Date : 04-08-2010
Scope & Installed Infra Tests SS test TMG Lan Router
# of tests
Total # # of tests Total # # of tests Total # # of tests Total # complete Total # # of tests
S.No. Site name SS TMG of tests completed of tests completed of tests completed of tests d of tests completed
Telephone Bhavan
1 Hyderabad 2 1 12 9 26 24 19 18 9 7 17 15
2 Rajahmundry 1 1 12 10 26 19 19 13 9 8 17 14
3 GUNTUR 1 1 12 5 26 19 19 16 9 8 17 15
4 Tirupathi (AT) 1 12 0 26 NA 19 18 9 8 17 15
5 Vizag(AT) 1 12 0 26 NA 19 15 9 8 17 15
KarimNagar
6 (AT) 1 12 9 26 NA 19 16 9 8 17 15
7 Elluru(AT) 1 12 10 26 NA 19 18 9 8 17 15
8 Kurnool (AT) 1 12 12 26 NA 19 10 9 7 17 15
9 Nalgonda (Pre-AT) 1 12 0 26 NA 19 14 9 8 17 15
Ananthpur
10 (Pre-AT) 1 12 0 26 NA 19 15 9 8 17 15
11 Warangal 1 12 0 26 NA 19 0 9 0 17 0
12 Khammam 1 12 0 26 NA 19 0 9 0 17 0
13 Vizianagram 1 12 0 26 NA 19 0 9 0 17 0
14 Sangareddy 1 12 0 26 NA 19 0 9 0 17 0
15 Srikakulam 1 12 0 26 NA 19 0 9 0 17 0
16 Nellore 1 12 0 26 NA 19 0 9 0 17 0
17 Cuddapah(PRE-AT) 1 12 0 26 NA 19 6 9 7 17 8
18 Mehbobnagar 1 12 0 26 NA 19 0 9 0 17 0
Remarks
AT ongoing
Some of the test are partialy
pass need
to clear the requirement of
BSNL.
AT Completed
successfully.Need to clear
some pending point.
At started on 21-06-2010.AT
Completed 90%
Need to clear now only 3 TMG
AT completed
pending points.
successfully.Some Test are NA
and need relaxation letter from
T&D jabalpur.
At started on 29-06-2010.AT
Completed 80%
Need to offer AT from BSNL.
A.C. Plant
5
Engine Alternator
6
Power Plant & Batteries & Inverter/UPS (If provided)
7
Location, Alignment & Rigidity (LAR)
10
QA certification of all equipment
Check of Documentation
11
General Check points
12
Infrastructure Test
(Digital E 10B)
As per approved layout plan PASS
PASS
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
NA
NA
Pass
N/A
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
REMARKS Vizag REMARKS
Pass
Pass
Pass
Pass
Pass
Common Atternator is proved
Pass by BSNL
Pass
Pass
Pass
Installation team not done
Earthing for E1 cables. At
asking do the earthing
Partially Pass
Pass
Pass
Kurnool REMARKS
PASSED ON 29-07-10
PASSED ON 29-07-10
PASSED ON 29-07-10
PASSED ON 29-07-10
PASSED ON 29-07-10
PASSED ON 29-07-10
PASSED ON 29-07-10
PASSED ON 29-07-10
PASSED ON 29-07-10
PASSED ON 29-07-10
PASSED ON 29-07-10
PASSED ON 29-07-10
PASSED ON 29-07-10
PASSED ON 29-07-10
PASSED ON 29-07-10
Khammam Remarks
pass
pass Passed on 6-Oct-2010 Dimentionig
letter need to submit
Sl.
No TEST DESIRIPTION
1. Power ON Test
7. M3UA connection function between the signaling gateway and soft switch
device.
8. Addition of carrier access code in case of no CLI received.
3. Check that the transfer of CDR files is programmable for the time of the
day and the frequency at which CDR shall be downloaded to the billing centre.
Also check the integrity of CDR file downloaded to the Billing Mediation
Device.
6. Check that 50%, 75% and 90% of capacity of billing file, alarm of suitable
category is generated.
7. CDR data is available in duplicated hard disks.
8. Check that CDR can be obtained in CSV format for further processing.
10. Check that counters can be used for each outgoing and incoming TG.
13. Check the Operation and Maintenance of SS is possible through local craft terminal as
well as remotely located NMS.
