You are on page 1of 95

Section 48 Book of plans

Summer 2012

Volume 2 / Site plans for: London Borough of Ealing London Borough of Hammersmith and Fulham Royal Borough of Kensington and Chelsea Westminster City Council

Section 48: Book of plans


List of contents Volume 2

This volume: Volume 2 Ealing Volume 2 Hammersmith & Fulham Volume 2 Hammersmith & Fulham Volume 2 Kensington & Chelsea Volume 2 Kensington & Chelsea Volume 2 Westminster Total Number of Drawings: Other volumes: Volume 1 Various Volume 1 Various Volume 3 Richmond Volume 3 Wandsworth Volume 3 Wandsworth Volume 3 Wandsworth Volume 3 Wandsworth Volume 3 Wandsworth Volume 3 Wandsworth Volume 4 Lambeth Volume 5 City of London Volume 4 Southwark Volume 4 Southwark Volume 4 Lewisham Volume 4 Lewisham Volume 4 Greenwich Volume 5 Tower Hamlets Volume 5 Tower Hamlets Volume 5 Newham Volume 5 Newham Section 1 Project wide Works plan and section Section 2 Project wide Land acquisition plan Section 5 Barn Elms Section 6 Putney Embankment Foreshore Section 8 Dormay Street Section 9 King Georges Park Section 10 Falconbrook Pumping Station Section 13 Kirtling Street Section 14 Heathwall Pumping Station Section 15 Albert Embankment Foreshore Section 17 Blackfriars Bridge Foreshore Section 18 Shad Thames Pumping Station Section 19 Chambers Wharf Section 20 Earl Pumping Station Section 21 Deptford Church Street Section 22 Greenwich Pumping Station Section 23 King Edward Memorial Park Foreshore Section 24 Bekesbourne Street Section 25 Abbey Mills Pumping Station Section 26 Beckton Sewage Treatment Works Section 3 Acton Storm Tanks Section 4 Hammersmith Pumping Station Section 7 Carnwath Road Riverside Section 11 Cremorne Wharf Depot Section 12 Chelsea Embankment Foreshore Section 16 Victoria Embankment Foreshore 91

Section 3

Location Acton Storm Tanks

Drawing Title Location plan As existing site features plan Access plan Demolition and site clearance Site works parameter plan Permanent works layout Proposed landscape plan Section AA As existing and proposed elevations Construction phases

No. of sheets 1 1 1 2 2 2 1 1 2 2 1 1 1 1 2 1 1 1 2 2 1 1 1 1 2 1 1 1

Hammersmith Pumping Station

Location plan As existing site features plan Access plan Demolition and site clearance Site works parameter plan Permanent works layout Proposed landscape plan Section AA As existing and proposed elevations Construction phases

Carnwath Road Riverside

Location plan As existing site features plan Access plan Demolition and site clearance Site works parameter plan Permanent works layout Proposed landscape plan Section AA

Section Location 7 11 Carnwath Road Riverside Cremorne Wharf Depot

Drawing Title As existing and proposed elevations Construction phases Location plan As existing site features plan Access plan Demolition and site clearance Site works parameter plan Permanent works layout Proposed site features plan Section AA As existing and proposed elevations Construction phases

No. of sheets 2 4 1 1 1 1 2 1 1 1 2 2 1 1 1 2 2 2 2 1 2 4 1 1 1 2 2 1 1 1 1 2 4

12

Chelsea Embankment Foreshore

Location plan As existing site features plan Access plan Demolition and site clearance Site works parameter plan Permanent works layout Proposed landscape plan Section AA As existing and proposed elevations Construction phases

16

Victoria Embankment Foreshore

Location plan As existing site features plan Access plan Demolition and site clearance Site works parameter plan Permanent works layout Proposed landscape plan Proposed site features plan Section AA As existing and proposed elevations Construction phases

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Acton Central Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Local authority boundary

Order limits

e h Vl Te a

Tunnel

Shaft

W W l pe r a

Acton Storm Tanks


a od mR na ah C

yG ne a l St s n re ad

G r e e n e n d

y a
W e pl ar

W
ay
d a d o l o R ob Cb

R o a d

London Borough of
Main tunnel

Hammersmith & Fulham

London Borough of Ealing


Em n y l R d oa

o os c R a Wo d t k o d

100m

100m

Scale 1:2500 at A1 1:5000 if reproduced at A3

FOR INFORMATION

Location

Acton Storm Tanks London Borough of Ealing


Document Information

Section 48 publicity Location plan Book of plans - section 3


S48-PP-02X-ACTST-000001 July 2012

London Borough of Hounslow

c Thames Water Utilities Ltd 2008

N Acton Park Industrial Estate Work/ Industrial Building

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

ad re n s

Access to Thames Water compound This drawing

St a l ne yG

+ 105.73m North Elev.


a od mR a ah C n

Residential Residential apartment block

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Residential + 105.75m Vegetation Residential Hall Vegetation + 106.06m apartment block apartment block

Key:
Limits of land to be acquired or used (LLAU) + 105.40m Existing levels (shown in metres above tunnel datum) Thames Water land

East Above ground overflow chamber + 107.96m Elev. + 105.97m Pumping station

Thames Water buildings/structures

W e pl ar W ay

Existing trees within surveyed area

o a d

Storm water tank 6 Pumping station wet well Storm water tank 5 Fuel storage Mobile

Thames Water access communication mast 1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between + 106.13m Storm water the Ordnance Survey base and the topographic survey base, both of which have been used in the preparation of this drawing.

u g b y

Notes :

Car park

tank 4

1 0 6 . 2 6 m

Storm water tank 3

Residential apartment block

d a d o l o R ob Cb
Storm water
oa d

tank 2

S al t c oa t s

G r e e n e n d

Storm water tank 1


R o a d

10m

10m

Scale 1:200 at A1 1:400 if reproduced at A3


oa d i l t on R

am

+ 106.10m

FOR INFORMATION

Screen housing Location

Acton Storm Tanks London Borough of Ealing


Document Information

Section 48 publicity As existing site features plan Book of plans - section 3


o a d

S48-PP-02X-ACTST-000002 July 2012

Ha wk s h e a dR

c Thames Water Utilities Ltd 2008

o t

g n o L

d n H e s u o

W R A E L P
23 to 37 1 to 38

C m a h n a M w e

Charles Court Ampere

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

W Y A

o 5t

Hall

Extent of area to be temporarily stopped up for the construction of crossover(s) for site and permanent accesses

A D

B Y

1 4

2 6

Un d

3 8

A D

S A LT C

G R E E N E N D

A T S

R O A D

14

27

15

A D

I LT O

A M

RO

AD

KS HE AD

HA W

y r re ug S
4 4
CE ST ER

6 1

5 3

6 o1 2t 2

Ac/Ap

5 0

6 2
4 3

7 6
3 4 24

House

Keyplan:

Playground

Ap
9

This drawing

R A E L P

W AY

D A O MR A H N A C

7 8

1 to 40

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

1 to 72

Anthony Court
41 to 84

Key:
Limits of land to be acquired or used (LLAU) Area of highway to be temporarily stopped up

o or B
C ,G t s on

L y l s A C
t& s on

Ap
Tesla Court

Access to permanent works

Ac Notes:

Access to construction works

Mast

LB dy B

1. This plan does not show stopping up and diversions of limited duration (eg hoarding erection, minor utility diversions and minor highway works). 2. Only rights of way in or close to worksites are shown. The full extents of rights of way are not shown where they cease to be relevant to the project.
1 to 55

Vandervell Court
1 to 66

3 3

3 1

1 7

1 5

Edison

Court

A O D L R O D O B C B

l M oe r ut Co

Extent of area to be temporarily stopped up for the construction of a crossover to provide access for Thames Water operations during construction

od fr o g L n r ut Co

29 o 4 3 t 20 29 o 6 5 t 20

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

ut o r e C L a 9 2 o2 1 t 2 5

n my E l ad n G re s
0 2 2
8 1 3
o t
E W ARPL

FOR APPROVAL

17
30
7 4

Location

Acton Storm Tanks London Borough of Ealing


Document Information

ut o r e lyC v r Be e 8 1 2

EK W AY

o 6 t 1 8

8 2

Ac
Area of third party car park access to be temporariliy stopped up to facilitate construction of CSO connection chamber

Section 48 publicity Access plan

B o r o

17 o 6 4 t 13

Book of plans - section 3


S48-AC-02X-ACTST-000001

16

8 8

0 9

o n s t , G

2 0
8

July 2012
A s l y C

o n s t & L B B d y
f De

C ig dn Ro u o

c Thames Water Utilities Ltd 2008

WA R Y
Kr eb 15 0. Ca 9 hn 4 nl e 16 0. 0 4
S P C 7 S 9 n 9 t .0 S 5 0 1
1 0 5 . 7 8
7 0 . 6 0 1 L C m r a T

15 0. 8 9
16 0. 0 0

c a

0 1 . 6 0 1
10 6. 05

C I

2 1 . 6 0 1 L C

Tr am a c

1 0 59 .6
G R
2 9 . 5 0 1

1 0 59 .7 1 0 58 1 .8 0 59 1 .8 0 58 .8
1 0 58 .3
1 0 59 .4

16 0. 1 4

S R I

16 0. 1 3

16 0. 0 2

1 0 60 .6 1 0 86 .2

16 0. 1 I 1 C

1 0 60 .2 1 5 0 . 8 9

10 6. 09

0 9 . 5 0 1 L C

G R

2 8 . 5 0 1 6 0 . 6 C 0 I 1 L C 5 9 . 5 0 1
A s ph al t 10 5. 10 10 93 6. 6. 07 03

S P C

W
W V

.4 60 0 1

S R I 16 6 1 0. 1 0. 6 8 1
Ga rs s

C I

Ap 1 sh 0 60 .2 a l t
16 0. 1 5

3 9 . 5 0 1 L C

4 9 . 5 0 1

London Borough of
1 0 59 .1

B J

1 6 1 6 0 . 0 . 0 0 4 4 1 6 0 . 0 8 h a n n e 1 5 CPS 1 6 l 0 . 0 . 8 C 0 1 9 P 0 0 59 .8 S Br ik c 1 5 0 . s t et 9 1 s

1 0 6 . 0 16 0. G 1 0 as 5 rs
16 0. 0 0

16 0. 1 0

16 0. 1 3

S B

S P C

y G

1 0 . 6 0 y 1 G

6 S 6 n 0 t .3 S 6 0 S Fh 1 30 . 16 0. 0 9

Hammersmith & Fulham


1 0 59 .0

1 0 57 .8
1 0 59 .3

8 9 . 5 C 0 I 1 L C G R
7 8 . 5 0 1

H F P L

17 0. 3 0

P B 3 0 . 6 0 1 16 0. 0 4 1 0 60 .3

1 0 60 .8
1 0 60 .7
1 0 60 .6

Tr am a c

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

P L

1 0 60 .3
1 0 60 .6 Ga rs s
1 0 60 .7

1 0 57 .1

C I

7 8 . 5 0 1 L C

1 0 58 .2

G R

5 6 . 5 0 1

15 0. 8 3
6 6 . 5 0 1 L C g

Keyplan:
15 0. 7 7
V G

10 6. 03

5. 90 10 5. 97 10 6. 06

C I

1 5 0 . 9 7 1 0 59 .5 Ke r bC

3 9 . 5 0 1 L C

1 0 59 .6

15 6. . SF h 2 7 10 1 61 0 .8

8 9 . G 6 5 8 C R . I 0 5 1 0 L 1 C 1 0 58 .6 1 0 5 . 9 1

1 0 61 .1

1 0 59 .8

1 0 60 .8

H / O

.1 60 0 1

6 9 . 5 0 1 V G

K er b

P T 1 0 61 .6 1 0 6 . 1 3 5 0 . 6 C 0 I 1 L 8 C S 2 n 0 t .2 S 6 0 1

Ap sh a l t S Fh 30 . 1 0 61 .1

C I

1 0 56 .4
4 6 . 5 C 0 I 1 L C

1 0 57 .7
15 0. 9 2

6 . 4 8 0 s 1 h b M

10

C P ha S nn el

15 0. 7 0
s s a r G

V M W

This drawing
Tr am a c
0 7 . 5 0 1

10 5. 98

01 6. 10

9 5 . 5 C 0 I 1 L C G R
V G 3 5 . 5 0 1

15 0. 7 2

1 0 58 .6

15 0. 6 7

0 .5 1 60

10 5. 93 10 5. 95

2 9 . 5 0 C 1 I L C 2 9 . 5 0 C I 1 L C

10 5. 96 10 5. 88 10 5. 84

0 .3 1 60

10 6. 05

6 9 . 5 0 1 P B

0. R 16 3 E 8
9 3 . 6 0 1 L C

c n o C

16 0. 3 2
5 3 . 6 0 1 L C

C I

15 0. 7 5

15 0. 6 5
S Fh 30 .

3 0. 16 1

0 .2 1 61

1 69 0 .6

0 .6 1 60

London Borough of Ealing


10 5. 93

4 0. 16 0
4 0. 16 6
W R

3 0. 16 2
P

C I

R E

S R

S P C
0 .8 1 62

E R

0 .0 1 60

10 5. 10 C P 94 5. S 84 10 5. 79

0 .2 1 64

a s Gr s

C I
1. 9

0 .9 1 61

10 5. 89

0 .1 1 64

9 8 . 5 0 1

0 .6 1 61

0 .2 1 63

5 6 . 6 0 1 B W 0 0 . 6 0 1
0 8 . 5 0 1 L C

5 0 . 6 0 1 L C

10 5. 93

G R

8 8 . 5 0 1

l e v e L .5 2 s 0 e 1 P v 1 D a E

16 0. 1 6
C I 5 2 . 6 0 1 L C

15 0. 7 2

Ap sh a l t

WA RP L E W AY
P L

15 0. 6 2
5 S 8 n 5 t .7 S 5 0 1

y G

1 4 . 6 0 1 W

Tp o oB fa n k
C I

M
3 0. 16 8

9 2 . 6 0 1 L C

15 0. 7 1
R E
16 0. 0 3

15 0. 5 8

s s a r G

0 .0 1 65

10 6. 02

C Fh . B 1 6

R E

15 0. 6 7

t Ga e

t Ga e

0 .1 1 60

0 .7 1 60

3 . CBF h 1

10 5. 85

10 5. 88 I C

C I

10 6. 01

9 0 0 . 1 6 8 0 0 . 1 6 1 62 0 . t a s1 Ga e Gr s 4 1 0 . 1 6 CPS 6 2 0 . 1 6 s r Rie

G R

0 .5 1 60

0 .3 1 60

0 .3 1 64

0 .1 1 64

0 .6 1 63

d0 . 7

t l a h p s A

0 .1 1 64

6 7 . 5 0 1

4 0 . 6 0 1

0 0 . 6 0 1 C I 8 9 . 5 0 1 L C

0 .0 1 65

c n o C
2 0. 16 3

4 0. 16 0

0 .0 1 64

10 5. 85

E R

E R

W R

E R

P D

l e v e L .6 2 s 0 e 1 v 1 a E

3 0. 16 5

3 0. 16 4

E R

E R

W R

4 0. 16 3

4 0. 16 0 3 0. 16 7
s s a r G

R E

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance S Fh 3 . 0 Datum Newlyn. 15 0. 9
6

L1 05 . 85

10 105 . 5. 97 89

5. 83 10 5. 80

10 5. 75

0 .4 1 60

I C

10

3 0 . 6 0 1

1 0 . 7 0 1

E R P

C I

4 0. 16 5

P 4 0. 16 4 D R 3 0. 16 7
0 .8 1 63

P D
0 .7 1 66

7 2 . 6 0 1 L C

Key:
Local authority boundary

0 .0 1 59

W R

R G 10 5. 76

0 .0 1 83

10 5. 89

10 10 5. 5. 78 86 10 5. 74

10 5. 78

105.91

9 0. 15 4

9 0. 15 7
1 0 0 . 1 6
6 1 0 . 1 6
c a

oc Cn 3 0. 16 6

9 0. 15 7
P L
1. 9

1 0 6 . 0 0
S Fh 26 .

ac

0 .6 1 63

e a G t

Ta r m

CPS

m r a T

e t a e i m i sz x r o e r p p mb A a h C

l e v e L e g d 8 i .7 R 4 1 1

7 3 . 6 0 1

CPS

1 0. 16 4

n Co c

S R

4 0 . 6 0 1

P B

4 0. 16 4

2 0. 16 9

0 .4 1 64 0 .0 1 64

1 63 0 .5

10 5. 79

A s ph al t

0 .6 1 64

6 1 0 . 1 6

0 .4 1 60

. SF h 2 6

0 .5 1 60

10 5. 71

ha nn el h 1. 8

Portacabin

n o i t a t e ) g s e s e V c e s Ac n e o D ( N

0 .2 1 64

E R

1 61 1 64 0 .9 0 .6

ha nn el

10 5. 86

10 10 5. 5. 81 78

C I

8 3 . 6 0 1 L C

0 .2 1 64

W R

BP

BP

3 9 0. 15 5 9 0. 15

l e v e L e g d 5 i .2 R 3 1 1

16 0. 2 0

Limits of land to be acquired or used (LLAU) Trees to be removed

P
5 0. 16 4

s s a r G

1 10 05. 5. 85 87

0 .1 1 62

0 .1 1 62

K er b

s s a r G

4 8 0. 16 2 3 . P 6 E 0 R W 1 R 1 0. 16 7 16 7 0. 1
8 0 . 6 0 1 L C

4 0. 16 9
oc Cn

E R 4 0. 16 1

WP R

oc Cn

s s a r G

C I

P S

3 2 . 6 0 1 L C

2 0. 16 0
0 3 . 6 C 0 I 1 L C

2 0. 16 0
0 0. 16 9

2 0. 16 0
e t a e i m i sz x r o e r p p mb A a h C

9 1 . 6 0 S 1 P C

Above ground structures to be removed Structure to be removed and relocated or reinstated

0 0. 16 9

P S

10 5. 76

10 5. 78

0 .9 1 59

C I

0 .2 0 .7 1 60 1 60

5. 73 10 5. 66

10 5. 82

5 0 . 6 0 1

10 5. 84 10 5. 85

9 9 . 5 0 1 3 0 . 6 0 1 0 0 . 6 0 1

10

s s a r G

9 0. 15 7

0 0. 16 2

e t a e i m i sz x r o e r p p mb A a h C

C I

I C

0 1 . 6 0 1 L C

K er b

0 0. 16 7

am c Tra

10 5. 73

10 I C 5. 78 L1 05 . 67 1 05 . 78

10 5. 68

7 0 . 6 0 1

am c Tra

C I
1 0. 16 6

0 .3 1 60 1 61 0 .9

0 2 . 6 0 1 L C G

c n o C
1 0. 16 9

S P C

CPS

P L
10 5. 84

10 10 5. 5. 105 74 84 . 82

0 .4 1 60

e a G t
P

IC 7 L0. C 16 8

0 .3 1 62

0 .3 1 62

10 A 5. s 78 ph al t

10 5. 79

0 .9 1 61

0 .4 1 61

0 .5 1 65

6 0. 16 5
1 61 CL 0 . 8

1 67 CL 0 . 7

R G 10 5. 77

0 .8 1 61 0 .3 1 60 1 62 0 .2

Po t k b n ra a i

0 .7 1 6 1 Co c n

1 67 CL 0 . 5

e s a B c n y) p o T C (

10 5. 74

C I

C I

C Dr

k n a ) T s e es g c a r o Ac t S o N (

0 .4 1 61

1 G . R 56 0 1

. SF h 2 6

0 .3 1 62

at e

n o i t a t e ) g s e s e V c e s Ac n e o D ( N

1 0. 16 4

oc Cn
2 0. 16 4

0 .0 1 62

1 1 0. 0. 16 7 16 6

16 0. 1 6

Notes:
19 6. 10

10 6. 15

0 .9 1 59

c n o C

t Ga e

P L

16 8 0. 1

am c Tra

2 0. 16 0

8 F 2 S h . 2 0. 16 1

P L

1. Minor items to be removed (e.g. barriers, bollards etc.) are not shown. 2. General activities of site clearance such as removal of hardstanding and foundations, stripping of topsoil and clearance of minor vegetation not shown.
1 62 0 .2
G R 8 9 . 5 0 1

10 5. 89

W V

C I

0 .0 1 60

0 .0 1 64

0 .2 1 63

r e s i R

10 10 5. 5. 62 64

lT p Co ( y )

I C

0 .6 1 60

0 .7 1 62

W
10 5. 79

a s Gr s

1 0. 16 9 e al Cb s

e ri Ba r r

C L1 10 05 5. . 79 73 10 5. 81 10 5. 70

0 .8 1 61

10 5. 79

e ri Ba r r

1 61 0 .2

s r Rie s

L 10 10 5. 74 5. 73

F 1 h 0 5 2. . 7 82

Temporary removal of sections of existing boundary fence


1 0 6 . 0 5

c n o C

G R

4 9 . 5 0 1 C I 1 0 . 6 0 1 L C

7 L0. C 16 6

IC

0 .7 1 61

0 .2 1 66

7 L0. C 16 7 7 0. 16 5

R G 10 5. 71

S Fh 276 7 . 1 0 1 .

G R

10 5. 78

10 10 5. 8 5. 8 98

Ta r m

0 .1 1 64

P S

10 5. 77

10 5. 81

16 4 0. 1

n Co c

K er b

0 .9 1 61

0 .7 1 61

10 5. 90

1 62 0 .1

10 5. 75 10 5. 87 105 A . 10 s 83 ph 6. al 0 t 10 3 6. 20

Barrier

CPS

0 .0 1 69

10 6. 02

5 0 . 6 C 0 I 1 L C
CPS 106.09 106.66

s 5 s 1 a . 6 Gr C 0 I 1 L C
106.18

Conc Wall
1 0. 16 1
P L

106.11
106.45

16 0. 1 4
s s a r G
16 0. 0 4

7 0 . 6 C 0 I 1 L C
106.25
106.13 106.19

9 0 . 6 C 0 I 1 L C
106.23

4 0 . 6 C 0 I 1 L C

CPS

1 0 6 . 1 0

.3 60 0 1

0 .5 1 61

2 1 . 6 0 1

16 0. 1 4

1 0. 16 3
8 0 . 6 C 0 I 1 L C

0 .6 1 61

7 9 . 5 0 1

G R

9 9 . 5 0 1

1 61 0 .1

T am r a c

S h F 2 . 7

G R

16 0. 0 8

3 9 . 5 0 1

S h . F 2 6

rs G as

3 1 0. 16

0 1 0. 16
s s a r G
IC 2 L0. C 17 6

C I

1 0. 16 7

8 2 . 6 0 1 c L n C o C s s a r G

ae L vl E vs ee 5 0. 18 5

RW P

16 0. 0 9

16 0. 1 6

16 0. 0 3

e s a B c n o C 0 0. 16 3 16 5 0. 0

G t a e

3 1 0. 16

6 6 . 6 C 0 I 1 L C

0 .3 1 66

0 .7 1 64

ha nn el

3 1 . 6 0 1

16 0. 2 3

n Co c

6 1 . 6 0 1

0 .7 1 61

16 0. 0 6

16 0. 2 3

107.68 106.46

d e e e Ri g L v l 1 .0 1 13

Reinforced conrete storm tank flow distribution channel

e t a e i m i sz x r o e r p p mb A a h C

10 5. 72 10 5. 69

ac

l l c rk Bi Wa

3 1 . 6 0 1

l v s e e Ea e L v 1 .8 1 03

s s a r G

16 0. 1 7

16 0. 1 7

4 9 . 5 0 1

10 6. 09

P L

I R

1 1 . 6 0 1

C I

2 0 . 6 0 1 L C

0 .7 1 60

y G
1 0 6 . 2 0

IC 7 L0. C 16 7
s s a r G

9 0 0. 16

P u m p

1 0. 16 0 i ar r B re

C Dr

r c Ta m a

8 3 . 6 0 1

8 1 . 6 0 1

I C

0 .3 1 61

1 61 0 .4

n Co c

5 5 . 9 d IC S

2 0. 16 1
2 0. 16 3

c n o C

1 F 2 S h .

4 0. 16 3

106.28

106.21

Sheet Layout

CPS

am c Tra

7 1 P 0. L 16 l l oc C n Wa

106.66 106.20 106.22


R E

IC 1 L0. C 16 3
106.17

3 2 0. 16

Barrier

106.11
106.45

106.14
CPS

106.13
106.66

106.16
106.67

106.23

CPS
Conc Wall

106.17

H F

106.09 CPS

106.23
FH

10 5. 93

1 63 0 .5 t Ga e

106.24
6 0. 16 6

106.08

106.09
Conc Wall

CPS

106.16 106.43

106.66

106.65

106.05 106.10
106.66
106.65

LP

CPS
Conc Wall

CPS

106.23 106.66

q l e Pa u
106.66 106.66
HR h 1 0 .

106.65 106.66

106.66

106.66

v ae Vl

Walkway
106.67 Gate

IC CL106.66

106.66

Walkway

106.66

10 5. 74

10 5. 64

10 6. 06

10 6. 20

10 10 5. 8 5. 3 75 10 5. A 67 s ph al t

10 5. 90

10 5. 74 10 5. 85

1 6 0 . 2 3

1 6 0 . 1 0

1 0 62 .0

ac

106.07

0 .7 1 60

7 6 . 6 0 1

Pl t r af m o

Pl t r af m o

Pl t r af m o

10 5. 78

e t e r c n o C

0 .5 1 66

G R

2 7 . 5 0 1

8 0 . 6 0 1

0 .8 1 60

Temporary removal of sections of boundary wall / fence to create site access

Ta r m

10 5. 78

G R

G 10 5. 70

10 6. 11

5 7 . 5 0 1

10 5. 10 75 5. 65

G R

I R

9 5 . 5 0 1

0 .6 1 66

2. 7

P L

1 10 06 6. . 6 0 24

Br c e a k t

10 6. 09

ac

3 7 . 5 C 0 I 1 L C

I C

Track

7 6 . 6 0 1

1 2 . 6 0 1

Sheet 1

Sheet 2

106.65

106.66

106.65

106.66

106.66

Conc Wall

8 6 . 6 0 1

Upper reinforced concrete walls of tanks to be demolished / modified Existing Storm Tanks Tank 6 Tanks to be decommissioned and filled using excavated material from the shaft. Drainage holes to be broken through base slab
Tracks

7 6 . 6 0 C 1 I L C

G R

10 5. 80 I C C L 10 5. 76 10 5. 73

K er b

P S

ha nn el

Notional location and size of existing trees


10 5 10 . 8 5. 0 73

0 .6 1 60

0 .5 1 61

1 61 0 .0

1 62 0 .1

h g u o R

1 60 0 .7

0 .7 1 66

I R

5 7 . 5 0 1 V W

Ta r m

d n u o r G

k c o t l s o n t e nr P o C

10 5. 85

P L

0 .1 1 60

1 60 0 .6

10 5. 68

1 60 0 .6

G R

6 7 . 5 0 1 V

e s n e D

0 .5 1 66

n o i t a t e g e V

Area of existing storm tanks to be partially backfilled for location of ventilation plant. Area backfilled to levels between 102.5 to 106.2mATD.
106.67

2. 7

k c o t l s o n t e nr P o C

Existing Storm Tanks Tank 4

10 5. 81

8 6 . 6 0 1

106.75
106.70 106.69

P L

10 10 5. 5. 74 83

10 5. SF 73 h

l n e a n 2 57 b h S 0 . r C CP 1 Ke

0 .5 1 61

W
3. 0

I R

2. 7

106.74

1 9 S 0 . 1 5 EN RD G A

0 .2 1 60

10 5. 65

S F h 3. 0 10 5. 69

0 .2 1 61

10 5. 86

8 1 . 6 0 1

05 6. 10

0 .7 1 66

1 8 0 . 1 5

8 8 0 . 1 5

A s ph al t

10m
Pl t r af m o

10m

r c Ta m a

C I
8 7 0 . 1 5 t h l p a As

05 . 70 10 5. 81

L1 05 . 76

1 I 05. C 63 C L 10 5. 77

0 .3 1 61

0 .5 1 61

0 .6 1 66

I C

9 6 . 5 0 1

3 8 0 . 1 5

C I 7 2 . 6 0 1 9 1 . 6 0 1
0 .5 1 61
0 .4 1 60 0 .4 1 60

c m r a Ta

E NL TA

8 6 0 . 1 5

C I

A s ph al t

ha nn el F h 2. 7 10 5. 82

CPS

4 7 . 5 0 1 L C

e s n e D

6 1 . 6 0 1 L C

7 6 . 6 0 1

Pl t r af m o

n o i t a t e g e V 8 9 . 6 0 1

Pl t r af m o

10 5. 74

4 8 . 5 0 1 L C

S R I

k c o t l s o n t e nr P o C

Existing Storm Tanks Tank 5

Existing storm tank reinforced concrete division wall to be removed

10 5. 79

k c o t l s o n t e nr P o C

7 6 . 6 0 1

Existing Storm Tanks Tank 3

Scale 1:250 at A1 1:500 if reproduced at A3

2 8 0 . 1 5 CL

P S

G R

9 8 0 . 1 5

10 5. 63

9 7 0 . 1 5

K er b

G R

10 10 5. 7 5. 6 10 73 5. 67

0 .3 1 60

10 5. 64 10 5. 75

b r C Ke

10 5. 77 Ta r m

4 7 0 . 1 5

V G

7 7 0. 15
7 . 5 0

7 0 0 . 1 7

10 5. 7 h5 0. 8

1 66 0 .7

1 0 5 . 8 4

10 7. 00

l al

1 Hardstanding will be0broken out to enable shaft & associated hardstanding 8 construction.4 5 0 5 1

G R

10 5. 70 10 5. 86

1 79 0 .7

HR h 1 0 .

