BERITA ACARA KEMAJUAN PEKEJAAN

No. :

Nomor Kontrak
Kontrak Awal
Tambah/Kurang
Total

: 886/964/III/SPP/17.11.2009
:
###
:
Rp:
###
(belum termasuk PPn 10%)

Nama Rekanan
Tanggal

(Rp)
NO

A
1
2
B
3
4
5

URAIAN PEKERJAAN

MUTU BETON
Harga 03 November s/d 13 Desember 2009
K-250
K-350
Harga 14 Desember 2009 s/d 28 Februari 2010
K-175
K-250
K-350

VOLUME

SAT

HARGA SAT

JUMLAH

BOBOT (%)
VOL

S. D. PERIODE LALU
JUMLAH (Rp.) PROGG.BOBOT (%) VOL

: PT. KREASIBETON NUSAPERSADA


: 17 Februari 2010

REALISASI
PERIODE INI
JUMLAH (Rp.) PROGG.BOBOT (%) VOL

S. D. PERIODE INI
JUMLAH (Rp.) PROGG.BOBOT (%)

321.50
465.50

M3
M3

565,000
615,000

181,647,500
286,282,500

6.53
10.30

321.50
450.00

181,647,500
276,750,000

100.00
96.67

6.5323
9.9524

321.50
450.00

181,647,500
276,750,000

100.00
96.67

6.53
9.95

130.00
395.50
3085.00

M3
M3
M3

532,000
595,000
651,000

69,160,000
235,322,500
2,008,335,000

2.49
8.46
72.22

112.00
###

66,640,000
1,845,259,500

28.32
91.88

2.3965
66.3584

112.00
###

66,640,000
1,845,259,500

28.32
91.88

2.40
66.36

2,780,747,500

100.00

TOTAL

Disetujui oleh,

###

###

Diperiksa oleh,

Diajukan oleh,
PT. Kreasibeton Nusapersada

Anas Yafid
Kepala Teknik

Ir. Lazuardi Laitly


Direktur

PT. JAYA KONSTRUKSI MP, Tbk

Ir. Shafril Yinurullah


Kepala Proyek

###

85.24

BERITA ACARA PEMBAYARAN


No : 010/BAP/KRATON/IX/2010
Kontrak Awal
No. Kontrak
:
Tanggal
:
Nilai Kontrak
:

Amandemen Kontrak
No. Amandemen
Tanggal
Nilai Kontrak Akhir

886/964/III/SPP/17.11.2009
16 November 2010
Rp2,780,747,500
(Belum termasuk PPN 10%)

: 307/964/III/ADD.II/12.04.2010
: 08 April 2010
: Rp. 3.462.344.500
(Belum termasuk PPN 10%)

Pada hari ini Sabtu tanggal Tiga puluh satu bulan Juli tahun Dua Ribu Sepuluh (31-07-2010), yang bertanda tangan dibawah
Nama
:
Perusahaan
:
Proyek
:
Jabatan
:
Alamat
:
Selanjutnya dalam

Ir. Shafrill Yinurullah


PT. Jaya Konstruksi Manggala Pratama, Tbk.
Gd. Kantor DPRD Sumut
Kepala Proyek
Kantor Taman Bintaro Jaya Gedung B Jalan Bintaro Raya Jakarta 12330
berita acara ini disebut PIHAK PERTAMA

Nama
:
Perusahaan
:
Jabatan
:
Alamat
:
Selanjutnya dalam

Ir. Lazuardi Laitly


PT. Kreasibeton Nusapersada
Direktur
Jl. P. Karimun Kav. 392 Kawasan Industri Medan II Mabar 20371
berita acara ini disebut PIHAK KEDUA

Berdasarkan Berita Acara Kemajuan Pekerjaan/Rekapitulasi Surat Jalan/Rekapitulasi Jam Kerja Alat tanggal Tiga puluh satu
bulan Juli tahun Dua ribu sepuluh, prestasi kemajuan terhadap kontrak telah mencapai 97,68 % (perincian terlampir)
Dengan demikian, berdasarkan Kontrak/Amandemen pasal 2 ayat 1 maka Pihak Kedua berhak menerima tagihan atas
prestasi tersebut dengan perincian sebagai berikut :
No

