensions: 16,8 x 3,6 x 3 mt. - Weight: 52.000 Kg each]

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : UOP / TECHNIP

Project: GREENGAS MANTOVA - [Italy] C O N S T R U C T I O N


Supply : N°6 PSA GREENGAS POLYBED [Dimensions: 26 x 3,6 x 2,5 mt. - Weight: 831 Kg]

Year: 2003
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : KBR / BP

Project: SAQQARA FIELD DEVELOPMENT PROJECT - [Egypt] C O N S T R U C T I O N


Supply : PSA NITROGEN GENERATION PACKAGE [Dimensions: 7,5 x 2,3 x 2,8 mt. - Weight: 10.000 Kg]

Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : KBR / BP

Project: SAQQARA FIELD DEVELOPMENT PROJECT - [Egypt] C O N S T R U C T I O N


Supply : PSA NITROGEN GENERATION PACKAGE [Dimensions: 7,5 x 2,3 x 2,8 mt. - Weight: 10.000 Kg]

Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : SAIPEM / NAOC

Project: IRRI FLOW STATION PROJECT - [Nigera] C O N S T R U C T I O N


Supply : NITROGEN GENERATION PACKAGE [Dimensions: 1 x 1,5 x 2 mt. - Weight: 600 Kg]

Year: 2003
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : KPO

Project: KPO KARACHAGANAK DEVELOPMENT - [Kazakhistan] C O N S T R U C T I O N


Supply : 1 LP CLOSED DRAIN VESSELS [Dimensions: 14,4 x ∅ 3,6 mt. - Weight: 39.000 Kg]

Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : KPO

Project: KPO KARACHAGANAK DEVELOPMENT - [Kazakhistan] C O N S T R U C T I O N


Supply : 1 LP CLOSED DRAIN VESSELS [Dimensions: 14,4 x ∅ 3,6 mt. - Weight: 39.000 Kg]

Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : GROUPEMENT SONATRACH - AGIP

Project: FLARING DOWN PROJECT - Centre de traitement satellite ROM - [Algeria] C O N S T R U C T I O N


Supply : UNIT 130 INLET MANIFOLD [Dimensions: 20 x 7 mt. - Weight: 130.000 Kg]

Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : GROUPEMENT SONATRACH - AGIP

Project: FLARING DOWN PROJECT - Centre de traitement satellite ROM - [Algeria] C O N S T R U C T I O N


Supply : UNIT 130 INLET MANIFOLD [Dimensions: 20 x 7 mt. - Weight: 130.000 Kg]

Year: 2006
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : PETROJET / PPC

Project: BASANDILA, SHATTA & TALKHA PROJECT - [Egypt] C O N S T R U C T I O N


Supply : SUPPLY OF NEW 3 LPG RECEIVING SKIDS [Dimensions: 15 x 3,5 x 3,4 mt. - Weight: 20.000 Kg]

Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : GE Oil&Gas NUOVO PIGNONE/QSGTL

Project: SHELL PEAR GTL/RAS LAFFAN - [Qatar] C O N S T R U C T I O N


Supply : N°6 NITROGEN PURGE SKIDS

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : NUOVO PIGNONE/SCOP

Project: NAJAF PS3 - [Iraq] C O N S T R U C T I O N


Supply : INDIRECT WATER BATH GAS HEATER [Dimensions: 9,8 x 2 x 2,5 mt. - Weight: 14.000 Kg]

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : NUOVO PIGNONE/SCOP

Project: NAJAF PS3 - [Iraq] C O N S T R U C T I O N


Supply : INDIRECT WATER BATH GAS HEATER [Dimensions: 9,8 x 2 x 2,5 mt. - Weight: 14.000 Kg]

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : NUOVO PIGNONE/SCOP

Project: NAJAF PS3 - [Iraq] C O N S T R U C T I O N


Supply : INDIRECT WATER BATH GAS HEATER [Dimensions: 9,8 x 2 x 2,5 mt. - Weight: 14.000 Kg]

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : NUOVO PIGNONE/SCOP

Project: NAJAF PS3 - [Iraq] C O N S T R U C T I O N


Supply : INDIRECT WATER BATH GAS HEATER [Dimensions: 9,8 x 2 x 2,5 mt. - Weight: 14.000 Kg]

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : NUOVO PIGNONE/GREENSTREAM

Project: MELLITAH GAS COMPRESSION STATION - [Lybia] C O N S T R U C T I O N


Supply : FUEL GAS HEATER SKID [Dimensions: 2 x 7,5 x 7 mt. - Weight: 6.000 Kg]

Year: 2003
EPC CONTRACTORS
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : PETROJET / P.P.C.

Project: AGROUD STATION - [Egypt] C O N S T R U C T I O N


Supply : TRUKS LOADING STATION FOR 6 LOADING SYSTEM GAS OIL, KERO, FUEL OIL [Dimensions: 9,4 x 2,4 x 3 mt. - Weight: 18.000 Kg]

Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : PETROJET / P.P.C.

Project: AGROUD STATION - [Egypt] C O N S T R U C T I O N


Supply : TRUKS LOADING STATION FOR 6 LOADING SYSTEM GAS OIL, KERO, FUEL OIL [Dimensions: 9,4 x 2,4 x 3 mt. - Weight: 18.000 Kg]

Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : PETROJET / P.P.C.

Project: AGROUD STATION - [Egypt] C O N S T R U C T I O N


Supply : TRUKS LOADING STATION FOR 45 LOADING SYSTEM [15 FOR GAS OIL, 15 FOR KERO, 15 FOR FUEL OIL] [Dimensions: 9,4 x 2,4 x 3 mt. - Weight: 18.000 Kg]

Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : PETROJET / P.P.C.

Project: AGROUD STATION - [Egypt] C O N S T R U C T I O N


Supply : TRUKS LOADING STATION FOR 45 LOADING SYSTEM [15 FOR GAS OIL, 15 FOR KERO, 15 FOR FUEL OIL] [Dimensions: 9,4 x 2,4 x 3 mt. - Weight: 18.000 Kg]

Year: 2004
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : KPO

Project: KARACHAGANAK DEVELOPMENT - [Kazakhistan] C O N S T R U C T I O N


Supply : N° 2 STEAM BOILER HOUSE & HOT WATER GENERATION PLANT composed of:
N°1 Chemical Injection Dosing, N° 1 Water/Steam Treatment Skid, MCC Panel/Control System N°1 Water Treatment

Year: 2003
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : KPO

Project: KARACHAGANAK DEVELOPMENT - [Kazakhistan] C O N S T R U C T I O N


Supply : N° 2 STEAM BOILER HOUSE & HOT WATER GENERATION PLANT composed of:
N°1 Chemical Injection Dosing, N° 1 Water/Steam Treatment Skid, MCC Panel/Control System N°1 Water Treatment

Year: 2003
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : KPO

Project: KARACHAGANAK DEVELOPMENT - [Kazakhistan] C O N S T R U C T I O N


Supply : N° 2 STEAM BOILER HOUSE & HOT WATER GENERATION PLANT composed of:
N°1 Chemical Injection Dosing, N° 1 Water/Steam Treatment Skid, MCC Panel/Control System N°1 Water Treatment

Year: 2003
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : KPO

Project: KARACHAGANAK DEVELOPMENT - [Kazakhistan] C O N S T R U C T I O N


Supply : N° 2 STEAM BOILER HOUSE & HOT WATER GENERATION PLANT composed of:
N°1 Chemical Injection Dosing, N° 1 Water/Steam Treatment Skid, MCC Panel/Control System, N°1 Water Treatment

Year: 2003
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : QATALUM - SNC LAVALIN INTERNATIONAL

Project: QATALUM MESAIEED INDUSTRIAL CITY (MIC) - [Qatar] C O N S T R U C T I O N


Supply : FUEL GAS SYSTEM composed of: Liquid Separator Skid, Filtration & Metering Skid, Condensate Tank Skid, Gas Heater Skid, Pressure Reduction Skid, Control Panel Shelter

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : QATALUM - SNC LAVALIN INTERNATIONAL

Project: QATALUM MESAIEED INDUSTRIAL CITY (MIC) - [Qatar] C O N S T R U C T I O N


Supply : FUEL GAS SYSTEM - PRESSURE REDUCTION SKID [Dimensions: 10,55 x 1,8 x 3,05 mt. - Weight: 8.600 Kg]

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : QATALUM - SNC LAVALIN INTERNATIONAL