5 7 0 . 1 5

1 1 . 6 0 1

s s a r G 9 2 . 6 0 1 6 2 . 6 0 1

L C

1 0 6 . 2 0

l l 5 wa 6 4 c 0 . ik 1 Br

7 . 5 0 1 L C l l a w c n o C 7 0 . 7 0 1 C I

0 2 . 6 6 0 0 1 . 8 0 1 5 9 . 7 0 1 9 1 . 6 0 1
7 9 . 7 C 0 I 1 L C 1 9 . 7 0 1

6 9 . 7 0 1 4 9 . 7 0 1

6 6 . 6 0 1

0 . 1 g 2 s 3 h 6 2 . 8 0 1

e n b o e sr I U a l t m a ue C c r d ce s et t R s ie A c s

W ak y lwa

e a G t

W ak y lwa

107.96

7 6 . 6 0 1

1 66 0 .5

n o i t a t e g e V

5 4 . 6 0 1 0 2 . 6 C 0 I 1 L C

1 66 0 .6

10 5. 85

2 3 . 6 0 1

4 2 . 6 0 1

106.66

1 0. 16 2

t Ga e

8 1 . 6 0 1

0 0. 16 5 1 0. 16 7

3 1 . 6 0 1 1 . S 62 P 0 6 C 1 0 . 8 0 1

. HR h 1 0

ac

1 2 . 6 0 1

0 .5 1 61 0 .9 1 61 0 .3 1 64

0 .9 1 61

Br c e a k t

l e a n h n

S CP

C I

8 6 . 5 0 1

e v l a V k c o t s n e P

8 1 . 6 0 1

0 .6 1 66

1 6 . 5 0 1

P L

I R

0 2 . 6 0 1

s s a r G

8 6 . 6 0 C 1 I L C

4 7 . 5 0 1

FOR APPROVAL
106.67

107.95

5 6 . 6 0 1

108.06

1 R 1 H h .

Track

HR h 1.0

106.67

e a G t

106.67

106.68

e a G t

106.66

IC Platform CL106.66
B J E

Bracket

106.66

106.67

6 0. 16 6 1 0. 16 3
106.66 106.20
0 .6 1 62

106.67

cw n Co

10 10 6. 2 7. 7 40

n o i t a t e g e V 3 2 . 6 r 0 e 1 d 1 0 d 61 1 .1 a 2 L . 6 0 1
16 1 0. 2

8 . h0

5 9 . 7 0 1

7 3 . 7 0 1

16 6 0. 6
3 . 0 g 1 s 2 h 106.63
106.09

106.66

106.66

106.67

106.66

106.66

106.27 106.66

106.17

106.14

P L

106.16

Location

106.66

4 2 . 8 0 1 V

3 2 . 6 0 1
C S P

10 7. 37

10 7. 96

S F

10 7. 02 10 7. 10 31 6 9 10 . 3 7. 27

l l wa .7 c 69 ik 0 1 Br

6 8 . 1 7 . Existing local drainage 0 7 1 0 1 9 0. to be diverted & relocated 1 79 t l 9 a 9 1 0. 3 17 6 h . 6 4 p 7 5 . 9 s 0 3 . within the Asite 7 1 7 0 . C 0 I 1 7 0 1 2 6 . 7 0 1 .0 5 7 0 .2 1 74 0 1 1 L C

3 6 . 6 0 1

P L

0 8 . 6 C 0 I 1 L C

2. 7

3 2 . 8 0 1 1

10 10 7. 4 9 8. 05

2 6 . 6 0 1

1 0 5 . 8 2

9 7 . 8 0 .5 1 h0

S P C
8 1 . 6 0 1 1 2 . 6 0 1
18 5 0. 0

1 2 . 6 8 0 0 1 . 8 0 1

4 9 . 7 0 1

4 3 . 7 0 1

106.58

4 6 . 6 0 1

g
106.63 106.09

107.32 106.08

106.65 106.10

5 . 0 3 s 6 h

106.22

106.64 106.15

106.64 106.16

106.62 106.20

106.63

106.64

106.64
106.21

106.63

106.66

106.63

106.62 106.25 106.26

0 . 8 17 0. 0 7

6 0 . 8 W 0 1

8 9 . 7 0 1 2 7 . 7 0 6 1 6 . 7 0 1

1 0 7 . 7 4

16 6 0. 1 16 0 0. 2

17 5 0. 9

7 9 . 7 0 1 1 9 . 7 0 1

m r o f 7 t 9 a l . P 7 0 e t 1 e r c n o C

0 0. 16 9

106.20

106.24

106.36
2 0. 16 6

4 7 . 8 0 1 106.64 Building Gate 106.20

Acton Storm Tanks London Borough of Ealing

106.64 106.19
106.13

106.62 106.20

Grass
106.14

rs G as

106.20

1 0. 16 8

2 0. 16 4

106.18

Grass

106.24

106.21

106.20

1 0. 16 2
rs G as
16 8 0. 1

1 0. 16 1
l l oc C n Wa
l l oc C n Wa
1 0. 16 6

BW 4 0. 1 6 21 6 5 5 0.

4 oc F 2 Cn S h .
4 . oc F 2 Cn S h 0 0. 16 7

1 0. 16 3
4 0. 15 1

106.09

105.88

Conc SF h 2.5 106.02

106.02

106.00

Conc SF h 2.2

Document Information

2 9 . 7 0 1

5 7 . 7 0 1

0 9 . 7 0 1

6 9 . 7 0 1

6 9 . 7 0 1

SF h 2.5

5 9 . 7 0 1

l l o c1 7 3 C n Wa. 0 3
W B 0 16 6 l 0 l . oc C n Wa 4 0. 17 2 3 F 1 S h .
0 0. 16 7 4 0. 17 0

W B 0 0. 16 2 9 3 3 0. F 1 17 S h .

0 0. 16 2 4 0. 17 0

om tr e lf e Pa oc t C nr
7 9 . 7 0 1

4 0. 17 0

7 0. 15 8
5 . 1 g 6 e l s 8 io b l h ut M

7 0. 15 7 uh s B se S rb & n hu s v rrw O ego

3 F 1 0. S h .7 1 1 4 7 0. 15 4

8 0. 16 1 3 0. 17 3 5 F 2 S h . 5 2 l l 0. oc C n Wa 1 6 7 0. 15 0

1 0. 16 1
2 0. 16 2
6 0. 15 7 5 0. 15 5 4 0. 15 2 4 0. 15 6
4 0. 15 0

4 0. 15 2

3 0. 15 8 4 0. 15 3 3 0. 15 7

Section 48 publicity Demolition and site clearance Sheet 1 of 2 Book of plans - section 3
S48-PP-02X-ACTST-000003 July 2012
O ego n hu s B s e v rrw S rb & u h s

6 0. 15 8

105.64

15 4 0. 5

v rrw S rb & u h s O ego n hu s B s e

3 0. 15 7

3 0. 15 4

1 0 53 .2

W B 9 . 5 0 4 0 0. 1 17 4
0 . 1 5 . g 6 e l 2 0 b s 1 io g 6 e l l 0 o h ut s 1 b i l 0. 7 h ut 1 5 8 M M

4 0. 17 2
0 . 1 g 6 e l s 8 io b l h ut M

7 0. 15 5
7 0. 15 4

7 0. 15 9 8 0. 15 0

1 71 0 .7

.1 69 0 1

1 68 0 .9

3 4 2 . 6 7 . 0 7 1 0 1 2 4 . 7 1 00. 7 11 6 6 7 . 6 0 1

9 0. 17 6 6 l 0. l 17 2 oc C n Wa 0 0. 16 4

7 . 9 0 F 2 . S h1 7 8 4 0. 17 6 6 0. 17 3

9 0. 17 8 l l oc C n Wa 4 0. 17 5

9 . F h1 CL

1 0. 15 5

0 0. 15 7

M a c l e Sh e 2 thi : e t n

3 7 0 . 1 6 3 . h2

7 3 . 7 0 1

SF

4 0 7 . . 67 6 0 0 1 1 P L

H F

1 0. 16 5
8 6 0 . 1 6

5 . 2 0 g 1 e l 2 b s 1 io l h ut M

uh s B se S rb & n hu s v rrw O ego

9 0. 17 5 4 0. 17 3 7 F 2 S h . 9 0. 15 5 6 8 . . 0 0 g 4 g 4 s 8 s 7 h h

g 8 e l s 5 io b l h ut M

5 . 1

Temporary removal of boundary fence and retaining wall to enable overflow pipe construction 15 6 0. 3 0. 15 0 3
15 3 0. 3
2 0. 15 2 15 6 k r. a Ta 3 m c 0c rv l T r G ae/ a 3 0. 15 5

15 2 0. 3

105.28

105.27

105.22

105.16

1 0. 15 3

Third party vehicle parking area


2 0. 15 2 1 0. 15 7 1 0. 15 2 0 0. 15 9 0 0. 15 3
104.99

8 7 0. 15
S 1 1 2 n 6 t .7 S 5 0 1

9 0. 15 0

Existing rising reinforced concrete main discharge chamber to be broken out and replaced with new overflow7chamber. 3 0. 15
4 0. 15 5
rv l G ae Temporary removal of boundary fence and retaining wall to enable chamber construction

6 6 0 . 1 6

0 1 . k 5 c5 1 T r a Ta / am c r

Sections of blockwork flow meter building 1 0. 15 3 to be demolished/broken out to enable overflow pipe construction
se uh s v rrw S rb &B O ego n hu s

4 3 5 . h2 0 . 1 6 RF I

6 0. 15 2

9 . F h1 4 CL 6 0 . 1 6 h t ta op Fo

a Ta k m c rc rv l T r G ae/ a

0 0. 16 1

4 3 0 . 1 6

Localised sections or existing cover slab to be removed to facilitate construction within 0 0. 16 0 chamber

6 0. 15 6 7 0. 15 3

0 0. 15 9 0 0. 15 7 0 0. 15 8
0 F 2 S h .

P L P L
0 F 2 S h .

m c r a Ta

9 0. 14 2 9 0. 14 0

9 0. 14 5

8 0. 14 9

14 7 0. 7

0 F 2 S h . 14 9 0. 6

14 4 0. 6

8 0. 14 5

8 3 0 . 1 6

3 4 . 5 0 C 1 I L C

Sections of existing reinforced concrete chamber wall to be removed. 51 F 2 S h 0 8 .


0 1

0 F 2 S h .

9 0. 14 3 9 0. 14 4

P L
0 0. 15 4

9 0. 14 2

0 F 2 S h .

2 0. 15 1 3 0. 15 2

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

London Borough of Hammersmith & Fulham

Keyplan:

This drawing
0 7 . 5 0 1

15 0. 7 2
15 0. 6 9

WA RP L E W AY
15 0. 6 2
5 S 8 7 5 .

15 0. 6 6

15 0. 4 9

15 0. 6 3 15 0. 6 2

15 0. 4 7

15 0. 5 8

n t S 5 0 1

R E

15 0. 6 7

15 0. 4 3

15 0. 5 4

C I
S Fh 3 . 0

5 3 . 5 0 1 L C

R E

15 0. 9 6

15 0. 6 7

15 0. 4 7

15 0. 4 2
Tr am a c

G R

1 6 0 . 0 1

C I

7 2 . 6 0 1 L C

s s a r G

8 1 . 9 0 1

15 0. 6 0

15 0. 4 1

7 2 . 5 0 1 P L

15 0. 3 4

1 0 5 . 4 8

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

15 0. 5 4

S h F 3 . 0

15 0. 3 3

e n o 9 h 2 . P 6 e 0 l i 1 b o M

t s a

15 0. 5 2

Ap sh a l t

15 0. 2 8

1 6 0 . 0 1

16 0. 2 0

S h F 2 . 1
16 0. 1 7

16 0. 1 7
g 4 . 1 3 s 6 h

1 0 5 . 2 0
1 0 5 . 4 2

W
1 . 1 g 3 s 6 h
1 0 5 . 4 0

1 0 5 . 2 9

BP

BP

s s a r G

7 0 . 6 0 1

16 0. 0 5

9 9 . 5 0 1

1 0 60 .9

E R

0 .5 1 54

Tp f o oB ak n 2 5 . 6 0 1 1 . 2 g 1 1 s 8 h

15 0. 5 1

4 S 5 n 3 t .2 S 5 0 1 15 0. 2 5
S Fh 30 .

1 0 52 .8
1 0 5 . 4 7
1 0 5 . 3 3

4 2 . 5 0 1

Key:
0 5 . 4 8 4 3 . 5 5 3 C . 0 I 5 1 I C 0 L 1 C L C 1

9 . 0 g 8 s 8 h

16 9 0. 3

16 0. 2 5
g 3 . 1 3 s 6 h
5 . 1 3 s 6 h

8 3 . 5 C 0 I 1 L C
1 0 5 . 4 7

Local authority boundary Limits of land to be acquired or used (LLAU) Structure to be removed and relocated or reinstated
A D

1 4 . 6 0 1

5 1 . 6 0 1 9 2 . 6 0 1 L C e t a e i m i sz x r o e r p p mb A a h C

L E W A Y

1 0 5 . 4 7
1 0 5 . 3 71 0 1 5 . 3 0. 8 54 9

g C I

3 . 1 3 s 5 h

C I

3 2 . 6 0 1 L C

0 2 . 6 0 1

1 0 6 . 2 0

P L

1 0 5 . 2 4

1 0 5 . 2 8

C I

10 5. 29

10 6. 11

16 8 0. 1
t Ga e

19 6. 10

am c Tra

G R

8 9 . 5 0 1

1 0 6 . 1 5

8 1 . 6 0 1 g 2 . 1 8 s 9 h

1 0 6 . 0 0
6 0 . 4 6 . 0 1 1 g 3 s 6 h

1 0 54 .6

1 0 5 . 3 1

G R

3 2 . 5 0 1

ac

g
0 .9 1 61

0 .4 1 61

0 .8 1 61 0 .3 1 60 1 62 0 .2

0 .8 1 61

Co c n

1 62 0 .2

g 3 . 0 g 3 s 4 h 0 1 . 6 0 1 C I

c n o C
0 .3 1 61

1 . 1 8 s 8 h
5 3 . 6 0 1

7 1 . 6 0 1

g 7 1 . 6 0 1

7 2 . 6 0 1

1 2 . 6 0 1

10 5. 29

G R

8 9 . 5 0 1

2 1 . 6 0 1 8 1 . 6 C 0 I 1 L C

3 2 . 6 0 1 s s a r G

6 . 1 3 s 6 h

1 0 5 . 4 8

A s p h P at L l

G R

4 1 2 . 2 . 5 C 5 0 I 0 1 1 L C

S F
5 . 0 g 6 s 4 h 5 3 . 1 . 1 6 1 g 0 0 6 3 1 . 0 s 5 9 h 6 . 1 f g 7 o 1 3 . p k s 6 6 o n 0 T a 1 h B g
5 . 1 3 s 6 h

1 61 0 .4

8 1 . 6 0 1

9 1 . 6 0 1 7 1 . 6 C 0 I 1 L C 1 . 1 g 6 s 7 h 1 2 . 6 0 1 L C

1 62 0 .2

1 62 0 .2

2 2 . 6 0 1 L C

5 2 . 5 0 1

1 0 6 . 1 3

7 . 0 6 s 6 h

C I

10 6. 04

8 . 0 6 s 5 h

1 0 6 . 1 2

1 52 0 .5

2 2 . 6 C 0 I 1 L C

4 3 . h C 5 3 I . 1 0 L0 C

3 S 9 n 3 t .8 S 5 0 1 1 0 55 .1 P S 1 0 5 1 . 4 0 4 6 . 4 8

C I

1 3 . 5 0 1 L S C R

Grass

0 5 3 S .2 R

106.14

106.17

106.13

G R

3 9 . 5 0 1 2 S 6 n 0 t .0 S 6 0 1

16 0. 0 9

C I
106.09

am c Tra

106.15

106.15

106.09

106.11

106.16

106.06

3 1 . 6 0 1 L C

16 0. 1 8

1 0 6 . 4 9

V G

G R

0 .7 1 61

7 9 . 5 0 1

G R

5 9 . 5 0 1

G R

am c Tra

4 9 . 5 0 1 g

106.16
106.12
IC

106.21

8 . 1 3 s 6 h

1 1 0 6 0 . 2 5 6. 4 8

1 0 5 . 3 8
C o n c R 1W 0 6 . 3 4

1 0 5 . 1 5

10 5. 30

s s a r G

1 0 61 .1

10 5. 24

f o p k o n T a B

1 0 5 . 2 4

A s ph al t

e p i P

1 0 6 . 0 9

1 0 54 .7

1 3 . 5 C 0 I 1 L C 1 0 5 . 2 5

3 3 . 5 C 0 I 1 L C

10 5. 33

P L

7 . 0 6 s 3 h

1 0 5 . 2 8

C I
T a r m a c

T ar m

W
2 1 . 6 0 1

0 0 15 . . 9 2 8 3 s 6 h

0 3 . 5 0 1 L C

5 3 . 5 0 1

S R

10 5. 21

1 0 5 . 3 2

1 0 5 . 4 2

10 5. 32

16 0. 1 6

1 . 1 3 s 6 h

3 1 . 6 0 1

10 5. 28

6 1 . 6 0 1

S F h 3 . 0
A s p h at l

3 1 . 6 0 1

1 0 5 . 3 2

1 0 5 . 4 9

1 0 5 . 3 4

1 0 6 . 0 9

0 1 . 6 0 1 L C

e t a e i m i sz x r o e r p p mb A a h C

4 . 1 g 3 s 6 h

T a r m a c

of Ealing
7 1 . 6 0 1

0 . 1 8 s 9 h

s s a r G

1 0 6 . 1 2

1 0 5 . 3 8

1 0 5 . 3 0

1 0 5 . 3 81 0 1 5 0 . 5 3 . 7 4 6

16 0. 2 0

8 . 1 3 s 6 h

1 0 5 . 4 7

9 1 . 6 0 S 1 P C

London Borough

1 0 6 . 1 3

S F h 3 . 0

G 8 1 R . 5 0 1 1 0 5 . 3 1

Notes:
1. Minor items to be removed (e.g. barriers, bollards etc.) are not shown. 2. General activities of site clearance such as removal of hardstanding and foundations, stripping of topsoil and clearance of minor vegetation not shown.

1 0 5 . 4 4

9 0 . 6 0 1

106.21

106.18

106.21

Grass
106.17

0 .2 1 62

106.15 106.16 106.44

Barrier

P L 106.15 106.17

106.45

6 3 . 6 0 1
7 0 . 6 0 1

28 5. 10 .1 52 0 1

P L

B a r r i e r

IC CL106.19 CL106.20 106.16 IC 106.44 106.65 Gate

106.17

106.20

106.15

Grass

Grass

1 0 61 .5

C I
P L

6 1 . 6 0 1 L C

CL106.20
106.17

106.18 106.66
CPS
Conc Wall

0 .8 1 61

106.17

106.16

106.16
CPS 106.66 Walkway Conc Wall
IC

106.18

106.15

106.59

19 6. 10

CPS

5 0. 16 6

e t a m r i x e o b r p m p a h A z C ie s
5 1 . 6 0 1

C I
1 0 6 . 4 8

8 0 . 5 0 1 L C
1 0 5 . 1 0

1 0 5 . 2 6

Sheet Layout

106.65

106.64

Bracket

Walkway Gate

IC C 16 6 L0. 6

106.66

106.65

t Ga e

HR h 1.0

106.68

Gate

CL106.67

106.68

106.68

Gate

CL106.66

Track

e s 0 .1 St p 1 6 1

7 6 . 6 0 1

106.67

106.67

o es c P nt k
7 6 . 6 0 1

10 6. 10

106.65 Walkway

106.65

106.66

106.66

106.66

106.66 106.65

0 .4 1 64

G R

IC

1 0 5 . 3 4

4 0 . 5 0 1
A s p h a l t

.9 61 0 1

Sheet 1
1 0 5 . 2 4

Sheet 2

3 2 0 . 1 6

Br c e a k t

Br c e a k t

8 6 . 6 0 1 6 6 . 6 0 C I 1 L C

n Co c

09 6. 10

1 0 6 . 4 8

7 6 . 6 C 0 I 1 L C

4 1 . 6 C 0 I 1 L C
0 .6 1 66 0 .2 1 61

1 0 5 . 3 5 C o n c
15 6. 10

T a r m

a c

0 .0 1 62

. HR h 1 0

S F

1 0 5 . 1 1

W A R P L

P L

. HR h 1 0

l n Co c W a l

0 .1 1 62

h 1 2. 0 5 5 . 3 2

CPS

Pl t r af m o

Pl t r af m o

Pl t r af m o

a s Gr s

op T

Existing Storm Tanks Tank 4

Br c e a k t

k c o t l s o n t e nr P o C

k c o t l s o n t e nr P o C

k an B of

9 6 . 6 0 1

Existing Storm Tanks Tank 2

8 6 . 6 0 1

0 .6 1 61

r c Ta m a

E W A
1 0 5 . 1 2

1 0 5 . 2 5

Y
B a r r i e r

0 .2 1 61

1 n w 05 o . n 3 k 4 n . U 11 g 3 s 7 h
1 0 61 .4

24 6. 10

0 .4 1 61

0 .6 1 66

0 .1 1 61

P L

1 0 5 . 2 4
1 0 5 . 1 2

0 .3 1 64 0 .5 1 61

0 .8 1 61

G R
0 .5 1 61

2 0 . 6 0 1

106.75
106.69 106.69 106.69 106.69 106.70

Ga e t

s s a r G n w o n k n . U 16 g 4 s 7 h

Tracks 106.68

d i n Bu l i g

.6 61 0 1

1 0 6 . 1 4

C I

4 1 . 5 0 1 L C

P L
1 0 5 . 2 1 1 0 5 . 1 4

. HR h 1 0

10 6. 13

0 .5 1 66

106.21
0 .1 1 61

.6 53 0 15 0 1 0. 2

1 0 5 . 3 8 1 0 5 . 3 6

8 6 . 6 0 1

CPS

c n o C e p t S

1 0 5 . 3 4

G R

2 0 . 5 0 1

Removal of boundary fence to enable temporary gate construction


4 2 . 5 0 1

106.16
1 0 6 . 1 6

Ke b Ob c r d b Gr s r s ue y a s

Es i a e Po io o Ke b t m td st n f r i

8 9 0. 15

5 0 0. 16

Bu h s 1 62 0 .0

1 60 0 .5

1 6 0 . 1 5

Pl t r af m o

l n Co c W a l

. HR h 1 0

1 66 0 .5

1 62 0 .1

Existing Storm Tanks Tank 3

k c o t l s o n t e nr P o C

Pl t r af m o

Existing Storm Tanks Tank 1

106.10

106.10

m r a T

k c o t l s o n t e nr P o C

b u r c S

106.16

0 .2 1 62

1 62 0 .3 1 6 1 CPS 0 .9

8 6 . 6 0 C 1 I L C

0 .0 1 62

Br c e a k t

0 .3 1 62

1 0 6 . 1 6

5 1 . 6 4 0 1 1 . 6 0 1
1 2 0. 16

5 1 . 6 0 1

8 1 . 6 0 1

1 0 6 . 2 0

1 0 5 . 1 8

1 0 5 . 4 1

1 0 5 . 3 8

8 6 . 6 0 1

c a

) b u r c c a m yS r b a T d e r e v o C (

Pl t r af m o

6 1 . 6 0 1

T a r m

a c

1 0 5 . 4 0

8 6 . 6 0 1

1 S 1 n 1 t .1 S 6 0 1

1 0 5 . 3 7

3 1 . 5 0 1

T a r m

a c

10m

10m

Scale 1:250 at A1 1:500 if reproduced at A3


1 0 5 . 3 3

6 2 . 6 0 1
1 62 0 .3

Br c e a k t

P L

1 61 CL 0 . 8

CPS

9 6 . 6 0 1

s s a r G

16 0. 1 6

1 6 0 . 1 7

c n o C e p t S

T o p

1 0 C o 5. n 4 c 5 S F h
o f B a n k

B a r r i e r

1 0 5 . 4 3

P L

1 6 0 . 1 7

7 6 . 6 0 1

1 6 0 . 2 0

1 81 0 .8

H O/ o af m Pl t r

IC

Gate
W ak y lwa

106.68

e h c a ns im

1 9 0 . 3 4

Bracket

1 6 0 . 6 5

CL106.68

1 66 CL 0 . 5

0 .6 1 59

C I

Lf ii t g n M

05 6. 10

Co n c Pl t af om r

106.67 106.16

106.66 106.10

6 0. 16 5 1 0. 16 2

106.09

Conc Wall

106.04

1 61 0 .9

106.19

106.12

106.12

105.91

Building
106.06 106.06

106.66

66 6. 10

Bracket

Pi e p

k c o t s n e e t P a l P l e e t S 106.67

. HR h 1 0

IC
0 .8 1 66

Gate Walkway 106.68 106.68

16 8 0. 6

IC 6 L0. C 16 9

106.68

Track

106.74

1 62 0 .0

16 0. 1 16 1 0. 6 6

e p i P
106.67

CL106.67

106.68

Roof Level 109.09

Gate

106.68

Conc Wall

16 0. 6 6

16 16 0. 0. 1 1 8 16 2 0. 6 16 5 0. 4 2 l 6 0 . l 6 a 0 1 cW n o C 16 0. 6 5 So tm r C hn an e l

2 . 5
1 0 5 . 5 2

1 0 5 . 4 2
A s p h a l t
8 3 . 5 C 0 I 1 L C P

C I

16 0. 4 4

c n o C e p t S a e r A

4 2 . 6 0 1

3 2 . 6 0 1

FOR APPROVAL
P L 1 1 0 0 5 5 . . 6 6 1 7 1 0 5 . 5 4 1 0 5 1 . 0 5 5 7 . 7 0
B a r r i e r
1 0 5 . 6 8
79 5. 10

6 2 . 6 0 1 0 3 . 6 0 1 L C

1 0 6 . 1 6

e p i P

106.15

G ae t
105.85

106.16

P L 8 6 . 6 C 0 I 1 L C

P L

n w o r g r e v O

C I

2 5 . 6 0 1

G 3 4 T R . a 5 r 1 m 0 a c

Location

106.09
Riser
Grass

106.14

106.22

106.15

1 0. 16 4

1 0. 16 7

1 Co0 . 6 n 1 c S4 F

1 61 0 .2

Grass
106.14

16 9 0. 1
106.10
1 0. 16 2 1 0. 16 3

C I

1 61 0 .2 1 71 0 .4

16 0 0. 2

5 6 . 6 C 0 I 1 L C
Grass

5 6 . 6 0 1 L C

C I

3 1 . 7 0 1 L C

e t a e i m i sz x r o e r p p mb A a h C G R 0 0 . 6 0 1

h2 . 5

106.16

106.17

5 6 . 6 C 0 I 1 L C

1 6 0 . 6 4 1 6 0 . 1 2

106.16

106.21

P L

P D

16 0. 6 7

8 0 . 6 0 1

106.24

4 4 16 0. . C 0 6 1 oc C n W 0 I 1 a l l L C

16 0. 6 6

1 2 . 6 0 1

8 2 . 6 C 0 I 1 L C 5 2 . 6 0 1

s s a r G
1 0 6 . 1 4

1 0 5 . 7 4 1 0 5 . 6 5

Acton Storm Tanks London Borough of Ealing


1 0 5 . 8 9

1 61 0 .7

1 71 0 .4

16 8 0. 1
106.00 Conc SF h 2.2
105.89
105.88
105.49

1 4 . 6 0 1

2 3 . 6 0 1

2 3 . 6 0 1

C I

16 1 0. 2

105.96

Cn S h . oc F 2 5

106.06
105.66 105.57

105.95
105.70 105.59
P 105.76 L

106.00
105.85 105.72

105.98
15 6 0. 9 15 5 0. 8

0 .2 1 55

3 0. 15 8

105.64

15 6 0. 9 15 4 0. 8

105.64

0 .4 1 59

1 0 53 .2
v rrw S rb & u h s O ego n hu s B s e

P L

0 .0 1 60

15 9 0. 9 15 9 0. 8 15 5 0. 9 15 4 0. 8

1 0 61 .4 1 0 59 .9

15 5 0. 9
15 0 0. 9 15 5 0. 9 15 4 0. 8

C I

15 3 0. 9
15 6 0. 9 15 6 0. 9 15 4 0. 8

Cn S h oc F 2 . 5

3 1 . 7 0 1 L C

.4 59 0 1

16 2 0. 1 1 0. 6 3 2

94 5. 10

16 3 0. 0

c m n o fr o C t a l P
16 2 0. 2

1 7 . 5 c 0 a 1 m L r C a T

1 0 5 . 8 7

Document Information

16 8 0. 1

16 3 0. 1

1 2 . 6 0 1

7 1 . 6 0 1

0 4 . 6 0 1 2 1 . 6 0 1 4 1 . 6 0 1

Speed Ramp

Section 48 publicity
8 9 . 5 0 1 L C

16 0 0. 1
15 9 0. 8 15 2 0. 9 15 0 0. 8

1 0 60 .2 1 0 59 .3

0 .1 1 60

105.19

105.25

105.36

15 7 0. 4
15 3 0. 5
G a e Ta k rv l rc

P L

1 60 0 .0 1 61 0 .1

EB J

S h . F 2 1a G t e

1 60 0 .3

1 0. 15 3

0 .9 1 50

1 0. 15 1

105.14

G ae rv l C r ot aP r

15 5 0. 9 15 4 0. 9 16 0 0. 0 15 5 0. 8

1 60 0 .5

1 60 0 .6

15 9 0. 8 N C V O O E 1E RSL 5 0 9 I0 . TD 15 8 0. 7

16 6 0. 0
15 9 0. 8 15 2 0. 9 15 1 0. 8

15 9 0. 9

C I

Cn S o c Fh 2 . 5 G t a e 16 2 0. 0

1 60 0 .6

6 0 . 6 0 1 L C

S ed pe Rm a p

1 60 0 .4

Third party vehicle parking area

P L

15 0 0. 9 15 1 0. 9 15 0 0. 8

Cn S h oc F 2 . 5

1 60 0 Co c . 5 n 0 .4 1 60

S 2 7 n 3 t .1 S 5 0 1

16 5 0. 1

Ba r r ri e

Ba r r ri e

G ae rv l C r ot aP r

G ae rv l C r ot aP r

16 8 0. 1

s s a r G

1 60 0 .3

3 7 . 5 0 C I 1 L 16 0. 0 C 4

c n o C

C I

9 8 . 5 0 1 L C

C I

Demolition and site clearance Sheet 2 of 2 Book of plans - section 3


S48-PP-02X-ACTST-000004 July 2012

0 0. 15 1

104.98

105.03

105.10

105.19

105.32

G a e Ta rv l rc k

105.40

104.91

104.96

104.90

104.94

105.05

15 1 0. 3

15 5 0. 3
G ae rv l C r ot aP r

15 5 0. 4 15 6 0. 3

O ego n hu s B s e v rrw S rb & u h s


7 0. 14 3

7 0. 14 6

G ae rv l C r ot aP r
P L

15 4 0. 3
15 2 0. 3

15 3 0. 4 15 4 0. 4
15 6 0. 3

15 3 0. 6

1 57 0 .8

G aeT rv l r ak 1 5 4 c 0. 4

1 58 0 .9 10 5 8 10 . 2 5. 80

Temporary removal of boundary fence to enable chamber construction 15 1 0. 5


15 8 0. 4

14 4 0. 6

0 F 2 S h . 14 8 0. 5

14 1 0. 7 14 7 0. 6

14 4 0. 6

14 5 0. 6 14 7 0. 5

P L

14 8 0. 9

15 9 0. 0

S h . F 2 0
15 0 0. 1 15 8 0. 0

0 0. 15 5

P L

15 1 0. 5

G ae rv l
S 1 4 n 7 t .0 S 5 0 1

15 7 0. 0

15 0 0. 1

1 . 0 S h5 8 F 20 . 0
15 9 0. 0 15 1 0. 1 15 3 0. 0
G ae rv l C r ot aP r

15 0 0. 8 15 9 0. 6
Tra am c

1 55 0 .6 1 56 0 .5

P L

15 0. 0 6
15 8 0. 0

15 9 0. 5

1 57 0 .2

SF h 2.0 14 1 0. 7

14 0 0. 8 14 8 0. 7

SF h 2.0 14 0 0. 9

15 7 0. 1

4 1 . 5 0 C I 1 L C

G ae rv l C r ot aP r

G aeT rv l r ak c

15 2 0. 6 15 8 0. 6

15 6 0. 7 15 5 0. 8

1 58 0 .5

104.99

M a c l e Sh e 1 thi : e t n

105.16

S 0 1 7 n 5 t .0 S 5 0 1

15 4 0. 5

15 3 0. 5
15 7 0. 4
15 0 0. 5

G ae rv l C r ot aP r

3 1 6 0 60 0. 0 0. 1 1 9 . 5 0 1

1 60 0 .1

0 0. 15 9

G t a e GP S no e sr GP 16 8 0. 0 S no e sr

57 5. 10 . 8 6 5 10

15 0. 2 0

c Thames Water Utilities Ltd 2008

o t

g n o L

d n H e s u o

W R A E L P
23 to 37 1 to 38

C m a h n a M w e

Charles Court Ampere

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

W Y A

Zone within which 15m high ventilation column(s) serving the shaft may be located

o 5t

Hall

Zone within which the overflow chamber may be located


2
Mast

Zone within which the interception chamber may be located

A D

1 4

Zone within which ventilation structure(s) for fan(s) and for air inlet(s) and for air outlet(s) may be located

B Y

2 6

Table 1
Above ground permanent structure Maximum height above finished ground level (Minimum heights are in brackets where applicable) 2.0m
Un d
3 8

Overflow chamber

Interception chamber

2.0m

Ventilation column(s) serving the shaft Inlet ventilation structure(s)