Uraian

a
b
c
d

Prestasi
Pembayaran uang muka
Pembayaran MOS
Potongan Retensi
Jumlah I (a+b+c+d)
Angsuran uang muka
Angsuran MOS
Pembayaran retensi
Jumlah II (e+f+g)
Total I - II
PPN 10%
Dibayarkan (h+i)

e
f
g
h
i

Realisasi s/d saat ini


%
Rp.
Err:508
Err:508

Realisasi s/d lalu


%
Rp.
Err:508 Err:508

Err:508
Err:508

Err:508

Err:508
Err:508
Err:508

Err:508
Err:508
Err:508

Dibayarkan saat ini


%
Rp.
Err:508
22,253,000
Err:508
Err:508
Err:508
Err:508
Err:508

Dibayarkan saat ini, terbilang : ( Dua puluh empat juta empat ratus tujuh puluh delapan ribu tiga ratus rupiah )
Demikian Berita Acara Pembayaran ini dibuat dengan sebenar-benarnya untuk digunakan sebagaimana mestinya.

Medan, 31 Juli 2010


PIHAK PERTAMA
PT. Jaya Konstruksi Manggala Pratama, Tbk.

Ir. Shafrill Yinurullah


Kepala Proyek

PIHAK KEDUA
PT. Kreasibeton Nusapersada

Ir. Lazuardi Laitly


Direktur

BERITA ACARA KEMAJUAN PEKERJAAN


Pekerjaan
No. Surat Perjanjian Pekerjaan
Tgl. Surat Perjanjian Pekerjaan

: Beton Readymix
: 886/964/III/SPP/17.11.2009
: 16 November 2010

Pada hari ini Sabtu tanggal Tiga puluh satu bulan Juli tahun Dua Ribu Sepuluh (31-07-2010), yang bertanda tangan dibawah i
1. Nama
Jabatan

: Ir. Shafrill Yinurullah


: Kepala Proyek
Bertindak untuk dan atas nama
PT. Jaya Konstruksi Manggala Pratama, Tbk.
selanjutnya disebut PIHAK PERTAMA

2. Nama
Jabatan

: Ir. Lazuardi Laitly


: Direktur
Bertindak untuk dan atas nama
PT. Kreasibeton Nusapersada
Selanjutnya disebut PIHAK KEDUA

Berdasarkan SPK No.886/964/III/SPP/17.11.2009 tanggal 16 November 2010 kedua belah pihak sepakat untuk
mengadakan pemeriksaan bersama terhadap pekerjaan Beton readymix Proyek Gedung Kantor DPRD Medan dengan
nilai kontrak Rp. 3.058.822.250,00 (terbilang : Tiga milyar lima puluh delapan juta delapan ratus dua puluh dua
ribu dua ratus lima puluh rupiah )
Dari hasil pemeriksaan/penelitian terbukti bahwa pekerjaan PIHAK KEDUA telah mencapai
85.24%

Demikian Berita Acara Pemeriksaan Pekerjaan ini dibuat untuk dapat dipergunakan sebagaimana mestinya.

PIHAK PERTAMA
PT. Jaya Konstruksi Manggala Pratama, Tbk.

Ir. Shafrill Yinurullah


Kepala Proyek

PIHAK KEDUA
PT. Kreasibeton Nusapersada

Ir. Lazuardi Laitly


Direktur

BERITA ACARA SERAH TERIMA BARANG


Kontrak Awal
No. Kontrak
Tanggal
Nilai Kontrak

Amandemen Kontrak
No. Amandemen :
Tanggal
:
Nilai Kontrak Akhir:
(Belum termasuk PPN 10%)

: 886/964/III/SPP/17.11.2009
: 16 November 2010
:
Rp2,780,747,500.00
(Belum termasuk PPN 10%)

Pada hari ini Sabtu tanggal Tiga puluh satu bulan Juli tahun Dua Ribu Sepuluh (31-07-2010), yang bertanda tangan dibawah
1. Nama
Jabatan

: Ir. Shafrill Yinurullah


: Kepala Proyek
Bertindak untuk dan atas nama
PT. Jaya Konstruksi Manggala Pratama, Tbk.
selanjutnya disebut PIHAK PERTAMA

2. Nama
Jabatan

: Ir. Lazuardi Laitly


: Direktur
Bertindak untuk dan atas nama
PT. Kreasibeton Nusapersada
Selanjutnya disebut PIHAK KEDUA

PIHAK KEDUA selaku pelaksana pekerjaan Pengadaan Beton K-250, K-350, K-450 Proyek GD Kantor DPRD Medan
dengan ini melaksanakan SERAH TERIMA barang dengan perincian sebagai berikut :
1 Beton K-175
2 Beton K-250
3 Beton K-350
Jumlah

754.00
754.00

M2
M2
M2
M2

Demikian Berita Acara Serah Terima ini dibuat dengan sebenarnya untuk dapat digunakan sebagaimana mestinya

PIHAK PERTAMA
PT. Jaya Konstruksi Manggala Pratama, Tbk.