2. Check that Call related data for such calls is stored in a separate file(write
protected) to be retrieved by authorized personnel or transferred to an
external equipment as per requirement.
21. It shall be possible through a single Man-Machine Command to obtain a list and
the total number of equipment of a particular type (e.g. trunks etc.) in a particular
state (e.g. in-service, blocked etc.).
24. Loop-back testing of signalling and voice paths for CCS7 and IP shall be supported.
Pass Pass
Pass Pass
Pass PASS
Pass PASS
Pass PASS
Pass PASS
Pass PASS
Pass PASS
Pass PASS
Pass PASS
Pass Pending
Pass PASS
Pass PASS
Pass PASS
Pass PASS
Pass PASS
Pass PASS
Pass Pending
Pass PASS
Pass PASS
Passed on 31-Aug-2010 PASS
pass
PASS
Passed on 31-Aug-2010 PASS
pass
partially pass
I shown for 100,108,139 calls PASS
but AT person is asking about
need to check with meetering
and non metering details
pending
pass PASS
pass Pending
pass PASS
pass Pending
PASS
pass
passed on 30-Aug-2010 PASS
Pass
PASS
pass PASS
pass PASS
I kept for so many times but it Pending
is disconneting by SS need to
check it
paending
AT person want to observer by
their BSNL people in NMS
pending NA
Pass PASS
pass PASS
pass PASS
pass PASS
Pass PASS
Pending
Pending
AT person want billing from Pending
their billing center for IP tax
calls
Pending
Pending
Pass
pass Pending
pass Pending
pass Pending
pass PASS
pass PASS
pass Pending
pass PASS
PASS
pass
pass PASS
pass
PASS
pass
NA NA
progress
progress
PASS
pass
pass Pending
Pending
pass
pass Pending
pass PASS
pass PASS
Pending
pass
pass Pending
Pending
pass Pending
Pending
need to configure in BSNL
pending SSTP side NA
pass PASS
PASS
pass
pass PASS
Pending
pass
Pending
pass
pass Pending
pending Pending
Partially pass
Passed on 31-Aug-2010
Pass
REMARKS
Again checked this test and Passed
on 23-06-2010
Checked for software version It was
pass and need to upgrade with new
version
MTP/SCCP/INAP IS PENDING
SIP-T IS PENDING
Billing center not ready so we cannot
perform.
NA
1. Power ON Test
1. Redundancies test-
7. Synchronization Test
7.
1. Clock synchronization test
9. Diagnose Test
1. Check the capability to Diagnose the
system
4. RTP
15 Operational Features
1. DTMF detection and generation.
17 Statistics Test
a. Redundancy Test
1. Control Module Redundancy
2. Disk redundancy
3. Power Supply redundancy
4. Network Link (Fast Ethernet Link)
Pass
Pass
Pass
Pass
NA
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Partly Pass
Pass
Pass
Pass
Pass
Pass
Pass
Partly done/Pass
Pass
Pass
BSNL need a letter noted that
the MSG can support SCTP
protocol and can be used as SG
Partly done/Pass
Pass
Pass
Pass
Pass
Ready for AT.
Not Done
NA
Need collect the supplementry
services.
Not Done
Pass
Pass
NA
Pass
Pass
pass
BSNL want to know How to
check generation?
pass
Partly Pass
pass
NA
Pass
Pass
NA
NA
NA
Pass
BSNL wants to check on live
Partially Pass traffic.