15.0m

G R E E N E N D

R O A D

2.0m
3 3

Outlet ventilation structure(s)

2.5m

Ventilation structure(s) for fans

3.5m
4 3

15

A D

I LT O

A M

RO

AD

KS HE AD

HA W

y r re ug S
2 7
4 4
CE ST ER

6 1

5 3

6 o1 2t 2

Sewage Pumping Station

5 0

6 2

7 6
3 4 24

House

Keyplan:

Playground

This drawing

Zone within which Work No. 2a would be located


9

D A O MR A H N A C

7 8

1 to 40

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

1 to 72

Anthony Court

Key:
Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located (those listed in Table 1) Zone within which required landscaping would be located

o or B
C ,G t s on

Zone within whichto 84 41 Work No. 2b would be located


y l s A C
t& s on

Tesla Court

LB dy B

Notes:
1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary 1 to 55 works may be located within or outside this zone Vandervell provided they are located within the Limits of land Court to be acquired or used.
1 to 66

1 5

Edison

Court

A O D L R O D O B C B

l M oe r ut Co

od fr o g L n r ut Co
29 o 6 5 t 20

29 o 4 3 t 20

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

ut o r e C L a 9 2 o2 1 t 2 5

n my E l ad n G re s
0 2 2
8 1 3
o t
E W ARPL

FOR APPROVAL

17
30
7 4

Location

Acton Storm Tanks London Borough of Ealing


Document Information

ut o r e lyC v r Be e 8 1 2

EK W AY

o 6 t 1 8

8 2
B o r o
2 0

Section 48 publicity Site works parameter plan Book of plans - section 3


S48-PP-02X-ACTST-000005

17 o 6 4 t 13

16

8 8

0 9

o n s t , G

July 2012
A s l y C

o n s t & L B B d y
f De

C ig dn Ro

4 7

c Thames Water Utilities Ltd 2008

u o

6 3

6 3

6 3

9 2

9 2

9 2

Cherry Court

Cherry Court

Cherry Court

Cherry Court

9 2

6 3

1 2

1 2

1 2

1 2

Warehouse
1 3
23

Warehouse
1 3
23

Warehouse
1 3
23

Warehouse
23

t5 1o

t5 1o
6 4

t5 1o
6 4

t5 1o

D A O DR R O F D A R B

Warple Mews

D A O DR R O F D A R B

Warple Mews

D A O DR R O F D A R B

Warple Mews

D A O DR R O F D A R B

Warple Mews

7 3

s o i td Su u Sn

1 1

1 1

1 1

2 13

2 13

2 13

1 1

2 11
0 6

7 3

7 3

o7 1t

o7 1t s o i td Su u Sn

o7 1t

o7 1t

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

5 3

5 3

5 3

6 4

o 6t

o 6t

o 6t

30

30

30

30

o 6t 0 1

0 1

0 1

0 1

2 11
0 6

s o i td Su u Sn

2 11
0 6

s o i td Su u Sn

27

27

27

27

32

32

32

32

5 19

5 19

5 19

5 19

33

33

33

33

7 11
5 10
Overstone House

7 11
5 10
Overstone House

7 11
5 10
Overstone House

7 11
5 10
Overstone House

BS

BS

BS

BS

4 3

4 3

4 3

4 3

W F
d n U
F C

W F

W F

6 3

6 3

6 3

6 3

d n U

F C

d n U

F C

d n U

3 8 1

3 8 1
37
8 10

3 8 1
37
8 10

3 8 1
37
8 10

37

9 3

9 3

9 3

9 3

1 to 19

1 to 19

1 to 19

1 to 19

Thompson
40

Thompson
40

Thompson
40

Thompson
40

Works
g n o L

1 to 11

Y A TW LI MU

House
1 to 66

Works
g n o L

1 to 11

Y A TW LI MU

House
1 to 66

Works
g n o L

1 to 11

Y A TW LI MU

House
1 to 66

Works
g n o L

1 to 11

Y A TW LI MU

House
1 to 66

9 1

9 1

9 1

9 1

Watt Court
13 to 22

Watt Court
13 to 22

Watt Court
13 to 22

Watt Court
13 to 22

Acton Park Estate


C
m a h n a

Acton Park Estate


23 to 37 1 to 38
C m a h n a

Acton Park Estate


23 to 37 1 to 38
C m a h n a

Acton Park Estate


23 to 37 1 to 38
C m a h n a

o t

o t

o t

o t

23 to 37

1 to 38

Charles Court
8

Charles Court
8

Charles Court
8

Charles Court Ampere House

o 5t

o 5t

o 5t

House

House

House

o 5t

Ampere

Ampere

Ampere

Playground
3 4 24 3 4 24

Playground
3 4 24

Playground
3 4 24

Playground

1 to 40

1 to 40

1 to 40

1 to 72

1 to 72

1 to 72

Anthony Court
41 to 84

Anthony Court
41 to 84

Anthony Court
41 to 84

Hall

Hall

Hall

Hall

Tesla
dy B

Tesla
dy B

Tesla
dy B

Court

Court

Court

Mast

Mast

Mast

A D

A D

A D

A D

1 to 55

1 to 55

1 to 55

B Y

B Y

B Y

B Y

Sewage Pumping
1 4

1 to 66

Sewage Pumping
1 4

1 to 66

Sewage Pumping
1 4

1 to 66

Station

Edison Court

Station

Edison Court

Station

Edison Court

2 6

2 6

2 6

A O D L R O D O B C B
1 7 1 7

A O D L R O D O B C B
1 7

A O D L R O D O B C B
1 7

Un d

Un d

Un d

S A LT C

S A LT C

S A LT C

S A LT C

R O A D

5 0

29 o 4 3 t 20 29 o 6 5 t 20
14

R O A D

5 0

29 o 4 3 t 20 29 o 6 5 t 20
14

R O A D

5 0

29 o 4 3 t 20 29 o 6 5 t 20
14

14

27

27

27

27

6 2
4 3

15

A D

15

15

15

A D

A D

A D

I LT O

I LT O

I LT O

I LT O

7 4

7 4

7 4

A M

A M

A M

A M

AD

AD

AD

RO

RO

RO

RO

AD

KS HEA D

KS HEA D

EA D

EA D

B o r o
2 0

17 o 6 4 t 13

B o r o
2 0

KSH

KSH

o n s t , G

17 o 6 4 t 13

B o r o
2 0

o n s t , G

17 o 6 4 t 13

HAW

HAW

HAW

HAW

A s l y

o n s t , G

A s l y

o n s t &

A s l y

y r re ug S
2 7
ST I VE ER

L B B d y
f De

o n s t & L B B d y
f De

o n s t & L B B d y
f De

y r re ug S
2 7 4 7
OR CE DRI ST VE ER

y r re ug S
2 7 4 7
ST I VE ER

y r re ug S
2 7 4 7
4 4
ST I VE ER

4 4
5

4 4

4 4

CE

CE

OR

OR

OR

DR

DR

DR

CE

5
1 0

HA W KS RO HE AD AD

HA W KSH RO EA AD D

KS HE AD AD

KSH EA AD D

BS

BS

BS

CE DR STER I VE

CE DR STER I VE

CE DR STER I VE

CE DR STER I VE

HA W

HA W

Southfield Primary School


School House El Sub Sta

4 2

Southfield Primary School


School House El Sub Sta

4 2
4 0

Southfield Primary School


School House El Sub Sta

4 2
4 0

Southfield Primary School


School House El Sub Sta

RO

RO

4 0

4 0

OR

OR

OR

OR

58
1

58
1

58
1

58
1

El Sub Sta

El Sub Sta

El Sub Sta

9 8

9 8

9 8

3 0 1

3 0 1
CF

3 0 1
CF

3 0 1
CF
0 1 6

9 8

7 8

7 8

7 8

7 8

7 8

7 8

3 8

7 8

7 8

3 8

3 8

9 7

9 7

9 7

9 7

O D EL C WH L O KR A
1 8

O D EL C WH L O KR A
1 8

O D EL C WH L O KR A
1 8

7 1

7 1

7 1

7 1

1 8

7 6

7 6

7 6

60

48

36

26

22

12

60

48

36

26

22

12

60

48

36

26

22

12

60

48

36

26

22

12

FIELDING ROAD
6 7 6 7
8 8

FIELDING ROAD
6 7
8 8

FIELDING ROAD
6 7
8 8

FIELDING ROAD
8 8

5 6

5 6

7 6

82

72

82

72

82

72

82

72

5 6

9 2

9 2

Cherry Court

Cherry Court

Cherry Court

Warehouse
1 3

Warehouse
1 3

Warehouse
23

9 2

t5 1o

t5 1o

t5 1o
6 4 6 4

D A O DR R O F D A R B

Warple Mews

D A O DR R O F D A R B

Warple Mews

D A O DR R O F D A R B

1 3

5 3

5 3

Warple Mews

30

30

30

7 3

s o i td Su u Sn

1 1

1 1

1 1

2 11
0 6

7 3

7 3

o7 1t

o7 1t s o i td Su u Sn

o7 1t

5 3

2 11
0 6

s o i td Su u Sn

2 11

2 13

2 13

2 13

3 15

3 15

3 15

32

32

32

5 19

5 19

5 19

33

33

33

7 11
5 10
Overstone House

7 11
5 10
Overstone House

7 11
5 10
Overstone House

BS

BS

BS

4 3

W F

4 3

4 3

W F

6 3

F C

6 3

6 3

d n U

d n U

F C

d n U

3 8 1

3 8 1

3 8 1

37

37

37

9 3

9 3

9 3

1 to 19

1 to 19

1 to 19

Thompson
40

Thompson
40

Thompson
40

Works
g n o L
9 3

1 to 11

Y T WA LI MU

House
1 to 66

Works
g n o L

1 to 11

Y A TW LI MU

House
1 to 66

Works
g n o L

1 to 11

Y T WA LI MU

House
1 to 66

9 1

9 1

9 1

Watt Court
13 to 22

Watt Court
13 to 22
D f e

Watt Court
13 to 22
D f e

Acton Park Estate


C m a h n a

Acton Park Estate


23 to 37 1 to 38
C m a h n a

Acton Park Estate


23 to 37 1 to 38
C m a h n a

o t

o t

o t

23 to 37

1 to 38

Charles Court
8

Charles Court
8

Charles Court Ampere House

o 5t

House

o 5t

House

o 5t

Ampere

Ampere

Playground
3 4 24 3 4 24

Playground
3 4 24

Playground

1 to 40

1 to 40

1 to 72

1 to 72

Anthony Court
41 to 84

Anthony Court
41 to 84

Hall

Hall

Hall

Tesla
dy B

Tesla
dy B

Court

Court

Mast

Mast

A D

A D

A D

1 to 55

1 to 55

B Y

B Y

B Y

Sewage Pumping
1 4

1 to 66

Sewage Pumping
1 4

1 to 66

Station

Edison Court

Station

Edison Court

2 6

2 6

A O D L R O D O B C B
1 7 1 7

A O D L R O D O B C B
1 7

Un d

S A LT C

R O A D

S A LT C

S A LT C

5 0

29 o 4 3 t 20 29 o 6 5 t 20

R O A D

5 0

29 o 4 3 t 20 29 o 6 5 t 20

6 2
4 3

15

15

A D

15

A D

A D

I LT O

I LT O

A M

A M

A M

I LT O

7 4

7 4

AD

AD

RO

RO

RO

AD

KS HEA D

KS HEA D

EA D

B o r o

17 o 6 4 t 13
0 9

B o r o

KSH

o n s t , G

17 o 6 4 t 13
0 9

o n s t , G

HAW

HAW

o n s t & L B B d y

HAW

A s l y

A s l y

o n s t & L B B d y

y r re ug S
2 7
O RC DR ESTE I VE R

y r re ug S
2 7
ST I VE ER

y r re ug S
2 7

4 4

4 4
5

4 4
5

CE

OR

OR

DR

DR

CE

5
1 0

ST I VE ER

HA W KS RO HE AD AD

KS HE AD AD

HA W KS RO HE AD AD

BS

BS

ES DR TE I VE R

CE DR STER I VE

CE DR STER I VE

HA W

Southfield Primary School


School House El Sub Sta

4 2

Southfield Primary School


School House El Sub Sta

4 2

Southfield Primary School


School House El Sub Sta

RO

4 0
2

4 0
2

4 0
2

O RC

OR

OR

58
1

58
1

58
1

El Sub Sta

El Sub Sta

9 8

9 8

9 8

3 0 1

3 0 1
CF
0 1 6

3 0 1
CF

7 8

7 8

7 8

7 8

7 8

7 8

3 8

3 8

9 7

9 7

9 7

O D EL C WH L O KR A
1 8

O D EL C WH L O KR A
1 8

7 1

7 1

7 1

1 8

7 6

7 6

60

48

36

26

22

12

60

48

36

26

22

12

60

48

36

26

22

12

FIELDING ROAD
6 7 6 7
8 8

FIELDING ROAD
6 7
8 8

FIELDING ROAD
8 8

7 6

82

72

82

72

82

72

5 6

5 6

5 6

13

23

35

45

57

69

81

57

6 8 a

4 8

13

23

35

45

57

69

81

57

6 8 a

80

72

62

52

42

80

72

62

52

42

6 8

6 8

32

22

12

32

22

12

80

72

62

52

42

32

22

12

O D EL C WH L O KR A

3 8

6 1

5 3

4 3

8 8

6 1

5 3

4 3

n my E l ad n G re s
0 2 2
8 1 3
o t

6 2

n my E l ad n G re s
0 2 2
8 1 3
o t

Zone within which ventilation structures(s) for fans and for air inlet(s) and for air outlet(s) may be located
5 0
27
3 3
6 2
30

14

14

14

27

27

3 1

3 3

3 1

Zone within which the interception chamber may be located


A D O

G R E E N E N D

Zone within which the overflow chamber may be located


A D O
G R E E N E N D

Un d

Un d

3 8

3 8

A D

A T S

A T S

A T S

1 5

1 5

Vandervell Court

Vandervell Court
R

1 4

2 6

3 8

G R E E N E N D

R O A D

8 8

4 8

13

23

6 1

35

5 3

45

6 o1 2t 2

6 o1 2t 2

6 o1 2t 2

Sewage Pumping Station

D A O MR A H N A C

D A O MR A H N A C

D A O MR A H N A C

1 to 40

1 to 72

Anthony Court
41 to 84

Tesla
dy B

Court

Mast

1 to 66

Edison Court

29 o 6 5 t 20

n my E l ad n G re s
0 2 2
8 1 3
o t
E W ARPL

7 4

B o r o

o n s t , G

A s l y

8
f De

o n s t & L B B d y

BS

4 2

3 12

3 16 3 14

5 12

6 10

7 10

8 10

3 12

3 16 3 14

5 12

6 10

7 10

8 10

3 12

4 17
37

A O D T R TA AE V L
n U d
3 16 3 14
FW

4 17

A O D T R TA AE V L
n U d
FW

4 17

A O D T R TA AE V L
n U d
FW

W F F C

5 6

1 to 55

Vandervell Court

A O D L R O D O B C B

29 o 4 3 t 20

17 o 6 4 t 13

El Sub Sta

13

23

35

45

57

69

81

57

6 8 a

4 8

13

23

35

45

57

69

81

57

6 8 a

4 8

13

23

35

45

57

69

81

57

6 8 a

80

72

62

52

42

80

72

62

52

42

80

72

62

52

42

6 8

6 8

6 8

32

22

12

32

22

12

32

22

12

80

72

62

52

42

32

22

12

O D EL C WH L O KR A

3 8

6 1

5 3

4 3

8 8

6 1

5 3

4 3

8 8

6 1

5 3

4 3

n my E l ad n G re s
0 2 2

6 2

n my E l ad n G re s
0 2 2
8 1 3
o t

6 2

n my E l ad n G re s
0 2 2
8 1 3
o t
E W ARPL

3 3

3 1

3 3

3 1

3 3

3 1

Zone within which Work No. 2b would be located


A D O
G R E E N E N D

Zone within which work No. 2a would be located


A D O

G R E E N E N D

G R E E N E N D

Zone within which ventilation column(s) serving the shaft may be located
O A D

Un d

3 8

3 8

3 8

A D

A T S

A T S

A T S

A T S

1 5

1 5

1 5

Vandervell Court
O R

Vandervell Court
O R

Vandervell Court
R O

1 4

2 6

3 8

G R E E N E N D

R O A D

8 8

4 8

5 12

6 10

13

7 10

23

8 10

6 1

35

5 3

45

6 o1 2t 2

6 o1 2t 2

6 o1 2t 2

6 o1 2t 2

Sewage Pumping Station

5 0

6 2

D A O MR A H N A C

D A O MR A H N A C

D A O MR A H N A C

D A O MR A H N A C

1 to 40

1 to 72

Anthony Court
41 to 84

Tesla
dy B

Court

Mast

1 to 66

Edison Court

29 o 6 5 t 20
ut o r e C L a

n my E l ad n G re s
0 2 2
8 1 3
o t
E W ARPL

7 4

B o r o
2 0

o n s t , G

A s l y

o n s t & L B B d y
f De

5
1 0

BS

4 2

3 12

3 16 3 14

5 12

6 10

7 10

3 12

3 16 3 14

5 12

6 10

7 10

3 12

3 16 3 14

5 12

6 10

7 10

3 12

3 16 3 14

5 12

6 10

7 10

8 10

0 6

o t

o t

o t

o t 35
3 15

35

35

35

3 15

3 15

3 15

4 17

A O D T R TA AE V L
n U d
FW

4 17

A O D T R TA AE V L
n U d
FW

4 17

A O D T R TA AE V L
n U d
FW

4 17

A O D T R TA AE V L
n U d

STAN

STAN

STAN

RD GA EY NL STA EN

Keyplan:
W F F C

EY L

EY L

EY L

FW

37

37

37

37 o t 41

o t

o t

o t

RD GA

RD GA

RD GA

41

41

41

CW

CW

CW

CW

4 6 6 6

4 6 6 6

4 6 6 6

4 6 6 6

EN

EN

EN S

S
W t n i o p t s e

0 5

0 5

0 5

0 5
W

This drawing
ARD L
D ROA EN

t n i o p t s e

t n i o p t s e

t n i o p t s e

O AD NR ARDE L

O AD NR ARDE L

RO AD EN A L RD

0 7

0 7

0 7

0 7
9 3

9 3

9 3

9 3

d n a l s I

d n a l s I

d n a l s I

d n a l s I H e s u o

E L P f R e D A

D
f e

f e

f e

R A

R A

R A E L P

e s u o

e s u o

e s u o

E L P

E L P
W

W Y A

Y A

Y A

Y A

M
w e

w e

w e

w e

7 6

7 6

7 6

7 6

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

7 8

7 8

7 8

7 8

o or B

o or B

o or B

o or B C ,G t s on L y l s A

C ,G t s on L y l s A C

,G t s on

,G t s on L y l s A C

L y l s A C

C
t& s on LB

t& s on

t& s on

t& s on LB

LB

LB

Key:
1 to 55

Vandervell Court

Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located

57

57

3 3

3 3

3 1

3 1

69

69

81

81

1 5

1 5

57

57

8 8

8 8

6 8

6 8

6 8 a

6 8 a

4 8

4 8

1
od fr o g L n r ut Co

A O D L R O D O B C B

Zone within which the shaft would be located Zone within which permanent above ground structures would be located (those listed in Table 1) Zone within which required landscaping would be located

r ut Co

r ut Co

r ut Co

r ut Co

od fr o g L n r ut Co

od fr o g L n r ut Co

od fr o g L n r ut Co

29 o 4 3 t 20

ut o r e C L a 9 2 o2 1 t 2 5

ut o r e C L a

ut o r e C L a 9 2 o2 1 t 2 5

o 1 t 2 5

o 1 t 2 5

2 2 9

2 2 9

8 1 3

EK E W AY W ARPL

o t

EK E W AY W ARPL

17

17

17

17
30

30

30

30

ut o r e lyC v r Be e

r ut e l y Co v r Be e 2 8 o1 6 t 1 8

r ut e l y Co v r Be e

r ut e l y Co v r Be e 2 8 o1 6 t 1 8

EK W AY

EK W AY

o 6 t 1 8

o 6 t 1 8

8 2

8 2

8 2

8 2

8 1 2

8 1 2

17 o 6 4 t 13

Notes:
1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.

16

16

16

16

8 8

8 8

8 8

8 8
4 7
2
SO

0 9

0 9

0 9

0 9

r ut Co ig dn Ro

r ut Co ig dn Ro

r ut Co ig dn Ro

C ig dn Ro r ut o

1 0

1 0
6

6
SOU

SOU

SO

0 7

0 7

0 7

0 7

1 3

1 3

1 3

1 3

D EL I HF UT AD

D EL I HF UT AD RO

D E IL THF AD

D E IL THF AD RO

RO

RO

1 1 0

1 1 0

1 1 0

1 1 0
0 1 6

El Sub Sta

CF

0 1 6

0 1 6
8 6

8 6

8 6

8 6
6 6

CW

CW

CW

CW

8 9

8 9

8 9

8 9
CF

6 6

6 6

6 6
CF

CF

CF

0 9

0 9

0 9

0 9

6 10

6 10

6 10

6 10

0 6

0 6

0 6

0 6
8 5

d Un

d Un

d Un

d Un
6 3

8 5

8 5

8 5

6 3

6 3

1 2

1 2

1 2

23
o 6t 0 1
27

23

6 4

o 6t

o 6t 0 1

0 1

27

27

0 6

o t

o t 35

o t 35

35

NS RDE GA EY NL STA

STAN EY L RD GA EN S
4 6 6 6

NS RDE GA EY NL STA

37

37

o t

o t 41

o t 41

41

CW

CW

CW

4 6 6 6

4 6 6 6

0 5

0 5

0 5
W

W t n i o p t s e

W t n i o p t s e

t n i o p t s e

O AD NR ARDE L

ARD L

O AD NR ARDE L

0 7

0 7

0 7

D RO A EN

9 3

9 3

d n a l s I

d n a l s I H e s u o
M w e

d n a l s I

D f e

R A

R A E L P
W Y A

R A

e s u o

e s u o

E L P

E L P

W Y A

Y A

M w e

w e

7 6

7 6

7 6

7 8

7 8

7 8

o or B

o or B C ,G t s on L y l s A C t& s on LB

o or B C ,G t s on

100m

100m

,G t s on
L

L
y l s A C t& s on LB

y l s A C t& s on LB

Scale 1:2000 at A1 1:4000 if reproduced at A3

1
od fr o g L n r ut Co

1
r ut Co

FOR INFORMATION

r ut Co

r ut Co

od fr o g L n r ut Co

od fr o g L n r ut Co

Location

r ut e Co L a 9 2 o2 1 t 2 5

r ut e Co L a 9 2 o2 1 t 2 5

r ut e Co L a

o 1 t 2 5

2 2 9

Acton Storm Tanks London Borough of Ealing


Document Information

EK E W AY W ARPL

EK E W AY W ARPL

17

17

17

30
8 2

30

r ut e l y Co v r Be e 2 8 o1 6 t 1 8

r ut e l y Co v r Be e 2 8 o1 6 t 1 8

r ut e l y Co v r Be e

EK W AY

o 6 t 1 8

8 2

8 2

8 1 2

16

16

16

8 8

8 8
4 7

8 8

0 9

2 0

2 0

2 0

Section 48 publicity
f De

f De

r ut Co ig dn Ro

r ut Co ig dn Ro

r ut Co ig dn Ro

Site works parameter key plan Book of plans - section 3


S48-PP-02X-ACTST-000006 July 2012

4 7

4 7

1 0

1 0

2
6

2
6

SO

SO D EL I HF UT AD RO

SO

0 7

0 7
8 6
6 6

0 7

1 3

1 3

1 3

D EL I HF UT AD RO

D EL I HF UT AD

RO

1 1 0

1 1 0

1 1 0
0 1 6

CF

0 1 6

8 6

8 6

CW

CW

CW

8 9

8 9
CF

8 9

6 6

6 6
CF

CF

0 9

0 9
106

0 9

6 10

6 10

0 6

0 6
8 5

0 6

d Un

d Un

d Un

8 5

8 5

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing
a od mR na ah C

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

CL107.96

Key:
Local authority boundary Limits of land to be acquired or used (LLAU) Existing sewers Proposed access cover Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located

E x i s t i n g S T t a om n r k 3 T a n k s

E x i s t i n g S T t a om n r k 4 T a n k s

Zone within which Work No. 2b would be located

Notes:
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan.

W l pe r a
y a

For details see Sheet 2


E x i s t i n g S T t a om n r k 2 T a n k s

T h i r d

G r e e n e n d

p a r t y v e h i c l e

R o a d

p a r k i n g

E x i s t i n g S T t a om n r k 1 T a n k s
a r e a

Work No. 1a. 6.5m internal dia main tunnel to Carnwath Road Riverside

1.8m internal dia pipe overflow to Acton Storm Relief CSO

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

ILLUSTRATIVE

Location 3m x 3.5m chamber to enable man access to the overflow connection to Acton Storm Relief CSO

Acton Storm Tanks London Borough of Ealing


Document Information

Section 48 publicity Permanent works layout Sheet 1 of 2 Book of plans - section 3


S48-PP-02X-ACTST-000007 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

ad re n s

Keyplan:

St a ne ly G

This drawing

2 No. 1.2m internal dia ventilation columns and subdivided areas providing 2m of flue area enclosed within a 5m x 4.5m structure of 15m height

Access for maintenance vehicles

a od mR na ah C

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Local authority boundary Limits of land to be acquired or used (LLAU) Existing tanks to be filled to surrounding ground level and left as hardstanding + 104.10m Existing sewers Proposed access cover Existing Level (shown in metres above tunnel datum) Proposed level (shown in metres above tunnel datum) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which ventilation column and ventilation equipment enclosure may be located Zone within which permanent above ground structures would be located

104.50 Ventilation structure 3.5m x 2.0m x 2m high

Interception chamber

CL107.96

Valve chamber

Notes:
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan.

Work No. 2a. Main tunnel shaft (15m internal dia)

Odour control chamber


WER I

Zone within which Work No. 2a would be located Overflow chamber Zone within which overflow chamber may be located

1.8m internal dia storm overflow to Acton Storm Relief CSO

106.20 10m Noise control chamber 0 10m

Ventilation structure 10m x 2.5m x 2.5m high

Scale 1:200 at A1 1:400 if reproduced at A3

Zone within which Work No. 2b would be located

E x i s t i n g S T t a om n r k 4 T a n k s
Noise control chamber Work No. 1a. 6.5m internal dia main tunnel to Carnwath Road Riverside

ILLUSTRATIVE

Location

Acton Storm Tanks London Borough of Ealing

Zone within which interception chamber may be located

Document Information

2No. ventilation structure 4.0m x 2.5m x 3.5m high

E x i s t i n g S T t a om n r k 3 T a n k s

Section 48 publicity Permanent works layout Sheet 2 of 2 Book of plans - section 3


S48-PP-02X-ACTST-000008

T h i r d

July 2012
p a r t y v e h i c l e

p a r k i n g

a r e a
c Thames Water Utilities Ltd 2008

AA

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

Work/ Industrial building

a od mR a ah C n

This drawing

+ 105.73m

New access gate to match fencing North Elev. Architectural fencing shown dotted

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU) Residential Zone within which permanent above ground structures would be located Zone within which required landscape would be located 15m high ventilation column. Allow for local feature lighting of ventilation column + 105.40m Existing Vegetation 105.40 Existing access retained Landscaping to be agreed with landowner Thames Water buildings/structures 106.00 Zone within which ventilation equipment and ventilation column would be located East Elev Thames Water access Existing trees within surveyed area Existing levels (shown in metres above tunnel datum) Proposed levels (shown in metres above tunnel datum) Thames Water land

+ 105.75m Existing footpath to be widened Hard standing for existing Thames Water infrastructure. Hardstanding access to hatches to be confirmed

Zone within which ventilation column would be located

106.00

+ 107.02m 106.00 Section marker change of direction Area for swale and vegetation

106.00

Notes :
1. All dimensions and levels are approximate. Overflow Chamber + 107.96m Handrail around overflow chamber 108.80 107.97 106.20 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and the topographic survey base, both of which have been used in the preparation of this drawing.

1 0 7 . 2 0

V e h ie c l e x c ii a c sn t s gp e s t u mp o i n gs tt ai o n

Landscape Key:
Hard Landscaping Soft Landscaping

Ventilation structures 3.5m high

Tree / Vegetation Canopy

Architectural fencing Area for ground Interception chamber. Top cover to align with the existing chamber top level cover, natural growth and wild flowers Architectural fencing along the existing boundary line Scale 1:200 at A1 1:400 if reproduced at A3 Ventilation structure 10m 0 10m

Redundant storm water tank 4 Car Park

INDICATIVE
Save for the layout of above ground structures which is illustrative

Redundant storm water tank 3 Open channel to be retained Housing/ Residential Existing grassed area Document Information Location

Acton Storm Tanks London Borough of Ealing

Section 48 publicity Proposed landscape plan Book of plans - section 3


S48-PP-02X-ACTST-000009 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

15m high ventilation column. Allow for local feature lighting of ventilation column Low maintenance ground cover natural growth and wild flower planting High quality architectural fencing around ventilation structure and above ground chamber Air release louvres

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Redundant storm water tanks

Notes :
2no. fan units in accoustic enclosure 1. All dimensions and levels are approximate. 2. The purpose of this section is to illustrate the scale of the below ground infrastructure to be provided.

Section cut through the building

Canham Road

Interception Chamber

Carbon filters

Valve Chamber

By pass chamber

Main tunnel shaft

Main tunnel

10m

10m

Scale 1:200 at A1 1:400 if reproduced at A3

Section AA
N

ILLUSTRATIVE
Playground

Location

Acton Storm Tanks London Borough of Ealing


A
Mast

Document Information

Section 48 publicity Section AA Book of plans - section 3


S48-PP-02X-ACTST-000010 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Shrubs and trees along fence boundary shown notionally Thames Water boundary metal palisade fencing Pumping station beyond

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Notes :
1. All dimensions and levels are approximate.

Residential

Acton storm tanks Thames Water property

Footpath

Residential

As existing North elevation

15m high ventilation column. Allow for local feature lighting of ventilation column High quality architectural fencing

10m Maintenance access Ventilation column High quality fencing

10m

Scale 1:200 at A1 1:400 if reproduced at A3

Proposed North elevation


N

ILLUSTRATIVE
Acton Park Estate

Playground

Location

n o i vt ea l hE r ot N

Acton Storm Tanks London Borough of Ealing


Document Information
Mast

Section 48 publicity As existing and proposed East elevation Book of plans - section 3
S48-PP-02X-ACTST-000011 July 2012

LB TCBs

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan: Storm water tanks Open channel upstand Existing balustrade Thames Water boundary fence vertical palasade Existing trees and shrubs Above ground overflow chamber

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn. Section cut through industrial building

Notes :
1. All dimensions and levels are approximate.