PIHAK KEDUA
PT. Kreasibeton Nusapersada

Ir. Shafrill Yinurullah


Kepala Proyek

Ir. Lazuardi Laitly


Direktur

PT. JAYA KONSTRUKSI MP. Tbk.


PROYEK : GD. KANTOR DPRD SUMATRA UTARA
PKP
: 964

MONITORING BETON
NO TANGGAL SAT

SURAT JALAN
K 175
K 250
K 350

K 175

REALISASI
K 250
K 350

DEVIASI
K 250

K 175

KET.

K 350

01-02-10

M3

21.00

21.00

- Harga baru

02-02-10

M3

45.50

45.50

- Harga baru

03-02-10

M3

19.00

19.00

- Harga baru

04-02-10

M3

12.50

12.50

- Harga baru

05-02-10

M3

27.50

27.50

- Harga baru

06-02-10

M3

108.00

108.00

- Harga baru

08-02-10

M3

90.50

90.50

- Harga baru

09-02-10

M3

9.50

9.50

- Harga baru

10-02-10

M3

59.50

59.50

- Harga baru

10

13-02-10

M3

212.50

212.50

- Harga baru

11

15-02-10

M3

6.50

6.50

- Harga baru

12

16-02-10

M3

5.00

5.00

- Harga baru

13

17-02-10

M3

18.50

18.50

- Harga baru

14

18-02-10

M3

5.50

5.50

- Harga baru

15

19-02-10

M3

36.00

36.00

- Harga baru

16

21-02-10

M3

5.00

5.00

- Harga baru

17

23-02-10

M3

41.50

41.50

- Harga baru

18

24-02-10

M3

6.00

6.00

- Harga baru

19

25-02-10

M3

6.50

6.50

- Harga baru

20

27-02-10

M3

18.00

18.00

- Harga baru

SUB TOTAL

754.00

754.00

- Harga baru

TOTAL

754.00

754.00

BB.000218
BB.000218

BBETON.000001
BBETON.000001

PT. KREASIBETON NUSAPERSADA


PT. KREASIBETON NUSAPERSADA

BETON JADI K 350 SLUMP 12


BETON JADI K 350 SLUMP 12

M3
M3

BB.000219
BB.000219
BB.000219

BBETON.000001
BBETON.000001
BBETON.000001

PT. KREASIBETON NUSAPERSADA


PT. KREASIBETON NUSAPERSADA
PT. KREASIBETON NUSAPERSADA

BETON JADI K 350 SLUMP 12


BETON JADI K 350 SLUMP 12
BETON JADI K 350 SLUMP 12

M3
M3
M3

BB.000219

BBETON.000001

PT. KREASIBETON NUSAPERSADA

BETON JADI K 350 SLUMP 12

M3

BB.000220
BB.000220
BB.000220
BB.000220

BBETON.000001
BBETON.000001
BBETON.000001
BBETON.000001

PT. KREASIBETON NUSAPERSADA


PT. KREASIBETON NUSAPERSADA
PT. KREASIBETON NUSAPERSADA
PT. KREASIBETON NUSAPERSADA

BETON JADI K 350 SLUMP 12


BETON JADI K 350 SLUMP 12
BETON JADI K 350 SLUMP 12
BETON JADI K 350 SLUMP 12

M3
M3
M3
M3

BB.000225
BB.000225
BB.000225
BB.000225

BBETON.000001
BBETON.000001
BBETON.000001
BBETON.000001

PT. KREASIBETON NUSAPERSADA


PT. KREASIBETON NUSAPERSADA
PT. KREASIBETON NUSAPERSADA
PT. KREASIBETON NUSAPERSADA

BETON JADI K 350 SLUMP 12


BETON JADI K 350 SLUMP 12
BETON JADI K 350 SLUMP 12
BETON JADI K 350 SLUMP 12

M3
M3
M3
M3

BB.000227
BB.000227
BB.000227
BB.000227

BBETON.000001
BBETON.000001
BBETON.000001
BBETON.000001

PT. KREASIBETON NUSAPERSADA


PT. KREASIBETON NUSAPERSADA
PT. KREASIBETON NUSAPERSADA