Partially Pass
Partially Pass
Partially Pass
Partially Pass
Pass
Pass
Pass
Pass
Partially Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Rajmundry Telephone
Exchange
(Pass/Fail)
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Partly done
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
pass
Pass
Pass
pending
progress
pending
Pass
pass
pass
NA
pass
pass
pass
pass
progress
pass
Pass
pass
pass
NA
NA
NA
Pass
progress
progress
progress
progress
progress
pass
pass
pass
pass
pass
pass
pass
pass
pass
pass
pass
pass
pass
pass
pass
pass
pass
pass
REMARKS
call released after 2 hours but in test case it is 24 hour long call, I
discussed with Parvez TSD he told me we need to check metering
in PC server,zhang is configuaring required parameters
passed on 6-09-2010
I shown in the OMC console but Alarm box is not generating any
voice it generating only beeps and he check the cleared alarms in
alarm box
I shown in the OMC console but Alarm box is not generating any
voice it generating only beeps and he check the cleared alarms in
alarm box
I shown in the OMC console but Alarm box is not generating any
voice it generating only beeps and he check the cleared alarms in
alarm box
I shown in the OMC console but Alarm box is not generating any
voice it generating only beeps and he check the cleared alarms in
Ialarm box
shown in the OMC console but Alarm box is not generating any
voice it generating only beeps and he check the cleared alarms in
alarm box
Passed on 26-Aug-2010
Passed on 26-Aug-2010
Passed on 26-Aug-2010
Passed on 26-Aug-2010
Passed on 26-Aug-2010
Passed on 26-Aug-2010
Passed on 26-Aug-2010
Passed on 26-Aug-2010
Passed on 26-Aug-2010
Passed on 26-Aug-2010
Passed on 26-Aug-2010
Passed on 26-Aug-2010 As per BSNL requirement we
test 10 Anouncements with diffent scenarios and AT
person is asking need to test more tones but those
are not loaded in AS. (1. This number is chnaged
please concern telephone directory or 197 2.This
number is changed please dail 1585)
Passed on 26-Aug-2010
Guntur Telephone
Exchange KarimNagar
REMARKS
Pass Pass
Pass Pass
Pass Pass
Pass Pass
Pass Pass
Pass Pass
Pass Pass
PASS
Pass Pass
Not Done NA
Pass Pass
Pass Pass
Pass Pass
Pass
Pass
Pass
Pass Pass
Pass Pass
Pass Pass
Pass Pass
Pass Pass
Pass Pass
Partly done/Pass
PASS Pass
PASS Pass
In Progress Pass
Pass Pass
Pass Pass
Not Done
NOT DONE
Fax call is pending Will be tested tommorow
because here fax
mechine is not
available.
Partly done/Pass
NA
N/A
Conference call need to be
tested
Not Done
Partly done/Pass
pass Pass
N/A NA
T.38 G.729(optional) is Pass
pending
pass
pass Pass
Pass Pass
Soft loop testing is
passed hard loop testing
in progress
In Progress Pass(Two electrical E1 are faulty)
Only one two tested
In Progress
PASS
PASS
PASS Pass
PASS Pass
N/A Pass
N/A NA
N/A NA
PASS Pass
BSNL wants to check Not Done
PASS this test with
announcement server
PASS
PASS
PASS
PASS
PASS
PASS Pass
PASS Pass
PASS Pass
PASS Pass
Pass
Not Done
Pass on 21-07-2010
Pass
Pass on 21-07-2010
Pass
Pass Pass on 28-07-10
Pass
Pass
NA
Pass
Pass
Pass on 28-07-10
Pass
Pass
Pass
Not Completed
Need ISDN no from BSNL Fax call from one Pstn it is
done the other Pstn is not
routed towards to the IP
TAX.
Partially Passed
NA
Pass
NA
Pass
Pass
Not Completed
Soft Loop is passed and Hard
loop is tested for 5 DTB
cards.
al E1 are faulty) In progress
The call is releasing after 2 or
3 hours.
Not Completed
Pass
NA
NA
NA
Passed on 28-07-10
Pass
It can be conducted when the
Not Completed traffic has started.
Not Completed
Not Completed
Not Completed
Not Completed
Passed on 28-07-10
Passed
Passed on 28-07-10
Passed
Passed on 28-07-10
Passed
Passed on 28-07-10
Passed
Partial Passed
Tirupathi REMARKS
pass
pass
pass
pass
pass
pass
pass
pass
pass
No PLMN connectivity
partially pass so pending only for PLMN.
pass
pass
pass
pass
pass
pass
pass
pass
pass
pass
pass
pass
pass
pass
pass
pass
pass
pass
Pass
not possible no exchange is
having the active standby
Not done provision
NA
Pass
pass
pass
NA
pass
need to capture packets from
pass router
pass
pass
Pass
Pass
pass
pass
pass
pass
pass
pass
Pass
pass
pass
pass
pass
pass
pass
pass
pass
pass
pass
Connected AS not ready so
now not possible to show
Not done this test
Elluru REMARKS
pass
pass
Passed on 6-Aug-2010 ISDN call is
progress
Pass
NA
Pass
Pass Passed on 31-Jul-2010
NA
pass
pass
N/A
N/A
Pass
Completed
Pass
Completed
Pass
KURNOOL REMARKS
Passed on 29-07-10
Passed on 29-07-10
Passed on 29-07-10
Passed on 31-07-10
Passed on 31-07-10
Passed on 31-07-10
Passsed on 30-07-10
Passed on 30-07-10
Passed on 30-07-10
Passed on 30-07-10
output Is not showing.