Storm water tank

Compound

Canham Road

Work/ industrial building

As existing East elevation

Widened pavement High quality architectural fencing behind Low maintenance landscaping/ wild flower Ventilation fan within accoustic enclosure Open channel upstand

15m high ventilation column. Allow for local feature lighting of ventilation column Air release louvres incorporated in upstand

Section cut through industrial building

10m Proposed vegetation Hardstanding for operational access Ventilation column

40m

Scale 1:500 at A1 1:1000 if reproduced at A3


A O D T R TA AE V L
n U d
FW

Proposed East elevation

STAN

RD GA E L Y
EN

6.7m

6.1m
CW

N
F C

BS

S
6.1m 6.4m
Y T WA LI MU

W F
d n U

F C

ILLUSTRATIVE

D N ROA A L RDE

5.8m

D ef

Acton Park Estate

R A LE P

W Y A
6.1m

Location
Playground

5.8m

5.8m

E a s t E l e v a t i o n

D A O MR A H N A C

Acton Storm Tanks London Borough of Ealing


o or B
Un d

,G t ns Co
L
y l As

t& ns Co

Document Information
5.5m

Mast

LB

y Bd

Section 48 publicity As existing and proposed South elevation


5.2m

A O D L R O D O B C B

Book of plans - section 3


S48-PP-02X-ACTST-000012

A D

S A LT C

G R E E N E N D

A TS

R O A D

July 2012

YN EM L

E L W ARP

5.2m

RO

EK W AY

A D

AD

A M

I LT O

RO

AD

KS HE AD

B o r o

o n s t , G

HA W

A s l y

o n s t &

L B B d y

f De

O RC DR ESTE I VE R

HA W KS RO HE AD AD

BS

CES TER

OR

c Thames Water Utilities Ltd 2008

n o L
d n a l l l

n Park Estate
C m a a a h n a M w e
8

H H H e s u o

e W l p r a E W L ay P R A W

o t

23 to 37

1 to 38

Charles

Court Ampere Existing site access for Thames Water operational activities to be maintained during construction
Playground

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Y A
4 1 6. 10

o 5t

7 6

13 6. 10 11 6. 10

ad re n s

Possible road strengthening works


3 4 24

House
4 0 . 6 0 1 4 0 . 6 0 1

Keyplan:
4 7

This drawing

6 0 . 6 0 1

St a l ne yG

Concrete batching plant and aggregate storage area

Security office

10 8. 30

10 6. 42

106 . 50

10 6. 50

CL107.96

10 6. 38

10 6. 40

10 6. 41

106 . 41

106 . 43

Approximate Chamber size

10 6. 42

10 6. 46

106 . 44

10 6. 55

10 6. 62

Excavated material storage and handling area


2

Crane
1 to 55

Crane
1 4
10 6. 65

10 6. 66

Ramp down to existing tank base


1 0 6 . 2 4

2 6

Storage tanks 5 & 6 taken out of operation and decommissioned

Vehicle turning area

3 8

A D

S A LT C

G R E E N E N D

A T S

R O A D

10 6. 15

27

15

A D

I LT O

A M

AD

RO

KS HE AD

HA W

y r re ug S
4 4
ST ER

OR

6 6 6 1

5 3

6 o1 2t 2

0 9 0. 15

Shaft
1 0 6 . 4 6

1 0 6 . 6 6

5 0

Modifications to be made to tanks 1-4 to enable removal of tanks 5 & 6

6 2
4 3

Construction access, left turn in, left turn out


7 8

2 2 2

3 3 3

D A O MR A H d N a A o Cm R na ah C

Existing site access for 1 to 40 Thames Water operational activities to be maintained during construction
1 to 72

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
6 8

Key:
Limits of land to be acquired or used (LLAU) Hoarding

Anthony
Court
41 to 84
1 0 6 . 4 0

1 0 6 . 4 4

Maximum extent of working area

W e pl ar

Approximate Chamber size


1 0 6 . 4 5

Vehicle turning area Tesla


8 9

Site access

1 0 6 . 4 2

1 0 6 . 3 7

W ay

Approximate Chamber size

1 0 6 . 4 9

Court Site power structure

Access / haul route

1 0 6 . 5 4

1 0 6 . 6 5

Existing sewers

Sd9.55

Mast
1 0 6 . 7 5
Approximate Chamber size

Notes :
Storage (open area or containerised) 1. These construction phasing plans have been prepared to illustrate possible site layouts for the principle construction phases. Contractors may choose to lay sites out differently during construction depending on their preferred construction methods subject to any controls on layout imposed through the planning submission and approval process. 2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown. 3. Utility supplies for the construction of the works Offices / welfare building (2 storey) would be agreed with the relevant utility company. 4. Additional noise mitigation including noise barriers may be required but is not shown Parking
Approximate Chamber size

Vandervell Court

1 to 66

Edison Court

3 3

3 1 1 1

1 1 1 7

1 5 5 5
1

A O D L R O D O B C B
d a d o l o R ob Cb

on this drawing.

l o o M oe r u u ut Co

Approximate Chamber size

Access for Thames Water screening facilities maintenance


29 o 4 3 t 20 29 o 6 5 t 20

r r o o od fr o g L n t t r r r ut Co

10m

40m

1 0 6 . 0 6 1 0 6 . 0 6
1 0 6 . 2 1

Scale 1:500 at A1 1:1000 if reproduced at A3

y e a rl W W ap

ut o r e C L a 9 o o o t 2 t 2 1 t 2 5

9
3 3 30
7 4

ut o r l de C 4 4 W W n Wa 1 1 1 2 4 0 0 o 0 t 2 3

n my E l ad n G re s
0 0 0 2 2
8 1 3
o t

ILLUSTRATIVE

E W ARPL W AY

Location

Acton Storm Tanks


t r C C u y Co v e v l v r Be e

London Borough of Ealing


Document Information

o 6 t 1 8

8 8 8 2
Approximate Chamber size

3 0. 15 8

4 0. 15 0

8 1 2

Section 48 publicity Construction phases - phase 1 Site setup & shaft construction
e C C a Cr n r ut Co

Book of plans - section 3


S48-PP-02X-ACTST-000013 July 2012

17 o 6 4 t 13

16

2 2 2 0
8

C n n ig dn R R Ro o o o

C C C t u ur ou
c Thames Water Utilities Ltd 2008

n Park Estate

W R A

Y eA l W p r a E L y W P a W
4 0 . 6 0 1 4 0 . 6 0 1
4 1 6. 10

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Existing site access for Thames Water operational activities to be maintained during construction
Playground

13 6. 10 11 6. 10

Keyplan:

ad re n s

This drawing

St a l ne yG

Construction access, left turn in, left turn out

6 0 . 6 0 1

Concrete batching plant and aggregate storage area

Security office
1
10 8. 30
10 6. 42

0 9 0. 15

Shaft
o or B
1 0 6 . 4 6

106 . 50

10 6. 50

CL107.96

10 6. 38

10 6. 41

10 6. 40

106 . 41

106 . 43

Approximate Chamber size

10 6. 42

Storage (open area or containerised)


1 0 6 . 6 5

10 6. 46

106 . 44

10 6. 55

10 6. 62

1 0 6 . 6 6

Crane

Crane
Approximate Chamber size

Sewage Pumping
Storage tanks 5 & 6 taken out of operation and demolished

Station
10 6. 65

10 6. 66

108.74

1 0 6 . 2 4

Vehicle turning area

A D

S A LT C

G R E E N E N D

A T S

R O A D

10 6. 15

A D

I LT O

A M

AD

RO

KS HE AD

HA W

ST ER

OR

5
1 0 6 . 4 4

D A O MR A H d N a A o Cm R na ah C

Existing site access for Thames Water operational activities to be maintained during construction

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU)
,G t s on

Hoarding
y l s A

1 0 6 . 4 0

Maximum extent of working area


t& s on

Approximate Chamber size


1 0 6 . 4 5

Vehicle turning area

Site access

1 0 6 . 4 2

1 0 6 . 3 7

e dy l p B r a LB W

Approximate Chamber size

1 0 6 . 4 9

Access / haul route Site power structure


ay

5.5m Existing sewers

1 0 6 . 5 4

Sd9.55

Notes :
Approximate Chamber size

1 0 6 . 7 5

1. These construction phasing plans have been prepared to illustrate possible site layouts for the principle construction phases. Contractors may choose to lay sites out differently during construction depending on their preferred construction methods subject to any controls Parking on layout imposed through the planning submission and approval process. 2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where Offices / welfare building (2 storey) appropriate, outline traffic management arrangements are shown. 3. Utility supplies for the construction of the works would be agreed with the relevant utility company. 4. Additional noise mitigation including noise 5.2m barriers may be required but is not shown

A O D L R O D O B C B
d a d o l o R ob Cb

on this drawing.

Approximate Chamber size

Access for Thames Water screening facilities maintenance 10m 0 40m

1 0 6 . 0 6 1 0 6 . 0 6
1 0 6 . 2 1

Scale 1:500 at A1 1:1000 if reproduced at A3

y e a rl W W ap
3 0. 15 8 4 0. 15 0

ILLUSTRATIVE

Location

Acton Storm Tanks London Borough of Ealing


Document Information

Approximate Chamber size

Section 48 publicity Construction phases - phase 2 Other structures & secondary lining
B o r o

Book of plans - section 3


C o n s t , G

S48-PP-02X-ACTST-000014 July 2012


L A s l y

o n s t & L B B d y
f De
c Thames Water Utilities Ltd 2008

Ravenscourt Park

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Hammersmith

Keyplan:

This drawing

Hammersmith

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Local authority boundary

Order limits

Tunnel

Shaft

London Borough of Hammersmith & Fulham

Mean low water Mean low water

Hammersmith Pumping Station


C p i rs R d oa

D y er l l i t s i R d oa

Hammersmith Bridge Main tunnel

d a o R s r o l l e c n a h C

w o l s n i

d a o R

Hammersmith connection tunnel

London Borough of Richmond Upon Thames


100m 0 100m

Scale 1:2500 at A1 1:5000 if reproduced at A3

as t el na u

FOR INFORMATION

Location

Hammersmith Pumping Station London Borough of Hammersmith & Fulham


Document Information

Section 48 publicity Location plan Book of plans - section 4


S48-PP-03X-HAMPS-000015 July 2012

c Thames Water Utilities Ltd 2008

y l ru d Pa go n

N
s ot Ps

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:
d n u o r g y a l P

This drawing

s t s o P

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn. Thames Water depot
e n a L y r e l l i t s i D

Key:
Limits of land to be acquired or used (LLAU) + 105.40m Existing levels (shown in metres above tunnel datum) Thames Water land

Frank Banfield Park

Thames Water buildings/structures


105.43

y l ru d Pa go n

Existing trees within surveyed area

Thames Water access

Notes :
Park entrance may be reconstructed as part of mixed-use development 1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and the topographic
+ 105.53m

d a o R s r o l l e c n a h C
n o i t a t S

survey base, both of which have been used in the preparation of this drawing.

Residential

North elev.

m a H

m s r e

h t i

m u P

g n i p

D y er l l i t s i

Boundary wall Screen house

Park

R d oa

Concrete wall

Venturi building South elev.

Concrete wall Pallisade fence

+ 105.05m

Blockwork wall

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

FOR INFORMATION
Site with planning consent under construction Location

Hammersmith Pumping Station London Borough of Hammersmith & Fulham


Document Information

Section 48 publicity
d a o R

As existing site features plan Book of plans - section 4


S48-PP-03X-HAMPS-000016 July 2012

W
River Thames

w o l s n i

M e br an R d oa
c Thames Water Utilities Ltd 2008

70

o t

Posts

63

Playground
0 1 o t 1
0 1 o t 1

Q
76
1 1

71

0 1 o t 1

o t

N d n u o r g y a l P
4 8 o t 7 7

s t s o P

0 1 o t 1 L

T S
PH
25

Riverside Studios
4 4
9 1
1

2 9

2 6

Chancellors

Wharf

4 6

LB

39 40

0 7

f e D

Thames Path

f e D
Y ROAD L R L E STI DI

D A O R
7 4

W O L S N I

8 3

7 2

9 1

3 3

9 5

3 1

M A J

0 6

2 1

S E

6 3

S R O L L E C N A H C

D A O R

Y R E L IL T S I D

2 8

2 1 a

T E E R T S

a 8 4
4

8 4

Ap

m u P

g n i p

n o i t a t S

1 2

R E V I R

0 2

9 1

E C A R R E T

1 1

y d B d r a

0 8

Ap

7 1

a 1 1

0 3

3 1

Depot

0 1 o t 1

2 1

1 1

3 1

S R O L L E C N A H C

T E E R T S

0 1 o t 1

0 1 o t 1

Ac
15 16 8

2 9

0 1

0 1 o t 1

8 6

8 1

R C

Extent of areas to be temporarily stopped up for the construction of crossovers for site and permanent access

Ap
R O D A

ea l E H or e s ou
Q U R A
1
0 1 o t 1

o t

Sub Sta

N
TCB

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

a l el ab s I

1 o t 20

e s ou

Keyplan:

5 8

o t

C ne i ol ar
9 23 24

This drawing

o t 20

H e s ou
17

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU) Existing public right of way

PH

23

E N A L

Area of highway to be temporarily stopped up

C R P S I R O D A
21

Ap Ac Notes:

Access to permanent works

Access to construction works

Playground

1. This plan does not show stopping up and diversions of limited duration (eg hoarding erection, minor utility diversions and minor highway works). 2. Only rights of way in or close to worksites are shown. The full extents of rights of way are not shown where they cease to be relevant to the project.

D R E LL TI S I Y R

10

27
s t os P

s t os P

D A D R E LL TI S I Y

R I FA Y LA P TR S T E E

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

FOR APPROVAL
El Sub Sta

Location

Hammersmith Pumping Station London Borough of Hammersmith & Fulham


Document Information

Section 48 publicity Access plan Book of plans - section 4


S48-AC-03X-HAMPS-000002
6 2

July 2012

c Thames Water Utilities Ltd 2008

E H A N

O L L

52 5. 10

c n o C

C
S P C

13 5. 10

52 5. 1 4 10 5. 10

R I F h
W B

r o o D C c on
C

B F B S

B F
R I

0 6 . 5 0 1 .9 4 5 0 1

GV

6 4 . 5 c 0 n 1 o C
W B

7 6 . 5 0 5 1 5 . 5 0 4 1 6 . 7 5 4 . 0 7 1 0 1

W B

DK 7 9 . 7 4 8 . 0 4 1 0 1

WV BP

S P C

BTIC
B

1 0 5 . 9 6

7 8 . 0 1 1 1 6 . 5 0 8 1 4 . 5 0 C 1 I L C

1 6 . 9 5 4 0 . 1 5 0 1

G .3 R 54 0 1

4 6 . 5 0 C I 1 W B L C

WV c n o C

Stn 5S 9 8 104.978 . 4 0 1

4 0 . 5 0 1
GV

GV

6 9 . 4 0 1

6 0 . 5 0 1 RS

10 5. 11

5 4 . 5 0 C 1 I L C

G .7 4 R 5 0 1 9 4 . 5 C 1 I L0 C

5 5 . 6 5 6 0 . 1 5 0 1 8 6 . 5 2 0 68 1 0. 1

3 0 WM . 5 0 1

LP

CL105.03
9 9 . 4 0 1

7 6 . 7 0 1

6 9 . 4 0 1

105.07

Ga t e

1 6 . 5 0 1 .0 5 5 7 0 5 . 1 5 0 1

0 5 . 5 0 C 1 I L C

c n o C

3 0 . 5 0 1

5 9 . 4 0 1

0 0 . 5 0 1

IC

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

38 5. 10

6 0.

1 4 0 . 9 8

O/ H

W 49 B 7. 10
OH /

70 5. 10

O/ H
4 9 . 4 0 1 DK 0 8 . 4 0 1 1 9 . 4 9 0 7 . 1 4 0 1

MH RG 104.79 TP CL104.95

0 9 . 4 0 1
BTIC

g 0.9 s 5 h 5
6 9 . 4 0 1

RG Conc Base

1 0 45 .4

18 5. 10 09 7. 10

75 7. 10 0 1 6. 10

48 5. . 9 5 10 05 1

c on

57 5. 4 10 . 6 5 10

11 6. 10

41 5. 10

62 5. DP 10

6 0 0 . 1 5

LP
45 5. 10
03 5. 10

Keyplan:

08 5. c 10 Ta

W B

08 7. 10

08 5. 10

W B
G 47 R 5. 10

WV
4 9 . 4 0 1 3 8 . Speed 4 0 1 Ramp 3 0 . 5 0 1 Speed Ramp
0 1 . 5 0 1
c a m r a T

This drawing

F h

48 . 05 C I L1 C

5 1.

0 0 0 . 1 5

49 5. 0 6 10 5. 10

e t a G

IC CL105.00
9 9 . 4 0 1

p m a R
BP

01 5. 10

G 84 R 4. 10

0 .1 1 50

Stn 1A 105.561

5 7 . 7 0 1 6 5 . .4 5 56 0 0 1 1
38 5. 28 44 10 5. 5. 10 10 54 7. l l 10 W a c on C 88 49 7. 5. 10 10

c n o C

5 9 5 7 . . 5 7 0 C 0 I 1 1 L r 3 C e 5 i . r r 5 a 0 B 1

3 1 . 6 0 8 1 0 . 6 0 1 W B

F B O

9 . 0

4 0 . 5 0 1

BP

5 8 . 4 0 1

51 . 55 05 . 6 C I L1 6 05 . C r1 5 i 10 re d ar pa 12 B ey 6. K 10

RW

DK

40 1. 11 47 9. 10 05 5. 10

F B O
105.01

9 . 0

4 . 2 h e g d e H 8 9 . 4 0 RS 1

WV

GV

8 S 9 P . 2 4 C 8 0 . 1 4 0 1

IC CL104.98
RG

4 0 . 5 RS 0 1

00 5. 10 c Ta

p m a R
RG 104.75

06 5. 10

FB

97 4. 10

RG 104.80 MH CL105.02

Speed 104.88 Ramp


6 0 . 5 0 1

B IC CL105.04

4 0 . 5 7 0 0 1 . C I 15 0 T B

15 6 0. 0

5 8 . 4 0 1

Tree to be removed by others as part of mixed use development

6 9 0 . 1 5

99 4. 10

S B
99 4. 10
London Plane g 1.3 s 10 h 10

IC
CL104.83

S B

WV

0 0 . 5 0 1
LP 2 2 9 . 0 . 4 5 0 0 1 1
6 0 . 5 0 1

t l a h p s A
g n i d r a . o 25 H h

RG 104.76

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

.2 48 0 1

r i re d ar pa B ey K

0 9 . 4 0 1

12 6. 10

W 5 B 1. h F R I ac m 01 ar 5. T C I L10 C
45 9. 10

t al ph s A

84 4. 10

R I F h 5 1.

89 4. 10

W B

27 5. 10

Gas Intake Cupboard 104.98

F B O

9 . 0 h

S P C

c a m r a T

RG 104.92

EJB

Stn 5A 105.066

9 9 . 4 0 1

c n o C

DK 5 8 . 4 0 1

31 5. 41 10 5. 10 12 5. 10
LP

C
c on

B F

10 6. c 10 on C
B S RG

83 4. 10

DP
6 9 . 4 0 1

104.99

Key:
Limits of land to be acquired or used (LLAU) Trees to be removed Above ground structures to be removed Structure to be removed and relocated or reinstated
54 4. 10 63 4. 10
96 5. 10

di r 5 oa . 2 h

93 4. 10

m r Ta

ng

106.00 F B O

9 . 0 WV h

FH

4 9 . 4 0 1
9 9 . 4 0 1

c n o C

t al ph s A

ac

14 5. . 4 0 10 05 1

104.93 IC CL104.99 104.95

r r e i e r i r r r a a B B
04 5. 10
B

C r 2 0 D . 5 0 1

C r 6 0 D . 5 0 1
e t a G c n o C

W GV B 4 7 . 7 0 1 LP

2 0 . 5 0 1

g n i d r a . 5 o H h2

69 4. 10

ng di r 5 oa 2. h

75 4. 10

04 5. 01 5. 10 . 3 1 5 10 10 09 6. W B 10 06 5. 10

TP
9 9 . 4 0 1

4 0 . 5 0 B 1
B

105.01 105.06
104.95

71 4. 10

12 5. 10 33 6. 10 W B

IC CL104.98 IC CL104.98 SP

t l a h p s A

Cherry
g 0.8

104.97 105.36

IC CL105.38

LP
75 4. 10 72 4. 10

3 0 . 5 0 1

B
105.03 B

C I E B

GV

9 6 . 7 0 1 t l a h p s A 9 8 . 4 0 1

6 8 . 4 0 1

This length of wall to be retained once inspection confirms it would H remain stable following removal O/ of adjacent wall 7
CL104.93 RG 104.78 RS

9 9 . 4 0 1

7 P&DTM 9 . 4 0 1

2 0 . 5 0 1 C I TP T B B

B g n B ri d a . o 25 H h

s 8 h 7 104.86 104.94 Piles of slabs

g 1.1 s 6 h 8 105.38

96 4. 10

BTIC
104.84

105.02 105.04

105.01
105.08

56 4. 10

B (Typ)

104.97 104.94 104.93

RG 104.42

04 5. 10
9 8 . 4 0 1

H ng di r 5 oa . 2 h

Notes:
96 5. 10
59 4. 10
67 4. 10
RG 104.44

g 1.3
s 6 h 6

Stn 6S 105.047
IC

01 5. 10

Rough Ground
13 5. 10
1 4 . 5 0 1
105.01

8 . 4 0 1

0 9 . 4 0 1 2 8 . 4 0 1 4 4 DK 9 9 . . 4 4 2 0 0 8 . 1 1 4 0 1
c a m r a T

3 9 . 4 0 1

t l a h p s A

CL105.01

RG WM WV B (Typ) g 0.9 104.94

s 5 h 5
98 4. 10
6 9 . 4 0 1

1 0 . 5 0 1 l l a W c RG n o C 6 104.86 8 . 7 0 1 1 0 . IC 5 0 2 1 0 . CL104.95 5 0 2 1 0 . e t 5 a 0 1 G

1. Minor items to be removed (e.g. barriers, bollards etc.) are not shown.
55 4. 10 48 4. 10

02 5. 10

87 7. 10

104.99

Rough Ground

00 5. 10

H O/

R W

2. General activities of site clearance such as removal of hardstanding and foundations, stripping of topsoil and clearance of minor
104.71
G ae t

59 4. 10

47 4. 10

O H /

59 4. 10

t al ph s A

105.40
O H /

104.83

O / H

BTIC IC CL104.93
3 8 . 4 0 1
3 9 . 4 0 1

4 8 . 4 0 0 1 8 . 4 0 1 DK 0 9 . 4 0 1
Speed Ramp

105.53

4 2 . 5 105.24 0 1
105.32

105.04

BP
R

g 1.4 s 10 h 8

45 4. 10

m r Ta

IC CL104.99

105.01

G P

DK

vegetation not shown.

56 4. 10

ac

54 4. 10

13 8. 10

LP

IC CL105.01 g 1.3 s 6

2 0 . 5 0 1

105.59 105.19 104.54

6 9 0. 15

104.61 GP 104.71 GP
1 0 4 . 7 2

am

41 5. 10 p

t al ph s A 54 4. 10 e at G

47 4. 10

105.55 105.73 105.29 105.17

5 0 . 5 0 1

FH IC

12 8. 10 H / O

06 5. 10

9 9 . 4 0 1

6 9 . 4 C 0 I 1 L C
t l a h p s A

h 6

2 0 . 5 0 1

44 4. 10

04 5. 10

105.00 Piles of Slabs 105.09

104.65 104.43 104.36 104.35

.8 .1 45 45 0 1 0 1
t al ph s A
G P

CL104.44 CPS

94 5. 10

41 4. 10

h nc Be

13 8. 10

9 9 . 4 0 1
IC CL104.93

105.12

104.59 IC CL104.45 DK IC CL104.46

6 9 . 4 0 1

LP

7 9 . 4 0 1
g 0.3

BP

IC CL104.91 RG 104.85

IC

105.00

CL105.00

3 8 . 4 0 1
5 9 . 4 0 1 1 8 . 4 0 1

h 3

Be c n h
Bin
7 5 . 4 0 1

9 . 4 0 1

3 9 . 4 0 1

s 4

B (Typ)

s 8 h 8

Stn 7S
7 104.979 9 . 2 t l 4 8 . a 0 4 h 1 0 p 1 s A 7 9 . e t 4 a 0 G 1

4 9 . 4 0 1

DK

6 9 . 4 0 1 6 8 . 4 0 1

4 8 . 4 0 1

9 9 . 4 0 1

3 9 . 4 0 1

IC CL105.01 RG 104.93

P M T I H

N I

G
4 8 . 4 0 1

104.74 Monitoring Well

9 5 . 4 0 1

105.03 104.81 BTIC

104.52

Speed Ramp

RG 104.38

W B . 8 2 h
9 0 . 5 0 1

104.73 105.06 Monitoring Well

104.40

IC CL104.49

RG

O L L

8 9 . 4 C 0 I 1 L C

BP B (Typ)

2 0 . 5 0 1

IC CL104.72 IC CL104.80

0 104.57 6 . 4 0 1
105.01 Rough Ground 105.12 104.45

g 0.9 s 4

4 9 . 4 0 1

h 4 RS

8 9 . 4 0 1

5 1 . 5 0 1

W c n o C

l l a

e t a G 6 1 . 5 0 1

105.08

4 8 . 7 0 1
5 1 . 5 C 0 I 1 L C

H
37 5. 10

s 2 tp e 4 . 5 cS 0 n 1 o IC C CL104.97

104.44

W c n o C

l l a
105.02 105.07 104.73

B (Typ)

g 1.7 s 10 IC h 10 CL105.07 RG 104.93

5 8 . 7 0 1

Tarmac

3 9 . 4 IC 0 1 CL104.99
1 0 . 5 0 1 105.29

t l a h p s A

5 1 . 5 0 1

P
7 3 . 5 0 1

2 0 . 5 0 1
37 5. 10

1 6 . 4 0 1

105.03

2.8m high solid blockwork wall with piers replaced with fence
105.09 104.89

Rough Ground 104.71

6 1 . 5 0 1

Conc

0 2 . 5 9 0 1 1 . 5
0 1

IC CL105.26

l i a R

W B . 8 2 h

IC
8 1 . 5 0 1 3 0 . 5 0 1

BP

5 1 . 5 0 1

CCTV

CL105.24

4 3 . 5 0 1

l i a R

5 3 . P 5 0 1

2 0 . 5 0 1

RG 104.62

IC

P&DTM 105.19 105.32

W c n o C 2 1 . 5 0 1

l l a

5 3 . 5 0 1
IC CL105.23 105.26

CL104.94

4 6 . 4 0 1

2 8 . 7 0 1

105.05 105.03

104.92 105.10 105.14 104.93

1 0 46 .4

c a m r a T

RG 104.83 g 1.7

5 9 . 4 0 1

O I

r a 2.8m high solid precast T concrete panel wall


104.50

c a

104.88

104.64

ng di r 5 oa 2. h

49 4. 10

90 4. 10

Speed Ramp

n h Be c

0 .0 1 47

44 4. 10

02 5. 10

Speed Ramp 104.34 104.54

104.47

RW

84 7. 10
TP

50 4. 10

104.62

43 4. 10 49 4. 10 58 4. 10

RG 104.35 RS

t al ph s A

m r Ta ac

48 4. 10

D
t al ph s A

IS

07 5. 10
el ev fL oo 47 R 2. 11
09 5. 10

48 4. 10

96 5. 10

93 4. 10

T IL

16 5. 10

44 4. 10 55 4. 10

L E

C r

H ng di r 5 oa 2. h

21 5. 10

R O A D

32 5. 10

96 4. 10

92 4. 10

5 l 2. al h W c ng on di r C oa H 9 2 . 5 0 1
104.95
94 4. 10

RG 104.78

4 2 . 5 0 1

9 2 . 5 0 1
1 0 . 5 0 1

s p 3 4 t . Se 5 0 n 1 oc C

IC CL104.78

l l a W c 8 n . o C h2

10m

10m

105.37

76 4. 10

92 4. 10

Rough Ground

IC CL105.06 IC CL105.06

Roof Level 109.60

105.10

105.06 104.93 104.97

Scale 1:200 at A1 1:400 if reproduced at A3


105.16

h nt i 84 l P 4. c 10 00 on 5. C 10

08 5. 10

Ash g 0.3 s 4 h 8 Triple Trunk

105.05

104.91

6 9 . 4 0 1 7 8 . 4 0 1

6 6 . 4 0 1

F S

73 4. 10

07 5. 10

h 0 3.

CLF h 0.4

Maple g 2.0 s 6 h 12 Triple Trunk 104.92 Monitoring Well

6 8 . 4 0 1

.5 52 0 1

105.10 RG 104.63

Tarmac 104.97 105.17 104.95 104.98

W c n o C

l l a

FOR APPROVAL

90 4. 10

105.11

94 4. 10 80 4. 10

92 4. 10

IC RG CL104.79

7 6 . 4 0 1

51 5. 10
105.11

104.74

14 6 0. 9
104.93

3 9 . 4 0 1

3 7 . 4 0 1

RG 104.67

Rough Ground

0 8 . 4 0 1 2 9 . 4 0 1

h t n i l P c n o C 105.05

1 6 . 4 0 1

4 8 . 7 0 1

l l a W c n . 8 o C h2

105.13

Demolition of this section of boundary wall to be conducted from the pumping station side of the compound boundary

105.04

84 4. 7 10 9 4. 10

0 76 3. 4. h F 10 S

4 2 . 5 0 1

Location
105.14
1 0 49 .3

97 4. 10 77 4. 10
105.09

104.95

Hammersmith Pumping Station London Borough of Hammersmith & Fulham


Rough Ground

94 4. 10
g 1.6 s 10 h 10 Mb

105.14 105.14

96 4. 10

75 4. 10

104.93

105.09 Rough Ground 105.14

4 1 . 5 0 1
2 9 . 4 0 1

Document Information
104.98

3 1 0 . 1 5

93 4. 10

Section 48 publicity Demolition and site clearance

94 4. 10

00 5. 10

04 5. 10

Trees to be removed by others as part of mixed-use development


74 4. 10

105.14

85 4. 10

5 1 . 5 0 1

104.99

0 0 . 5 0 1

Book of plans - section 4


S48-PP-03X-HAMPS-000017

105.14
2 1 . 5 0 1

July 2012
105.01

83 4. 10
81 4. 10
12 5. 10

22 5. 10

105.11

09 5. 10

7 9 . 4 0 1

75 4. 10

7 1 . 5 0 1

105.02

5 9 . 4 0 1

21 5. 10

75 4. 10

1 1 . 5 0 1
c Thames Water Utilities Ltd 2008

Table 1
Above ground permanent structure Maximum height above finished ground level (Minimum heights are in brackets where applicable) 4.5m

Ventilation structure(s)

S R O L L E C N A H C
4 4
Zone within which ventilation column(s) and ventilation structures(s) serving the inlet of the pumping station may be located

D A O R

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Ventilation column(s) serving the interception chamber

9m (8.5m)

Ventilation column(s) and ventilation structures(s) 9m (4m) serving the inlet of the pumping station Replacement screen house 9.5m

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located (those listed in Table 1)

a 8 4
8 4

Notes:

s t os P

0 6

1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.

m u P

g n i p

n o i t a t S
Zone within which Work No. 3c would be located

s t os P

R E LL TI S I

Zone within which ventilation structure(s) may be located Zone within which ventilation column(s) serving the interception chamber may be located

Y R O D A
10m 0 10m

Zone within which Work No. 3a would be located

Scale 1:200 at A1 1:400 if reproduced at A3

FOR APPROVAL

Location

Hammersmith Pumping Station London Borough of Hammersmith & Fulham


Document Information

Section 48 publicity Site works parameter plan Book of plans - section 4


S48-PP-03X-HAMPS-000018 July 2012

c Thames Water Utilities Ltd 2008

T S

S R O L L E C N A H C
4 4

T S

m 1 . 5
a 8 4
8 4 8 4

0 6
2 6 2 6

4 6

m u P

g n i p

n o i t a t S

4 6

LB

LB

5.1m

5.1m

Zone within which Work No. 3c would be located

T S

S R O L L E C N A H C
4 4

T S

m 1 . 5
a 8 4 a 8 4

8 4

0 6

2 6
4 6

m u P

g n i p

n o i t a t S

2 6
4 6

LB

LB

5.1m

Zone within which ventilation column(s) serving the interception chamber may be located

5.1m

Zone within which ventilation structure(s) may be located

3 1

9 1

3 1

M A J

6 3

D A O R

M A J

0 6

2 1

2 1

S E

S E

2 1 a

2 1 a

T E E R T S

0 3

T E E R T S

4 4

8 4

m u P

g n i p

n o i t a t S

1 2

3 1

9 1

1 2

3 1

M A J

6 3

D A O R

M A J

0 6

2 1

2 1

S E

S E

2 1 a

2 1 a

T E E R T S

0 3

T E E R T S

4 4

a 8 4

m u P

g n i p

n o i t a t S

Zone within which Work No. 3a would be located

1 2

1 2

N
0 3
6 3

S R O L L E C N A H C

D A O R

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

9 1

9 1
s t os P s t os P

m 1 . 5

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

s t os P

s t os P

Key:
Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located

D R E LL TI S I Y R O D A

s t os P

R E LL TI S I Y R O D A

Zone within which the shaft would be located Zone within which permanent above ground structures would be located (those listed in Table 1)

Notes:
1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.

