You are on page 1of 12

Exhaust System and Emission Control

of BAHA ATV

 Guided by:-  Prepared by:-


 Prop.Varun Tiwari  Arpit Sanghvi
 Nitesh kumar Tahariya
 Hatim siyawala
 Ankur Lahoty
objective

 To design Exhaust
System and Emission
Control for BAHA ATV
2011
Need of project

 It will result in very low emission of BAHA


ATV
 It will reduces the noise
 It will increases the performance of vehicle
ELEMENTS
 Place the catalytic converter at
proper position
 Choose the right material for it
to control emission
 It must fill our requirements of
minimum cost
 Use of exhaust system which
reduce back pressure
 Using resonator to check noise
like chassis rattle
 Using muffler of desired type
and appropriate size
 Exhaust pipe design with proper
bends
 tail pipe design
Catalytic Converter

 A catalytic converter is a
device used to reduce the
toxicity of emissions from an
IC engine..
 provides an environment
for a chemical reaction
wherein toxic combustion
by-products are converted
to less-toxic substances.
Resonator
 A resonator is a device
or system that exhibits
resonance or resonant
behavior, that is, it
naturally oscillates at
some frequencies,
called its resonance
frequencies, with
greater amplitude than
at others.
Muffler
 Is a device for reducing
the amount of noise
emitted by a machine.
 Advantages
 Types and positions of
mufflers
Requirements

 Catalytic converter
 Muffler
 Exhaust pipe
Work plan

 We will study different ATVs participates in


recent competition
 Analyzing at local workshops
 Implementing innovations
 Changes according to chassis design
 Finalizing design for BAHA 2011
Implementation

 It will be used in BAHA 2011 ATV


competition
 Will be a source of knowledge for future

competitors from our institution


TEST PLAN

 By end of march thorough study of the project will be


done
 Visits to local workshops for practical knowledge by
2nd week of April.
 Look for possible innovations through out the project
time.

 Finalizing the design by end of April


 Submission of final project as per the schedule date

You might also like