Professional Documents
Culture Documents
Dat
Rosen Center
AT&T
9/7/1
Team Ramon
Freq Band
1900 U
Travel back
0.50
SITE INFORMATION
GSM (850 Mhz / 1900 Mhz)
No. of Cabinet HW Installed Combining Method Working Config
Abis Mapping
VISIT DETAILS
1 2 3 4 5 6
Items LMU Inst/Com/Int Ext. Alarms Connected Bia Tees Installed Sync Cables Installed T1 Ran Underground Surge Arrestor Ground Weatherproofing DC Terminated to Power Plant E911 cables All Labels (DC, T1, jumper, breakers) NODE B Cabinet MCPA RXAIT Power Plant
Rosen Center
Status
completed
CHECKLIST
Status N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Antenna 1 Sector A Sector B Sector C Items bbbbbbbbbbbbbbbbb Surge Arrestor Antenna Jumpers (GSM) Antenna Connectors (gsm) Antenna Jumpers (UMTS) Antenna Connectors (UMTS) GSM DC cable UMTS DC cable DC Breaker Bias tee installed Equipment counts Batt string Purcell cabinets MHA PDU Auxilliary Rack / FIF Antenna 2 Status N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Antenna 3
# X Length / H
Anten
Anten
E911 INFORMATION
COUNTY Sector A Sector B Sector C CALL BACK NUMBER COORDINATES
REMAR
te
/11
75
75
Cabinet ALM FSME Replaced FSME Replaced FSME Add ALM FSME Add Serial FSMB Pulled out Parent Code ALM Number Serial Number Number Number ALM Number A2E0424C n/a TM06878347 TY110403916 N/A N/A TM01342709 A2E0567A TM01318680 TM06878350 L6111100134 N/A N/A TM06802433 site#
FA Code
Site Name
Market Name
Date
Team Lead
Team
Sites
Travel back
Total Hrs
Rosen Center
AT&T
9/7/2011
Edison
Ramon
Rosen Center
9.75
0.5
10.75
Completed cable lacing and installation of cable rung.Ran rectifier alarm cable to UMTS alarm block.
EXPENSES WORKSHEET
TODAY'S PER DIEM EXPENSES: FUEL MATERIALS AMOUNT $90.00
$92.79 $172.09
TOTAL EXPENSES
$264.88