0 3

6 3

S R O L L E C N A H C

D A O R

m 1 . 5

s t os P

s t os P

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

FOR INFORMATION

D R E LL TI S I Y R O D A

s t os P

R E LL TI S I Y R
Zone within which ventilation column(s) and ventilation structures(s) serving the inlet of the pumping station may be located

Location

O D A

Hammersmith Pumping Station London Borough of Hammersmith & Fulham


Document Information

Section 48 publicity Site works parameter key plan Book of plans - section 4
S48-PP-03X-HAMPS-000019 July 2012

c Thames Water Utilities Ltd 2008

Zone within which ventilation column(s) and ventilation structure(s) serving the inlet of the pumping station may be located

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

New boundary wall

This drawing

Existing pumping station inlet channel

Kerb temporary realignment reinstated Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Structural and hydraulic alterations to existing pumping station inlet sump

Key:
Limits of land to be acquired or used (LLAU) Existing sewers The existing screen house will be demolished and replaced by a similar functionary structure with a height and a footprint size not exceeding that of the existing screen house Proposed access cover Hammersmith Storm Relief Sewers 104.50 Proposed level (shown in metres above tunnel datum) Zone within which all permanent site structures would be located Zone within which the shaft would be located Access for Thames Water maintenance vehicles Mechanical piping and electrical equipment to be installed in existing pumping station Existing roof level +112.47m Secondary dry weather flow pumping station Zone within which permanent above ground structures would be located Proposed St. George development (Refer to drawing MP-001 rev B, dated 25.07.2011)

Notes:
Existing manhole Screen house existing roof level +114.52m (estimated)
105.00

Existing 15" dia rising main

1.5m high penstock control panel Footprints of proposed mixed-use development as approved with outline consent on 23/12/2011 Zone within which Work No. 3c would be located

1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan.

d a o R s r o l l e c n a h C
Ventilation structure 2m wide (height and length to match the existing adjacent chamber superstructure)

6 No. 0.3m internal dia ventilation columns, 8.5m minimum to 9m maximum height Zone within which control panel and ventilation column(s) serving the interception chamber may be located Zone within which ventilation structure may be located

Interception chamber

D y er l l i t s i R d oa

Ventilation duct 10m 0 10m

0.6m x 0.6m ventilation column, flush with ventilation structure roof

e c n e f y r a d n u o b d e t a t s n i e R Passive filter chamber

Connection culvert

Scale 1:200 at A1 1:400 if reproduced at A3

ILLUSTRATIVE
Access for Thames Water maintenance vehicles

Location

Existing roof level +109.60m


105.13

Hammersmith Pumping Station London Borough of Hammersmith & Fulham


Document Information

Zone within which Work No. 3a would be located 0.3m dia rising main Area of permanent hardstanding for maintenance access. To be kept clear of permanent above ground structures (subject to a legal agreement with the developer)

Section 48 publicity Permanent works layout Book of plans - section 4


S48-PP-03X-HAMPS-000020 July 2012

Work No. 3a. CSO drop shaft (11m internal dia)

Work No. 3b. 5m internal dia de-aeration chamber


c Thames Water Utilities Ltd 2008

Thames Water Depot

Tree to be removed by others as part of mixed-use development

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

c i l ub P
d a o R s r o l l e c n a h C

h t pa t oo f

Frank Banfield Park

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

+ 104.99m

New boundary wall to match existing concrete wall

Key:
Limits of land to be acquired or used (LLAU) Zone within which permanent above ground structures would be located Footprint of proposed mixed-use development as approved with outline consent on 23.12.2011 + 105.40m Existing levels (shown in metres above tunnel datum) Consented development footprint (by others) Existing trees within surveyed area
d oa

D y er l l i t s i

Screen house

Notes :
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on

North elev.

+ 105.19m

Penstock control panel + 104.90m New boundary wall/ fence


n o i t a t S g n i p m u P h t i m s r e m 6 No.ventilation columns of 8.5m m a H minimum to 9m maximum height

the drawings are due to differences between the Ordnance Survey base and the topographic survey base, both of which have been used in the preparation of this drawing.

+ 105.00m

Existing rails

g n i c n e f n i a t n o South c y a elev. M . d e c a l p e r l l a w g n i t s i x E

Location of mixed-use development "Boulevard"

+ 105.26m

Pallisade fencing

New brown roof to existing Venturi building and ventilation kiosk

10m

10m

Access to ventilation structure Trees to be removed by others as part of mixed-use development

Final landscape above shaft and around covers to be completed by others as part of the mixed-use development

Scale 1:200 at A1 1:400 if reproduced at A3

ILLUSTRATIVE
Save for the scale of ventilation structures which is indicative

2m wide combined ventilation structure ventilation column with brown roof. Minimum height to align with existing venturi buidling approximately 4.3m high to 6m maximum height

Location

Hammersmith Pumping Station London Borough of Hammersmith & Fulham


Document Information

Section 48 publicity
AA

Proposed landscape plan Book of plans - section 4


S48-PP-03X-HAMPS-000021 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Dashed line shows mixed-use development Shaft lid incorporated into mixed-use landscaping scheme

Existing Hammersmith Pumping Station Building

Notes :
1. All dimensions and levels are approximate. 2. The purpose of this section is to illustrate the scale of the below ground infrastructure to be provided.

Pallisade boundary fence beyond New concrete wall to match existing

Chancellors Road

CSO drop shaft

Interception Chamber Existing pumping station inlet

10m

10m

Scale 1:200 at A1 1:200 if reproduced at A3

ILLUSTRATIVE

MP

Connection tunnel to main tunnel

MP

Location

Hammersmith Pumping Station London Borough of Hammersmith & Fulham


Document Information

Section 48 publicity Section AA Book of plans - section 4


S48-PP-03X-HAMPS-000022

Section AA

July 2012

M n a e h g Hi W r e t a

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan: Existing hoarding Existing Venturi structure Wall to be demolished by others as part of mixed-use development

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Notes :
1. All dimensions and levels are approximate.

Distillery Road

Existing hoarding

Screen house

Maintenance access

Hammersmith Pumping Station

Maintenance access

Hammersmith Pumping Station

Existing hoarding

As Existing North elevation

Outline mixed-use development shown indicatively only

Existing Venturi structure New concrete wall to match existing Tree to be removed by others as part of mixed-use development

Trees to be removed by others as part of mixed-use development

2m wide combined ventilation structure ventilation column with brown roof. Minimum height to align with existing venturi buidling approximately 4.3m high to 6m maximum height

10m New concrete wall Ventilation column

10m

Scale 1:200 at A1 1:400 if reproduced at A3

ILLUSTRATIVE
Proposed North elevation
MP

h t r o N

n o i t a v e l E

Location

Hammersmith Pumping Station London Borough of Hammersmith & Fulham


Document Information

Section 48 publicity As existing and proposed North elevation Book of plans - section 4
S48-PP-03X-HAMPS-000023 July 2012

M n a e h g Hi W r e t a

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing Concrete wall to be removed as part of mixed-use development Existing concrete wall Existing Hammersmith Pumping Station Building

Palisade fencing Existing Venturi building Main access gate Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Notes :
1. All dimensions and levels are approximate.

As existing South elevation

Venturi building

Hammersmith Pumping Station

Screen house

Distillery Road

Tree to be removed by others as part of mixed-use development Outline of mixed-use development shown indicatively Existing Venturi building proposed with new brown roof 2m wide combined ventilation structure ventilation column with brown roof. Minimum height to align with existing venturi buidling approximately 4.3m high to 6m maximum height Outline of mixed-use development shown indicatively Existing Hammersmith Pumping Station Building New concrete wall to match existing

Trees to be removed by others as part of mixed-use development

10m

10m

Ventilation structure

New boundary extension


S R O L EL C N A H C

Scale 1:200 at A1 1:400 if reproduced at A3


T E E R T S

Proposed South elevation


R E V I R

N
E C A R R E T

T S

M A J

S E

T E E R T S
D A O R

S R O L L E C N A H C

ILLUSTRATIVE

C R P S I R O D A

Location
LB

n o i t a v e l E h t u o S

D ER LL I ST I Y

Hammersmith Pumping Station


O
W

R AD

London Borough of Hammersmith & Fulham


Document Information
Y L L ER STI DI
RO AD

Section 48 publicity As existing and proposed

D A O R W O L S N I

South elevation Book of plans - section 4


T E E R T S

LB

E N I L A H C O L

S48-PP-03X-HAMPS-000024 July 2012

M AN BR E R O AD

Y RE RF A P

T E RE T S

M n a e h g Hi W r e t a

c Thames Water Utilities Ltd 2008

63

o t

70

76

71

0 1 o t 1

o t

N d n u o r g y a l P
4 8 o t 7 7

s t s o P
1

0 1 o t 1 L

1 1

0 8

T S
PH

Existing site access for Thames Water operational activities to be maintained during construction
9 1
1

a 8 4

Security office
105.01 105.06

2 9

2 6
4 6
P M T I H U M P S N I G T A T O I

4 10

8 10

LB

0 11

0 7

d a o R s r o l l e c n a h C

2 11

f e D
49 4. 10
96 4. 10

4 6 . 4 0 1

0 1 . 5 0 1

1 4 . 5 0 1

El
9 1

Sub Sta

1 0 52 .5

D A O R
7 4

W O L S N I

6 2

8 3

E N I L A O L

T E E R T S

9 1

7 2

3 3

9 5

3 1

M A J

0 6
8

2 1

S E

6 3

S R O L L E C N A H C
4 4
105.01

D A O R

Welfare building

Y R E L IL T S I D

2 8

Dismantle and re-erect pump station access steps in reverse direction

2 1 a

T E E R T S

Short term lane closure in Chancellors Road to connect utilities

8 4

0 8 . 4 0 1

Storage (open area or containerised) Excavated material storage and handling area

Workshop buildings
07 . 105

7 1

a 1 1
9 1

0 3

3 1

Depot

0 1 o t 1

2 1

1 2

1 1

3 1

S R O L L E C N A H C

0 1 o t 1

8 1

d a o R s r o l l e c n a h C

W
17

y d B d r a

PH

R C

R C

Kerb realignment

E N A L

Offices
0 1 7

Playground

Construction access, right turn in, left turn out

Storage (open area or containerised)

Site power structure

Concrete batching plant and aggregate storage area


94 4. 10

Crane

Shaft Crane

W O L S N I D W A O R

s k r o

4 1

T E E R T S

0 1 o t 1

2 9

0 1

0 1 o t 1

8 6

1 1

5 8

o t

0 2

a l el ab s I
C R P S I R
23 24

0 1 o t 1
0 1 o t 1

TCB

1 o t 20

N
7 8

8
9 8

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

H
O
4

e s ou
23
21

Keyplan:
A H M ED Y L O D R A

This drawing

1 9

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
9 9

Key:
Limits of land to be acquired or used (LLAU) Hoarding

0 1 1

Maximum extent of working area

D A
25

Site access

Access / haul route

Existing sewers

0 1 9
1 1 1

Notes :
1. These construction phasing plans have been prepared to illustrate possible site layouts for the principle construction phases. Contractors may choose to lay sites out differently during construction depending on their preferred construction methods subject to any controls on layout imposed through the planning submission and approval process. 2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where

27

appropriate, outline traffic management arrangements are shown. 3. Utility supplies for the construction of the works would be agreed with the relevant utility company. 4. Additional noise mitigation including noise barriers may be required but is not shown on this drawing.

y er lD l iA t sO i R D Y R E LL TI S I

84 4. 10 90 4. 10
84 4. 10

d oa
R I FA Y LA P

76 4. 10

TR S T E E

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

Y ROAD L R L E STI DI

.4 51 0 1

Works

ILLUSTRATIVE

0 .8 1 51

Location

Hammersmith Pumping Station


8

London Borough of Hammersmith & Fulham


Document Information

Section 48 publicity Construction phases - phase 1 Site setup, shaft construction & tunnelling Book of plans - section 4
S48-PP-03X-HAMPS-000025 July 2012

48 5. 10

49 5. 10

c Thames Water Utilities Ltd 2008

63

o t

70

76

71

0 1 o t 1

o t

N d n u o r g y a l P
4 8 o t 7 7

s t s o P
1

0 1 o t 1 L

1 1

0 8

T S
PH

Existing site access for Thames Water operational activities to be maintained during construction

a 8 4

Security office
105.01 105.06

2 9

Connection of a new riser pipe to an existing manhole but no road closure.

2 6
4 6
P M T I H U M P S N I G T A T O I

4 10

8 10

LB

0 11

0 7

d a o R s r o l l e c n a h C

2 11

f e D
49 4. 10
96 4. 10

4 6 . 4 0 1

0 1 . 5 0 1

1 4 . 5 0 1

El
9 1

Sub Sta

1 0 52 .5

D A O R
7 4

W O L S N I

6 2

8 3

E N I L A O L

T E E R T S

9 1

7 2

3 3

9 5

3 1

M A J

0 6
8

2 1

S E

6 3

S R O L L E C N A H C
4 4
105.01

D A O R

Welfare building

Y R E L IL T S I D

2 8

2 1 a

T E E R T S

8 4

0 8 . 4 0 1

Storage (open area or containerised) Workshop buildings Shaft

Piling for open cut excavation


07 . 105

7 1

a 1 1
9 1

0 3

3 1

Depot

0 1 o t 1

2 1

1 2

1 1

9 1

3 1

S R O L L E C N A H C

0 1 o t 1

8 1

d a o R s r o l l e c n a h C

W
17

y d B d r a

PH

R C

R C

E N A L

Offices
0 1 7

Playground

Construction access, right turn in, left turn out

Storage (open area or containerised)

Site power structure

Excavated material storage and handling area


94 4. 10

Crane

W O L S N I D W A O R

s k r o

4 1

T E E R T S

0 1 o t 1

2 9

0 1

0 1 o t 1

8 6

1 1

5 8

o t

a l el ab s I
C R P S I R
1 23 24

0 1 o t 1
0 1 o t 1

TCB

0 2

1 o t 20

N
7 8

8
9 8

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

H
O
4

e s ou
23
21

Keyplan:
A H M ED Y L O D R A

This drawing

1 9

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
9 9

Key:
Limits of land to be acquired or used (LLAU) Hoarding

0 1 1

Maximum extent of working area

D A
25
.4 51 0 1

Site access

Access / haul route

Existing sewers

0 1 9
1 1 1

Sheet piles to be installed

Secant piles installed

Notes :
1. These construction phasing plans have been prepared to illustrate possible site layouts for the principle construction phases. Contractors may choose to lay sites out differently during construction depending on their preferred construction methods subject to any controls on layout imposed through the planning

submission and approval process. 2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown. 3. Utility supplies for the construction of the works would be agreed with the relevant utility company. 4. Additional noise mitigation including noise barriers may be required but is not shown on this drawing.
R I FA Y LA P

R y er l D l i t A s i O D R Y R E LL TI S I

84 4. 10 90 4. 10
84 4. 10

d oa

76 4. 10

TR S T E E

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

Y ROAD L R L E STI DI

Works

ILLUSTRATIVE

0 .8 1 51

Location

Hammersmith Pumping Station


8

London Borough of Hammersmith & Fulham


Document Information

Section 48 publicity Construction phases - phase 2 Construction of other structures Book of plans - section 4
S48-PP-03X-HAMPS-000026 July 2012

48 5. 10

49 5. 10

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

DSW W AN

South Park

Keyplan: This drawing

O RTH

DG BRI AD E RO

London Borough of Hammersmith & Fulham

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

h g u o r o b r e t e P

Key:
Local authority boundary

R d a o
W O T N M D A E D A O R

Order limits

Tunnel

Shaft

Piper Building Hurlingham Club

Main tunnel PC World

Carnwath Road

Riverside

d a h o a R wt an Cr

W w ds an h t or e dg i Br

Mean low water

Mean low water Main tunnel

London Borough of Wandsworth

Frogmore connection tunnel 100m 0 100m

Scale 1:2500 at A1 1:5000 if reproduced at A3


Wandsworth Town

FOR INFORMATION

Location

Carnwath Road Riverside London Borough of Hammersmith & Fulham


Dormay Street Document Information

Section 48 publicity Location plan Book of plans - section 7


S48-PP-06X-CARRR-000066 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

gh ou r bo er et P R d oa

This drawing Philpot Square

d a o R h t a w n r a C

Retail unit

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU)
D A O R

Thames Path Industrial building Existing levels (shown in metres above tunnel datum)

The Piper Building residential and car parking Murals


d a o R h t a w n r a C
W N R A C

H T A

+ 105.40m

Notes :
Retail unit Carnwath Road industrial estate 1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and the topographic El Sub Sta survey base, both of which have been used in the preparation of this drawing. Residential

Commercial

Piper Centre

d a h o a R wt an Cr

+ 105.44m Industrial building

+ 105.45m

Industrial building

+ 105.43m

El Sub Sta

West Elev.

Whiffin Wharf

Hurlingham Wharf (Safeguarded wharf)

+ 105.44m Residential

+ 105.35m + 105.11m

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3


M a l e no w w a r t e

South Elev.

FOR INFORMATION

Location

Carnwath Road Riverside London Borough of Wandsworth


Document Information

Section 48 publicity As existing site features plan Book of plans - section 7


nl hne h s ca u oi d A t re

S48-PP-06X-CARRR-000067

River Thames

July 2012

c Thames Water Utilities Ltd 2008

2 o3 8t 1 3

Lodge

8 3
7 4

0 8

0 5
LB
4 8

1 5

1 to 19

LB

Ismailia
1 to 46
8 3 3

2 6

3 4

O R
N A V I L U S

Playground

9 3

51

Tennis Courts

45

6 34

Croquet Lawn

3 1
9 4
0 4

7 2

El Sub Sta
38

39

8 3
1 5

P
5 2 6 8

Bowling Green

1 3

G N I L R U H
5 2

M A H

8 8

27

Q S G N I L R U H M A H

7 3

O R

N A V I L U S
Tennis Courts

9 1

13

0 9

6 1

3 3 1

0 2 9 1

6 1

Philpot Square
1b
6 2

1a

25 o t 61 o 16 t 42

Park
0 5

The Piper Building


Block 1

Works

W N R A C

H T A

D A O R

Works Warehouse

Warehouse
s B C T

El

Timber Yard

16 1

9 t14 2o 0

C R WA H R A N T O D A

Ac
81
13 4

1t 2 o 2

Lonsdale House

Hurlingham
El Sub Sta

Thames Path
87 17 3 11 5 21 0

Wharf

S M

M S

Whiffin Wharf
8 t11 9o 0

Play MP Area

Broomhouse
Un d
Hard Jetty

P t fa e o n Wh r ri af

y B d L B s& nt y l o s C G A , t L os Cn oo Br CW C L

B rC oo o nt L s G A , s Cn l os y t L B & B d y

Authorised channel

e n ry Go

Sluice
1 4

e g nl h Si
rs ld oa Bl
6 4 o t3 3 26

Mud Travelling Crane Shingle Bol

Bollard Bollard

e t Wa r h en i M a Hg

FB

Feathers Wharf

9 o7 1t

0 6 o t4 4 37

r e t Wa h i Hg en M a

5 3 o t2 2 14

k l Wa s kl io Nc

3 2 o1 0t 8

7 2

Ap

r e t h a i W Hg en M a

Shingle

s a e hm eT ir Rv

1 2

1 3

0 5

Ac

7 t8 4o 2

Sta

Piper Centre

86

84

Sub

7 1

1 4 o t 9 6 6 2 o t 2 6

Works

9 1

1 1

H r g a B s es ul h m u i s i n n
2 1

8 1

9 4

2 1

D A

Tennis Courts

Q S

E R A U

Sub Sta

8 35

El

El Sub Sta

E R A U

PH
1

Swedish Wharf

Depot

Ac
5 1 o t 1
Block 2

n h o J

e s u o o t H t 1 h g i w D
8

Auction Mart

Albert Wharf
Tanks

3 k c o l B

Access along the Thames Path route would be available at all times

El Sub Sta

Thames Path

w o nL a Me

e tr Wa

s e m a h T r e v i R

& t s n o C y l s A L G , t s n o C o r o B W L C C

n a e

w o L

r e t a

El Sub Sta

5 1

5 3

Pavilions

D A

3 2

Secondary School

N O G U H

1 5

Hurlingham & Chelsea

D A O R

9 4

46

1 29

2 5

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

4 3
Bs TC

3 3

4 2

a 4 2
2 2

House

Down House
0 2

Keyplan:
D A O R
Warehouses

8 1

6 1

o t

0 2

m k c a p S

n a

e s u o H

W O T

M N

D A E

This drawing
Fulham Wharf

50

7 4

4 1

D AN

2 1

R EE BR ET RE ST
2

SW O H RT DG I BR E RO
1 to 26
6

Warehouses

Dwyer House

1
5 10

AD

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

m ho T

26

s as

D ay

M DY

on nd Lo ol ho c S

7 10

h at nw r Ca

O CK

o t

9 10 1 11

ET RE ST

R TE E P O B R O U G H R O

27

e us Ho

Key:
Comleys Wharf

3 11 5 11
7 11 o t

14

Limits of land to be acquired or used (LLAU)


Works

3 12

D A

7 1

5 12
o t

Existing public right of way Route of temporary diversion of right of way Existing right of way temporarily stopped up
2

n a v i l u S

7 1

1 13

1 2

e s i r p r e t n E C e r t n e

7 2 2 8 3 2

FB Tanks FB Bollard

Ap Ac
Bollard

Access to permanent works Access to construction works

W H M

13 0

17 0

19o 3 0 t15

10

13o 7 5 t19

15 4

11 8

15

Notes:
Mud

1. This plan does not show stopping up and diversions of limited duration (eg hoarding erection, minor utility diversions and minor highway works). 2. Only rights of way in or close to worksites are shown. The full extents of rights of way are not shown where they cease to be relevant to the project.
W w ds an h t or
Battersea Reach

15 8

27 0

e dg i Br
W L C C

17o 9 8 t19

B L

y d B

d ar R y Bd

W a d Bd r y
Hopper Tank
s k n a T

d Un

10m

100m

Scale 1:1000 at A1 1:2000 if reproduced at A3

Pier Wharf

m ha f r Du har W

FOR APPROVAL

Hopper

Location
R E CE I P A R R E T

Carnwath Road Riverside London Borough of Hammersmith & Fulham


Document Information

PH

EW J

W E J

W O R

Un d

S
R

O
W

Posts

Section 48 publicity Access plan Book of plans - section 7

nH p i lh Do u e o s

H s a s mp Co

s u e Ho tr ae e u w Bl

Bus Depot

S48-AC-06X-CARRR-000006 July 2012

u e o s

s u e Ho h r c o An

y d r Bd Wa s & n t r Co Bo o

h t Pa d ie es tr Wa

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Pair of 0.75m high brickwork planter retaining walls

0.75m high brickwork retaining wall

Keyplan: This drawing

London Borough of
gh ou r bo er et P R d oa

Hammersmith & Fulham

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn. 2.4m high brickwork wall

W w ds an

d a o R h t a w n r a C

Key:
Piper Building Limits of land to be acquired or used (LLAU) Trees to be removed
d oa

h t or ge i rd B R

Trees to be pruned

2.1m high x 4.5m long freestanding brickwork wall

d a o R h t a w n r a C
Existing iron railings Portal 2-storey commercial buildings with masonry and profiled sheet cladding

Above ground structures to be removed Structure to be removed and relocated or reinstated

Notes:
1. Minor items to be removed (e.g. barriers, bollards etc.) are not shown.

Insert Area:Carnwath Road/Wandsworth Bridge Road junction works area at CR/WB1


d h o tR a an a C rw

Pruned on site side only

2. General activities of site clearance such as removal of hardstanding and foundations,

2 . 2 B h C F 4 0. 15 5
GP Gates IC CL105.43

4 0. 15 4

4 0. 15 6

stripping of topsoil and clearance of minor


105.52

4 0. 15 5
2 . 2 B h C F 4 0. 15 6 4 4 5 3 6 a p0 . 0. 15 R m 1 6 0. 15 5 2 6 0. 15

GP IC CL105.43

IC CL105.39 RG 105.33

d h o tR a an a C rw
4 6 0. 15 3 6 0. 15 4 6 0. 15
l l Wa oc Cn
IC

vegetation not shown.

CBF

2 . h2

4 6 0. 15 l l Wa oc Cn
) k d ce bo (l

IC CL105.62 IC CL105.66

IC CL105.68 (filled in)

4 4 0. 6 0. 15 5 15

0 4 0 . 1 5

105.44 IC CL105.39 105.37 IC CL105.38

3 6 0. 15

1 W 6B 0. 15 5 4 0. 15 GP
O / S H B

Gate
7 4 0 . 1 5 . 25 RF h I

2 8 0. 17

8 5 0. 15

3 4 0. 18

2 6 0. 15

e t e oc C nr rk n Bo e

x) d4 o b ce (l k
RG 105.45

6 0. 15 1 4 0. 15 6

CL105.45 9 4 0. 15

IC CL105.42 IC CL105.45 IC

IC CL105.37 105.48

4 0. 15 6

1 . 2 B h C F 7 4 LP 0. 15

5 4 0. 15 GP

Gates

IC CL105.43

d h o tR a an a C rw
9 4 0. 15 2 4 0. 15
4 . 2 B C Fh 4 0. 15 3
3 0. 15 4 4 0. 15 6 4 0. 15 9 8 3 0. 15

4 . 2 B h C F
5 4 0. 15

5 4 0. 15

6 4 0. 15

IC CL105.46

x) d4 o b ce (l k ) d o b ce (l k 4 0. 15 6 5 0. 15 9 4 0. 15 1 6 0. 15 0

Cabin

6 0. 15 0 4 0. 15 3

RG 105.43 IC CL105.42 RG 105.34 105.44 IC CL105.45

g d i e h r g b i We e e rt oc Cn

CL105.37 IC IC CL105.39 105.45 RG 105.41 CL105.39

105.43

Fh CB

) d o b ce (l k

IC CL105.40 Concrete

105.46

RG 4 0. 15 5 105.41 IC IC CL105.44

IC CL105.45

l a wl n g in a i rt fe o o Tp l l a g n w a i tn e i or e f d i l Md
g dn ii ul eb s u o e rh Wa

. 22

7 4 0 . 1 5 4 . h2 CBF

Sub-station
2 4 0. 15 2 4 0. 16 9 5 0. 18 4 5 3 0. 4 1 4 0. 15

CL105.40

4 4 0. 15
Gates

3 0. 15 7

4 0. 15 8 5 4 0. . 15 0 2 B C Fh e oc e c n rt 4 0. rk n 15 6 Bo e 4 0. 15 1

RG RG 105.34 105.42 105.37 105.33

RG 105.47

4 0. 15 2

C Fh . B 2 4

3 0. 15 8

105.45 105.32 105.44

2 4 0. 15

15 3 0. 4
1 72 0 .7

GP 105.47

Gates 105.48

GP

1 5 0. 15

7 3 0. 15
105.44 105.46 Concrete 105.46

101.46 111.96 101.42 101.39

ek hc e tc ni os e r is eu rq oe cv l a ad ln l a w f no Outfall i co et s is h T 101.37 101.45

.1 55 0 1

n i le

BW

0 .4 1 54 0 .7 1 53

105.51

BW

Overgrown nettles

Concrete

I F h17 R .

6 4 0. 15

105.42

104.92 105.28 105.41


BW

105.27 105.48

1 72 0 .0

105.30
6 4 0. 15 4 2 0. 15

Concrete IC CL105.39 IC CL105.48 IC CL105.42 RG 105.33

105.30 1 71 0 .3 I F h17 R .

