Haryana State Agricultural Marketing Board

Summary of Road Network


Name of Constituency: Indri
Name of Hon'ble MLA:

Shri Ashok Kashyap

Constituency information
Total population:
Area (Sq km):

227070
517.13

HSAMB Roads Chronology:


Roads Completed before 1-4-2005
Roads Sanctioned prior to 1-4-2005 and Completed after 1-4-2005
Roads Sanctioned between 1-4-2005 and 24-9-2009
Total:

57 roads

115.72 km

4 roads

7.55 km

16 roads

31.50 km

77 roads

154.77 km

HSAMB Road Network Status


Completed Roads under Maintenance
Good Condition
Repairs Taken Up between 16K and 44k
SR Sanctioned
Work Plan Approved

25
8
6
16
Sub Total:

roads
roads
roads
roads

55 roads

46.45
13.98
10.51
39.01

km
km
km
km

109.95 km

Transferred
Transferred to MC
Transferred to PWD (938 roads)

1
14
Sub Total:

roads
roads

0.83 km
32.00 km

15 roads

32.83 km

New Construction going on


New Construction

7
Sub Total:
Group Total:

Thursday, February 23, 2012

Indri

roads

11.99 km

7 roads

11.99 km

77 roads

154.77 km

Page 1 of 12

Completed Roads under Maintenance


Good Condition
1)

H - 3907 Dabkoli To Biana


9072

2)

1.43 km.

07-Oct-11 Constructed 12/1998. Crust 150mm. 75mm WBM+PC (entire) done 1/2010.
(56.24sqm) patches done 4/09/2011 to 6/09/2011 (16 K). No patch.

2.79 km.

07-Oct-11 Constructed 3/1999. Crust 150mm. CC(0.148 km ) +PC (2.64 )km done 12/2007.
(502.18 sqm) patches done 2/09/2011 to 6/09/2011 (95 K). No patch.

0.59 km.

15-Nov-11 Constructed 7/1999. Path 4, 5 Karam. Crust 150mm. CC done on 3/2008. Patchless.

1.28 km.

07-Oct-11 Cosntrucrted 3/2000. Crust 150mm. 75mm WBM + PC (entire) done 10/2009.
(82.73sqm) patches done 5/09/2011 to 7/09/2011 (18 K). No patch.

H - 3927 Manoharpur To Nagla Roran


14447

0.71 km.

07-Oct-11 Constructed 11/1999. Crust 150mm. CC(0.14 km) + PC (0.570 km) done 3/2008.
(47.32sqm) patches done 2/09/2011 to 6/09/2001 (10 k) . No patch.

H - 3926 Rasulpur To Johar Majra


9078

10)

15-Nov-11 Constructed 3/1998. Path 4, 7 Karam. Crust 150mm. SR done on 6/2006. Patchless

H - 3925 Dabkoli Bus Stand To Cause Way Dabkoli


14446

9)

1.07 km.

H - 3924 Dhanokheri To Dhanora


9077

8)

15-Nov-11 Constructed 3/1996. Path 5 Karam. Crust 150mm. 75mm WBM done on 1/2010.
No Patches.

H - 3922 Karnal Garhi Birbal Road To Kalsora Japti Chhapra Road Via Govt. High
School
9076

7)

0.90 km.

H - 3919 Norta To Depot Janesaro

9075

6)

15-Nov-11 Constructed 3/1994. Path 5 Karam. Crust 150mm. SR done on 7/2006. No Patches.

H - 3918 Garhi Birbal Road To Indri Road Via Kartapur


14445

5)

2.47 km.

H - 3912 Ghari Jattan To Ghari Sadan


14444

4)

07-Oct-11 Constructed 12/1994. Crust 150mm. PC (2.145 km) C/C (0 .415 km) done on
10/2009. (108.34 sqm) patches done 5/09/2011 to 7/09/2011 (22 K). No patch.

H - 3911 Dhona Kheri To Kalra Jagir


14443

3)

2.56 km.

1.50 km.