Project: QATALUM MESAIEED INDUSTRIAL CITY (MIC) - [Qatar] C O N S T R U C T I O N


Supply : FUEL GAS SYSTEM - LIQUID SEPARATOR SKID [Dimensions: 7,5 x 2 x 4,05 mt. - Weight: 9.700 Kg]

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : QATALUM - SNC LAVALIN INTERNATIONAL

Project: QATALUM MESAIEED INDUSTRIAL CITY (MIC) - [Qatar] C O N S T R U C T I O N


Supply : FUEL GAS SYSTEM - FILTRATION & METERING SKID [Dimensions: 9,8 x 2 x 3,5 mt. - Weight: 10.000 Kg]

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : QATALUM - SNC LAVALIN INTERNATIONAL

Project: QATALUM MESAIEED INDUSTRIAL CITY (MIC) - [Qatar] C O N S T R U C T I O N


Supply : FUEL GAS SYSTEM - CONDENSATE TANK SKID [Dimensions: 4,3 x 2,3 x 3,3 mt. - Weight: 4.700 Kg]

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : QATALUM - SNC LAVALIN INTERNATIONAL

Project: QATALUM MESAIEED INDUSTRIAL CITY (MIC) - [Qatar] C O N S T R U C T I O N


Supply : FUEL GAS SYSTEM - GAS HEATER SKID [Dimensions: 5,3 x 2,3 x 3,1 mt. - Weight: 5.300 Kg]

Year: 2008
SOLUTION FOR OIL&GAS, POWER AND PETROCHEMICAL INDUSTRY

Client : QATALUM - SNC LAVALIN INTERNATIONAL

Project: QATALUM MESAIEED INDUSTRIAL CITY (MIC) - [Qatar] C O N S T R U C T I O N


Supply : FUEL GAS SYSTEM - CONTROL PANEL SHELTER [Dimensions: 5,66 x 2,5 x 2,7 mt. - Weight: 5.350 Kg]

Year: 2008
MECHANICAL - ELECTRICAL
INSTRUMENT BULK MATERIALS
Wellhead control
em
st

Telemetry panel
Sy
&G
-F
em

Pipeline
st
Sy

Process
D
ES

Computer
Operator Console

Christmas
Control Network Plant I/O
Tree
L
O

Regulatory PID
TR
N

& Logic Control


O
C
ED

Controller
C
N
A
DV
A

Inlet Manifold
Gas Filtration Chemical Corrosion/Inhibitor
Fuel gas skid
em

skid injection skid solar powered skid


st
Sy
S
C
-D
DA
A
SC

N2 production skid Gas reduction skid Gas Heater skid Analyzer shelter Gas metering
skid

C O N S T R U C T I O N
Process
Operator Console Computer

MECHANICAL - ELECTRICAL
Regulatory PID Control Network Plant I/O INSTRUMENT BULK MATERIALS Welhead control
& Logic Control

R
panel

TM
D
Controller ES
&
S
C
D

em
st
Sy
Instrument and Air/Gas filtration
G
&
-F

service gas skid skid


em
st
Sy
D
ES
em
st
Sy
S
C
-D
DA
A
SC

Analyzer
Instrumentation
Chemical shelter
injection skid

C O N S T R U C T I O N
Process
Computer
Operator Console

MECHANICAL - ELECTRICAL
INSTRUMENT
Control Network Plant I/O BULK MATERIALS
R

Gas metering skid


TM

Regulatory PID
D

& Logic Control


ES
&
S

Controller
DC

Analyzer shelter

ESD System - F&G System

Chemical
injection skid

Air/Gas filtration Gas treatment


skid skid

Chemical
injection skid

C O N S T R U C T I O N
MECHANICAL - ELECTRICAL
INSTRUMENT BULK MATERIALS

e m
st
Sy
&G
-F
em
st

Stack Gas
Sy
D

Analysis
ES

em
st
Sy
S
C
-D
DA
A
SC

Gas Analysis skid Sample conditioning Sample conditioning


system & analysis system & analysis

Chemical feed Hypochlorite skid Gas metering skid


system & control NH3 Injection skid

C O N S T R U C T I O N
CONSTRUCTION
DIVISION
Skids & Packages,
EPC Contractors

References
R EFERENCES:
SKIDS/CHEMICAL INJECTION/PROCESS EQUIPMENT

CUSTOMER END USER PROJECT DESCRIPTION YEAR

Manifold Skids Dim. LxW xH KARMA 7,5 x 2,5 x 3,6 m


PDG e KARMA PDG 10,2 x 2,5 x 2 m
ENI TUNISIA BV 2010
TUNISIE Weight: KARMA ~17.000 Kg - PDG ~22.000 Kg
Oil Flow Rate: PDG 1.500 bbl/day KARMA 3.000 bl/day

Nitrogen Generator Package


New land Oil
Dim. LxWxH 5,9 x 2,5 x 2 m
ENPPI Treatment Train 2010
Weight: ~2000 Kg
EGYPT
N2 Production: 200 Nm3/h 6 barg

“TURN KEY JOB”


BAGHDAD CO. FOR Supply of 2 Fuel Gas Scrubber Skids
NUOVO PIGNONE 2009
GAS TURBINE INC. Dimension 3,6 x 2,2 x 3,85 m
NUOVO PIGNONE Weight: 4.500 kg

“TURN KEY JOB”


Supply of 1 air compressor Package
EGYPT SWGEZ
EMC Dimension: 6,3 x 4,2 x 3,86 m - Weight: 8.100 kg 2009
ONSHORE FACILITY
Supply of 1 Chemical Injection Skid
Dimension: 1,2 x 0,9 x 1,5 m - Weight: 500 kg

1 Methanol Injection Skid


EGYPT PFSE 2 BIS
ENPPI Dimension: 1,5 x1 x1 m 2009
DEV. PROJECT
Weight: 400 kg

QARUN 1 Air Compressor Package


EGYPT KARAMA
EMC PETROLEUM Dimension: 10 x 5 x 5,54 m 2009
POWER PLANT
COMPANY Weight: 37.000 kg

1 Nitrogen Supply Package


VENEZUELA Dimension: 10 x 6 x 10,55
ENPPI 2009
PAGMI PROJECT Weight: 20.000
(This job is in development)

CENTRALE 2 Fuel Gas Treatment Skid


NUOVO PIGNONE IDROGENO ENEL Dimension: 3,4 x 1,5 x 2,4 m 2009
FUSINA VENEZIA Weight: 3.000 kg

5 Fuel Gas TreatmentSkid


ALGERIA
NUOVO PIGNONE Dimension: 4 x 2,5 x 3,6 m 2009
SKIKDA LNG
Weight: 6.600 kg

KARACHAGANAK 1 deg/Water Fired Heater Package


KPO DEVELOPMENT Dimension: 14 x 8,5 x 3,1 m 2009
PROJECT (This job is in development)

5 Chemical Injection Dimension: 10 x 4 x 2,4 m


POLYSTYRENE
1 Fire Water Sodium Hypochloryte Injection Package
PROJECT
ENPPI Dimension: 3 x 2,2 x 3,2 m - Weight: 3.500 2009
AL - DEKHILAH,
1 Cooling Tower Chemical Injection Package
ALEXANDRIA
Dimension: 10 x 4 x 3,8 m - Weight: 10.000 kg

2 Gas Metering Skid


VENEZUELA
ENPPI Dimension: 16,8 x 3,6 x 3 m 2009
PAGMI PROJECT
Weight: 52.000 Kg
R EFERENCES:
SKIDS/CHEMICAL INJECTION/PROCESS EQUIPMENT

CUSTOMER END USER PROJECT DESCRIPTION YEAR


2 Chemical Injection Skid
EGYPT EL GAMIL Dimension: 19,6 x 3,2 x 2,7 m (Port Fouad)
ENPPI UPGRADING Dimension: 13,4 x 3,2x 2,7 m (Denise) 2009
PROJECT Weight: 44.150 kg (Port Fouad)
Weight: 36.000kg (Denise)

1 Gas Filter Skid Package


EMC EGYPT SWGEZ-2 Dimension: 1,5 x 1 x 2 m 2008
Weight: 700 kg

Chemical Injection Skid


EGYPT SWGEZ-2
EMC Dimension: 12 x 0,9 x 2,4 m 2008
PLATFORM
Weight: 1.700 kg

“TURN KEY JOB”


