You are on page 1of 2

Later

Equipment datasheet is not governing and required to change Other documents like equipment list and PFD's are required to update later on. This is not affecting cost at this stage

Discrepancy of Equipment data


Project : RTIP EOD Project Client : Aramco & Dow Company NO. ITEM SERVICE Description PFD P&ID

202-PK-1205 VACUUM SYSTEM PACKAGE

Capacity (m3/h)

G2IR-2020-25-DW-3005

202-V-1503

Ouench Hydrocyclone

Operating conditions

G2IR-2020-25-DW-3009

Equipment List

Data Sheet

G2IR-2020-55-EL-0001

G2IR - 2020 - 55 -

DS - 2045 G2IR-2020-55-EL-0001

As per Datasheet, the Vaccum system packege (202PK-1205) - For Case 1, off gas vapours having 100%N2, are to be evacuated at the rate of 32m3 in 30 min. Similarly, for Case 2, off gas vapours having 80%PO and 20% N2, are to be evacuated at the rate of 8.5m3 in 20 min. As per the Heat and Mass Balance for Polyol Unit (Doc. G2IR-2020-25-DW-3050 and Steam no.9) , the design off gas flow rate is 225 kg/h, which has supposedly high volume of gas to the current Vaccum system packege desgined for Case 1- and Case 2 for evacuation. Please clarify the design basis of Vacuum Packege. Operating conditions are missing

You might also like