15-Nov-11 Constructed 5/2000. Path 5 Karam. Crust 150mm. 75mm WBM + PC done
10/2009. Patchless.

Thursday, February 23, 2012

Indri

Page 2 of 12

11)

H - 3928 Japti Chhapra To Nabiabad


14448

12)

07-Oct-11 Constructed 12/2001. Crust 150mm. 75mm WBM (2.4 km) + PC (entire) done
1/2010. (178.48sqm) patches done 30/08/2011 to 3/09/2011 (39 K). No patch.

0.19 km.

15-Nov-11 Constructed 3/2009. Path 4 Karam. Crust 225mm. Patchless.

2.22 km.

07-Oct-11 Constructed 12/2002. Crust 150mm. 75mm WBM + PC (entire) done 2/2010.
(281.11sqm) patches done 30/08/11 to 4/09/2011 (56 K ). No patch.

3.84 km.

07-Oct-11 Constructed 3/1995. Crust 150mm. PC (entire) done 1/2010. (436-78 sqm) patches
done 3/09/2011 to 4/09/2011 (88 K). No patch.

1.34 km.

15-Nov-11 Constructed 4/1995. Path 3, 4 Karam. Crust 150mm. SR done on 12/2007.


Patchless.

H - 3962 Johar Majra To Fazilpur


9083

21)

3.00 km.

H - 3955 Karnal Indri Road To Dera Amrik Singh


14458

20)

07-Oct-11 Constructed 10/2001. Crust 150 mm. PC (entire) done 1/2010. (439.52sqm)
patches done 3/09/2011 to 4/09/2011 (90 K). No patch.

H - 3951 Bara Goan To Sangoya


9082

19)

3.60 km.

H - 3949 Ramba To Kheri Man Singh


9081

18)

15-Nov-11 Constructed 9/2000. Path 4, 5 Karam. Crust 150mm. CC (Rajepur phirni) + 75mm
WBM + PC done 10/2009. Patchless.

H - 3948 Approach Road To Stadium At Kalri Jagir

14457

17)

1.79 km.

H - 3933 Rampur To Sawarn Majra


9080

16)

15-Nov-11 Constructed 7/2000. Path 5 Karam. Crust 150mm. 75mm WBM + PC done
10/2009. Patchless.

H - 3931 Chand Samand To Nagla Roran


9079

15)

2.90 km.

H - 3930 Rajepur To Umarpur Society


14450

14)

15-Nov-11 Constructed 9/2000. Path 5 Karam. Crust 150mm. CC done on 9/2009. Patchless.

H - 3929 Churni To Bibipur Jattan


14449

13)

1.20 km.

1.92 km.

07-Oct-11 Constructed 12/2009. Crust 225mm. WBM. (28.67 sqm) Patches done 3/09/2011
to 4/09/2011 ( 8 K). No patch.

H - 3964 Kurak To Gobind Garh Gamri Of Nadana Uptogamri Chopri Road

Thursday, February 23, 2012

Indri

Page 3 of 12

1.78 km.

14459

22)

H - 3965 Karnal Indri Road To Village Churni


14460

23)

15-Nov-11 Constructed 6/2010. Path 5 Karam. Crust 225mm. Patchless.

0.32 km.

15-Nov-11 Constructed 12/1997. Path 4, 5 Karam. Crust 150mm. CC done on 4/2007.

H - 4694 Baragoan To Makhu Majra


19072

18-Feb-12 Completed 30.11.2011.

16554

02-Jan-12 Completed.

9739

25)

2.31 km.

H - 3970 Kunjpura Bus-Stand To Vegetable Market/Mehma-Dpur Road (Old Mandi


Of Kunjpura Town)
14461

24)

15-Nov-11 Constructed 12/2009. Path 3, 4 Karam. Crust 225mm. Patchless.

2.37 km.

12-Oct-11 A/A on 12.08.09 for Rs. 43.36 lacs. Path 11 & 5 Karam. Crust 225mm. Allotted on
24.12.09 to Chopra Constn. Co; 1st Coat painting completed. Likely date of
completion 30.11.11.