AMERYA AMERYA APRC’S NITROGEN
Supply of One Adsorption Unit
PETROLEUM PETROLEUM PLANT 2008
Dimensions: 4 x 2 x 2,5 m.
REFINARY Co. REFINARY Co. EGYPT
Weight: 4000 Kg

“TURN KEY JOB”


CENTRE SATELLITE
BROWN & Supply of Fire Water Pumps Skids
ROM 2008
ROOT - CONDOR Dimensions 1,6 x 3 x 2,5 m
ALGERIA
Weight 14.000 kg

“TURN KEY JOB” Supply of Pressure reduction &


HBA/2006 LPG
Metering Station. Dimensions for Reduction skid 10,5 x
PIPELINE FROM
PETROJET PPC (EGYPT) 2,6 x 3,5 m - Weight 17.000 kg 2008
DELTA TO
Dimensions for Metering skid 9 x 1,2 x 1,5 m
MOSTOROD
Weight 4200 kg

“TURN KEY JOB”


NAJAF PS3
NUOVO PIGNONE SCOP Supply of 1 Indirect Water Bath Gas Heater 2008
IRAQ
Dimensions 9,8 x 2 x 2,5 m - Weight:14.000 kg

“TURN KEY JOB”


Supply of 1 Fuel Gas Treatment Package and
interconnecting site installation.
Scrubber Skid
QATALUM Dimensions: 3,6 x 1,5 x 2,5 m - Weight: 2500 kg
SNC LAVALIN ALUMINIUM Filtration & Metering Skid: 2008/2009
PLANT Dimensions: 8,6 x 1,4 x 3 m - Weight: 5500 kg
Pressure Reducing Station Skid:
Dimensions: 7 x 1,5 x 1,5 m - Weight: 4000 kg
Fuel Gas Condensate Tank Skid:
Dimensions: 4 x 0,5 x 2,5 m - Weight: 4000 kg

“TURN KEY JOB”


SHELL PEARL GTL
Supply of 6 Nitrogen Purge Skids
NUOVO PIGNONE PROJECT 2008
Dimensions: 2,6 x1,5 x 2 m
QATAR
Weight: 2000 kg each

“TURN KEY JOB”


DAS ISLAND Supply of 2 Fuel Gas Treatment Skid
NUOVO PIGNONE 2008
PROJECTOAG Dimensions: 8 x 3 x 4,3 m
Weight: Kg 12.000

“TURN KEY JOB”


SHELL PEARL GTL
Supply of 6 NG + 6 HOG Fuel Gas Scrubber Skids NG:
NUOVO PIGNONE PROJECT 2007
Dimensions: 3,20 x 2,15 x 3,8 - Weight: 3000 kg each
QATAR
HOG: Dimensions: 4,10 x 2,45 x 4; Weight: -4300 kg each
R EFERENCES:
SKIDS/CHEMICAL INJECTION/PROCESS EQUIPMENT

CUSTOMER END USER PROJECT DESCRIPTION YEAR

“TURN KEY JOB”


RAS LAFFAN/QATAR Supply of 2 Fuel Gas Treatment Skids
NUOVO PIGNONE 2007
GAS III -TRAIN 7 Dimensions: 3,2 x 2,3 x 3,6 m
Weight 4500 kg each

WEST EAST “TURN KEY JOB”


NUOVO PIGNONE WGTE II CHINA PIPELINE FLOW Supply of 6 Fuel Gas Conditioning Skid 2007
INCREASED PROJ. Dimensions 1,8 x 4,2 x 3 m - Weight 3520 kg

“TURN KEY JOB”


HDS VII PLANT Supply of 2 Chemical Dosing Systems
TECHNIP 2007
POLAND Dimensions: 3 x 2 x 3,64 each
Weight: Kg 2.200 each

“TURN KEY JOB”. Supply of 1 Analyzer Shelter & 1


Metering Skid & 1 Filtering Skid.
EDISON COLLALTO PLANT Analyzer Dimensions: 3 x 2,5 x 2,7m; Weight: 15 000 kg 2007
Metering Skid Dim.: 19 x 3,7 x 2m; Weight: 25 000 kg
Filtering Skid Dim.: 9,7 x 3,2 x 3m; Weight: 24 000 kg

“TURN KEY JOB”


Supply of 7 MEG Dosing Systems
EDISON COLLALTO PLANT 2007
Dimensions7,2 x 2,75 x 4 m each
Weight: Kg 8800 each

“TURN KEY JOB”


DENIS “ A” FIELD
Supply of 1 Corrosion Inhibitor skid
ENPPI DEVELOPMENT 2007
Dimensions: 4 x 3,3 x 3 m each
EGYPT
Weight: Kg 4000

“TURN KEY JOB”


ONS DEVELOPMENT
Supply of 1 Fuel Gas Conditioning Package
ENPPI NOSPCO PROJECT 2007
Dimensions: 2,8 x 6 x 4 m
EGYPT
Weight 7.000 kg.

“TURN KEY JOB”


CENTRE
BROWN & ROOT - Supply of Inlet Manifold Unit
SATELLITE ROM 2007
CONDOR Dimensions: 20 x 7 x 2.6 m
ALGERIA
Weight: Kg 80.000

“TURN KEY JOB”


BLNG POWER
Supply of 1 Fuel Gas Scrubber Skid
NUOVO PIGNONE PROJECT 2007
Dimensions: 3 x 1,6 x 4,1 m
BRUNEI
Weight: Kg 3.600

“TURN KEY JOB”


ASAB
Supply of 2 Seal Gas Skid
NUOVO PIGNONE DEVELOPMENT 2007
Dimensions: 1,2 x 3,5 x 2,6 m
PHASE II
Weight: Kg 2000

“TURN KEY JOB”


POWER PLANT 3
Supply of 1 Fuel Gas System
NUOVO PIGNONE YARA SLUISKIL 2007
Dimensions: 5 x 3 x 4 m
NETHERLANDS
Weight: 12.000 kg

HA’PY PRODUCTION “TURN KEY JOB”


INCREASED 3RD Supply of 1 Glycol Injection Package
ENPPI 2006
PROJECT Dimensions: 9 x 2,6 x 2,8 m
EGYPT Weight: Kg 9.000
R EFERENCES:
SKIDS/CHEMICAL INJECTION/PROCESS EQUIPMENT

CUSTOMER END USER PROJECT DESCRIPTION YEAR

ONS DEVELOPMENT
“TURN KEY JOB”
ENPPI PROJECT 2006
Supply of 1 Chemical Injection System
EGYPT

“TURN KEY JOB”


LNG RAS LAFFAN -
Supply of 3 Seal Gas Skids
NUOVO PIGNONE QATAR GAS 3 2006
Dimensions: 2,3 x 9,4 x 4 each
TRAIN 7
Weight: Kg 6000 each

“TURN KEY JOB”


LNG RAS LAFFAN -
Supply of 3 Seal Gas Skids
NUOVO PIGNONE QATAR GAS 3 2006
Dimensions: 2,3x 9,4 x 4 m each
TRAIN 6
Weight: Kg 6000 each

“TURN KEY JOB”


COVE POINT Supply of 2 Fuel Gas Treatment Skid
NUOVO PIGNONE 2006
U.S.A. Dimensions: 2,6 x 1,7 x 3,8 m
Weight: Kg 3.500

SAQQARA FIELD “TURN KEY JOB”


DEVELOPMENT Supply of 1 Chemical Injection System
KBR 2006
PROJECT Dimensions: 16 x 3,5 x 4 m - Weight: Kg 23000
EGYPT

SAQQARA FIELD “TURN KEY JOB”


DEVELOPMENT Supply of 1 PSA Nitrogen Generation Package
KBR 2006
PROJECT Dimensions: 7,5 x 2,3 x 2,8 m
EGYPT Weight: Kg 10.000

“TURN KEY JOB”


DENIS FIELD
Supply of 4 Chemical Injection Skids
ENPPI DEVELOPMENT 2006
Dimensions: 4 x 3,5 x 3 m each
EGYPT
Weight: Kg 4.500

KARACHAGANAK “TURN KEY JOB”


KPO DEVELOPMENT Supply of 1 LP Closed Drain Vessels 2006
PROJECT L : 14,7 m; Ø: 3.6 m - Weight: 39.000 kg

WEST EAST
“TURN KEY JOB”
PIPELINE FLOW
NUOVO PIGNONE WGTE II CHINA Supply of 16 Fuel Gas Conditioning Skid 2006
INCREASED
Dimensions 1,8 x 4,2 x 3 m; Weight 3520 kg
PROJ.