PT. KREASIBETON NUSAPERSADA

BETON JADI K 350 SLUMP 12


BETON JADI K 350 SLUMP 12
BETON JADI K 350 SLUMP 12
BETON JADI K 350 SLUMP 12

M3
M3
M3
M3

BB.000228
BB.000228

BBETON.000001
BBETON.000001

PT. KREASIBETON NUSAPERSADA


PT. KREASIBETON NUSAPERSADA

BETON JADI K 350 SLUMP 12


BETON JADI K 350 SLUMP 12

M3
M3

BB.000229
BB.000229
BB.000229
BB.000229

BBETON.000001
BBETON.000001
BBETON.000001
BBETON.000001

PT. KREASIBETON NUSAPERSADA


PT. KREASIBETON NUSAPERSADA
PT. KREASIBETON NUSAPERSADA
PT. KREASIBETON NUSAPERSADA

BETON JADI K 350 SLUMP 12


BETON JADI K 350 SLUMP 12
BETON JADI K 350 SLUMP 12
BETON JADI K 350 SLUMP 12

M3
M3
M3
M3

BB.000233
BB.000233
BB.000233
BB.000233

BBETON.000001
BBETON.000001
BBETON.000001
BBETON.000001

PT. KREASIBETON NUSAPERSADA


PT. KREASIBETON NUSAPERSADA
PT. KREASIBETON NUSAPERSADA
PT. KREASIBETON NUSAPERSADA

BETON JADI K 350 SLUMP 12


BETON JADI K 350 SLUMP 12
BETON JADI K 350 SLUMP 12
BETON JADI K 350 SLUMP 12

M3
M3
M3
M3

BB.000234
BB.000234

BBETON.000001
BBETON.000001

PT. KREASIBETON NUSAPERSADA


PT. KREASIBETON NUSAPERSADA

BETON JADI K 350 SLUMP 12


BETON JADI K 350 SLUMP 12

M3
M3

BB.000237
BB.000237
BB.000237
BB.000237

BBETON.000001
BBETON.000001
BBETON.000001
BBETON.000001

PT. KREASIBETON NUSAPERSADA


PT. KREASIBETON NUSAPERSADA
PT. KREASIBETON NUSAPERSADA
PT. KREASIBETON NUSAPERSADA

BETON JADI K 350 SLUMP 12


BETON JADI K 350 SLUMP 12
BETON JADI K 350 SLUMP 12
BETON JADI K 350 SLUMP 12

M3
M3
M3
M3

BB.000241
BB.000241
BB.000241

BBETON.000001
BBETON.000001
BBETON.000001

PT. KREASIBETON NUSAPERSADA


PT. KREASIBETON NUSAPERSADA
PT. KREASIBETON NUSAPERSADA

BETON JADI K 350 SLUMP 12


BETON JADI K 350 SLUMP 12
BETON JADI K 350 SLUMP 12

M3
M3
M3

BB.000242
BB.000242

BBETON.000001
BBETON.000001

PT. KREASIBETON NUSAPERSADA


PT. KREASIBETON NUSAPERSADA

BETON JADI K 350 SLUMP 12


BETON JADI K 350 SLUMP 12

M3
M3

BB.000258
BB.000258
BB.000258
BB.000258
BB.000258

BBETON.000001
BBETON.000001
BBETON.000001
BBETON.000001
BBETON.000001

PT. KREASIBETON NUSAPERSADA


PT. KREASIBETON NUSAPERSADA
PT. KREASIBETON NUSAPERSADA
PT. KREASIBETON NUSAPERSADA
PT. KREASIBETON NUSAPERSADA

BETON JADI K 350 SLUMP 12


BETON JADI K 350 SLUMP 12
BETON JADI K 350 SLUMP 12
BETON JADI K 350 SLUMP 12
BETON JADI K 350 SLUMP 12

M3
M3
M3
M3
M3

BB.000260

BBENAG.000000

PT. KREASIBETON NUSAPERSADA

BETON JADI K 350 SLUMP 12

Rol

BB.000261
BB.000261
BB.000261

BBETON.000001
BBETON.000001
BBETON.000001

PT. KREASIBETON NUSAPERSADA


PT. KREASIBETON NUSAPERSADA
PT. KREASIBETON NUSAPERSADA

BETON JADI K 350 SLUMP 12


BETON JADI K 350 SLUMP 12
BETON JADI K 350 SLUMP 12