H - 5206 Nasirpur To Kunda Kalan


14992
8666

2.37 km.

16-Nov-11 Patchless.
07-Oct-11 Constructed 2/2009. No SR done, Path-4 & 8karam, Crust-225 mm, width-5.49m
Sub Total:

46.45 km.

Repairs Taken Up between 16K and 44k


1)

H - 3917 Jainpur To Chhaper


19098

2)

18-Feb-12 WBM patch done PC patch left likely date 31.032012.

9291

16-Nov-11 Patches are being contracted (Estimated cost 52 K).

9290

07-Oct-11 Constructed 01/1998. Crust 150mm WBM. 97m (RD0 to 97m)(Jainpur Phirni)
CC+rest length (1.393km) PC done in 03/2008.

H - 3920 Ghisar Puri To Johar Majra


19099

3)

1.49 km.

1.19 km.

18-Feb-12 WBM patch done PC patch left likely date 31.032012.

9293

16-Nov-11 Patches to be contracted. (EC 41 K).

9292

07-Oct-11 Constructed 11/1998. Crust 150mm WBM. 183m (Jainpur Phirni) CC+rest length PC
done in 03/2008.

H - 3921 Matak Majri To Ngm Indri


19100

0.97 km.

18-Feb-12 WBM patch done PC patch left likely date 31.032012.

9295

10-Nov-11 Patches to be contracted. (EC 44 K).

9294

07-Oct-11 Constructed 11/1998; 3.66 m wide. Crust 150mm WBM. PC done in 02/2010 with
3' widening of both side Crust is 225m.

Thursday, February 23, 2012

Indri

Page 4 of 12

4)

H - 3940 Dhano Kheri To Kalri Jagir


19101

5)

6)

16-Nov-11 Patches to be contracted. (EC 18 K).

9298

07-Oct-11 Constructed 03/2004. Crust 150mm. Path 5 karam.

H - 3943 Rampur To Habitpur

1.82 km.

19102

18-Feb-12 WBM patch done PC patch left likely date 31.032012.

9305

07-Oct-11 Work Plan:Needs O/R within 44 K-Per Km (EC. 80 K).

9304

07-Oct-11 Constructed 04/2004. Crust 150mm. Path 5 & 8 karam.

H - 3957 Tikri To Dera Khera

0.50 km.

18-Feb-12 WBM patch done PC patch left likely date 31.032012.

9317

15-Nov-11 Patches to be contracted. (EC 22 K).

9316

07-Oct-11 Constructed 11/1999. Crust 150mm. Path 3 karam.

H - 3961 Nanhera To Badarpur


19104

8)

18-Feb-12 WBM patch done PC patch left likely date 31.032012.

9299

19103

7)

0.44 km.

4.47 km.

18-Feb-12 WBM patch done PC patch left likely date 31.032012.

9323

16-Nov-11 Patches to be contracted. (EC 1.34 lacs)

9322

07-Oct-11 Constructed 12/2009. Crust 225mm. Path 5, 6 & 7 karam.

H - 3966 Baragoan To Mugal Majra


19105

3.10 km.

18-Feb-12 WBM patch done PC patch left likely date 31.032012.

9325

16-Nov-11 Patches to be contracted. (EC 62 K)

9324

07-Oct-11 Constructed 05/2010. Crust 225mm. Path 5 & 8 Karam.


Sub Total:

13.98 km.

SR Sanctioned
1)

2)

H - 3934 Pathera To Budhanpur

2.24 km.

14914

16-Nov-11 75 mm WBM + PC (Rs. 21.47 lacs) sanctioned on 15/10/2010. Awarded to Harjit


Contractor on 9/8/2011. Not Started yet.

14451

15-Nov-11 Constructed 11/2002. Path 5 Karam. Crust 150mm.

H - 3935 Shekupura To Manak Majra

1.03 km.

14915

16-Nov-11 75 mm WBM + PC (Rs. 9.92 lacs) sanctioned on 15/10/2010. Awarded to Harjit


Contractor on 9/8/2011. Not Started yet.