“TURN KEY JOB”.


RAS LAFFAN -
Supply of 3 Seal Gas Skids
NUOVO PIGNONE QATAR 2006
Dimensions: 2,3x 9,4 x 4 m each
GAS II - TRAIN 5
Weight: Kg 6.000 each

“TURN KEY JOB”


RAS LAFFAN
Supply of 3 Seal Gas Skids
NUOVO PIGNONE QATAR 2005
Dimensions: 2,3x 9,4 x 4 m each
GAS II - TRAIN 4
Weight: Kg 6.000 each

TEMSAH NORTH “TURN KEY JOB”


WEST PLATFORM Supply of n. 7 Chemical Injection Skids
ENPPI 2005
PROJECT (Methanol, Glycol and Chemical injection skids)
EGYPT Dimensions: 5 x 2,8 x 4 m each - Weight: Kg 5.000
R EFERENCES:
SKIDS/CHEMICAL INJECTION/PROCESS EQUIPMENT

CUSTOMER END USER PROJECT DESCRIPTION YEAR

TEMSAH NORTH
“TURN KEY JOB”.
WEST PLATFORM
ENPPI Supply of New One Instrument & Service Gas Skid 2005
PROJECT
(ext. dim. 7 x 3,2 x 5,2 m.).
EGYPT

“TURN KEY JOB”


VAL D’AGRI RETE Supply of n 12 chemical injection skids
ENI DIV. E&P 2005
DI RACCOLTA Dimensions: 3,2 x 2,4 x 2 each
Weight: Kg 3.000

“TURN KEY JOB”


SOUTH PARS
Supply of 9 fuel gas skids
NUOVO PIGNONE ASSALUYEH 2005
Dimensions: 6,8 x 2,5 x 4 each
IRAN
Weight: Kg 15.000 each

“TURN KEY JOB”


KARACHAGANAK
Supply of Spent Caustic Neutralization Skid
KPO DEVELOPMENT 2005
Dimensions 2.5 x 1 x 2.8 m
PROJECT
Weight 550 kg

“TURN KEY JOB”


KARACHAGANAK
Supply of Nitrogen Purification Package
KPO DEVELOPMENT 2004
Dimensions: 2.5 x 1 x 2.8 m
PROJECT
Weight 1.500 kg

“TURN KEY JOB”


HASSI R’MEL Supply of one fuel gas skid
NUOVO PIGNONE 2004
ALGERIA Dimensions: 3 x 12 x 4,3 m
Weight: Kg 28.000

BASANDILA,
“TURN KEY JOB”
PETROJET SHATTA 2004
Supply of new 3 LPG Receiving Skids
& TALKHA PROJECT

TEMSAH - 4 TURN KEY JOB”


ENPPI PLATFORM Supply of new one instrument & service gas skids 2004
PROJECT (ext. dim. 7 x 3,2 x 5,2 m.).

“TURN KEY JOB”


RASHID - 2
Supply of n. 3 chemical injection skids (methanol, glycol
PLATFORM AND
ENPPI and chemical injection skids) 2004
SEA LINE TO P - 1
Dimensions: 5,3 x 2 x 4,6 m each
EGYPT
Weight: Kg 7.500 each

“TURN KEY JOB”


TEMSAH - 4
Supply of n. 7 chemical injection skids
ENPPI PLATFORM PROJECT 2004
(methanol, glycol and chemical injection skids)
EGYPT
Dimensions: 5 x 2,8 x 4 m each

GREENGAS 6 PSA Greengas Polybed


UOP 2003
MANTOVA Dimensions: 26 x 3,5 x 2,5 m

“TURN KEY JOB”


AL ANBAR
Supply of Oil metering skid
MEIS SCOP POWER STATION 2003
Dimensions: 2,5 x 6,5 x 2,7 m
(IRAQ)
Weight:10.000 Kg
R EFERENCES:
SKIDS/CHEMICAL INJECTION/PROCESS EQUIPMENT

CUSTOMER END USER PROJECT DESCRIPTION YEAR

“TURN KEY JOB”


YOUSFYIA
Supply of Oil metering skid
MEIS SCOP POWER STATION 2003
Dimensions: 2,5 x 6,5 x 2,7 m
IRAQ
Weight 10.000 Kg

MELLITAH GAS “TURN KEY JOB”


COMPRESSION Supply of N. 3 fuel gas heater skids
NUOVO PIGNONE GREENSTREAM 2003
STATION Dimensions: 2 x 7,5 x 7 m
LYBIA Weight 6.000 Kg

“TURN KEY JOB”


RPP PLATFORM Supply of instrument and service gas skid
PETROBEL 2003
EGYPT Dimensions: 2 x 5 x 4,5 m
Weight: 7.500 Kg

PFD & RPP “TURN KEY JOB”


PETROBEL PLATFORM Supply of n. 5 chemical injection skids 2003
EGYPT (methanol, glycol and chemical injection skids)

“TURN KEY JOB”


PFD PLATFORM Supply of instrument and service gas skid
PETROBEL 2003
EGYPT Dimensions: 2 x 5 x 4,5 m
Weight: 7.500 Kg

“TURN KEY JOB”


IRRI FLOW for execution of nitrogen generator package
- N° 1 Compressor and Air treatment skid
SAIPEM STATION PROJECT Dim. 2,2 x 6 x 3,5 m - Weight 5.800 Kg
2003
NIGERIA - N° 1 Nitrogen Vessel
NAOC - N° 1 Membrane skid Dim. 1 x 1,5 x 2 m - Weight 600 Kg

KARACHAGANAK
“TURN KEY JOB”
KPO DEVELOPMENT 2003
Supply of Water Steam Plant 6t/h + skids
PROJECT

“TURN KEY JOB”


ROSETTA FIELD Supply of one fuel gas treatment skid.
NUOVO PIGNONE 2002
EGYPT Dimensions: 4,2 x 2,6 x 4,2 m
Weight: 6.500 Kg
(EGYPT)

OBIAFU/ OBRIKOM
“TURN KEY JOB”
PLANT WORKS &
Supply of one chemical injection skid.
SAIPEM IRRI 2002
Dimensions: 4 x 2,5 x 2,8 m.
FLOWSTATIONS -
Weight: 2.500 Kg
NAOC NIGERIA

“TURN KEY JOB”


ISAB REFINERY Supply of four new GPL treatment skids
ERG PETROLI 2002
(Priolo ITALY) Dimensions: 6,8 x 2,5 x 4m each
Weight: Kg 15.000 each

“TURN KEY JOB”


ENI DIV. AGIP CENTRO OLIO Supply of four chemical injection skids 2002
(each ext. dim. 4 x 2,5 x 3,5 m.)
VIGGIANO (PZ)

“TURN KEY JOB”


PPC Supply of two pressure control skids for liquid
PETROJET AGROUD 2002
(EGYPT) hydrocarbons products (each ext dim.9.4 x 2.4 x 3 m.)
Weight: 18.000 Kg
R EFERENCES:
SKIDS/CHEMICAL INJECTION/PROCESS EQUIPMENT

CUSTOMER END USER PROJECT DESCRIPTION YEAR

HYUNDAI ATTAHADDY “TURN KEY JOB”


ENGINEERING GAS FIELD N° 3 Corrosion Inhibitor Injection Skids
2001
& CONSTRUCTION DEVELOPMENT, Dimensions: 3 x 2 x 3 m/each
COMPANY LIBYA Weight: Kg 3.000

ISA MANNAI/
ABHA BULK PLANT Disinfectant Injection System 2001
IMAD

HYUNDAI ATTAHADDY “TURN KEY JOB”


ENGINEERING GAS FIELD N° 25 Corrosion Inhibitor Injection Skids
2001
& CONSTRUCTION DEVELOPMENT, Dimmensions: 3 x 2 x 3 m/ each
COMPANY LIBYA Weight: Kg 3.000

HYUNDAI ATTAHADDY “TURN KEY JOB”


ENGINEERING GAS FIELD N° 8 Chemical Injection Skids
2001
& CONSTRUCTION DEVELOPMENT, Dimensions: 3 x 2 x 2,5 m/ each
COMPANY LIBYA Weight: Kg 2.200

UNITY WATER
“TURN KEY JOB”
PETROFAC INJECTION.
Supply of new two chemical injection skids 2001
INTERNATIONAL PROJECT
(each ext. dim. 5,65 x 2,55 x 2,30 m)
PHASE 1-SUDAN