M3
M3
M3

BB.000262
BB.000262

BBETON.000001
BBETON.000001

PT. KREASIBETON NUSAPERSADA


PT. KREASIBETON NUSAPERSADA

BETON JADI K 350 SLUMP 12


BETON JADI K 350 SLUMP 12

M3
M3

19.50
1.50
21.00
4.00
3.00
37.00

651,000
651,000

12,694,500
976,500

01/02/10
01/02/10

- U/ Selasar Lt1
- U/ Kolom

651,000
651,000
651,000

2,604,000
1,953,000
24,087,000

02/02/10
02/02/10
02/02/10

- U/ Kolom
- U/ Kolom PH
- U/ Jembatan Lt4

1.50
45.50
3.50
12.50
1.00
2.00
19.00
2.50
4.50
3.50
2.00
12.50
5.00
14.00
3.00
2.00
24.00
105.50
2.50
108.00
3.50
15.50
1.00
70.50
90.50
5.00
2.00
0.50
2.00
9.50
2.50
57.50
60.00
42.50
1.50
1.00
167.50
212.50
2.50
2.00
2.00
6.50
3.00
2.00
5.00
1.50
19.00
15.00
5.00
1.00
41.50
6.00
6.00
1.50
3.50
1.50
6.50
5.00
13.00
18.00

651,000

976,500

02/02/10

- U/ Kol. Pedestal

651,000
651,000
651,000
651,000

2,278,500
8,137,500
651,000
1,302,000

03/02/10
03/02/10
03/02/10
03/02/10

U/ Ram Lt 1
U/ Pond. Genset
U/ Blk Lif
U/ Kolom

651,000
651,000
651,000
651,000

1,627,500
2,929,500
2,278,500
1,302,000

04/02/10
04/02/10
04/02/10
04/02/10

U/ Kolom PH
U/ Kolom Lt3
U/ Ram Lt 1
U/ DDG Tangga

651,000
651,000
651,000
651,000

3,255,000
9,114,000
1,953,000
1,302,000

05/02/10
05/02/10
05/02/10
05/02/10

U/ Selasar
U/ Jembatan Lt4
U/ Ddg Lif
U/ Ddg Tangga

651,000
651,000

68,680,500
1,627,500

06/02/10
06/02/10

- U/ Plat Lt 4
- U/ Kolom Lt 2

651,000
651,000
651,000
651,000

2,278,500
10,090,500
651,000
45,895,500

08/02/10
08/02/10
08/02/10
08/02/10

U/ Cor Kolom Lt4


U/ Jembatan lt2
U/ Klm Pedestal
U/ Plat Lt 4

651,000
651,000
651,000
651,000

3,255,000
1,302,000
325,500
1,302,000

09/02/10
09/02/10
09/02/10
09/02/10

U/ Kolom Lt 4
u/ Kolom Lt 5
U/ Blk Lif
U/ Parapet Lt 5

651,000
651,000

1,627,500
37,432,500

10/02/10
10/02/10

- U/ Kolom
- U/ Selasar, Jban

651,000
651,000
651,000
651,000

27,667,500
976,500
651,000
109,042,500

13/02/10
13/02/10
13/02/10
13/02/10

651,000
651,000
651,000

1,627,500
1,302,000
1,302,000

15/02/10
15/02/10
15/02/10

- U/ Kolom
- U/ Blk Lif
- U/ DDk GRC

651,000
651,000

1,953,000
1,302,000

16/02/10
16/02/10

- U/ Kolom
- U/ GRC

651,000
651,000
651,000
651,000
651,000

976,500
12,369,000
9,765,000
3,255,000
651,000

23/02/10
23/02/10
23/02/10
23/02/10
23/02/10

651,000

3,906,000

24/02/10

- U/ Parapet,lisbl

651,000
651,000
651,000

976,500
2,278,500
976,500

25/02/10
25/02/10
25/02/10

- U/ Kolom kotak
- U/ Blk. Lipft
- U/ Kolom Lift

651,000
651,000

3,255,000
8,463,000

27/02/10
27/02/10

- U/ Kolom
- U/ Jembatan

686.00

U/ Atap PH
U/ kolom
U/ DDk GRC
U/ Plat Lt 5

U/ Kolom Kotak
U/ Jembatan
U/ Tanggga
U/ kolom
U/ Kolom Lift