14452

15-Nov-11 Constructed 5/2009. Path 5 Karam. Crust 150mm.

Thursday, February 23, 2012

Indri

Page 5 of 12

3)

4)

5)

6)

H - 3936 Randoli To Dabkoli Kalan

2.13 km.

14916

16-Nov-11 75 mm WBM + PC (Rs. 20.39 lacs) sanctioned on 15/10/2010. Awarded to Harjit


Contractor on 9/8/2011. Not Started yet.

14453

15-Nov-11 Constructed 4/2002. Path 5 Karam. Crust 150mm.

H - 3937 Garhi Birbal To Ghat

2.44 km.

14917

16-Nov-11 75 mm WBM + PC (Rs. 23.97 lacs) sanctioned on 15/10/2010. Awarded to Harjit


Contractor on 9/8/2011. Not Started yet.

14454

15-Nov-11 Constructed 11/2003. Path 4, 12 Karam. Crust 150mm.

H - 3938 Ghari Birbal Road To Inder Garh Primary School

1.91 km.

14918

16-Nov-11 75 mm WBM + PC (Rs. 17.97 lacs) sanctioned on 15/10/2010. Awarded to Harjit


Contractor on 9/8/2011. Not Started yet.

14455

15-Nov-11 Constructed 2/2003. Path 4 Karam. Crust 150mm.

H - 3939 Main Road Ram Nagar To Dera School

0.76 km.

14919

16-Nov-11 75 mm WBM + PC (Rs. 7.26 lacs) sanctioned on 15/10/2010. Awarded to Harjit


Contractor on 9/8/2011. Not Started yet.

14456

15-Nov-11 Constructed 6/2003. Path 4 Karam. Crust 150mm.


Sub Total:

10.51 km.

Work Plan Approved


1)

H - 3900 Bir Rahat Khana To Garhi Sadan


14900

2)

3)

4.02 km.

16-Nov-11 Work Plan: 157m (Bir Rahat Khana) Paver blocks (EC 7 lacs)

8481

04-Oct-11 Constructed- 1990, Path- 4&5 Karam, Crust- 150mm, SR 02/2010 with 75mm
WBM + PC in 1350m and PC in entire length. AR ( 09/ 2011) done with Rs. 0.86
Lacs.

5504

20-Sep-11 AR done during 30-Aug-11 to 31-Aug-11

H - 3901 Darar To Sanghoya

3.78 km.

9281

16-Nov-11 Work Plan:120m (Sanghoya Phirni RD0 to 120m), 80m (Darar Phirni RD 2924 to
3004m) GSB+pavers; in rest Patches (EC. 11 lacs).

9280

07-Oct-11 Constructed 11/1990. Crust 150mm WBM. CC in 510m(RD3004 to 3514m): in rest


PC(3.070 Km) done in 12/2007.

H - 3904 Nandi To P.C.Ghari Birbal

3.06 km.

9283

07-Oct-11 Work Plan:75mm WBM+PC in entire length.(EC. 33 lacs).

8482

04-Oct-11 Constructed- 1994, Path- 5 Karam, Crust-150mm, Patch + PC in 07/2006 in entire


length. Road falls in Yamuna Belt and damaged due to traffic diversion in 7/10 to
9/10.

Thursday, February 23, 2012

Indri

Page 6 of 12

4)

5)

6)

H - 3908 Karwa To Badheri


9285

07-Oct-11 Work Plan: 347m (Karwa Phirni), 270m (Santri Phirni), 60m ( (Badheri Phirni)
GSB+pavers (EC 34 lacs).

9073

07-Oct-11 Constructed 10/06/1994. Crust 150mm. CC (0.325) +PC (2.485 km) done 12/2007.
(316.62 sqm) patches done 1/09/2011 to 13/09/2011 (63 K).

H - 3914 Kalsora To Japti Chhapra

8)

16-Nov-11 Work Plan: Patches (EC 3 lacs).

9286

07-Oct-11 Constructed 05/1997. Crust 150mm. Path 5 & 8 karam. CC in 153m (Japti Chhapra
Phirni)+in rest PC done in 01/2010.

