Professional Documents
Culture Documents
Pgin a
Item
03 03.01 04 04.01 05 05.01 05.01.01 05.01.02 05.01.03
Costo al
Und.
Metrado
Precio S/.
m3
77.76
34.80
2706.048 940.90
m2
38.88
24.20
m3 M2
Costo Directo GASTOS GENERALES (10 .52%) UTILIDAD (5%) ================================== ===== SUB TOTAL IVG (18%) ====================== ================ TOTAL
22388.6 7
S10
Pgin a
Costo al
28/11/201 1
S10
Pgin a
Costo al
28/11/201 1
S10
Pgin a
Costo al
28/11/201 1
TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA und 1.00 554.64 554.64 20.02 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 15 A pza 1.00 120.01 120.01 20.03 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 20 A pza 2.00 160.66 321.32 20.04 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 30 A pza 1.00 48.39 48.39 21 ARTEFACTOS ELECTRICOS 2,335.04 21.01 ARTEFACTO TIPO SPOT LIGHT und 32.00 72.97 2,335.04 22 INSTALACIONES SANITARIAS 1,437.12 22.01 SISTEMA DE AGUA DE LLUVIA 1,437.12 22.01.01 TUBERIA DE BAJADA Y DISTRIBUCION 289.36 22.01.01.01 TUBERIA PARA AGUAS PLUVIALES DE PVC SAL 3" ml 22.31 12.97 289.36 22.01.02 ACCESORIOS 202.56 22.01.02.01 CODOS 202.56 22.01.02.01.01 CODO PVC-SAP 3" * 90 pza 12.00 16.88 202.56 22.01.03 CAMARAS DE REUNION 411.45 22.01.03.01 CONCRETO f'c=175 kg/cm2 MEZCLA C-H m3 1.00 288.85 288.85 22.01.03.02 ENCOFRADO Y DESENCOFRADO EN CAMARA DE REUNION m2
S10
Pgin a
Costo al
28/11/201 1
349,458 .55 34,945 .86 17,472 .93 401,877 .34 19,780 .00 72,337 .92 493,995 .26