“TURN KEY JOB”


ENI DIV. AGIP CENTRO OLIO Supply of new four chemical injection skids 2000
(each ext. dim. 4 x 2,5 x 3,5 m)
VIGGIANO (PZ)

EL GAMIL
“TURN KEY JOB”
GAS TREATMENT
PETROBEL Supply of one new gas metering skid 2000
PLANT
(ext. dim. 13 x 5,1 x 4,5 m)
EGYPT
TEMSAH PROJ. (EGYPT)

EL GAMIL
“TURN KEY JOB”
GAS TREATMENT
PETROBEL Supply of one new fuel gas skid 2000
PLANT
(ext. dim. 8 x 3,2 x 4,4 m)
EGYPT
TEMSAH PROJ. (EGYPT)

EL GAMIL “TURN KEY JOB”


GAS TREATMENT Supply of new three glycol injection skids
PETROBEL 2000
PLANT (ext. dim.: 9 x 3,2 x 3,2 m.; 6 x 3,1 x 3,2 m.;
EGYPT 4,3 x 2,5 x 2,8 m)
TEMSAH PROJ. (EGYPT)

NORTH WEST “TURN KEY JOB”


PETROBEL GAS PLATFORM Supply of new one instrument & service gas skids 2000
EGYPT (ext. dim. 7 x 3,2 x 5,2 m)
TEMSAH PROJ. (EGYPT)

“TURN KEY JOB”


ENI DIV. AGIP CENTRO OLIO Supply of new four chemical injection skids 2000
(each ext. dim. 4 x 2,5 x 3,5 m)
VIGGIANO (PZ)

“TURN KEY JOB”


BALTIM EAST PROJ.
PETROBEL Supply of new one instrument and service gas skid 1999
GAS PLATFORM
(ext. dim. 4 x 2 x 4 m)
BALTIM (EGYPT)
R EFERENCES:
SKIDS/CHEMICAL INJECTION/PROCESS EQUIPMENT

CUSTOMER END USER PROJECT DESCRIPTION YEAR

BALTIM EL QARA “TURN KEY JOB”


PETROBEL PROJ. Supply of new three glycol injection skids 1999
GAS ON SHORE (each ext. dim. 4 x 2,5 x 3 m).
BALTIM EL QARA (EGYPT)

“TURN KEY JOB”


HA’PY PROJ. Supply of new one gas and liquid metering skid
GUPCO GAS TREATMENT (ext. dim. 10,7 x 5 x 3,3 m) design for: 1999
EGYPT q.ty 3 + 1 spare metering line by 14” and
q.ty 2 headers by 24” 900 RJ.

“TURN KEY JOB”


HA’PY PROJ.
Supply of new one air treatment skid composed by:
GUPCO GAS TREATMENT 1999
- q.ty 1 air compressors skid (ext. dim. 6 x 1,5 x 2 m);
EGYPT
- q.ty 1 instrument and service air treatment

“TURN KEY JOB”


INTERMARE CLARA COMPLEX
Supply of new two glycol injection skids 1999
SARDA GAS PLATFORM
(each ext. dim. 2 x 2,5 x 2 ,m )

SARAS S.p.A. N° 3 Oxygen Control Skid


SARROCH 1999
Raffinerie Sarde (ext. dim. 5,9 x 0,9 x 2,1 m - Weight : 2.000 Kg.)

“TURN KEY JOB”


ENI DIV. AGIP CENTRO OLIO Supply of new two chemical injection skids 1999
(each ext. dim. 4 x 2,5 x 3,5 m)
VIGGIANO (PZ)

“TURN KEY JOB”


ENI DIV. AGIP CENTRO OLIO Supply of new twelve chemical and injection skids 1998
(each ext. dim. 4 x 2,5 x 3,5 m)
VIGGIANO (PZ)

“TURN KEY JOB”


DARFEEL PROJ. GAS
Supply of new one instrument and service gas skid
PETROBEL PLATFORM 1998
(ext. dim. 4 x 2 x 4 m) and new one chemicals injection
EGYPT
skid (ext. dim. 6,5 x 2,5 x 3 m)

“TURN KEY JOB”


Supply of new one air treatment skid composed by:
PORT FOUAD PROJ.
PETROBEL N°1 air compressors skid (ext. dim. 6 x 1,5 x 2m); N°1 1997
GAS ON SHORE
instrument and service air treatment (ext. dim. 4 x 2 x
4m); N°1 air surge drum having capacity about 30 m3.

“TURN KEY JOB”


ABU MADI PROJ.
PETROBEL Supply of new two corrosion inhibitor injection skids 1997
GAS ON SHORE
(each ext. dim. 3 x 2 x 2 m)
ABU DHABI

ANEMONE CLUSTER “TURN KEY JOB”


AGIP 1997
PLATFORM Supply of new one fuel gas treatment control unit

RAVENNA (RA)

LOANGO DP1 “TURN KEY JOB”


CHEMIT 1995
PLATFORM Supply of new three water service treatment skids

RECHERCHES CONGO
SERVICE DIVISION
THE VENDOR SPECIALIST

ECISGROUP Service Division was originally set up to guarantee the putting into
operation of its proprietary production systems and has grown and developed
more and more up to becoming an organized multi-services structure able to face
typical “on field” after-sales problems:

- Mechanical completion
- Pre-commissioning
- Commissioning
- Start-up
- Training
- Maintenance
- Spare parts
- Modernization
- Revamping (of proprietary and third parties systems)

Our Service Division introduces itself to Customers as a Vendor Specialist


proud of:

its long experience covering many fields in the development of equipment and
typical systems in the Oil & Gas, Refinery, Power Generation areas;

its knowledge of problems arising in production processes and on site;

its expertise on the professional utilization of equipment.


THE REASONS FOR A MAINTENANCE
CONTRACT
The reasons for carrying out regular maintenance operations on a plant are to:

A keep all its components constantly efficient, so as to guarantee the nominal


performance for which it has been designed

B reduce to the least all stops for failure, eliminating in advance typical critical
events which may occur

C verify in advance plant and structures safety systems efficiency for workers
protection during simulation of emergency situations

A maintenance contract allows to avail of a qualified partner able to intervene within


the agreed time when a plant suddenly stops to recover the proper operation of
the same.

A periodical maintenance of a plant eliminates or reduces the unforeseeable


costs to be borne when production is stopped in favor of a reduced cost, thus
guaranteeing plants efficient operation and long life.
OUR SERVICE DIVISION YOUR RELIABLE
PARTNER
PROFICIENCY:
– Direct and highly qualified knowledge of its proprietary plants/systems
– Top level technical-managerial and industrial culture.
The staff consists of engineers and technicians who have acquired a specific
proficiency in the main fields and sectors: systems, electrical, electronic,
automation, IT, carpentry mechanical structures, fluidic mechanics
– Capability to understand and manage non proprietary plants similar to its own
as to type, components, logics and criteria

EXPERIENCE:
– Years of technical experience applied to problem solving in the electrical,
instrumental, pneumatic - fluidic, automation, Oil & Gas, refinery, power
generation fields
– Knowledge of peculiar aspects of oil extraction and production sites located
abroad (Middle East, Africa, Northern Europe, map with location of sites)

WE KNOW WHERE
THE PROBLEM IS
AND HOW TO
SOLVE IT

MATERIALS PROCUREMENT NETWORK:


An important unit of Ecisgroup is specialized in the commercialization of specific
electrical and mechanical materials, it is in charge of procurement for the
whole Group having a preferential relationship with suppliers who guarantee
top reliability and best quality/price ratio, found in the vendors lists of the most
prestigious engineering companies

WE HAVE
THE
MATERIALS
STRUCTURE:
Ecisgroup avails itself of a specific Service Division made up of managers and
qualified technicians, devoted to satisfy customers requirements for any after-
sales problem. The technical staff is trained to operate in any operating condition
(onshore, offshore, hazardous areas, sensible areas).

CONTINUITY:
Non - stop operation of its own plants, followed up in the commissioning and start-
up stage. Maintenance activity takes advantage of historical experience of plants,
limiting intervention times and assuring a precise intervention.

WE HAVE
THE PEOPLE

SCHEDULED MAINTENANCE
PERIODICAL
1. Study of the plant to sort out critical elements
2. (if applicable) definition of most significant parameters to be detected on field
and periodically notified to Ecisgroup – Service Dept. for a remote monitoring
of plant performance
3 Definition of an ordinary maintenance program: list of maintenance activities
and timing
UPON STOP
4. Definition of maintenance program on scheduled stop: verification of
components which are accessible only upon plant standstill.