H - 3916 Garhi Birbal To Leading To Nandi

10)

11)

2.25 km.

18-Feb-12 Tenders to be received on 15.03.2012.

9289

07-Oct-11 Work Plan:155m (Garhi Birbal Phirni RD 0 to 100m, RD 250 to 305m) GSB+pavers;
(EC 8 lacs).

9074

07-Oct-11 Constructed 31/03/1998. Crust 150mm. PC (entire) done 8/2006. (170.97sqm)


patches done 1/09/2011 to 5/09/2011(33 K).

H - 3923 Khanpur To Ladwa Indri Road

0.82 km.

9297

07-Oct-11 Work Plan:70m (RD750 to 820m Khanpur Phirni) GSB+pavers; in rest patches (EC.
5 lacs).

9296

07-Oct-11 Constructed 03/1999. Crust 150mm. Path 4 & 5 karam. PC done in 02/2005.

H - 3941 Garhi Jattan To Dhumsi


19088

9)

4.61 km.

9287

19087

7)

2.81 km.

2.81 km.

18-Feb-12 Tenders to be received on 15.03.2012.

9301

07-Oct-11 Work Plan:53m (Garhi Jattan Phirni), 385m (Dhumsi) GSB+pavers; in rest 75mm
WBM+PC (EC. 46 lacs).

9300

07-Oct-11 Constructed 04/2004. Crust 150mm. Path 5 karam.

H - 3942 Garhpur Khalsa To Kalri Khalsa

2.52 km.

9303

07-Oct-11 Work Plan:385m (Garhpur Khalsa Phirni) GSB+pavers; in rest patches with in 44Kper Km (EC. 20 lacs).

9302

07-Oct-11 Constructed 06/2004. Crust 150mm. Path 4, 5 & 6 karam.

H - 3944 Chhaper To Bhoot Majra

1.84 km.

9307

07-Oct-11 Work Plan:75mm WBM+PC in entire length (EC. 19 lacs).

9306

07-Oct-11 Constructed 05/2004. Crust 150mm. Path 4 karam.

H - 3945 Shah Pur To Manohar Pur

1.54 km.

9309

16-Nov-11 Work Plan: Patches (EC. 5 lacs).

9308

07-Oct-11 Constructed 12/2006. Crust 150mm. Path 5 karam.

Thursday, February 23, 2012

Indri

Page 7 of 12

12)

13)

14)

15)

16)

H - 3946 Rajepur To Umar Pur

1.22 km.

9311

16-Nov-11 Patches to be contracted. (EC 1 lacs).

9310

07-Oct-11 Constructed 05/2007. Crust 150mm. Path 4 & 6 karam.

H - 3953 Kalweri-Kunjpura Road To Kalwari Basti

0.72 km.

9313

07-Oct-11 Work Plan:75mm WBM in 370m (RD350 to 720m) in rest patches also PC in entire
length (EC 7 lacs).

9312

07-Oct-11 Constructed 01/2001. Crust 150mm. Path 4 karam.

H - 3954 Darar To Bara Gaon

4.82 km.

9315

07-Oct-11 Work Plan:75mm WBM+PC in entire length (EC. 53 lacs).

9314

07-Oct-11 Constructed 06/2004. Crust 150mm. Path 5 karam.

H - 3958 Uchani To Indri Road

0.66 km.

9319

07-Oct-11 Work Plan:255m (Uchani Phirni) GSB+pavers; in rest 75mm WBM+ PC in entire
length (EC. 17lacs).

9318

07-Oct-11 Constructed 04/2004. Crust 150mm. Path 4 karam.

H - 3960 Abdulapur To Kurali

1.53 km.

9321

07-Oct-11 Work Plan:495m (Kurali Phirni RD0 to 495m)) GSB+pavers; In 47m 6' high R/W (RD
315 to 362m) in phirni Kurali: in rest 75mm WBM+PC (EC. 38 lacs).

9320

07-Oct-11 Constructed 10/2004. Crust 150mm. Path 4 karam.