0 4 0. 15 7 3 0. 15

105.45 105.40 105.62

di t c h

105.21

Existing sections of concrete post & plank wall and brickwork wall
9 5 0. 15

Outfall l a w l vr re fi mo o ot Bt
5 4 0. 15

101.34

101.30 Outfall ek hc tc se ni e o r is 101.17 e r u l q wl fa 101.15 i o tn co 101.11 se h s Ti 101.06 Outfall 101.04 100.02

IC CL105.46

ex po s ed

25 Pe

4 4 0. 15

5 5 0. 15

0 6 0. 15

99.84

e e rt oc Cn

8 5 0. 15

r as s

i t h

t cee n r n Co o e Br k

105.45 Rough grass


3 4 0 . 1 5 6 3 0 . 1 5

105.43

BW

Rough Ground & Grass 104.88 105.29

9 4 0. 15 9 5 0. 15
IC CL105.43 RG 105.39
7 5 0. 15

5 4 0. 15

Outfall

.9 55 0 1

100.98

99.98

105.27

IC CL105.43

9 5 0. 15

GP
10 5. 48

105.42 Gates GP 1 5 0. 4 6
1 5 0 . 3 2

105.27

2 4 0. 15 3 3 0. 15
5 . 2 B C Fh

105.37

RG 105.35

5 4 0. 15 9 5 0. 15

105.61

Outfall Ladder

101.07 101.03

100.02

1 5 0 . 3 7

1 0 5 . 4 2

7 2 0. 15 5 1 0. 15

5 . 2 B h C F

10 5. 38

1 5 0 . 2 8

105.47
BW 1 7 0 0 .5

e s e a e rt B oc Cn 3 4 0. 15
7 5 0. 15

Gravel

10 5. 21

1 52 0 .0

1 51 0 .3

1 69 0 .6

BW

1 68 0 .8

BW

1 68 0 .4

BW

7 . RF h 1 I

BW

98.95 101.06 Outfall Pipe 100.96 100.97 Outfall Outfall


l a wl vr re fi mo t oo Bt

.9 86 0 1

0 .5 1 70

BW
7 3 0. 15

P RG 105.43 IC CL105.45
0 5 0. 15
7 4 0 . 1 5 4 2 0 . 1 5

3 4 0. 15 4 . 5 8 9 0 5 1 0. 15

99.95

4 2 0. 15

1 0 54 .6

105.57

105.58

7 4 0. 15

1 6 0. 15
8 5 0. 15

105.32

105.34 105.10 Concrete


2 5 0. 15 3 6 0. 15

RG 105.45

Cabin

DP 105.13

Cabin

9 3 0. 15

105.45 RG 105.46 105.06 105.14 104.97


1 6 0. 15

9 4 0. 15

105.60

Concrete

Existing concrete post & plank and wooden board site boundary fence
1 6 0. 15

100.97

99.99

O E H R R S O E SF A E H M RT IE RV
99.01

98.99

. 06 BW h

CBF 0 . h2
105.45 105.38 105.30 105.25 105.14 104.86 105.17 104.97

0 .0 1 54

.8 55 0 1

0 .2 1 84

99.00 98.52

0 .7 1 54 0 .3 1 84

9 4 0. 15

8 5 0. 15 5 5 0. 15 5 4 0. 15 2 4 0. 15
RF I
100.64 100.69 Outfall Ladder 100.94

100.91 99.97 98.53

0 6 0 . 1 5

3 4 0. 15

9 5 0. 15 1 4 0. 15

99.98 98.49 99.01

4 . h2

ee rt oc C n

105.44

2 6 0 . 1 5

0 .3 1 56

105.18

111.61 Gravel Concrete

7 5 0. 15 5 4 0. 15 2 4 0. 15 1 4 0. 15 3 4 0. 15
IC CL105.42

IC CL105.43

IC CL105.44

105.37

105.18

Broken Concrete

7 5 0. 15 3 4 0. 15
9 5 0. 15

4 4 0. 15

4 . 5 4 l 0 l1 Wa oc C n

.3 54 0 1 .0 56 0 6 1 8 . 5 0 1

Outfall
l l a g n w a i tn e i l or l a p f g 3o n w 4T a i tn 0. e i 15 or e f d i l Md 100.93

99.99 101.07

101.01 100.02 99.02

98.55

105.13 105.42 105.12

IC CL105.39

2 4 0. 15

105.41

Concrete

8 5 0. 15 4 4 0. 15
IC CL105.44 105.42 IC CL105.42

3 4 0. 4 15 . 0 6 15

3 4 0. 15 2 4 0. 15

ee rt oc C n

) .1 05 d1 n 6a 0 1. t0 1a 21 /0 /8 10 &3 3 (0 vl ee l d i te o Lw

.2 56 0 1

0 6 0 . 1 5

105.01 Skip Gravel

7 4 0 . 1 5 5 2 0 . 1 5
IC CL105.36

2 6 0 . 1 5

0 .3 1 56

1 6 0. 15

RG
1 6 0. 15 9 4 0. 15 6 4 0. 15

4 4 105.45 0. 15 4 4 0. 15

l l Wa oc Cn

6 8 0. 2 15 4 0. 15

100.55 Ladder 100.18

99.96

99.02 98.51

3 6 0 . 1 5

3 6 0 . 1 5

1 6 0 . 1 5

2 4 0. 15

Recycling Depot
105.40

l a wl v ir re n g in a i rt fe o o Tp

8 4 0. 15

3 4 0. 15

l l a ew vr fi or o tm ot B
100.01 99.82 99.98

99.04 99.98 99.83 98.49

4 6 0 . 1 5

2 6 0. 15 8 4 0. 15

IC CL105.45 IC CL105.43 105.43 IC CL105.43 100.04

RG 105.35 105.29 105.34


4 6 0. 15
3 6 0. 15 9 4 0. 15

105.46

4 4 0. 15
IC CL105.45 105.45 105.43

2 4 0. 15 6 4 0. 15

l l Wa oc Cn

4 4 0. 15 W B

99.93 99.92 99.03 98.46

105.03 105.27 104.96 105.11 105.03

7 4 0. 15 RG

e e rt oc Cn

1 4 0 . 1 5 8 1 0 . 1 5

Concrete

105.45 IC CL105.44 IC CL105.44


1 4 0. 15 4 6 0. 15 2 4 0. 15 2 4 0. 15 1 4 0. 15

.7 58 4 0 4 1 0. 15

e e rt oc Cn
Ladder 100.11

99.95

99.76

IC CL105.45 105.43 105.11

99.69

105.24

104.91

g i ln ln o i obi f d g f ud n o r n i sa r u d g cf o n ay f u B udros

l l Wa oc Cn
5 4 0. 15

6 8 0. 15 2 4 0. 15

100.10 Ladder 100.13 99.72

O E H R R S O E SF A E H M RT IE RV 99.02
99.04 98.99

99.02 98.54

98.91 99.02 98.54


1 5) 1. d 0 6 n 0 a . t0 a1 01 21 0/ 1 8 3/ 0 3 & 98.52 e( vl ee d l i o t Lw

105.11 104.84 Gravel

105.26 105.18 104.89 104.86

105.25

105.18 104.84

104.85

Gravel 104.91

104.90

3 5 5 0. 105.19 1
3 2 l 0. l 15 oc C n Wa

l l oc C n Wa

4 0. 15 2

l l v ir a re w a i tn g e in o or Tp f Outfall
e t e oc C nr

CBF h

0 .7 1 48 . 24

Ladder 100.02 99.98

m t oo Bt

l l a v w fi r o re

100.03 99.86 98.81 98.56 98.81 99.74 98.81 98.81 98.80 98.87
1 5) 1. d 0 6 n 0 a 1. t0 1 a 01 0 2 / / 1 8 3 &3 (0 vl eee d l o i L wt

Outfall 100.94 100.84

Outfall 100.85 100.94

104.92

104.86

104.90
15 7 0. 8

Conc Wall

104.90

104.91

104.93

l l104.93 oc C n Wa

8 0. 104.92 1 4 7

9 0. 14 2

9 0. 14 6

9 0. 14 3

l e v wl ir a a i r tn g e in o or Tp f
Ladder 100.13 100.19

98.51 98.52

Mean low water

100.19 98.47

Outfall
8 0. 15 4

Outfall 100.90 Pile 100.87 Pile 100.57

100.41

100.34

Outfalls

101.62

Outfall

B t m o re w l oo t fi r a v l

101.60

Outfalls

101.55

101.54

Outfalls

101.42Outfall

101.22 Pile 101.11

101.16

99.75

99.87 99.20 100.07 98.95 99.82

98.72 98.55

100.30 99.71 100.17 100.60 100.71 100.45 100.61 99.48 98.55 98.81 99.17 98.80 98.81

99.13 98.73 98.82

98.53

98.52

R S O E O E H R E H M SF IE RV RT A
99.53 99.63

99.56 99.14 98.82 98.64

99.72 99.60

99.60 99.51 99.14 98.59 98.64 99.17

w o L

98.60 ) .1 05 d1 n a .6 00 1 t 1a 1 2 98.57 /0 /8 10 &3 (0 l3 e v e el d i t

Along this section, all necessary measures shall be taken to maintain flood defence functions if any elements are to be demolished and replaced as a consequence of construction works such as wall strengthening

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

98.61

98.68 98.60 5 0 n 1. ) . ad 0 1 2 1 t0 6 0/ 1 a1 3 & 1 8 0 v (0 3 / d o i l l L wt e e e

98.62

98.65

FOR APPROVAL
s a e hm eT ir Rv

Location Authorised channel

Carnwath Road Riverside London Borough of Hammersmith & Fulham


Document Information

Section 48 publicity Demolition and site clearance Book of plans - section 7


S48-PP-06X-CARRR-000068 July 2012 Authorised channel

c Thames Water Utilities Ltd 2008

M DY

M A H I L R U H

E R A U M A H

C h at nw r

CK ET RE ST

R TE E P

Table 1
Above ground permanent structure
9 1

13

6 1

Building to house air management plant and equipment Ventilation column(s) serving 3 the shaft

5.5m

15.0m

New boundary wall

5.5m (2.5m)
n h o J
1
1a
7 2 2 8 3 2
6 2

e s u o H t h g i w D
1

o t

1b

The Piper Building

Insert Area:Carnwath Road/Wandsworth Bridge Road junction works area at CR/WB1

W N R A C

H T A

D A O R

Works

Zone within which a building to house air management plant and equipment would be located

El Sub
7 t8 4o 2

s B C T

Sta

Piper Centre
5

Hurlingham
8 1

El Sub Sta

Wharf

Whiffin Wharf
8 t11 9o 0

r e t h a i W Hg en M a

Shingle

Zone within which Work No. 6a would be located

Zone within which Work No. 6b would be located

Required landscaping area for Work No. 6b

Zone within which ventilation column(s) may be located

y B d L B s& nt y l o s C G A , t L os Cn oo Br

1 2

7 2

1 3

0 5

tr ae ww no a l Me
10m 0 40m

Limit of land to be acquired or used for Work No. 6a & 6b

7 1

1 4 o t 9 6 6 2 o t 2 6

9 1

2 1

G N I L R U H

e us Ho

h at nw r Ca

PH
1

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

O B R O U G H R

e 2 o us t Ho

14

Maximum height above finished ground level (Minimum heights are in brackets where applicable)

Keyplan: This drawing

O D A
2

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located (those listed in Table 1) Zone within which required landscaping would be located
El Sub Sta

1 1 2 1
3 k c o l B

Notes:
1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.

8 7 13 0

Scale 1:500 at A1 1:1000 if reproduced at A3

FOR APPROVAL

Location

Carnwath Road Riverside London Borough of Wandsworth


Document Information

Section 48 publicity Site works parameter plan Book of plans - section 7


S48-PP-06X-CARRR-000069 July 2012

c Thames Water Utilities Ltd 2008

25 o t 61 o 16 t 42

25 o t 61 o 16 t 42

3 k c o l B

The Piper Building


Block 1

The Piper Building


Block 1

W N R A C

H T A

D A O R

El Sub Sta

W N R A C

H T A

D A O R

Works Warehouse Warehouse

Works

El

s B C T

El

s B C T

El Sub Sta

Wharf

Whiffin Wharf
8 t11 9o 0

r e t h a i W Hg en M a
8 t11 9o 0

Play Area

Shingle

Play Area s e m a h T r e v i R

Zone within which Work No. 6b would be located

y B d L B s& nt y l o s C G A , t L os Cn oo Br CW C L

s a e hm eT ir Rv
25 o t 61 o 16 t 42

25 o t 61 o 16 t 42

3 k c o l B

The Piper Building


Block 1

The Piper Building


Block 1

W N R A C

H T A

D A O R

El Sub Sta

W N R A C

H T A

D A O R

Works Warehouse Warehouse

Works

El

s B C T

El

s B C T

El Sub Sta

Wharf

Whiffin Wharf
8 t11 9o 0

r e t h i Wa Hg en M a
8 t11 9o 0

Play Area

Shingle

Play Area s e m a h T r e v i R

y B d L B s& nt y l o s C G A , t L os Cn oo Br CW C L

s a e hm eT ir Rv

25 o t 61 o 16 t 42

3 k c o l B

The Piper Building


Block 1

W N R A C

H T A

D A O R

El Sub Sta

Works Warehouse

El

s B C T

Hurlingham
81

El Sub Sta

Wharf

Whiffin Wharf
8 t11 9o 0

r e t h i Wa Hg en M a

Play Area

Shingle

Zone within which ventilation column(s) serving the shaft may be located

y B d L B s& nt y l o s C G A , t L os Cn oo Br
CW C L

s a e hm eT ir Rv
c Thames Water Utilities Ltd 2008

1 2

7 2

1 3

0 5

7 t8 4o 2

Sta

Piper Centre

86

84

Sub

s e m a h T r e v i R

81

87

13 0

17 0

13 4

Hurlingham
81

Hurlingham
El Sub Sta

Wharf

Whiffin Wharf
19o 3 0 t15

r e t h i Wa Hg en M a

Shingle

Zone within which a building to house air management plant and equipment would be located

y B d L B s& nt y l o s C G A , t L os Cn oo Br CW C L

s a e hm eT ir Rv

1 2

7 2

1 3

17 3

1 2

7 1

1 4 o t 9 6 6 2 o t 2 6

9 1

7 2

1 3

0 5

0 5

7 t8 4o 2

Sta

Piper Centre

7 t8 4o 2

Sta

Piper Centre

86

84

Sub

86

84

Sub

7 1

1 4 o t 9 6 6 2 o t 2 6

9 1

1 1

2 1

81

87

13 0

17 0

13 4

Hurlingham
81

Hurlingham
El Sub Sta

Wharf

Whiffin Wharf
19o 3 0 t15

r e t h a i W Hg en M a

Shingle

Zone within which Work No. 6a would be located

y B d L B s& nt y l o s C G A , t L os Cn oo Br CW C L

s a e hm eT ir Rv

3 k c o l B

1 2

7 2

1 3

17 3

10

1 2

7 1

1 4 o t 9 6 6 2 o t 2 6

9 1

7 2

1 3

0 5

0 5

El Sub Sta

7 t8 4o 2

Sta

Piper Centre

7 t8 4o 2

Sta

Piper Centre

86

84

Sub

86

84

Sub

7 1

1 4 o t 9 6 6 2 o t 2 6

9 1

1 1 2 1
10
7 1

1 4 o t 9 6 6 2 o t 2 6

9 1

1 1

1 1

1 1 2 1 2 1 2 1
87 87 87 13 0 13 0 13 0 17 0 17 0 17 0 13 4 13 4 13 4
19o 3 0 t15 19o 3 0 t15 19o 3 0 t15

3 k c o l B

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

17 3

17 3

17 3

10

10

10

9 9 9

El Sub Sta
N

Keyplan: This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
s e m a h T r e v i R

Key:
Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located (those listed in Table 1) Zone within which required landscaping would be located

Notes:
1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.

s e m a h T r e v i R

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

FOR INFORMATION

Location

Carnwath Road Riverside London Borough of Wandsworth


Document Information

Section 48 publicity Site works parameter key plan Book of plans - section 7
S48-PP-06X-CARRR-000070 July 2012

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

r t ne e e i C Pp r

Keyplan: This drawing

d a h o a R wt an Cr

h t s a e P hm Ta
Building to house air management plant and equipment 20m x 8m x 5.5m maximum high with brown roof

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU) Proposed access cover Proposed level (shown in metres above tunnel datum) Zone within which the shaft would be located

Access for Thames Water maintenance vehicles

104.50

Fixed bollard

Fixed bollards

Zone within which the shaft would be located Noise control chamber(s) Works No. 1a. 7.2 internal dia main tunnel to Kirtling Street Zone within which permanent above ground structures would be located

Removable bollards

Notes:
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan.

Odour control chamber

Zone for the location of the building to house air managment plant and equipment

Works No. 6a. Main tunnel shaft (25m internal dia)

Zone for the location of the ventilation column(s)

These parallel lines encompass an area within which ground works/anchors may be installed if river wall strengthening is deemed necessary following site investigation(s)

Th m e Pa h a s t

Whiffin Wharf

Works No. 1a. 6.5 internal dia main tunnel to Acton Storm Tanks

Zone within which Works No. 6a will be located 105.50

Boundary wall between wharves, 5.5m maximum (2.5m minimum) Ventilation column 4.4m wide, x 7m long x 15m high containing 2 No. 1.2m internal dia. stacks and 2 subdivided flue areas measuring 4.5m and 6.2m each

Hurlingham Wharf

10m 10m Thames Path

0 0 Scale 1:200 at A1 Scale 1:500 at A1 1:400 if reproduced at A3 1:1000 if reproduced at A3

10m 40m

r af m Wh n i a r h ulg r H af n i f f Wh i Wh

ILLUSTRATIVE

River wall strengthening works may be undertaken along most of the length of the Carnwath Road Riverside site in support of temporary and permanent works. All necessary measures shall be taken to maintain flood defence functions

Zone within which Works No. 6b will be located

Location

Carnwath Road Riverside London Borough of Hammersmith & Fulham


Document Information

Section 48 publicity Permanent works layout

Works No. 7. 2.6m internal dia connection tunnel Mean low water

Book of plans - section 7


S48-PP-06X-CARRR-000071 July 2012

River Thames

c Thames Water Utilities Ltd 2008

C m ec l o m ra i
tn ao ti us Sb

d g ln ii e u p B i r h P Te

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:
r ne et eC i r Pp

This drawing

AA

d a h o a R wt an Cr

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU) Zone within which permanent above ground structures would be located Existing Electrical Substation Authorised channel Thames Path Building to house air management plant and equipment 5.5m maximum high with brown roof and fall restraint system

Notes :
1. All dimensions and levels are approximate.

R s e tl ei na d i

H r g a Wh r ul h m i n af l d o re o a e a h ad d f f r n f t c n t co a d v ib o s u t n n a aa l r i l e f f ue a g ad d o u r s f u re r t e wharf uses
West Elev.

2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and the topographic survey base, both of which have been used in the preparation of this drawing.

Landscape key:
Whiffin Wharf Public Realm Ground cover around access hatches Granite strips Resin bounded gravel

New trees Feature wall 2.5m minimum to 5.5m maximum height Herbaceous perennial planting/ ground cover Bench/ Seating Stepping stone Hoarding 2 No. ventilation columns and 2 No. flues combined in a single ventilation structure 15m high Removable bollards LED Uplighters Bound Lights

R s e tl ei na d i

Maximum eastward extent of land available for future development following construction

Existing Thames Path route maintained

10m

10m

Scale 1:200 at A1 1:400 if reproduced at A3

INDICATIVE
Save for the layout of above ground structures Handrail along river edge on top of flood defence wall Location which is illustrative

Carnwath Road Riverside London Borough of Wandsworth


Document Information

Section 48 publicity

River Thames
South Elev.

Proposed landscape plan Book of plans - section 7


S48-PP-06X-CARRR-000072 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan: This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn. 15m high ventilation column. Allow for local feature lighting of ventilation column Horizontally banded feature wall with combined lighting and gaps Building to house air management plant and equipment 5.5m maximum high with brown roof with and fall restraint system

Notes :
1. All dimensions and levels are approximate. 2. The purpose of this section is to illustrate the scale of the below ground infrastructure to be provided.

Handrailing along river edge on top of flood defence

Carnwath Road

River Thames

Connection tunnel to Dormay Street and King Georges Park

Main tunnel shaft

10m

10m

Scale 1:200 at A1 1:400 if reproduced at A3 Main tunnel


N

ILLUSTRATIVE

Location

Carnwath Road Riverside London Borough of Wandsworth


A
Document Information

Section 48 publicity

Section AA

r e t h a i W Hg en M a

Section AA Book of plans - section 7


S48-PP-06X-CARRR-000073 July 2012

s a e hm eT ir Rv

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan: Electrical substation Industrial building beyond to be demolished for construction This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Notes:
1. All dimensions and levels are approximate.

Piper Building

Piper Centre

Carnwath Road

Whiffin Wharf

River Thames

As existing West elevation

Horizontally banded feature wall with combined lighting and gaps Seating/ bench Brown roof with fall restraint system Removable wall panel for periodic maintenance access Concealed maintenance access Building to house air management plant and equipment

15m high ventilation column. Allow for local feature lighting of ventilation column

New railings along river wall

10m

10m

New landscaping public realm

Scale 1:200 at A1 1:400 if reproduced at A3

Proposed West elevation

ILLUSTRATIVE

Location

Carnwath Road Riverside London Borough of Hammersmith & Fulham


Document Information

Section 48 publicity
o a in v t t e s El We

As existing and proposed West elevation Book of plans - section 7


S48-PP-06X-CARRR-000074 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 Electrical substation on Hurlingham Wharf to be retained 4 storey residential building Apartment/ commercial building behind 3 storey residential building

Keyplan: This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Notes:
1. All dimensions and levels are approximate.

Residential

Thames Path

Whiffin Wharf

Hurlingham Wharf

As existing South elevation

Maximum extent eastwards of land available for future development following construction Line of balustrade along the river wall shown dotted

15m high ventilation column. Allow for local feature lighting of ventilation column

Building to rear to house air management plant and equipment 5.5m maximum high with brown roof and fall restraint system

10m Ventilation column and fan building behind

10m

Area reserved for development

New public realm

Scale 1:200 at A1 1:400 if reproduced at A3

Proposed South elevation


N

ILLUSTRATIVE
Philpot Square

Location

Carnwath Road Riverside London Borough of Hammersmith & Fulham


Document Information

Section 48 publicity As existing and proposed South elevation Book of plans - section 7
n i ao vt Ee h l ot Su

S48-PP-06X-CARRR-000075 July 2012

c Thames Water Utilities Ltd 2008

8 35

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

n a v i l u S e s i r p r e t
h at nw r Ca
1

PH

Kerb realignment works

Keyplan: This drawing

n h o J

C e r t n e

e s u o o t H t 1 h g i w D
8

d a o R h t a w n r a C

o t 27

Construction access, left turn in, right turn out

e us Ho

gh ou r bo er et P R d oa

Philpot Square

Offices / welfare buildings (2 storey )

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Insert Area:Carnwath Road/Wandsworth Bridge Road junction works area at CR/WB1

W w ds an h t or ge i rd B

Key:
Limits of land to be acquired or used (LLAU) Site power structure Hoarding Maximum extent of working area Storage (open area or containerised) Storage (open area or containerised) Existing public right of way

R d oa

Construction access, left turn in, right turn out

d a o R h t a w n r a C

Route of temporary diversion of right of way

Site access Access / haul route

Security office

s B C T

Notes :
1. These construction phasing plans have been prepared to illustrate possible site layouts for

Excavated material storage and handling area

the principal construction phases. Contractors may choose to lay sites out differently during construction depending on their preferred construction methods subject to any controls on layout imposed through the planning submission and approval process.

Hurlingham Wharf
Thames Path Security office

2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown. 3. Utility supplies for the construction of the works would be agreed with the relevant utility company.
r e t h a i W Hg en M a

4. Additional noise mitigation including noise barriers may be required but is not shown on this drawing.

Storage (open area or containerised)

Whiffin Wharf

Workshop buildings and storage (open area or containerised

Piling rig Jack up barge servicing piling operations Thames Path Scale 1:500 at A1 1:1000 if reproduced at A3

10m

40m

ILLUSTRATIVE
Crane

Location Shaft

Carnwath Road Riverside London Borough of Hammersmith & Fulham


Document Information

Section 48 publicity
Area within LLAU shown to allow flexibility in choice of barge berthing options
y B d L B s& nt y o s C Al , Pilings G rig L o t Cn oo Br

Barge berthing at a jetty is a possible alternative

Construction phases - phase 1 Site setup & shaft construction Book of plans - section 7
S48-PP-06X-CARRR-000076 July 2012

Concrete pumps

Crane

Gravel storage and handling area

Barge on campshed

Authorised channel

Concrete batching plant and aggregate storage area

Jack up barge servicing piling operations

s a e hm eT v ir R

Excavated material storage and handling area

c Thames Water Utilities Ltd 2008

N
n a v i l u S e s i r p r e t C e r t n e
Philpot Square

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Site power structure


N

Keyplan: This drawing

Offices / welfare buildings (2 storey)

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU) Security office
D A O R

Hoarding Maximum extent of working area Existing public right of way Route of temporary diversion of right of way Site access Access / haul route

Construction access, left turn in, right turn out

W N R A C

H T A

Segment storage area

Construction access, left turn in, right turn out Security office

s B C T

Noise enclosure over shaft and gantry crane

Notes :
1. These construction phasing plans have been prepared to illustrate possible site layouts for the principal construction phases. Contractors may choose to lay sites out differently during construction depending on their preferred construction methods subject to any controls

Hurlingham Wharf
Thames Path

on layout imposed through the planning submission and approval process. 2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown.
r e t h a i W Hg en M a

3. Utility supplies for the construction of the works would be agreed with the relevant utility company. 4. Additional noise mitigation including noise barriers may be required but is not shown Workshop buildings and storage area (open area or containerised) Excavated material storage and handling area on this drawing.

Storage (open area or containerised)

Whiffin Wharf

Workshop buildings and storage area (open area or containerised)

Thames Path 10m 0 40m

Gantry crane loading bay

Scale 1:500 at A1 1:1000 if reproduced at A3

Shaft

ILLUSTRATIVE

Gantry crane

Location

Carnwath Road Riverside London Borough of Hammersmith & Fulham


Document Information

Section 48 publicity Construction phases - phase 2 Tunnelling


Overhead conveyor Overhead conveyors Grout batching plant and aggregate storage area Authorised channel Barge on campshed Piled jetty Barges berthing at a jetty y B d is a possible alternative s &L B t
n y l o s C G A , t L os Cn oo Br

Book of plans - section 7


S48-PP-06X-CARRR-000077 July 2012

Area within LLAU shown to allow flexibility in choice of barge berthing options

s a e hm eT v ir R

c Thames Water Utilities Ltd 2008

N
n a v i l u S e s i r p r e t C e r t n e
Philpot Square

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan: This drawing

Site power structure Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Offices / welfare buildings (2 storey)

Key:
Limits of land to be acquired or used (LLAU) Security office
D A O R

Hoarding Maximum extent of working area Existing public right of way Route of temporary diversion of right of way Site access Access / haul route Noise enclosure over shaft and gantry crane

Construction access, left turn in, right turn out Storage (open area or containerised) Steel reinforcement preparation area

W N R A C

H T A

s B C T

Notes :
Noise enclosure to be dismantled to allow construction of other structures Crane 1. These construction phasing plans have been prepared to illustrate possible site layouts for the principal construction phases. Contractors may choose to lay sites out differently during construction depending on their preferred construction methods subject to any controls

Hurlingham Wharf
Thames Path

on layout imposed through the planning submission and approval process. 2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown.
r e t h a i W Hg en M a

3. Utility supplies for the construction of the works would be agreed with the relevant utility company. 4. Additional noise mitigation including noise barriers may be required but is not shown on this drawing.

Whiffin Wharf

Shingle

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3 Workshop buildings and storage (open area or containerised) Thames Path

ILLUSTRATIVE

Location

Carnwath Road Riverside London Borough of Hammersmith & Fulham


Shaft Document Information

Section 48 publicity Construction phases - phase 3


Storage (open area or containerised)

Secondary lining
y B d L B allow flexibility in choice of s& nt y l o s C barge berthing options G A , L t s Cn o o o Br

Area within LLAU shown to

Book of plans - section 7


S48-PP-06X-CARRR-000078 July 2012

Barges berthing at a jetty is a possible alternative C W C L Authorised channel Concrete batching plant and aggregate storage area

s a e hm eT v ir R

Barges on campshed

Storage (open area or containerised)


c Thames Water Utilities Ltd 2008

8 35

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

n a v i l u S e s i r p r e t
n h o J
h at nw r Ca

PH
1

Reinstatement to original kerb alignment

Keyplan: This drawing

C e r t n e
e s u 8 o o t H t 1 h g i w D

d a o R h t a w n r a C

Reinstatement to original kerb alignment

o t 27

e us Ho

Philpot Square

Pedestrian diversion removed Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn. Access/haul route removed

Insert Area:Carnwath Road/Wandsworth Bridge Road junction works area at CR/WB1

W w ds an h t or ge i rd B R d oa

Key:
Limits of land to be acquired or used (LLAU) Hoarding
D A O R

Maximum extent of working area Existing public right of way Route of temporary diversion of right of way Access / haul route

W N R A C

H T A

s B C T

Thames Path

Hurlingham Wharf
Thames Path

Whiffin Wharf

r e t h a i W Hg en M a

Shingle

Thames Path reinstated

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

Thames Path

ILLUSTRATIVE

Location

Carnwath Road Riverside London Borough of Hammersmith & Fulham


Document Information

Section 48 publicity
Campshed (or jetty alternative if used) removed and foreshore reinstated
y B d L B s& nt y l o s C G A , L t os Cn oo Br

Construction phases - phase 4 Site demobilisation Book of plans - section 7


S48-PP-06X-CARRR-000079 July 2012

Authorised channel

Construction phase facilities removed and left hoarded for owner / developer

CW C L

s a e hm eT v ir R

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Mean low water

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

d e ig Br et b r Al

Key:
Local authority boundary

Order limits Main tunnel Tunnel


ea s r t te Ba

Shaft

Royal Borough of Kensington & Chelsea


od Ra re on rm Ce

e dg i Br

Cremorne Wharf Depot


s t o L d a o R

Lots Road connection tunnel

Mean low water Battersea Park

Cremorne Wharf

London Borough of Wandsworth

100m

100m

Scale 1:2500 at A1 1:5000 if reproduced at A3

London Borough of Hammersmith & Fulham


Imperial Wharf

Chelsea Harbour

FOR INFORMATION

Location

Cremorne Wharf Depot Royal Borough of Kensington & Chelsea


Document Information

Section 48 publicity Location plan Book of plans - section 11


S48-PP-11X-CREWD-000117 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

h t di E G e ov r

od Ra re on rm Ce

Keyplan:

This drawing

e od n Ra rm r Ce o

Cremorne Riverside Activity Centre

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

S t r e e t

Key:
a t e r w
Limits of land to be acquired or used (LLAU) Thames Path Existing levels (shown in metres above tunnel datum) Thames Water land

S t a d i u m

o a d

e a n

l o w

A s h b u r n h a m

y b a n r u B

t e e r t S

R o a d

L o t s

+ 105.40m

Thames Water buildings/structures Cremorne Gardens

Listed buildings/structures

Approximate position of CSO outlet

Existing trees within surveyed area

Thames Water access

Notes :
Station House Chelsea Wharf Depot welfare facilities + 105.30m Ventilation column Weighbridge (surface mounted) Lots Road Pumping Station 1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and the topographic survey base, both of which have been used in the preparation of this drawing.

t e e r t S m u i d a t S

m de Ta a ad Ro

s t o L

d a o R

Cremorne Wharf Depot

+ 105.60m

Jetty

Line of Cremorne Wharf depot building + 105.30m South elev. Cremorne Wharf
L o C t s S O Ro d a i dP s c h a S r g e

Weighbridge (recessed)

10m

40m

East elev. Concrete upstand and ramps Brick boundary wall approximately 4m high

Scale 1:500 at A1 1:1000 if reproduced at A3

Concrete panel wall 2m high

+ 105.90m

FOR INFORMATION

Location

Cremorne Wharf Depot Royal Borough of Kensington & Chelsea


Lots Road Power Station cooling water intakes (disused) part of Circadian development Document Information

Section 48 publicity As existing site features plan

Lots Road Power Station (disused)

Circadian development site

Book of plans - section 11


S48-PP-11X-CREWD-000118 July 2012

Chelsea Creek
c Thames Water Utilities Ltd 2008

1a

St Johns

E E T

A O D R ER O N R M C E

S T A D

A D

2
8
21

LO

T S

2 2

R O A D
1 1

a i c a c l A ak W

3 4

28

6 1

0 1

8 1

4 6

M U I D A T S

Mud and Shingle


S t a t i o n
27

l ow

e s u o H 1 r e i r r e K

o t

at er

2 1

48

Ac/Ap

Y B N R U B

29

12

o t

33

35

35

6 8 8 8

62

0 9

70

B C T

5 1 o t 1 2 9

5 5

7 6

9 2

T E E R T S

6 3 8 3

6 2

Extent of area to be temporarily stopped up for the construction of crossovers for site and permanent accesses
12

H o u s e

C h e l s e a

ea n

8 2 0 3

0 6

Pumping Station

Refuse Tip (public)

Ac/Ap
4 7

Pumping Station Recycling Centre

El Sub WB

O L
73

S T

O R

D A

Sta

Thames Path

Water Screens

Tanks
e t h en i M a Hg Wa r n e u ad h g M d n Si l

Mud and Shingle

Chelsea Creek
CC e k re
L By B d

MLW

Chelsea Creek
re CC e k

B d L By

Weir

C e e Ce k h l a re s
Shingle MP MP

1 1

1 4

5 3

A S H B U R N H A M

1 9

5 4

1 3

9 3

M A D

7 3

3 1

7 2

R E

1 2

E C A R R E T

S T R

I U

1 4

T E E R T S
1 5

3 1

PCs Pond Post

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

9 1

1
e gi ai Cr as l l Vi
65

o t

5 1

Post Keyplan:

11

This drawing
Pier
Post

Thames Path Pier


Landing Stage

Cremorne Gardens
29
1 o t 3

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU) Existing public right of way Route of temporary diversion of right of way Existing right of way temporarily stopped up Area of highway to be temporarily stopped up

3 5

M DE TA A RO AD
a i ph el a ld i Ph

1 7

Ap Ac Notes:

Access to permanent works Access to construction works

h a r f

1. This plan does not show stopping up and diversions of limited duration (eg hoarding erection, minor utility diversions and minor highway works). 2. Only rights of way in or close to worksites are shown. The full extents of rights of way are not shown where they cease to be relevant to the project.

