Professional Documents
Culture Documents
W HEN cascading outages happen the lights tum out and Racionamiento Programado Condicionado - Expected Value
everything stops. With the facility down and in the Of Conditioned Loss Of Load) in order to reduce lost of load
dark, there is nothing to do but to sit and wait until the utility supply and providing energy in an economical way.
company finds out the problem and solves it. This process
usually takes only few minutes but sometimes it takes hours II. ANTECEDENTS
and to complete system restoration, it can even take days. There are about 82 main blackouts registered in countries
Blackouts are by sure the most troublesome problem that a as: United States, France, Canada, Brazil, Portugal, Chile,
utility company will have to deal with. Statistics show that Mexico, Italy, Sweden and Colombia among others. In the
power failures are, in general, a strange situation in most Fig. 1 it is presented the incidence of blackouts from 1966 to
countries. Blackouts are also short in duration. Studies have present time. It can be seen that from 2003 the occurrence of
shown that 50 percent of blackouts last to 6 s. And 35 percent those contingencies is been drastically increasing. Notice that
are less than 11 min long. These failure times are not a cause in this year it is been registered 8 events by may [2-10].
to concern for most commercial users, but for those industries
where there are computer-based operations, transportation 18 bleck outs In the world 17
control systems, medical facilities, and communications sites 16
they can be a problem.
When service continuity is critical, redundancy must be
14
I la 12
carried throughout the system. It means that some sites should
never depend upon one critical path for ac power. For
12
10
J
15
example, if the facility is fed by a single step-down
transformer, a lightning flash or other catastrophic event could
8
6
I•
::I
8
Authorized licensed use limited to: Universidad Nacional de Colombia. Downloaded on March 13,2010 at 11:46:14 EST from IEEE Xplore. Restrictions apply.
2
Authorized licensed use limited to: Universidad Nacional de Colombia. Downloaded on March 13,2010 at 11:46:14 EST from IEEE Xplore. Restrictions apply.
3
not any international power transfers with Ecuador. This In spite of that situation, Guavio and Chivor, the biggest
power interchange with Ecuador it is been done using the generation plants in that area were on line, but the
Jamondino - Pomasqui tie line and the political agreement transmission corridor that carries out the energy was overload
between the countries is called TIES. so frequency and bus voltages were decreasing beyond the
safe limits causing this area insulation from the rest of the
system. That caused that thermo plants of Paipa and Yopal
were shut down. At that moment there was a lost of generation
close to 2100 MW that corresponds to 31 % of the load (6644
MW). That causes separation of the network into islands and
the disconnection of:
• Guavio-Tunal transmission line
• Tunal- Reforma transmission line
In Fig. 6 can be seen that the disconnection of those lines
causes the islanding of Boyaca and Santander regions.
Disparo de Guavio - Tunal/Reforma Boyee' y santanderes
.~ .a:".,~".~~~
.. •
....
~f~·---~.,.~--~---~--~...L-_-~
,. ..
" " m 1_'_'-- ..
• .
-'""
tr,,'IQ'::-CA.·...
T....-;~T
'..:-~t
......:.:hlO._I._'.-.
:~~
~· 1lQ!
.... .........,.Ull"'"'*_~.·ot:
Authorized licensed use limited to: Universidad Nacional de Colombia. Downloaded on March 13,2010 at 11:46:14 EST from IEEE Xplore. Restrictions apply.
4
Authorized licensed use limited to: Universidad Nacional de Colombia. Downloaded on March 13,2010 at 11:46:14 EST from IEEE Xplore. Restrictions apply.
5
[16] Van Hulst N. Lessons Learned from the Power Outage in North America
and Europe Director, Long-Term Co-operation and Policy Analysis
RIETI Policy Symposium Tokyo, 15 December 2004
[17] Illic M. Granger M. et AI. Electrical Blackouts: A Systemic Problem.
[18] Mandozzi M., Menditto V., Moreschini G. et AI. "Recent improvements
of emergency automatic control of Enel power system in interconnected
and isolated operation", CIGRE Session, paper, Paris, 1992.
[19] Veloza O. P. and Cespedes R.H. "Vulnerability of the Colombian
Electric System to Blackouts and Possible Remedial Actions", IEEE PW
2006.
IX. BIOGRAPHIES
Authorized licensed use limited to: Universidad Nacional de Colombia. Downloaded on March 13,2010 at 11:46:14 EST from IEEE Xplore. Restrictions apply.