Definition/Management of spare parts stock necessary for scheduled


maintenance. Spare parts which are more critical to be found or which are more
subject to wearing or rupture.
EXTRAORDINARY MAINTENANCE
(upon request)
EMERGENCY
5. On the occurrence of a sudden and unforeseen failure
Ecisgroup Service Division effects emergency interventions
within max pre-fixed time, assuring stock of critical materials
for each specific application necessary for intervention.
6. For top critical plants Ecisgroup Service Division guarantees
24/24 hrs non stop assistance.

MODERNIZATION & BULLDOZING


IMPROVE YOUR PERFORMANCE THROUGH ECISGROUP CARE
- Detecting actual situation on site
- Developing detailed engineering
- Developing HW & SW design
- Replacing the obsolete plant with a new one
- Turnkey plant after Commissionig, Sat, Start Up

POWER GENERATION REFINERY CONTROL ROOM OIL&GAS


site site site site
WORKFORCE
20 Supervising Service Engineers

2 Million turnover in Service Activities

More than 25 Maintenance open contracts for:

- DCS - GAS REDUCING SKID


- ESD - F&G - GAS ODORIZER SKID
- SCADA - LAUNCHING AND RECEIVING TRAP
- FIELD EQUIPMENT - MANIFOLD SKID
- ANALYSIS SHELTERS - CHEMICAL INJECTION
- CEMS - INSTRUMENT AND SERVICE AIR
- WHCP PACKAGE
- SKID - PACKAGES - NITROGEN PRODUCTION PACKAGE
- GAS FILTRATION SKID - TRUCKS AND RAIL TANKERS LOAD
- GAS METERING SKID ING SYSTEM
- GAS HEATER SKID - WATER TREATMENT PACKAGE
SERVICE
DIVISION
References
R EFERENCES: SERVICE DIVISION

CUSTOMER END USER PROJECT DESCRIPTION YEAR

BOILER HOUSE Water treatment and boilers commissioning,


KPO 2009
KAZAKHISTAN start up & training

BOILER HOUSE Heat exchanger Skids:


KPO 2009
KAZAKHISTAN Commissioning, start up and training

ALLUMINIUM PLANT
LAVALIN Gas treatment skids: commissioning start up & training 2009
QATAR

ALLUMINIUM PLANT
LAVALIN Automation: commissioning & training 2009
QATAR

QATOFIN LLDPE
SAIPEM Analysis shelter commissioning & start up 2009
PLANT QATAR

AMREYA REFINERY
WECO AM. CO Air drier skid commissioning & start up 2009
EGYPT

ON-SHORE GAS Maintenance for CEM panels - 4 sites


SAIPEM 2008
STATION (Casalborsetti, Fano, Trecate, Sabbioncello)

QGX PROJECT -
CTJV Whcp: commissioning & start up 2008
QATAR

QGV PROJECT - Whcp: commissioning, start up & training and


CTJV 2008
QATAR revamping

SAQQARA REFINERY
GUPCO Nitrogen generation skid Training 2008
EGYPT

SAQQARA REFINERY
GUPCO Chemical injection skid training 2008
EGYPT

OFF SHORE: PLAT-


NOSPCO FORM TAO 93-t Whcp commissioning, start up and training 2008
EGYPT
R EFERENCES: SERVICE DIVISION

CUSTOMER END USER PROJECT DESCRIPTION YEAR

OFF SHORE:
NOSPCO PLATFORM TAO 93-t Chemical injection skid training 2008
EGYPT

HA’PY PRODUCTION
GUPCO INCREASE 3D LST Chemical injection skid commissioning 2008
EGYPT

OFF-SHORE
GAS PLATFORM
PETROBEL Whcp revamping 2008
TEMSAH NW2
EGYPT

OFF-SHORE GAS
PLATFORM TEMSAH
PETROBEL Whcp Denise commissioning & start up 2008
NW2
EGYPT

RAS LAFFAN
LDPE / HDPE
TECNIMONT Analysis shelters commissioning & start up - 4 shelters 2008
PLANT
SAUDI ARABIA

GAS RECEIVING
Filtering,pressure reduction,Metering skids commissioning
PETROJET PPC STATION 2007
and training - 3 sites
EGYPT

OFF-SHORE GAS
PLATFORM TEMSAH
PETROBEL Whcp commissioning & start up 2007
NW2
EGYPT

GAS STORAGE
PLANT /RIPALTA /
SAIPEM ENERGY Technology Emerson Delta V/RS3 - Maintenance
BRUGHERIO / 2007
SERVICE System DCS
SERGNANO
ITALY

BOILER HOUSE Automation & Scada:


KPO 2006
KAZAKHISTAN Commissioning, start up and training

OFF-SHORE GAS
Maintenance for CEM panels - 2 sites
SAIPEM PLATFORM 2006
(Garibaldi, Cervia)
ITALY

POWER PLANT
COMBINED CYCLE /
ABB E.A. Technology HIMA - Maintenance System ESD 2006
OSTIGLIA
POWER ITALY

POWER PLANT
COMBINED CYCLE/
ABB E.A. Technology HIMA - Maintenance System SDS 2005
FERRARA - MANTOVA -
POWER RAVENNA (ITALY)
R EFERENCES: SERVICE DIVISION

CUSTOMER END USER PROJECT DESCRIPTION YEAR

GAS STORAGE
SAIPEM ENERGY
PLANT /RIPALTA - Technology Invensys I/A Series 2005
SERVICE
ITALY

OFF- SHORE/ON- SHORE


C.Le Grottamare, Piatt.Me
Barbara T2, Clara Nord,
SAIPEM ENERGY Clara Est, Calpurnia, Emilio,
E&P Davide, Fratello, Emma, Technology HIMA - Maintenance System HIMA 2005
SERVICE C.le Casalborsetti, Fano,
Spilamberto, Trecate,
Piatt.Me Cervia e Angela
(ITALY)

GAS TERMINAL / System DCS/RTP/ESD Triconex/System F&G e Field


GREENSTREAM 2005
GELA Equipment
GREENSTREAM

SAIPEM ENERGY TRECATE OIL CENTER


E&P Technology MOORE - Maintenance System DCS 2004
SERVICE ITALY
PRODUCT
LIST

Oil & Gas


P RODUCTS & SERVICES FOR THE
OIL&GAS INDUSTRY MECHANICAL
& CONTROL EQUIPMENT

A - SKIDS
1 Fuel Gas Treatment Skids (ESD, Filtration, Metering, Analysis, Heating, Reducing,)
2 Gas Odorizer Skids
3 Meter Provers
4 Launching and Receiving Traps
5 Manifold Skids
6 Chemicals Injection Skids (Corrosion, Methanol, Glycol, etc...)

B - PACKAGES
1 Instrument and Service Air Packages
2 Water Treatment Packages (primary & secondary water /biological)
3 Diesel Oil Package
4 Hydrogen Production Package
5 Nitrogen Production Package: (Membrane & PSA)
6 Trucks And Rail Tankers Arm Loading Systems
7 Fire Fighting Packages
8 Early Production Facilities
(Manifold, Well Test Production, HP & LP Test Separators, Slug Catcher, Oil Stabilizer)
9 TEG - MEG Packages
10 Dehydration Systems Packages

C - PNEUMO-HYDRAULIC SYSTEMS
1 Wellhead Control Panels
2 Electro-pneumatic Control Panels
3 Hydraulic Power Units

D - ANALYZER SYSTEMS
1 Analyzer Shelter Packages
2 Sampling Conditioning Systems
3 Environmental Monitoring Systems (CEMS)

I - SERVICES
1 Engineering
2 Commissioning / Start-up
3 On site maintenance
4 Training

Oil & Gas


P RODUCTS & SERVICES FOR THE
OIL&GAS INSTRUMENT ELECTRICAL
& AUTOMATION EQUIPMENT

E - PLC/DCS/F&G/SCADA/SYSTEMS
1 Burner Management Systems (BMS)
2 DCS & PLC Hardware
3 DCS & PLC Application Software
4 Emergency Shutdown Systems (ESD) PLC Based
5 Safety Plc TÜV Certified To Sil3
6 Relay Logic Systems TÜV Certified To Sil4 - HIPPS
7 Fire & Gas Detectors
8 Fire & Gas Monitoring and Detection Systems
9 RTU and Scada Systems
10 Complete protection systems (sensors + logic solver + final elements) like HIPPS