27

t ur Co
74

Pier

39

Cremorne Wharf

37 38

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

FOR APPROVAL
Mud
Authorised channel Location

Cremorne Wharf Depot Royal Borough of Kensington & Chelsea


Document Information

Section 48 publicity Access plan Book of plans - section 11


S48-AC-11X-CREWD-000010 July 2012
L BB d y U d n

c Thames Water Utilities Ltd 2008

T a r m

105.40
PL

CL105.50

WV

CL105.41
LP

Flower bed
WM

GV

r B a W v e l

48

I C C L 1 0 5 . 5 5 1 0 5 . 7 5
o n c

WV WM
5 4 0 . 1 5

1 0 5 . 4 4

WV

WV

WM

GV WV IC CL105.56

1 0 5 . 4 9

CHELSEA

WHARF

1 0 4 . 6 1

105.63

1 0 6 . 0 9

1 0 4 1 . 9 0 2 6 . 0 4

10 4 9 10 . 9 5. 90

RG

IC

a c

C P S

IC

B W

Ba s e

1 0 5 . 6 1

1 0 4 . 8 1

P S

of R

N
101.21

100.69

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

BP

L 1 0 5 . 4 9

Stn K12 105.518 PB


I C C L 1 0 5 . 4 6
RG 105.40

10 5. 75

I C

10 5. 67 C P S C L 1 0 C 5 I . 5 5

1 0 T 5 a . 4 r m 5

L1 05 . 62

a c

1 DP 0 5 . 5 C 8 105.35 o n c
1 0 7 . 3 0
1 0 5 . 4 6

104.99 S F h 2 . 6 101.17
1 0 5 . 3 6 1 0 1 53 0 .4 5 . 5 0
101.14

100.84

Mud and Shingle


Keyplan: This drawing
100.20

1 0 5 . 5 3

I C

Coal chute

IC

C o n c C P S 1 0 5 . 4 5 1 I C 0 5 . C 4 5 L B 1 0 W C 5 L1 . 57 C I 05 C L1 I . C 0 10 48 5. 1 6 5. 0 0 5 49 . 5 7 C L1 1 0 05 7 . 1 . 51 4 1 0 I C 1 5. 4 0 G 5. 9 y 47

Coal

10 5. 67

chute

B T I C

1 0 5 . 7 0

1 0 5 . 3 3

1 0 5 . 6 1

C o n c

at e

CL105.35

1 0 5 . 3 3

Single storey welfare / office building


T a r m
a c

101.02

IC CL105.62

IC
GV Coal
o n c

1 0 5 . 5 5

CL105.61
a c

T a r m

GV

chute

WV

A T V I C

chute

L1 05 . 61

Coal

A T V

chute
Coal

IC

IC CL105.44

1 0 5 . 5 5

1 0 5 . 6 1

1 0 9 . 0 6

CL105.44 IC

1 0 5 . 6 5

chute

1 0 5 . 5 3
VP
1 0 5 . G 2 9 y

Col

10 5. 33

1 0 5 . 4 4

T 10 a m 5. r 42 ac

CL105.32

10 5. 1 33 1 2 . 3 0

y 1 0 5 . 4 1

I C L 1 0 5 . 5 9

1 0 5 . 5 0

IC CL105.41

WV

T a r m 1 a 0 c 5 . 4 0

Brick chamber

1 0 5 . 5 4 1 0 5 . 4 3

of R

CL105.39

o f P a v e m

B a c k

1 0 5 . 5 7

L1 05 1 0 . 45 5 . 5 4 I C 10 5. 47

5 6 . 5 0 1

1 0 5 . Ga 6 2 t e C o 1 n 0 c 5 . 6 0

0 6
C I T B
GV WV

1 10 05 5. . 3 15 5

1 0 5 . 3 3

WV

Surface mounted weighbridge Brick passage way Concrete foundation

e i g h b r i d g e

C W

1 0 5 . 4 9

LP
B W

1 0 1 5 0 . 5 6 . 4 9 4 1 0 5 . 3 4

1 0 5 . 9 4

1 0 5 . Col 3 3 1 0 5 . 3 3

C o n t a i n e r s
1 0 5 . 3 4

Ba s e

1 0 1 5 0 . 5 6 . 3 9 3

C W

1 0 5 . 3 5

e n t

IC

105.41

1 0 5 . 4 9

105.41

IC

RG

/ H

RG

1 1 0 0 5 1 5 . 4 0 . 1 5 3 . 5 5 C 3 o n c

1 0 5 Col . 3 1 3 0 1 5 0 . 5 8 1 . 0 6 C 0 1 5 . 1 o n 3 0 c 4 1 5 1 0 . 0 5 6 5 . 2 8 . 6 1 3

/ H

WVs

RS

1 1 0 0 54 5 .9 . 3 0

Col

1 0 5 . 5 7

B W

P S

1 1 05 0 . 5 34 1 . 7 0 1 5 . 3 4
C o n c
D r C

1 0 5 . 7 2

CL105.60

2 No. redundant 0.375m dia. cast iron pipes

1 0 5 . 4 2

1 1 0. 0 55 5 . 2 3 4 B a r r i e r IC

10 5. 35

Coal

1 0 1 54 0 .5 5 C . 6 0 o n c

T a r m

1 1 0 0 5 5 . . 3 3 5 5
a c

10 7 5 10 . 3 5. 28

RG 105.36

1 1 0 0 5 . 5 5 . 1 5 2 1 C 0 o 5 n . 4 1 c 7 0 5 . 6 0

on c

Gy 105.51

Gy

105.52
IC

1 0 5 . 5 2

100.65

1 0 5 . 5 4

1 1 0 0 5 55 . .0 2 4

CL105.48

Col
1 0 5 . 7 2

C o n c

Col
1 0 5 . 3 5

100.92

Shingle

1 1 0 0 5 5 . 3 . 7 4 2

99.82 Col

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

100.23

100.76
1 1 2 . 2 6 / H

Col

5 1 . 1 1 1

O O

Key:
99.63

/ H

99.96

Limits of land to be acquired or used (LLAU) Trees to be removed


99.03

Reinforced concrete pile caps and ground beams


100.77

Above ground structures to be removed


99.24

5 5 . 5 0 1

RG 105.37 RG

L1 L1 05 05 . 4 . 1 41 I C I C

4 6 . 5 0 1

T M

RS

10 5. 10 62 5. 39

m r a T
4 4 . 5 0 1

c a

IC CL105.37

105.36

9 4 . 5 0 1

10 5. 45

g 0.5 s 3 h 6

LOTS

ROAD

PUMPING

STATION

L1 05 . 46

1 0 5 D . 9 1 r C 3 0 5 1 . 6 0 3 5 . 8 3 1 0 1 1 5 0 0 . 5 5 6 . 5 1 . 4 9 4 0 1 4 1 5 0 C 0 . 3 5 5 o 1 1 . . 3 n 0 3 3 c 5 2 Col . 8 2 1 0 5 . 8 2 1 0 5 . 3 2
1 0 5 . 3 2

P & D

1 0 5 . 3 4

1 0 5 . 3 6
C o n c

/ H

99.94

105.33
Bh

Below ground structures to be removed or infilled

1 0 5 . 3 3

1 0 5 . 3 2
1 0 5 . 3 3

1 1 2 . O 2 6 / H / H

99.80

1 0 5 . 4 3
1 0 5 . 4 7

99.31 100.74

Notes:
1. Minor items to be removed (e.g. barriers, bollards etc.) are not shown. 2. General activities of site clearance such as

Mean low water


Camera Pole 100.02

s 3 h 6

S P C

0 4 . 5 0 1

C o n c

10 5. 46

11 1. 81

I C C L 1 10 0 5 G 5. . y 3 44 T 7 a r m C a L1 c I C 05 . 45

RG
105.27

W B

1 0 5 . 3 3

Ba ri CL rer F h 1 1. 2 1 05. Ba 05 60 s e . 89 o f RW

I C

g 0.5

7 c 4 . n 5 o 0 C 1

1 0 5 . 3 7

101.00

100.77

105.34
1 0 5 . 3 2
105.33

5 4 . 5 0 C I 1 L C

B
RS

5 0 . 7 .3 0 54 1 0 1

CL105.48

1 0 5 . 5 2

100.58

Reinforced concrete retaining wall and ground slab


99.67

removal of hardstanding and foundations, stripping of topsoil and clearance of minor vegetation not shown.

IC CL105.31 B

1 5 0 . 5 6

WV

105.33

1 4 . 5 0 1

C I

5 3 . 5 0 e t 1 a L G C

1 0 5 . 3 8

IC CL105.48 IC CL105.35

Council Depot

Conc

N o

IC CL105.24

10 10 5. 5. 25 14

1 . 8 1 0 5 . 3 0

11 4. 57

RE

11 5. 00

IC CL105.21 IC Conc

1. 2

8 15 1 1 0. 2 0. 15

10 5. 38 1 0 5 . 2 2

9 9 8. 9 93 . 2 3

1 0 5 . 2 8 Conc

10 10 5. 5 5. 9 88 G

6 5 1 1 . . 5 5 0 0 1 1 L C C I Conc
23 5. 10

I C C 107.94 L 1 0 5 1 . 3 0 0 5 . 2 6

10 5. 31

98 . 94

1 0 5 . 2 1

1 5 0 . 5 Co 5 n c Ba ri r r e CL 1 5 0 . Fh 12 1 3 . 0 5 59 .0 1 1 0 . 6 2

Conc

107.33

115.88

1 10 01 3 1. 7 .7 3

Col I R F 108.05 h

Building Line

1 5 0 . 1 5 5 0 . 8 9 0

A c c e s s

Estimated

Ga t e

Ba s 1 eo 0 10 .4 f RW

1 5 0 . 5 9

1 0 5 . 3 5

Conc

Tarmac

Conc
1 0 5 . 2 2

CL105.22

Conc

1 0 5 . 1 6

10 10 5. 5 5. 9 88

8 9 . 4 0 1

105.09

at e

2 0. 15 3
IC CL104.96
2 0. 15 3

1 1 0 . 6 9

10 5. 55

Two storey office building

C r D
18 9. 10

d g i bi e We h r g 2 0. 15 4 2 0. 15 3
2 0. 15 3

2 0. 15 3
10 5. 88
0 0. 16 5

100.96 101.35 100.01 Shingle 99.67 Underside of Pier 103.87 (Estimated) BP

IC CL105.09 Tarmac 105.28

2 0. 15 5
i ar r B re
8 0. 16 7
2 0. 15 7

9 0. 16 0

1 1 0 . 5 2

8 0. 16 8
105.24

1 0 6 . 9 0

1 0 5 . 5 4

/ H

9 8 . 2 8
BP

1 1 2 . 3 0

oc a p Cn Rm 7 0. 16 0 i ar r B re 0 0. 16 8
3 0. 3 0. 15 3 15 2

117.94

10 6. 22

100.77 101.30 100.46 100.88 99.37

98.82

10 (s 5. E t i a m t 84 e ) Ba d s o e f RW

Weighbridge

4 1 . 5 0 1 C 1 L 0 1 5 0 . 5 1 . 6 2 0 1 I C 0 9 . 2 5

Col 106.87

IC CL105.30

105.31

o n c

1 1 2 . 3 0
1 0 6 . 8 3

C o n c
O / H 1 0 6 . 8 4

a m

3 0. 15 2

1 0 8 . 6 7

Embanked roadway
98.88 101.15 100.87

98.53

98 . 17

3 0. 15 6

10 6. 43

RWP

1 0 6 . 8 6

98.58

98 . 29

98 . 31
62 . 98 68 . 98
8 8 . 8 9
61 . 98

5 0 . 5 0 1

CR

98 . 23

0 0. 15 5

Steel clad building (13.5m high)

0 9 . 4 RG 0 1 104.90

2 0. 15 3

IC CL105.16

103.83 103.83 RWP 1 1 0 1 01 0 0 58 . 6 5 .8 Refuse Pile 1 .0 5 0 C 8 . 100.01 8 o (No Access) 100.46 3 n O c / 1 H W 0 a 0 l . l 99.66 5 3 1 0 1 5 0 . 1 . 5 9 1 058 9 1 00 6 8 0 5. . 6 0 .6 55 4 . 3 6 1 7 0 0 . 8 11 1 00 0 1 C011 .. 0 L 77 5 100.10 F . 5 h 9 Underside of Pier 99.86 1 1 . 0 2 0 . 4 103.81 2 1 0 1 58 9 . 0 9 5 4 . 9 . 5 2 4 101.01 1 1 0 1 0 5 0 0 . 5 . 0 5 9 . 99.73 C 6 2 o 1 99.27 C n 1 1 0 o c 0 5 n 5 . 100.93 c 1 O 5 . S 1 0 9 6 9 / 0 5 9 H 0 i 5 . . l BP 5 7 t . 5 2 8 / 9 M 1 u 1 0 1 IC 0 d 5 0 5 . 0 8 1 117.90 6 100.77 1 .0 . 5 0 0 0 CL105.55 0 1 99.30 5 9 . 2 . 9 9 5 . 0 6 4 BP O C 1 / o 0 H 5 9 n . 9 5 c . 9 IC 3 99.09 W C 1 a o 0 l n 5 l CL105.54 c 1 . 1 1 0 8 0 0 5 3 Columns (Typ) 5 Columns (Typ) 5 . . . 5 9 6 100.44 0 8 0 1 5 0 9 100.96 5 . 9 . 99.06 9 Gy 8 99.06 1 9 9 105.51 . C 8 Conc 1 100.34 L 7 Conc 0 F 5 h . 100.84 5 1 8 101.24 98.94 . 2 9 8 . 1 0 1 9 5 100.07 94 7 5 0 .0 . 5 5 9 9 9 1 .1 94 0 6 9 .4 5 . 5 . 9 3 1 9 Underside of Pier 9 100.63 9. 99.87 . 94 6 BP 5 4 100.61 103.88 (Estimated) 100.61 101.02 1 0 5 1 9 0 1 .0 8 99.71 5 0 6 . . 5 2 5 . 8 101.31 8 8 100.54 9 9 99.17 8 . 6 0 O 100.52 / H 100.09 1 100.76 1 0. 99.18 0 58 101.26 5 . 9 5 9 Conc 99.83 99.43 99.10 99.43 99.18

/ H

37 5. 10

3 1. h c F n o .8 R 3 I C 5 47 10 5. 10

Mud

35 5. 10

C c n o

47 5. 10 c n o

40 5. 10

11 9. 14

at e

1 5 0 . 5 3

LF

1 5 0 . 5 1 5 3 0 . 9 0

10 6. 41 10 6. 37

B W

IC CL105.27 Conc

1 0 6 . 8 4

To po f W R

1 0 5 . 1 45 0 8 . 6 8

1 5 0 . 9 Es i 0 t a m t e d

Concrete road ramp

4 8 . 8 0 1

105.44

E s t i m

W a l l

o n c

o n c

1 0 6 . 8 9

10 6. 81

(Limited Access)

11 2. 29 / H

Area Obscured by Refuse Skips

1 0 6 . 8 4
Col

106.38

1 0 0 . 9 7

B a r r i e r B u 1 s 0 h 6 e . 8 s 4

98.47 100.76

a l l

100.89 99.51

98 98 98 . .3 3 33 . 22

10 6. 83

B a r re i r

1 0 5 . 3 2

1 08 0 .8

1 0 1 5. 0 8 56 . 1 6

a l l

Dense Vegetation

0 E 6. s t 81 1 i m 0 a 8 t . e 6 d 7

106.85 100.39

h 6

i v er Th am

Concrete panel wall 2m high

o f B r i c k

1 0 6 . 8 4

s 4

1 0 8 . 6 9

1 59 0 .0 Es i t ae m td

g 0.8

es

P o s i t i o n

S B

100.28

1 5 0 . 9 Es i 0 t a m t e d

Water Screens

1 0 0 . 6 9

(s E t i a m t e ) d Ba s o e f RW

1 0 E 6. s t 86 i m a 1 t e 0 d 8 . 5 9

100.37

1 0 E 6. s t 86 1 i m 0 a 8 t . e 6 d 3

(No Access)

To po f W R

IV

99.74 99.43 98.48 Shingle

1 5 0 . 9 Es i 0 t a m t e d

1 0 0 . 2 4

1 49 0 .8

5 0 . 9 0 1

W B

88 5. 10

7 4 . 5 0 1
36 5. 10 07 . 9 0 1

64 7. 10

35 4 5. 1. 10 h F R I 48 5. 1 3 10 5. 10

W B

30 5. 10
13 9. 10

98.43

5 2 . 5 0 1

98.22

8 0 . 5 0 1
C

P B
95 4. 10
06 . 05 L1 C I
W B

9 85 .6 9 91 .5 9. 91 1
9. 89 4
9. 86 4

98.17

9. 90 5 9. 87 6
9. 8 4 6 9. 8 4 6

9 86 .1 9 82 .8
6 8 4 9.

48 . 99

9 8 . 3 0

9 86 .3
9. 84 7

8 4 . 9 9

9 83 .3

08 5. 10
3 1 . 5 0 1 4 2 . 5 0 1

3 6 . 8 9 04 . 99

4 1 1 . 9 9

3 2 . 5 0 1
a t e d

10m

10m

62 . 98

99.65 100.27

Col

Scale 1:200 at A1 1:400 if reproduced at A3

7 4 . 8 9 7 4 . 8 9

98.48

FOR APPROVAL

Location

Cremorne Wharf Depot Royal Borough of Kensington & Chelsea

99.40

100.05

98.50

Document Information

Section 48 publicity
99.42

Top of Retaining Wall Largely Obscured by Vegetation

Demolition and site clearance Book of plans - section 11


S48-PP-11X-CREWD-000119 July 2012

99.40 99.43

99.79

99.44

c Thames Water Utilities Ltd 2008

ea n

l ow

at er

1 4

e s u o o t Table 1 H 1 r e i r Abover ground permanent structure e K


2 1
Ventilation column(s) serving the shaft Reinstated depot building

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

1 7

Maximum height above finished ground level (Minimum heights are in brackets where applicable) 8.0m (4.0m)

Keyplan:

This drawing

13.85m to apex of roof

S t a t i o n
27

H o u s e

C h e l s e a

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

h a r f

Key:
Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located Zone within which the shaft would be located

12
0 6

Pumping Station
Notes:

Zone within which permanent above ground structures would be located (those listed in Table 1) Limits of permanent access

27
Refuse Tip (public)

Pumping Station Recycling Centre

1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.

Pier
Zone within which ventilation column(s) serving the shaft may be located

El Sub
Zone within which Work No. 11c would be located

Sta

WB

Cremorne Wharf
10m 0 10m Scale 1:200 at A1 1:400 if reproduced at A3

Zone within which Work No. 11a would be located

FOR APPROVAL

Location

Cremorne Wharf Depot


Maximum outline of reinstated depot building

Royal Borough of Kensington & Chelsea


Document Information

Water Screens

Section 48 publicity Site works parameter plan Book of plans - section 11


S48-PP-11X-CREWD-000120 July 2012

c Thames Water Utilities Ltd 2008

E E R T S
0 1

E E R T S
0 1

e s u o H r e i r r e K
o t
2 1

1
1 7

Mud and Shingle


S t a t i o n
27

e s u o H r e i r r e K
o t
2 1

4 6

4 6

M U I D A T S

M U I D A T S

1 5

1 5

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

48

48

H o u s e

C h e l s e a

h a r f

0 6

Pumping Station

Refuse Tip (public)

Pumping
Station Recycling Centre

4 7

4 7

Pier

El Sub Sta WB

Cremorne Wharf
Zone within which Work No. 11a would be located

Zone within which Work No. 11c would be located

Maximum outline of reinstated depot building

Water Screens

wa t er

l ow

ea n

T E E R T S
0 1

T E E R T S
0 1

4 6

e s u o H r e i r r e K
o t 2 1

1
1 7

Mud and Shingle


S t a t i o n
27

e s u o H r e i r r e K
o t 2 1

4 6

M U I D A T S

M U I D A T S

48

48

ea n

l ow

wa t er

H o u s e

C h e l s e a

h a r f

0 6

Pumping Station

Refuse Tip (public)

Pumping Station Recycling Centre

4 7

4 7

Pier

El Sub Sta WB

Cremorne Wharf

Zone within which ventilation column(s) serving the shaft may be located

Maximum outline of reinstated depot building

Water Screens

ea n

l ow

wa t er

1 4 1 4
5 4

5 4

1 4 1 4
5 4

Keyplan:

S t a t i o n
27

1 7

Mud and Shingle

H o u s e

C h e l s e a

This drawing

h a r f
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

12

12
0 6

Pumping Station

27

27

5 4

7 12 7

Refuse Tip (public)

Pumping
Station Recycling Centre

Key:
Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located Zone within which the shaft would be located

Pier

El Sub Sta WB

Cremorne Wharf

Zone within which permanent above ground structures would be located (those listed in Table 1) Limits of permanent access

Notes:
1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.

Maximum outline of reinstated depot building

Water Screens

1 5

1 5

S t a t i o n
27

1 7

Mud and Shingle

H o u s e

C h e l s e a

h a r f

12
0 6

Pumping Station

10m
Refuse Tip (public)

40m

27

27

Pumping Station Recycling Centre

Scale 1:500 at A1 1:1000 if reproduced at A3

Pier

FOR INFORMATION

El Sub Sta WB

Cremorne Wharf

Location

Cremorne Wharf Depot Royal Borough of Kensington & Chelsea


Document Information

Section 48 publicity Site works parameter key plan


Maximum outline of reinstated depot building
Water Screens

Book of plans - section 11


S48-PP-11X-CREWD-000121 July 2012

c Thames Water Utilities Ltd 2008

Access for maintenance vehicles

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan: Existing Counters Creek sewer

This drawing

A c c e s s

Electrical and control equipment located in existing pumping station Connection to existing ventilation chamber Existing 0.225m x 0.355m ventilation column approximately 10.5m high Local control pillar 0.3m x 0.7m x 1.2m high Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

oa d

0.225m internal dia ventilation duct Existing access to sewer to be retained Interception chamber

Lo t s

Key:
Limits of land to be acquired or used (LLAU) Existing sewers Proposed access cover

Lots Road PS discharge pipe

Existing tidal flap valve chambers

104.50

Proposed level (shown in metres above tunnel datum) Zone within which all permanent site structures would be located

105.33

Zone within which the shaft would be located 105.41 Zone within which permanent above ground structures would be located Limits of permanent access

Lots Road Pumping Station

Notes:
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan.

Access for maintenance vehicles

105.30

New access covers over tidal flap valves

Existing jetty (with outfall under)

Work No. 11b. 3m internal dia connection tunnel

s es c c A
105.25 Work No. 11a. CSO drop shaft (8m internal dia) Passive filter chamber Ventilation duct

Connection culvert

Relocated access to existing flap valve chambers

1m internal dia de-aeration vent duct

Access to de-aeration vent

De-aeration chamber 3.6m internal dia Zone within which Work No. 11a would be located

10m

10m

Scale 1:200 at A1 1:400 if reproduced at A3 Outfall apron

ILLUSTRATIVE

Location Zone within which Work No. 11c would be located

Cremorne Wharf Depot Royal Borough of Kensington & Chelsea


Document Information

Section 48 publicity Permanent works layout Book of plans - section 11


Mean low water 2 No. 0.9m internal dia ventilation columns of 4m minimum to 8m maximum height S48-PP-11X-CREWD-000122 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

h t di E G e ov r

od Ra re on rm Ce

Keyplan:

This drawing

e od n Ra rm r Ce o

Cremorne Riverside Activity Centre

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

S t r e e t

Key:
a t e r w
Limits of land to be acquired or used (LLAU) Zone within which permanent above ground structures would be located Thames Path Existing levels (shown in metres above tunnel datum) Proposed levels (shown in metres above tunnel datum) Consented development footprint (by others) Listed buildings/structures

S t a d i u m

o a d

A s h b u r n h a m

L o t s

e a n

l o w

y b a n r u B

t e e r t S

R o a d

+ 105.40m

105.40 Cremorne Gardens

Approximate position of CSO outlet

Existing trees within surveyed area

Notes :
t e e r t S m u i d a t S
Station House Chelsea Wharf Interception chamber ventilation incorporated into existing vent to pumping station corner Local control pillar 1.2m high Lots Road Pumping Station 1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and the topographic survey base, both of which have been used in the preparation of this drawing.

+ 105.30m

Electrical and control kiosk to be housed inside existing Thames Water pumping station building

m de Ta a ad Ro

s t o L

d a o R

Maximum outline of reinstated depot building

+ 105.60m

+ 105.30m South elev.

L o C t s S O Ro d a i dP s c h a S r g e

East elev. Notional parking zone

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

Existing brick boundary wall retained. Approximately 4m high 105.60 2 No. ventilation columns of 4m minimum to 8m maximum height Proposed Circadian development mid rise building by others

ILLUSTRATIVE
Save for the scale of above ground structures which is indicative

Location

Cremorne Wharf Depot Royal Borough of Kensington & Chelsea


Document Information Proposed Circadian development high rise tower by others Lots Road Power Station to be redeveloped as part of Circadian scheme by others

Section 48 publicity Proposed site features plan Book of plans - section 11


S48-PP-11X-CREWD-000123 July 2012

New bridge proposed as part of Circadian development Chelsea Creek


c Thames Water Utilities Ltd 2008

Boundary wall retained

Grey shading denotes maximum outline of reinstated depot building

Electrical and control equipment housed inside Thames Water pumping station building, location to be confirmed. Service connection through basement wall below ground.

Lots Road Pumping Station beyond

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

Local control pillar 1.2m high

This drawing

Existing ventilation column adjacent to existing pumping station retained Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Approximate massing of proposed Circadian development shown dotted

Notes :
1. All dimensions and levels are approximate. 2. The purpose of this section is to illustrate the scale of the below ground infrastructure to be provided.

Chelsea Wharf

Chelsea Wharf

Interception chamber

10m

10m

Scale 1:200 at A1 1:200 if reproduced at A3

CSO drop shaft

ILLUSTRATIVE

Location

Cremorne Wharf Depot Royal Borough of Kensington & Chelsea


Document Information

Section 48 publicity Section AA Book of plans - section 11


S48-PP-11X-CREWD-000124 July 2012

Section AA

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 Vegetation overgrows river wall Cremorne Wharf depot building Jetty with CSO below Keyplan:
i v er el ev at i on

Lots Road Pumping Station

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Notes :
1. All dimensions and levels are approximate.

2020 flood defence level 105.41m ATD Mean high water springs 103.97m ATD

Mean low water springs 97.97m ATD

Site for proposed Circadian redevelopment

Decomissioned Lots Road Power Station

Chelsea Creek

Cremorne Wharf depot

Chelsea Wharf

Cremorne Gardens

As existing East (river) elevation

Approximate massing of proposed Circadian development shown dotted

2 No. ventilation columns of 4m minimum to 8m maximum height

Jetty with CSO below retained as existing

Existing ventilation column attached to existing pumping station retained and used Local control pillar 1.2m high

Grey shading denotes maximum outline of reinstated depot building

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

ILLUSTRATIVE

Location

Cremorne Wharf Depot Royal Borough of Kensington & Chelsea


2020 flood defence level 105.41m ATD Mean high water springs 103.97m ATD

Document Information

Section 48 publicity
Mean low water springs 97.97m ATD

As existing and proposed East (river) elevation Book of plans - section 11

Reinstated depot building

S48-PP-11X-CREWD-000125 July 2012

Proposed East (river) elevation

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 Ventilation column Cremorne Wharf depot Ramp up to higher level Jetty with CSO below
N

Keyplan:

Lots Road Pumping Station

Vegetation overgrows river wall

S o u t h

This drawing

Brick and masonry boundary wall

e s t e l e v a t i o n

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Notes :
1. All dimensions and levels are approximate.

2020 flood defence level 105.41m ATD Mean high water springs 103.97m ATD

Mean low water springs 97.97m ATD

Low rise housing and commercial

Stadium Street

Low rise housing and commercial Lots Road Lots Road Pumping Station

Cremorne Wharf depot

River Thames

As existing South West elevation

Existing ventilation column attached to existing pumping station retained and used

2 No. ventilation columns of 4m minimum to 8m maximum height

Jetty with CSO below retained as existing

Grey shading denotes maximum outline of reinstated depot building

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

ILLUSTRATIVE

Location

Cremorne Wharf Depot Royal Borough of Kensington & Chelsea


Document Information
2020 flood defence level 105.41m ATD Mean high water springs 103.97m ATD

Section 48 publicity As existing and proposed

Mean low water springs 97.97m ATD

South west elevation Book of plans - section 11

Reinstated depot building

S48-PP-11X-CREWD-000126 July 2012

Proposed South West elevation

c Thames Water Utilities Ltd 2008

S T R

E E T

A O D R ER O N R M C E
9 1

N
3
PCs Pond Post Post

S T A D

A D

LO

T S

2 2

R O A D
1 1

3 4

f or es ho r e

6 1

0 1

4 6

i v er Th am

es

M U I D A T S

Security office

ea n

e s u o o t H 1 r e i r rConstruction access, e K left turn in


2 1

Site power structure


48

at er

Mud and Shingle

l ow

6 3 8 3

6 2

33

35

35

6 8 8 8

0 9

B C T

5 5

8 2 0 3

Lots Road Pumping Station


0 6

Construction access, right turn out


7

Existing gated access Existing jetty


4 7
7 6

O L

S T

O R

D A

Tanks
e t h en i M a Hg Wa r n e u ad h g M d n Si l

MLW

Chelsea Creek

1 4

5 3

A S H B U R N H A M

1 2

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

I U
7 3
9 3

1 9

5 4

1 3

3 1

7 2

2
2

Keyplan:
Pier
Post

11

This drawing

21

Pier

Landing Stage

1
1 4

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

29

Cremorne Gardens
3 5

Key:
Limits of land to be acquired or used (LLAU) Hoarding

Shared access road

T E E R T S

Existing gated access

Maximum extent of working area

Existing public right of way

M DE TA A RO AD
74

Route of temporary diversion of right of way

Site access

Access / haul route

Workshop buildings / stores

Existing sewers

12

Excavated material storage and handling area

Notes :
1. These construction phasing plans have been

Offices / welfare building

prepared to illustrate possible site layouts for the principal construction phases. Contractors may choose to lay sites out differently during construction depending on their preferred construction methods subject to any controls on layout imposed through the planning Authorised channel submission and approval process. 2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown. 3. Utility supplies for the construction of the works would be agreed with the relevant utility company.

39 37 38

Excavated material storage and handling area Crane

Existing Lots Road PS discharge outfall in river wall and associated spillway

4. Additional noise mitigation including noise barriers may be required but is not shown on this drawing.

Water Screens

Water treatment

Shaft 10m Crane Barge on campshed Scale 1:500 at A1 1:1000 if reproduced at A3 Concrete batching plant and aggregate storage area 0 40m

ILLUSTRATIVE
Mud
Location

Cremorne Wharf Depot Royal Borough of Kensington & Chelsea


Mud and Shingle

Chelsea Creek

Document Information

Section 48 publicity Construction phases - phase 1 Site setup, shaft construction & tunnelling
Weir

Book of plans - section 11

C e e Ce k h l a re s
Shingle MP MP

S48-PP-11X-CREWD-000127 July 2012

c Thames Water Utilities Ltd 2008

S T R

E E T

A O D R ER O N R M C E
9 1

N
3
PCs
1 0 5 . 2 1

S T A D

1 2

Pond

Post Post

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

A D

LO

T S

2 2

R O A D
1 1

3 4

f or es ho r e

6 1

0 1

4 6

i v er Th am

es

M U I D A T S

48

Security office

Mud and Shingle


l ow

at er

Construction access, left turn in


5 4

ea n

6 3 8 3

6 2

Construction access, right turn out


10 5. 89

33

Existing gated access


7 Excavated material storage and handling area
1

35

1 5 0 . 9 0

1 5 0 . 9 0

35

1 0 5 . 9 1

10 5. 88

1 5 0 . 9 0

1 0 5 . 8 9

10 5. 88

6 8 8 8

0 9

B C T

5 5

8 2 0 3

Lots Road Pumping Station

O L

S T

O R

D A

Tanks
e t h en i M a Hg Wa r n e u ad h g M d n Si l

MLW

Chelsea Creek
re CC e k

1 4

5 3

A S H B U R N H A M

I U
7 3
9 3

1 9

1 3

3 1

7 6

7 2

2
2

Keyplan:
Pier
Post

11

This drawing

21

Pier

Landing Stage

1
1 4

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

29

Cremorne Gardens
3 5

Key:
Limits of land to be acquired or used (LLAU) Hoarding

Shared access road

T E E R T S

Existing gated access

Maximum extent of working area

Existing public right of way

e s u o o t H 1 r e i r r e K
2 1

Site power structure

M DE TA A RO AD
74

Route of temporary diversion of right of way

Site access

Access / haul route

Existing sewers

12
0 6

Notes :
1. These construction phasing plans have been Piling rig prepared to illustrate possible site layouts for the principal construction phases. Contractors Offices / welfare building
1 0 5 . 8 8

may choose to lay sites out differently during construction depending on their preferred

1 0 5 . 8 6

Existing jetty
1 0 5 . 8 4

construction methods subject to any controls on layout imposed through the planning submission and approval process.