Sub Total:

Thursday, February 23, 2012

Indri

Page 8 of 12

39.01 km.

Transferred
Transferred to MC
1)

H - 3968 G.T. Road To Baldi Via School


8572

0.83 km.

07-Oct-11 Constructed 12/1998. Path-5karam, Crust-225 mm. SR 31.12.09.


Sub Total:

0.83 km.

Transferred to PWD (938 roads)


1)

H - 3902 Taprian To Chaprian


14440
8582

2)

8583

4)

5)

6)

7)

15-Nov-11 Transferred to PWD. PWD RoadID : 8844


07-Oct-11 Constructed 7/1990. No SR done, Path-6karam, Crust-150 mm.

H - 3903 Bibi Pur Jattan To Kamal Pur Roran


14439

3)

1.80 km.

3.09 km.

15-Nov-11 Transferred to PWD. PWD RoadID : 8845


07-Oct-11 Constructed 5/1991. SR 15.04.07 with PC, Path-6karam, Crust-150 mm.

H - 3905 Bibipur Jattan To Nagla Roran

3.80 km.

8584

07-Oct-11 Constructed 2/1994. SR 29.01.10, Path-8karam, Crust-225 mm.

7698

03-Oct-11 Transferred to PWD. PWD RoadID : 8846

H - 3906 Garhi Birbal To Shergarh

3.10 km.

8585

07-Oct-11 Constructed 3/1994. SR 10.12.07, Path-12karam, Crust-150 mm

7701

03-Oct-11 Transferred to PWD. PWD RoadID : 8847

H - 3909 Hanori To Bhoji

3.88 km.

8586

07-Oct-11 Constructed 4/1994. SR 20.03.04, Path-6,8 & 10karam, Crust-150 mm

7706

03-Oct-11 Transferred to PWD. PWD RoadID : 8848

H - 3910 Chourni To Samora

2.73 km.

8587

07-Oct-11 Constructed 3/1995. SR 29.01.10, Path-6karam, Crust-225 mm

7697

03-Oct-11 Transferred to PWD. PWD RoadID : 8849

H - 3913 Chand Samand To Bir Majri

1.44 km.

8588

07-Oct-11 Constructed 6/1997. SR 30.09.06, Path-6 & 8karam, Crust-150 mm

7699

03-Oct-11 Transferred to PWD. PWD RoadID : 8850

Thursday, February 23, 2012

Indri

Page 9 of 12

8)

9)

10)

11)

12)

13)

14)

H - 3915 Garhi Sadhan To Panjokhera

2.08 km.

8589

07-Oct-11 Constructed 3/1998. SR 30.09.06, Path-6karam, Crust-150 mm

7702

03-Oct-11 Transferred to PWD. PWD RoadID : 8851

H - 3932 Biana To Shahpur

2.33 km.

8590

07-Oct-11 Constructed 8/2001. SR 29.09.10, Path-6karam, Crust-150 mm

7696

03-Oct-11 Transferred to PWD. PWD RoadID : 8852

H - 3947 Pathera To Rajepur

0.75 km.

8591

07-Oct-11 Constructed 3/2008. No SR done, Path-6 & 8karam, Crust-225 mm

7704

03-Oct-11 Transferred to PWD. PWD RoadID : 8853

H - 3950 Ganger To G.T. Road

1.30 km.

8592

07-Oct-11 Constructed 7/2001.SR 29.01.10, Path-6, Crust-225 mm

8243

03-Oct-11 Transferred to PWD. PWD RoadID : 8854

7109

30-Sep-11 Transferred to PWD (B&R) on 16/3/2010.

H - 3952 Shergarh Tapu To Yamuna Bandh.

0.66 km.

8593

07-Oct-11 Constructed 11/1997. SR 10.12.07, Path-6karam, Crust-150 mm

7700

03-Oct-11 Transferred to PWD. PWD RoadID : 8855

H - 3959 Salaru To Taprana

2.48 km.

8594

07-Oct-11 Constructed 9/2005. No SR done, Path-6karam, Crust-150 mm

7695

03-Oct-11 Transferred to PWD. PWD RoadID : 8857

H - 3963 Nagla Roran To Gheer

2.56 km.