F - COMPUTER HW & SW
1 Hardware And Software
2 Local Area Network Systems
3 Personal Computers
4 Fiber Optic Networks

G - PANEL
1 Control Panels
2 Control Panels For Classified Areas – Pressurized Constructions
3 Local Panels
4 Marshalling Cabinets
5 Marshalling Panels
6 Purging / Pressurized Systems For Local Panel

H - TELECOMMUNICATION SYSTEM & SECURITY


1 Building Security System
2 CCTV systems

I - SERVICES
5 Configuration of DCS and PLC Systems
6 Multivariable Plant Optimization
7 Instrument Engineering
8 Electrical Engineering
9 After Sales Services
10 Maintenance Of Control Systems
11 SIL Assessment
P RODUCTS & SERVICES FOR THE
OIL&GAS BULK MATERIAL
FOR ERECTION

α - INSTRUMENT MECHANICAL BULK MATERIALS


1 Instrumentation Tubing In Coils And Bars
2 Pre-Insulated and Pre-Traced Multi-Tubing Bundles
3 Double Ferrule Compression Fittings
4 Instrument Flanges
5 High Pressure Valves, Fittings And Tubing
6 Instrument Valves And Manifolds
7 Ball And Needle Valves
8 Double Block & Bleed Valves
9 Monoflange Valves
10 Instrument Protection & Heating Boxes/Sunshades
11 Seal Chambers, Condensing And Air Distribution Pots
12 Engineered Supplies

β - ELECTRICAL BULK MATERIALS FOR HAZARDOUS AREA


1 Conduit Pipes
2 Cable Glands and Electrical Fittings IEC / NEC
3 Junction Boxes IEC / NEC
4 Plugs and Sockets IEC / NEC
5 Fluorescent and Floodlight Lighting IEC / NEC
6 Electrical Cables
7 Cable Protection Systems
8 Trefoil Cable Cleats
9 Metal / Fiber Glass Cable Trays & Ladders
10 Multi Cable Transit Systems
11 EExp certified Pressurized Systems / Enclosures
12 Control Stations IEC / NEC
13 Intrinsic safety (EExia) Solenoid Valves
14 Engineered Supply

γ - INSTRUMENT VALVES FOR SEVERE SERVICE


1 Pilot And Changeover Safety Relief Valves
2 Triple-Offset Control Butterfly Valves
3 Choke And Control Valves

Oil & Gas


P RODUCTS & SERVICES FOR THE
OIL&GAS BULK MATERIAL
FOR ERECTION

δ - PIPING VALVES & FLANGES SAVING SOLUTIONS


1 High performance metal to metal valves & flanges
a Twinsafe® double block & bleed ball valves
b Triple-offset butterfly valves
c Cryogenic triple-offset butterfly valves
d Double isolate triple-offset butterfly valves
e Dual plate check valves
f Flanges and clamp connectors

ε - INSTRUMENT VALVES & DEVICES FOR HYDRAULIC & PNEUMATIC SYSTEMS


1 Hydraulic water/glycol and oil pumps
2 Pressure intensifiers
3 Pressure regulators
4 Directional control valves / slide valves
5 Safety relief valves
6 Quick exhaust valves
7 Flowline pilot valves
8 Pneumatic/hydraulic/electric pressure switches
9 Pneumatic/electric level switches
10 Manual reset relays
11 Sand probes
12 ESD manual valves
13 Pneumatic/hydraulic indicators
14 Fusible plugs

ζ - ELECTRICAL & STEAM TRACING


1 Basic design of the electrical & heating systems
2 Detail design of the electrical & heating systems
3 Drawings and typical installation sketches
4 Heating cables, self-regulating or constant wattage type
5 Pre-traced and pre-insulated multi-tubing systems
6 Main low voltage panels
7 Local panels
8 Junction boxes
9 Low voltage cables for feeding and control
10 Cable-ways, conduit pipes and cable-trays
11 Instrumentation for control and regulation
12 Instrument protection and heating boxes
13 Instrument tubing in coils
14 Engineered supplies
P RODUCTS & SERVICES FOR THE
OIL&GAS
EPC CONTRACTORS
MULTIDISCIPLINARY ENGINEERING DIVISION
For over 20 years, ECISGROUP Engineering Division has provided Customers

with qualified engineering services and has powered the development of advanced
technology solutions in Control & Safety Systems, Instrumentation, Process Simulation,
Multivariable Control and Optimization Technologies for plant management.

Along with the group’s increasing needs, ECISGROUP Engineering Division with the
implementation of Electrical, Process and Piping engineering depts., has grown to
become a full Multidisciplinary Engineering Business Unit with over 125.000 Man-
Hours/Year Multidisciplinary Engineering Staff

– Project Management Consulting – PMC


– Process
– Mechanical & Piping
– Civil
– Instrumentation & Analysis
– Advanced Control
– Electrical
– Telecommunications

Oil & Gas


PRODUCT
LIST

Petrochemical
P RODUCTS & SERVICES FOR THE
PETROCHEMICAL INDUSTRY MECHANICAL
& CONTROL EQUIPMENT

A - SKIDS
1 Gas Reducing Station
2 Gas Heater Skids
3 Gas Metering Skids
4 Gas Treatment Skid
5 Chemical injection/Corrosion skids

B - PACKAGES
1 Instrument and service air packages
2 Water treatment packages (primary & secondary water /biological)
3 Diesel oil package
4 Nitrogen production package: Membrane & PSA
5 Fire fighting packages
6 TEG - MEG Packages
7 Dehydration Systems Packages

C - ANALYZERS SYSTEMS
1 Sampling Systems
2 Sampling, Conditioning System & Analysis Systems
3 Analyzer Cabinet
4 Analyzer Shelters

D - SERVICES
1 Engineering
2 Commissioning / Start-up
3 On site maintenance
4 Training

PETROCHEMICAL
P RODUCTS & SERVICES FOR THE
PETROCHEMICAL INSTRUMENT ELECTRICAL
& AUTOMATION EQUIPMENT
E - PLC/DCS/F&G/SCADA/SYSTEMS
1 Burner Management Systems (BMS)
2 DCS & PLC Hardware
3 DCS & PLC application Software
4 Emergency Shutdown Systems (ESD) PLC based
5 Safety PLC TÜV certified to SIL3
6 Relay logic systems TÜV certified to SIL4 - HIPPS
7 Fire & Gas Detectors
8 Fire & Gas Monitoring and Detection Systems
9 RTU and SCADA systems
10 Complete protection systems (sensors + logic solver + final elements) like HIPPS

F - COMPUTER HW & SW
1 Hardware and Software
2 Local area network systems
3 Personal computers
4 Fiber optic networks

G - PANEL
1 Control panels
2 Control panels for classified areas - pressurized constructions
3 Local panels
4 Marshalling cabinets
5 Marshalling panels
6 Purging / pressurized systems for local panel

H - TELECOMMUNICATION SYSTEM & SECURITY


1 Building security system
2 CCTV systems

D - SERVICES
5 Configuration of DCS and PLC Systems
6 Multivariable plant optimization
7 Instrument Engineering
8 Electrical Engineering
9 After sales services
10 Maintenance of Control Systems
11 SIL assessment
P RODUCTS & SERVICES FOR THE
PETROCHEMICAL BULK MATERIAL
FOR ERECTION

α - INSTRUMENT MECHANICAL BULK MATERIALS


1 Instrumentation tubing in coils and bars
2 Pre-insulated and pre-traced multi-tubing bundles
3 Double ferrule compression fittings
4 Instrument flanges
5 High pressure valves, fittings and tubing
6 Instrument valves and manifolds
7 Ball and needle valves
8 Double block &bleed valves
9 Monoflange valves
10 Instrument protection & heating boxes/sunshades
11 Seal chambers, condensing and air distribution pots
12 Engineered supplies

β - ELECTRICAL BULK MATERIALS FOR HAZARDOUS AREA


1 Conduit Pipes
2 Cable Glands and Electrical Fittings IEC / NEC
3 Junction Boxes IEC / NEC
4 Plugs and Sockets IEC / NEC
5 Fluorescent and Floodlight Lighting IEC / NEC
6 Electrical Cables
7 Cable Protection Systems
8 Trefoil Cable Cleats
9 Metal / Fiber Glass Cable Trays & Ladders
10 Multi Cable Transit Systems
11 EExp certified Pressurized Systems / Enclosures
12 Control Stations IEC / NEC
13 Intrinsic safety (EExia) Solenoid Valves
14 Engineered Supply