Passed on 30-07-10
N/A
N/A
Passed on 30-07-10
Passed on 30-07-10
Khammam REMARKS
Passed on 6-Oct-2010
Pass
Passed on 6-Oct-2010
Pass
Passed on 6-Oct-2010
Pass
Passed on 6-Oct-2010
Pass
Passed on 6-Oct-2010
Pass
Passed on 6-Oct-2010
Pass
Passed on 6-Oct-2010
Pass
Passed on 6-Oct-2010
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Physical OMP card is ok,but in
diagnose test OMP card shows
Pass fault
in diagnose test EUIM card
shows fault
Pass
Pass
Pass
Pass
Pass
output Is not showing.
Pass
pass
Pass
pass
Pass
pass
AT sir asked Differet users to be
created other than ADMIN.
pass
pass
Pass
NA
Pass
Pass
NA
Pass
Pass
Pass
pass
pass
Pass
Pass
Pass
Pass
N/A
N/A
N/A
N/A
N/A
Reachable for Slave Board
only ,not a Master Board.
Pass
Partially Pass
Partially Pass
Partially Pass
Partially Pass
Partially Pass
Pass
realtime history alarms not
getting in client pc and alarm
codes calrification
Pass
Pass
Pass
Pass
Pass
AS not available at
site.So play the
annocement according to
AT requirement.
NA
NA
NA
NA
NA
NA
NA
NA
Pass
Pass
Pass
KADAPA(PRE-AT)
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
N/A
Completed
N/A
Completed
Completed
Completed
Not tested
Completed
Completed
N/A
N/A
N/A
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Not tested
Not tested
Not tested
Not tested
Completed
Completed
Remarks
Need to Perform
Need configure in Bsnl end
Need to perform
Not Tested,Need to Perform
LAN Switch Generic Tests
Sl No Test Item Telephone
Bhavan,Hyderabad
Status
(Pass/Fail)
1 Hardware check Pass
a. Power Supply NA
b. Hard disk NA
c. Processor NA
A. Console Pass
B. Telnet Pass
(Completed
P
a
sCompleted
s
/
F
a
iCompleted
l
)
Completed
Completed
Completed
Completed
pass
Completed
P Need confiuration in
r NOC
o
g
r
e
s
s
P
r
o
g
Pass
Completed
r
e
s
s
Router Generic Tests
Sl No. Test Item Guidelines
5 Verify modules
6 View connections
7 IP address viewing • LAN IP
• WAN IP
8 Link status • up/down
Error/traffic
9 Configuration • Start-up
configuration
• Running
configuration
• Configure one port
• Final Configuration
• Protocol wise
11 Remote IP Reachability
12 View Neighbors
14 Redundancy Check
17 Check of Alarms
Telephone Bhavan,Hyderabad Status
(Pass/Fail) Kadapa(Pre-AT Remarks
Pass
Pass Completed
Pass Completed
Pass Completed
Pass Completed
Pass
Completed
Pass Completed
Pass Completed
Pass Completed
Pass Completed
pass N
Completed
e
Completed
e
Patialy Pass d
Completed
h
e
lCompleted
p
fCompleted
r
o
m
I
P
Completed
pass E
n
gCompleted
Not Done i
nCompleted
e
e
r
Pass Completed
(
Pass MN/A
r
NA .N/A
A
Not Done rCompleted
Pass uCompleted
n
)
NA N/A
Pass Completed
LETTERS TO BE SUBMITTED
Test No. test SS1/SS2
Checking Software version partially pass
2.
Physical & Software verification of capacity partially pass
3. (Trunk and Signaling links)
Maintenance Features
11. pass
Test No. test MSG
2 Checking Software version Partially Pass
Physical & Software verification of capacity Pass
3 (Trunk and Signaling links)
3. TMGW shall provide the support of SCTP in
addition to TCP and UDP.
11 Partly done/Pass
ROUTER/LAN SWITCH
Configuration • Final Configuration
9
Software conformity to be checked by showing Partially Pass ( Need Version
the software version using the console Letter)
commands
3