8595

07-Oct-11 Constructed 12/2009. No SR done, Path-6karam, Crust-225 mm. CC in phirni of


village Gheer.

8248

03-Oct-11 Transferred to PWD. PWD RoadID : 8858


Sub Total:

Thursday, February 23, 2012

Indri

Page 10 of 12

32.00 km.

New Construction going on


New Construction
1)

H - 4695 Gharpur To Yamuna Ghat


19073

18-Feb-12 Tender to be received on 27.02.2012.

16555

02-Jan-12 Tender to be received on 31.01.2012.

9740

2)

18-Feb-12 Tender to be received on 27.02.2012.

16556

02-Jan-12 Tender to be received on 31.01.2012.

Sikligran

19075

18-Feb-12 Tender to be received on 27.02.2012.

16557

02-Jan-12 Tender to be received on 31.01.2012.

1.57 km.

16-Nov-11 A/A on 26.08.09 for Rs. 28.41 lacs. Path 5 K .Crust 225mm. Allotted to The
Madhan Co.Op Ltd. on 4/6/2010. Earth work completed. Agency left the work.
Tender re-invited on 22.11.11 at risk and cost.

H - 4698 Ghor Garh To Kheri Man Singh

1.91 km.

19076

18-Feb-12 Tender to be received on 27.02.2012.

16558

02-Jan-12 Tender to be received on 31.01.2012.


16-Nov-11 A/A on 28.08.09 for Rs. 34.63 lacs. Path 6 K.Crust 225mm. Allotted to Jitender
Singh on 9/6/2010. Earth work completed. Agency left the work. Tender re-invited
on 22/11/2011 at risk and cost.

H - 5100 Pucca Road In Skindrabad

0.41 km.

19080

18-Feb-12 Tender received on 27.02.2012.

16563

02-Jan-12 Tender to be received on 31.01.2012.

9753

6)

16-Nov-11 A/A on 02.09.09 for Rs. 38.37 lacs. Path 5 K .Crust 225mm . Earth work partially
completed. Agency left the work. Tender re-invited on 22.11.11 at risk and cost.

H - 4697 Sayid Chappra Via Dera Halwana

9743

5)

1.92 km.

19074

9742

4)

16-Nov-11 A/A on 20.08.09 for Rs. 17.39 lacs. Path 7 K. Crust 225mm . Allotted to Mohan Lal
on 24/12/2009. Work not started. Being included in group of 3 roads, tenders for
balance work invited on 22/11/2011 at the risk & cost of previous agency.

H - 4696 Kamalpur To Churni

9741

3)

0.95 km.

16-Nov-11 A/A on 20.08.09 for Rs. 7.84 lacs. Path 6 K .Crust 225mm. Earth work in 150 m
completed. Agency left the work. Tender re-invited on 22/11/2011 at risk and cost.

H - 5101 Shergarh To Dhano Kheri

2.50 km.

19081

18-Feb-12 Tender received on 27.02.2012.

16564

02-Jan-12 Tender to be received on 31.01.2012.

Thursday, February 23, 2012

Indri

Page 11 of 12

9754

7)

16-Nov-11 A/A on 20.08.09 for Rs. 48.15 lacs. Path 10 K .Crust 225mm. Earth work in 1 km
completed. Agency left the work. Tender re-invited on 22/11/2011 at risk and cost.

H - 5102 Samora To Bibipur

2.73 km.

19082

18-Feb-12 Tender received on 27.02.2012.

16565

02-Jan-12 Tender to be received on 31.01.2012.

9755

16-Nov-11 A/A on 28.08.09 for Rs. 58.78 lacs. Path 6 K .Crust 225mm. alloted on 9.6.10 to Sh,
Jitender Singh. Retaining wall completed in length 91.50 Rmt. Agency left the
work. Tender re-invited on 22/11/2011 at risk and cost.
Sub Total:

Thursday, February 23, 2012

Indri

Page 12 of 12

11.99 km.