γ - INSTRUMENT VALVES FOR SEVERE SERVICE


1 Pilot and changeover safety relief valves
2 Triple-offset control butterfly valves

PETROCHEMICAL
P RODUCTS & SERVICES FOR THE
PETROCHEMICAL BULK MATERIAL
FOR ERECTION

δ - PIPING VALVES & FLANGES SAVING SOLUTIONS


1 High performance metal to metal valves & flanges
a Twinsafe® double block & bleed ball valves
b Triple-offset butterfly valves
c Cryogenic triple-offset butterfly valves
d Double isolate triple-offset butterfly valves
e Dual plate check valves
f Flanges and clamp connectors

ε - ELECTRICAL & STEAM TRACING


1 Basic design of the electrical & heating systems
2 Detail design of the electrical & heating systems
3 Drawings and typical installation sketches
4 Heating cables, self-regulating or constant wattage type
5 Pre-traced and pre-insulated multi-tubing systems
6 Main low voltage panels
7 Local panels
8 Junction boxes
9 Low voltage cables for feeding and control
10 Cable-ways, conduit pipes and cable-trays
11 Instrumentation for control and regulation
12 Instrument protection and heating boxes
13 Instrument tubing in coils
14 Engineered supplies
P RODUCTS & SERVICES FOR THE
PETROCHEMICAL
EPC CONTRACTORS
MULTIDISCIPLINARY ENGINEERING DIVISION
For over 20 years, ECISGROUP Engineering Division has provided Customers

with qualified engineering services and has powered the development of advanced
technology solutions in Control & Safety Systems, Instrumentation, Process Simulation,
Multivariable Control and Optimization Technologies for plant management.

Along with the group’s increasing needs, ECISGROUP Engineering Division with the
implementation of Electrical, Process and Piping engineering depts., has grown to
become a full Multidisciplinary Engineering Business Unit with over 125.000 Man-
Hours/Year Multidisciplinary Engineering Staff

– Project Management Consulting – PMC


– Process
– Mechanical & Piping
– Civil
– Instrumentation & Analysis
– Advanced Control
– Electrical
– Telecommunications

PETROCHEMICAL
PRODUCT
LIST

Power
P RODUCTS & SERVICES FOR THE
POWER INDUSTRY MECHANICAL
& CONTROL EQUIPMENT

A - FUEL GAS SYSTEMS CONDITIONING


1 ESD
2 Pre-Filtering
3 Metering Station
4 Analyzer Systems
5 Preheating
6 Gas Pressure Reducing Station And Final Filtering For Gas Turbine
7 Gas Pressure Reducing Station For Auxiliary Boiler

B - CHEMICAL DOSING SYSTEM FOR WATER-STEAM CYCLE AND WATER


1 Corrosion Inhibitor Package Oxygen Scavenger
2 PH Correction Package Ammonia/Hydrazine
3 Phosphate Package

C - CHEMICAL DOSING SYSTEM FOR COOLING WATER TOWERS


1 Corrosion Inhibitor Package
2 Anti-Scale Package
3 Hypo-Chlorite Package
4 Sulphuric Acid Package

D - ANALYZER SYSTEMS
1 Environmental Monitoring Systems (CEMS)
2 Sampling Conditioning Water System
3 Oil In Water Monitoring System
4 Gas Analyzer System

E - INSTRUMENT AND SERVICE AIR SYSTEM


1 Air Receivers
2 Filter and Dryer Unit Air Receivers

I - SERVICES
1 Engineering
2 Commissioning / Start-up
3 On site maintenance
4 Training

PO WER
P RODUCTS & SERVICES FOR THE
POWER INSTRUMENT ELECTRICAL
& AUTOMATION EQUIPMENT

F - PLC/DCS/F&G/SCADA/SYSTEMS
1 Burner Management Systems (BMS)
2 DCS & PLC Hardware
3 DCS & PLC application Software
4 Emergency Shutdown Systems (ESD) PLC based
5 Safety PLC TÜV certified to SIL3
6 Relay logic systems TÜV certified to SIL4 - HIPPS
7 Fire & Gas Detectors
8 Fire & Gas Monitoring and Detection Systems
9 RTU and SCADA systems
10 Complete protection systems (sensors + logic solver + final elements) like HIPPS

G - COMPUTER HW & SW
1 Hardware and Software
2 Local area network systems
3 Personal computers
4 Fiber optic networks

H - PANEL
1 Control panels
2 Control panels for classified areas – pressurized constructions
3 Local panels
4 Marshalling cabinets
5 Marshalling panels
6 Purging / pressurized systems for local panel

L - TELECOMMUNICATION SYSTEM & SECURITY


1 Building security system
2 CCTV systems

I - SERVICES
5 Configuration of DCS and PLC Systems
6 Multivariable plant optimization
7 Instrument Engineering
8 Electrical Engineering
9 After sales services
10 Maintenance of Control Systems
11 SIL assessment
P RODUCTS & SERVICES FOR THE
POWER BULK MATERIAL
FOR ERECTION

α - INSTRUMENT MECHANICAL BULK MATERIALS


1 Instrumentation tubing in coils and bars
2 Pre-insulated and pre-traced multi-tubing bundles
3 Double ferrule compression fittings
4 Instrument flanges
5 Instrument valves and manifolds
6 Ball and needle valves
7 Instrument protection & heating boxes/sunshades
8 Seal chambers, condensing and air distribution pots
9 Engineered supplier

β - ELECTRICAL BULK MATERIALS FOR HAZARDOUS AREA


1 Conduit Pipes
2 Cable Glands and Electrical Fittings IEC / NEC
3 Junction Boxes IEC / NEC
4 Plugs and Sockets IEC / NEC
5 Fluorescent and Floodlight Lighting IEC / NEC
6 Electrical Cables
7 Cable Protection Systems
8 Trefoil Cable Cleats
9 Metal / Fiber Glass Cable Trays & Ladders
10 Multi Cable Transit Systems
11 EExp certified Pressurized Systems / Enclosures
12 Control Stations IEC / NEC
13 Intrinsic safety (EExia) Solenoid Valves
14 Engineered supply

γ - INSTRUMENT VALVES FOR SEVERE SERVICE


1 Pilot and changeover safety relief valves
2 Triple-offset control butterfly valves

δ - INSTRUMENT AND SERVICE AIR SYSTEM


1 Air Receivers
2 Filter and Dryer Unit and Air Receivers

ε - CLOSE CYCLE COOLING WATER SYSTEM (DEMI WATER)


1 Slope Oil System
PO WER
P RODUCTS & SERVICES FOR THE
POWER BULK MATERIAL
FOR ERECTION

ζ - PIPING VALVES & FLANGES SAVING SOLUTIONS


1 High performance metal to metal valves & flanges
a Triple-offset butterfly valves
b Dual plate check valves

η - ELECTRICAL& STEAM TRACING


1 Basic design of the electrical & heating systems
2 Detail design of the electrical & heating systems
3 Drawings and typical installation sketches
4 Heating cables, self-regulating or constant wattage type
5 Pre-traced and pre-insulated multi-tubing systems
6 Main low voltage panels
7 Local panels
8 Junction boxes
9 Low voltage cables for feeding and control
10 Cable-ways, conduit pipes and cable-trays
11 Instrumentation for control and regulation
12 Instrument protection and heating boxes
13 Instrument tubing in coils
14 Engineered supplies
P RODUCTS & SERVICES FOR THE
POWER
EPC CONTRACTORS
MULTIDISCIPLINARY ENGINEERING DIVISION
For over 20 years, ECISGROUP Engineering Division has provided Customers

with qualified engineering services and has powered the development of advanced
technology solutions in Control & Safety Systems, Instrumentation, Process Simulation,
Multivariable Control and Optimization Technologies for plant management.

Along with the group’s increasing needs, ECISGROUP Engineering Division with the
implementation of Electrical, Process and Piping engineering depts., has grown to
become a full Multidisciplinary Engineering Business Unit with over 125.000 Man-
Hours/Year Multidisciplinary Engineering Staff

– Project Management Consulting – PMC


– Process
– Mechanical & Piping
– Civil
– Instrumentation & Analysis
– Advanced Control
– Electrical
– Telecommunications

PO WER

You might also like