88 5. 10

3 5 . 5 0 1

1 0 5 . 9 0

1 0 5 . 8 5

Authorised channel
1 0 5 . 8 3

2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown. 3. Utility supplies for the construction of the works would be agreed with the relevant utility company.

1 0 5 . 9 1

39 37 38

1 0 5 . 8 9

Existing Lots Road PS discharge outfall Shaft

4. Additional noise mitigation including noise barriers may be required but is not shown on this drawing.

Water Screens

Water treatment

Crane 10m Barge on campshed Scale 1:500 at A1 1:1000 if reproduced at A3 Concrete batching plant and aggregate storage area 0 40m

ILLUSTRATIVE
Mud
Location

Cremorne Wharf Depot Royal Borough of Kensington & Chelsea


Mud and Shingle

Chelsea Creek
CC e k re
L By B d

Document Information

Section 48 publicity
B d L By

Construction phases - phase 2 Construction of other structures Book of plans - section 11

Weir

C e e Ce k h l a re s
Shingle MP MP

S48-PP-11X-CREWD-000128
L BB d y U d n

July 2012

c Thames Water Utilities Ltd 2008

k l Wa v oe D

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:
Posts

This drawing

P o s t s

City of Westminster
Posts

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Royal Borough of Kensington & Chelsea

Key:
Posts Posts

Local authority boundary


Post Posts

Posts

Order limits
Posts Post

Tunnel
t ss Po

Ps ot s

Shaft
Posts

t ss Po

Post

Post

Posts

Posts

Posts Posts

Post

Chelsea Embankment Foreshore


GP

Posts

Ps ot s

y b Su wa

Ps ot

Ranelagh connection tunnel Mean low water

n et nm ak mb e E sa hl C e
d e ig e Br es a Ch l

Mean low water

Main tunnel

Kirtling Street

London Borough of Wandsworth


k l a c W ae er Tr

Conveyor

Festival Pleasure Gardens Battersea Power Station

100m

100m

Millennium Arena

Scale 1:2500 at A1 1:5000 if reproduced at A3

FOR INFORMATION

Location

Chelsea Embankment Foreshore


e u e vn l aA t nr e C

Royal Borough of Kensington & Chelsea


Document Information

Section 48 publicity
Battersea Park

Location plan Book of plans - section 12

e au el tn nr ev CA

S48-PP-12X-CHEEF-000129 July 2012


Post Post

Central Peninsula

Battersea Park

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan: This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Ranelagh Gardens

Key:
Limits of land to be acquired or used (LLAU) Authorised channel Thames Path + 105.40m Existing levels (shown in metres above tunnel datum) Listed buildings/structures Approximate position of CSO outlet Existing trees within surveyed area

Royal Hospital South Grounds

Notes:
1. All dimensions and levels are approximate. + 104.18m 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and the topographic survey base, both of which have been used
R o y a l H o s p i t a l a x i s

in the preparation of this drawing.

+ 103.71m + 106.43m Entrances to Royal Hospital Grounds Brick dwarf wall with railings above to Royal Hospital perimeter forms setting to historic park and gardens Traffic island for pedestrians + 104.25m + 104.84m

+ 107.80m

+ 106.00m

"Bull Ring" gates Bus stop Raised grassed central reservation Royal Hospital "Bull Ring" + 104.88m End of stone parapet (brick wall below)

End of brick parapet

r e t w a l w e no M a

n et nm ak mb E e sa e hl C

Brick parapet to river wall Earthed embankment up to Chelsea bridge Ranelagh CSO

10m

40m

+ 104.90m

Scale 1:500 at A1 1:1000 if reproduced at A3

At time of issue this tree had been removed by others + 104.88m Regular stone piers with cast iron lampstands River wall constructed of brick with a stone parapet above east and west of Grosvenor College stairs Apron (scour protection) to outfall

FOR INFORMATION
e nl hn ca s i d re to uh A
Location

Chelsea Embankment Foreshore Royal Borough of Kensington & Chelsea


Document Information

Grosvenor College stairs End of listed wall (stone wall and parapet) West elev.

Section 48 publicity
South elev.

As existing site features plan Book of plans - section 12


S48-PP-12X-CHEEF-000130 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Royal Hospital
(Army Pensioners)

Keyplan:

Ranelagh Gardens

This drawing

Highway to be temporarily stopped up for diversion of utilities and construction of a connection to the existing Low Level Sewer No.1
War Memorial

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU)

Ap

Existing public right of way Route of temporary diversion of right of way

Highway to be temporarily stopped up for site access and deliveries

Signalised temporary pedestrian crossing on diversion

Existing right of way temporarily stopped up Area of highway to be temporarily stopped up

Ap
Existing signalised pedestrian crossing

Area of temporary extinguishment of public rights of navigation Length along which access to construction would be located

Thames Path

Notes:
1. This plan does not show stopping up and diversions of limited duration (eg hoarding

T N ME K N A MB E A LE ES H C

Shingle

erection, minor utility diversions and minor highway works). 2. Only rights of way in or close to worksites are shown. The full extents of rights of way are not shown where they cease to be

Ap
tr ae hW g i nH a Me

relevant to the project.

Thames Path

Authorised channel

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

FOR APPROVAL

Location

Chelsea Embankment Foreshore Royal Borough of Kensington & Chelsea


Document Information

Section 48 publicity

s a e hm eT v i r R
y B d L B s& nt y o l s C G A , L nt os C oo Br

Access plan Book of plans - section 12


S48-AC-12X-CHEEF-000011 July 2012

h ec R a s l a e e h C
CW C L
c Thames Water Utilities Ltd 2008

10 4. 41

1 0 4 . 6 6

1 0 1 4 0 . 4 5 . 6 4 1

0 3 0. 15

15 7 0. 3

1 0 53 .9
.1 51 0 1

105.82

105.70

14 4 0. 5

3 4 . 4 0 1

7 4 . 4 0 1

1 0 1 4 0 . 4 3 . 7 4 8

1 0 4 1 . 0 4 5 . 3 2 6

0 8 . 4 0 1

0 4 0. 14

105.81

1 0 5 . 3 9
14 3 0. 4 14 8 0. 2
1 0 4 . 6 9

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

1 0 4 . 3 0

3 5 . 4 0 1

105.67

7 3 0. 15
8 3 0. 15 5 9 0. 14
N

1 0 1 4 0 . 4 3 . 5 5 1

3 3 0. 14 7 1 0. 14

1 0 4 . 6 0
1 0 5 . 3 7

1 0 4 . 2 3

1 0 4 . 2 6

8 2 . 4 0 1

Keyplan:
8 7 0. 14

8 2 . 4 0 1

4 2 . 4 0 1

1 0 4 . 3 9

105.50
4 3 0. 15
2 9 0. 14 9 8 0. 14 8 8 0. 14

4 9 0. 14

This drawing

1 0 4 . 1 3 0 2 4 . 5 7

8 3 0. 15
1 0 5 . 4 2

6 6 0. 14

1 0 4 . 7 4
1 0 4 . 3 3

5 4 0. 15

1 0 54 .2
0 5 0. 15
9 8 0. 14

1 0 4 . 3 9

10 10 4. 3 4. 4 28

1 0 4 . 6 7 1 0 4 . 5 4

1406
15 0. 4 3
7 7 0. 14 5 6 0. 14 1 7 0. 14
14 0. 6 6

14 0. 7 6

15 7 0. 4 14 2 0. 8

14 7 0. 6

6 8 0. 14

7 7 0. 14

.7 45 0 1
1 0 4 . 6 9
10 4. 66

8 5 0. 14 8 7 0. 14

14 0. 5 1

1 44 0 .7

1 4 0 . 3 9 1 4 0 . 2 0

.8 48 0 1

14 2 0. 7
14 7 0. 5

14 4 0. 7 14 7 0. 5

6 7 0. 14

8 7 0. 14 1 6 0. 14

3 6 0. 14

9 7 0. 14

1 45 0 .4

1 0 49 .1

1 0 53 .2

1 46 0 .9

Traffic island to be replaced with permanent pedestrian refuge on completion of works. (Refer to landscaping plan for proposed position)
8 7 0. 14

6 6 0. 14

1 6 0. 14

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

.3 47 0 1

1 8 0. 14
3 6 0. 14 0 7 0. 14

1 47 0 .1

1 0 53 .1

1 0 52 .9

9 6 0. 14

9 8 0 . 1 4

1 53 0 .5

0 3 0 . 1 5

1 7 0. 14
4 8 0. 14

Key:
0 0 0. 15
0 9 0. 14

0 .2 1 43

0 0 0. 15 9 8 0. 14

5 6 0. 14 2 7 0. 14
6 8 0. 14

Limits of land to be acquired or used (LLAU)


8 3 0. 10

1 0 46 .6

8 7 0. 14

0 .8 1 45
0 7 0 . 1 4

89 4. 10

0 3 . 5 0 1
8 2 . 5 0 1 5 8 . 4 0 1

6 6 0. 14

1401
Stn 1401 104.739
7 7 0. 14

5 7 0. 14 0 8 0. 14

2 7 0. 14

6 8 0. 14

Trees to be removed

73 4. 10

6 4 0 . 1 4

5 6 0 . 1 4
0 .1 1 47

1 0 46 .9
104.72

n et nm ak mb E e s l a 1 9 0. h 14 C e

8 8 0. 14
5 8 0. 14

8 8 0. 14 4 3 0. 10

4 3 0. 10

Trees to be pruned Above ground structures to be removed Below ground structures to be removed or infilled Structure to be removed and relocated or reinstated

5 6 0. 14
5 7 0. 14

3 5 0 . 1 4

3 6 0 . 1 4

1 9 0. 14
8 97 9.

99.48
3 98 9.
99.41

Stone parapet materials to be re-used elsewhere on site where possible


1 9 0. 14

4 6 0. 14

2 9 0. 14

6 7 0. 14

4 8 0. 14
4 9 0. 14

9 96 .0

99.43

9 96 9 .

5 93 9.

8 6 0. 14

4 8 0. 4 14 8 0. 14

JB

9 1 0. 15

6 8 0. 14

IC CL104.79 LP

L Plane 2 7 g 2.5 0. 14 s 18 8 5 0. 14 h 18

.2 45 0 1

9 7 0. 14

Stn 1405 104.881

1 9 0. 14

3 95 9.

8 96 9.

99.37

5 7 0. 14 1 8 0. 14

M a c l e Sh e 2 thi : e t n

6 1 0. 15

0 8 1 0. 1 48 0. 14

99.50

1 7 0. 14

1405

99.37

65 . 99

1 97 9.

9 96 9 .

3 9 5 9.

9 . 96 8

W B 8 . h1 R IF
0 2 0. 15

7 8 0. 14

3 9 0. 14

99.39

6 98 9.

JB

7 8 0. 14

C I .5 48 L0 C 1
CPS

6 7 0. 14 0 7 0. 14

.5 47 0 1

5 8 0. 14
4 7 0. 14 2 8 0. 14

C I .1 48 L0 C 1 0 8 0. 14

TL

2 7 0. 14

0 90

6 8 0. 14

0 7 0. 14

14 d.
L Plane g 2.0 s 18 h 14

6 9 0. 14

9 . 95 4

7 8 0. 14 3 6 0. 14 0 8 0. 14

5 9 0. 14

8 8 0. 14

tr ae hW i Hg a en M
4 9 0. 14 2 99 9. 6 2 0. 10

Stone parapet and section of river wall brick facing to be stored during construction and reinstated post construction

Notes:
1. Minor items to be removed (e.g. barriers, bollards etc.) are not shown. 2. General activities of site clearance such as removal of hardstanding and foundations,

56 . 99

2 95 9 .

c Ta

99.16

46 . 99

99.59
2 95 9 .

99.46

99.03

stripping of topsoil and clearance of minor


99.39

99.55

99.13 99.17
28 . 99

vegetation not shown.

4 6 0. 10
9 92 9 .

99.74

8 8 0. 14

2 7 0. 14
8 8 0. 14

7 9 0. 14

7 8 0. 14

1 8 0. 1 4 LP
3 8 0. 14 4 8 0. 14

Stone Paving Slabs

.6 49 0 1

7 9 0. 14

1 6 0. 11

99.85

99.36
6 92 9 .

IC CL104.90

TL

6 9 0. 14
c Ta

8 9 0. 14

. 22 00 16 0. 12 1 6 0. 12

100.16 99.58

9 .0 94

99.32

98.98

9 8 0 . 1 4

.1 49 0 1
L Plane g 3.0 s 18 h 18

.5 20 0 1

100.58
99.45 101.00

7 90 9 .

9 .2 91

.7 48 0 1

5 9 0. 14

JB

C 9 I .6 14 6 L0 9 C 0. 14 9 0 0. 16

W R 2 8 0. 11

99.38

99.07 98.67
6 3 . 8 9

l l a eW tn So

l l 7 a 9 0. gW 14 8 n i n 0 ti ea 0. R 16 e pd l So
5 9 0. 14 8 0 0. 16

7 9 0 . 1 4

3 5 0. 11
6 3 0. 11
101.28

3 No. Ornamental lamp standards


99.51

99.51

0 94 9.

8 87 9 .

98.15

5 88 9 .

101.08
101.14
99.22

4 8 9 9.

98.27

JB

2 1 0. 11 9 0 0. 11

IL101.08

100.90

99.67
5 8 0 9.

7 0 0. 11

100.46

99.80

98.51

6 3 . 8 9

97.91
9 8 . 3 6

98.90

7 3 . 8 9
9 8 . 3 7

Sheet Layout:
Sheet 2

99.96

98.67

6 3 . 8 9

100.25
98.75 99.85

3 8 8 9.
97.86

100.05

Stone parapet and section of river wall brick facing to be stored during construction and reinstated post construction
99.19

98.70

98.25 97.84

99.38
98.73 97.54
6 83 9.

6 3 . 8 9
96.90

Sheet 1

99.41

98.35

97.21

98.77

3 8 4 9.

99.16

Brick outfall apron


98.75
3 8 8 9.

10m

10m

99.03

98.57

3 8 6 9.

2 8 8 9.
3 8 1 9.

3 8 7 9.

Concrete scour damage repair Mean low water

Scale 1:200 at A1 1:400 if reproduced at A3

2 8 8 9.
) 0 0 1 1 t 1a 1 2 /0 /9 10 0 e( n i L e tr Wa

FOR APPROVAL

w o L .8 82 9

.8 82 9

Location
s e a hm eT i r Rv

Chelsea Embankment Foreshore Royal Borough of Kensington & Chelsea


Document Information

Section 48 publicity
Authorised channel

Demolition and site clearance Sheet 1 of 2 Book of plans - section 12


S48-PP-12X-CHEEF-000131 July 2012

c Thames Water Utilities Ltd 2008

104.61

N
104.59

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:
7 8 . 4 0 1

.3 46 0 1

1 0 5 . 1 2

90 3. 10

This drawing

.1 39 0 1

104.47

0 5 0. 14

1 7 . 4 0 1
.0 47 0 1

Ranelagh Gardens
.8 41 0 1
9 1 0. 14

14 9 0. 1

3 0. 14 4

.7 44 0 1

5 0. 15 6
14 2 0. 6

10 5. 64

.8 43 0 1

1 0 4 . 3 0

.2 42 0 1

.7 42 0 1
9 1 . 4 0 1

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
.9 78 0 1

1 0 41 .4

8 1 0. 14

.4 75 0 1
5 2 0. 17
8 8 . 5 0 1

104.07

.8 75 0 1

Key:
Limits of land to be acquired or used (LLAU)

0 .7 1 41

0 2 0. 14

03 . 37 1 0 3 . 3 2

4 9 0. 13

1 0 4 . 1 4

.4 73 0 1

81 5. 10

2 9 0. 13
10 3. 45 10 3. 36

3 1 0. 14
1 41 0 .8

.9 69 0 1
17 . 6 10

.0 75 0 1 .8 73 0 1

1 1 0. 14
4 1 . 4 0 1

1 0 4 . 9 1

Trees to be removed
.1 73 0 1

.2 71 0 1

.0 72 0 1

0 9 0. 13
7 9 0. 13

.6 73 0 1

8 3 0 . 1 3

6 1 . 6 0 1

6 7 0. 13
1 7 0. 13
9 3 0 . 1 3

.1 72 0 1
16 5 0. 6

Trees to be pruned Above ground structures to be removed

.3 72 0 1

6 8 . 4 0 1

5 0. 16 4

5 0. 13 9

6 8 0. 13
1 0 65 .3

7 0. 13 8

4 0. 13 1

5 4 0. 13

2 7 0. 16

.4 70 0 1

.2 70 0 1

5 0. 13 9
4 0. 13 7

6 0. 13 7

.2 38 0 1
5 7 0. 13

6 2 0. 16

.0 67 0 1

.2 66 0 1

.5 68 0 1

9 8 . 5 0 1

.0 58 0 1

.9 69 0 1

.0 71 0 1 .9 69 0 1

Structure to be removed and relocated or reinstated


.0 73 0 1

8 6 0. 16
3 6 0. 16
9 2 0. 16

.0 68 0 1

Borehole
5 0. 13 7

106.19

5 0. 16 7

2 5 0. 16

.9 66 0 1

7 0. 13 6 6 0. 13 4 8 0. 13 4
6 0. 13 4

1 0 1 35 0 . 3 . 8 6 5

.5 37 0 1
7 6 0. 13
0 3 . 6 0 1

Notes:
.0 71 0 1

.1 37 0 1

5 5 0 . 1 3

7 2 . 6 0 1

6 2 0. 16

8 3 0. 16

1402
.3 64 0 1

2 5 0. 16
0 4 0. 16

7 0. 13 4

106.20

3 2 0. 16
3 1 0. 16

1. Minor items to be removed (e.g. barriers, bollards etc.) are not shown.

0 8 0 . 1 3

5 1 0. 16
6 6 0. 15

103.92

7 0 0. 16

5 2 0. 16 3 1 0. 16
.1 68 0 1

106.24
1 9 0. 15 2 9 0. 15 0 0 0. 16 6 7 0. 15 9 7 0. 15 0 9 0. 15

.9 40 0 1

2. General activities of site clearance such as removal of hardstanding and foundations,


.4 72 0 1

.4 40 0 1

106.14
.7 55 0 1

3 5 0. 16

105.82
8 6 0. 15 1 5 0. 15 8 3 0. 15

105.13 105.03 105.30

4 6 0. 15

7 7 0. 15
7 6 0. 15
1 3 0. 16

Brick boundary wall with .5 68 railings to be dismantled 0 1 .7 69 0 1 and re-instated on completion of works to match existing
.0 66 0 1 .4 67 0 1

stripping of topsoil and clearance of minor vegetation not shown.

.0 42 0 1

.5 43 0 1
.4 48 0 1
59 4. 10

.1 71 0 1

64 5. 10

.3 57 0 1

9 4 0. 15

.7 69 0 1
9 7 0. 16

9 2 0. 15 3 2 0. 15
18 5. 10 94 4. 10

0 4 0. 15
9 3 0. 15

6 1 0. 16
7 3 0. 16

.9 67 0 1

.4 68 0 1 .6 64 0 1

.4 66 0 1

105.74

8 1 0. 15

1 5 0. 16
0 9 0. 15 7 2 0. 15 3 1 0. 15
3 1 0. 16 6 2 0. 16
9 0 0. 15 7 9 0. 14

105.63

105.39

1 5 0. 16
2 7 0. 16 .3 64 0 1 3 6 0. 16

.6 48 0 1

105.63

105.73
3 9 0. 14

5 0 0. 15

9 5 0. 15

2 9 0. 15 5 0 0. 16 0 4 0. 16

3 4 0. 15 6 4 0. 15

1 5 0. 16

1 4 0. 16

3 7 0. 14

2 9 0. 14
4 8 0. 14

8 9 0. 14 5 8 0. 14

105.02
8 0 0. 10

7 3 0. 15

9 4 0. 15

3 9 0. 14
4 7 0. 14

2 7 0. 14

5 4 0. 15

3 8 0. 14
5 9 0. 14 7 7 0. 14

2 6 0. 14

2 1 0. 15

n et nm ak mb aE s e e hl C
5 3 0. 15

8 6 0. 15 7 7 0. 15 1 1 0. 16

4 2 0. 16
7 8 0. 15

9 9 0. 15
3 7 0. 14

0 7 0. 14

4 3 0. 10

4 4 0. 15
1 5 0. 15 0 9 0. 15

2 0 0. 16 7 8 0. 15
4 8 0. 15
1 7 0. 14

3 4 0. 15

3 7 0. 14 5 4 0. 10

0 4 0. 10

7 5 0. 14 5 9 0. 14 5 7 0. 14

9 9 0. 14

99.79

0 2 0. 15
7 2 0. 15

4 5 0. 15

6 7 0. 15 8 6 0. 15

5 5 0. 15
7 5 0. 10

99.86
99.32

5 9 0. 14 6 8 0. 14 5 7 0. 14 3 6 0. 14 8 7 0. 14 6 6 0. 14

8 5 0. 14

4 8 0. 14

6 9 0. 14 7 0 0. 15

8 4 0. 15 5 3 0. 15
5 7 0. 14 8 6 0. 10 8 5 0. 10

5 8 0 . 1 5

6 5 0. 15

99.88

99.33

Sheet Layout:
Sheet 2

105.66
1 4 0. 15

99.37

7 7 0. 14

1 8 0. 14
2 9 0. 14 1 7 0. 14 7 0 0. 15 7 1 0. 15
0 1 0. 11

99.84
0 3 0. 15 4 2 0. 15
7 8 0. 10

99.46

99.51 99.84 99.51

6 7 0. 14 5 6 0. 14 6 7 0. 14 6 7 0. 14 4 5 0. 14 3 7 0. 14 5 5 0. 14 7 6 0. 14 0 6 0. 14 0 7 0. 14

Sheet 1
98.79 99.94 99.56

9 0 0. 15 5 0 0. 15 0 0 0. 15

5 2 0. 15

7 7 0. 14

1 4 0. 11

99.56

98.66

0 9 0. 15

6 3 0. 11

100.06 99.76

9. 8 3 3

10m
9 83 .0

10m

99.95
7 8 0. 14 6 3 0. 10 9 8 0. 10

100.13

.3 83 9
9 8 . 3 4

1 6 0. 14 9 6 0. 14

1 8 0. 14

4 8 0. 14

Scale 1:200 at A1 1:400 if reproduced at A3


.4 83 9

100.21

3 8 5 9.

9 9 3 9.

100.37 100.26 100.24

4 8 0. 14

100.11

98.60

3 1 0. 10
6 8 0. 14 8 3 0. 10

100.03 100.04

Shingle
98.79

5 3 . 8 9

3 83 9.

FOR APPROVAL

99.58

99.95

99.80 99.60 99.58

98.89

2 3 . 8 9

Mean low water

Location

99.48 98.85
3 83 9.

Chelsea Embankment Foreshore Royal Borough of Kensington & Chelsea


Document Information

99.39 99.48

98.79 99.41
.3 83 9

Section 48 publicity
98.98

Demolition and site clearance


.7 83 9
99.09
3 8 4 9.

4 3 . 8 9

Sheet 2 of 2 Book of plans - section 12


S48-PP-12X-CHEEF-000132 July 2012

M a c l e Sh e 2 thi : e t n

99.17

.5 83 9

99.16

99.15
.5 83 9

s e a hm eT i r Rv

2 3 . 8 9

c Thames Water Utilities Ltd 2008

Table 1
Above ground permanent structure Maximum height above finished ground level (Minimum heights are in brackets where applicable)

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

Ranelagh Gardens
Ventilation column(s) serving the shaft 8.0m (4.0m)

This drawing

Ventilation column(s) serving interception and overflow weir chambers Electrical and control kiosk(s)

6.0m

1.5m Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
War Memorial

Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located (those listed in Table 1) Zone within which required landscaping would be located Maximum extent of intertidal terracing Zone within which ventilation column(s) serving the interception and overflow weir chamber(s) may be located

Notes:
1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.

Zone within which electrical and control kiosk(s) and ventilation column(s) serving the shaft may be located

Zone within which Work No. 12a would be located

T N ME K N A MB E A LE ES H C

Shingle

tr ae hW g i nH a Me

tr ae ww o nl a Me

Zone within which electrical and control kiosk(s) and ventilation column(s) serving the interception chamber may be located

Maximum extent of intertidal terrace (See Typical Section A) Maximum extent of intertidal terracing Top of river/parapet wall 106.00m maximum 105.45m minimum Zone within which Work No. 12c would be located Intertidal terrace 10m 0 40m

Scale 1:500 at A1 1:1000 if reproduced at A3

FOR APPROVAL

Location

Chelsea Embankment Foreshore


Varies

Royal Borough of Kensington & Chelsea


Document Information

Section 48 publicity

s a e hm eT v i r R
y B d L B s& nt y o l s C G A , L nt os C oo Br

Foreshore structure

River foreshore (level varies)

Site works parameter plan Book of plans - section 12


S48-PP-12X-CHEEF-000133 July 2012

h ec R a s l a e e h C
CW C L

Typical Section A
(Not to scale)
c Thames Water Utilities Ltd 2008

Ranelagh Gardens
Monument

Ranelagh Gardens
Monument

A E S L T E N H C ME K N A MB E
War Memorial War Memorial

A E S L T E N H C ME K N A MB E

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:
H M W H M W

This drawing

Shingle

Shingle

Zone within which Work No. 12c would be located

Zone within which Work No. 12a would be located

T N ME K N A MB AE LE ES H C

Shingle

r e t w a o l w en M a

T N ME K N A MB AE LE ES H C

Shingle

r e t w a o l w en M a

tr ae hW g i nH a Me

tr ae hW g i nH a Me

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Chelsea Reach

Chelsea Reach

Key:
Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located (those listed in Table 1) Zone within which required landscaping would be located

s a e hm eT i r Rv
y B d L B s& nt y o l s C G A , t L os Cn oo Br

s a e hm eT i r Rv
Ranelagh Gardens
Monument

y B d L B s& nt y o l s C G A , t L os Cn oo Br

Ranelagh Gardens
Monument

Maximum extent of intertidal terracing

A E S L T E N H C ME K N A MB E
War Memorial War Memorial

A E S L T E N H C ME K N A MB E

Notes:
1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.

H M W

H M W

Shingle

Shingle

Zone within which electrical and control kiosk(s) and ventilation column(s) serving the shaft may be located
r e t w a o l w en M a r e t w a o l w en M a

T N ME K N A MB AE LE ES H C

Shingle

T N ME K N A MB AE LE ES H C

Shingle

tr ae hW g i nH a Me

tr ae hW g i nH a Me

Chelsea Reach

Chelsea Reach

Zone within which electrical and control kiosk(s) and ventilation column(s) serving the interception chamber may be located

s a e hm eT i r Rv
y B d L B s& nt y o l s C G A , t L os Cn oo Br

s a e hm eT i r Rv
Ranelagh Gardens
Monument

y B d L B s& nt y o l s C G A , t L os Cn oo Br

War Memorial

Zone within which ventilation column(s) serving the interception and overflow weir chamber(s) may be located

10m 0
A E S L T E N H C ME K N A MB E

100m Scale 1:1250 at A1 1:2500 if reproduced at A3

H M W

Shingle

FOR INFORMATION

T N ME K N A MB AE LE ES H C

Shingle

r e t w a o l w en M a

Location

Chelsea Embankment Foreshore Royal Borough of Kensington & Chelsea

tr ae hW g i nH a Me

Document Information

Section 48 publicity
Chelsea Reach

Site works parameter key plan Book of plans - section 12


S48-PP-12X-CHEEF-000134 July 2012

s a e hm eT i r Rv
y B d L B s& nt y o l s C G A , t L os Cn oo Br

c Thames Water Utilities Ltd 2008

Existing Ranelagh and Kings Scholars Pond Storm Relief Sewer

Existing Ranelagh Sewer (Main line)

Existing Sloane Street Sewer

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan: This drawing

To be modified. For landscaping refer to proposed landscape plans. Existing northern Low Level Sewer No. 1 0.225m internal dia. ventilation column, 6m high
n et nm ak mb aE s e e hl C

Trees shown are existing. For landscaping refer to proposed landscape plans. Bull Ring Zone within which electrical and control kiosk and ventilation column serving the interception chamber may be located

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Ranelagh CSO

Key:
M a c l e Sh e 2 thi : e t n Existing access Limits of land to be acquired or used (LLAU) Existing sewers Proposed access cover 104.50 Proposed level (shown in metres above tunnel datum) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located

Access for maintenance vehicles 103.10 Passive filter chamber 106.05

Inter-tidal terrace over connection culvert

Ranelagh connection culvert

2 No. 0.9m internal dia. ventilation columns of 4m minimum to 8m maximum height

Electrical and control kiosk 4.5m x 2m x 1.5m high

e tr 104.95 Wa h g i nH a Me
Electrical and control kiosk 4.5m x 2m x 1.5m high

Notes:
Connection culvert from northern Low Level Sewer No. 1 overflow weir chamber 1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan.

103.10

River wall Scour protection

To Grosvenor College stairs

Zone within which the ventilation columns and the electrical and control kiosk serving the shaft may be located Parapet wall Inter-tidal terrace to match opposite side Ventilation duct Scour protection Work No. 12a. CSO drop shaft (12m Internal dia.)

Interception chamber and valve chamber

CSO overflow

Zone within which Work No. 12a would be located

Sheet Layout:
Sheet 2 Sheet 1

10m 4.8m internal dia. de-aeration chamber

10m

Scale 1:200 at A1 1:400 if reproduced at A3 Mean low water

ILLUSTRATIVE
Outfall apron Work No. 1b. 7.2m internal dia. main tunnel to Kirtling Street

Location

Zone within which Work No. 12c would be located Authorised channel

Chelsea Embankment Foreshore Royal Borough of Kensington & Chelsea


Document Information

Section 48 publicity Permanent works layout Sheet 1 of 2 Book of plans - section 12

Work No. 1b. 7.2m internal dia. main tunnel to Cremorne Wharf

Work No. 12b. 4m internal dia. connection tunnel

S48-PP-12X-CHEEF-000135 July 2012

c Thames Water Utilities Ltd 2008

N Ranelagh Gardens

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan: This drawing

Trees shown are existing. For landscaping refer to proposed landscape plans

Zone within which ventilation column may be located

New gate for utility company access to diverted gas main

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU) Existing sewers Proposed access cover 104.50 Proposed level (shown in metres above tunnel datum) Zone within which all permanent site structures would be located
n hr r e r o1 ot e N . gn sn ii e S w x t vl e E e L o Lw

Zone within which permanent above ground structures would be located

Notes:
106.45 1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan.

0.225m internal dia. ventilation column, 6m high


.7 72 0 1

.9 74 0 1

.1 71 0 1

.7 69 0 1

2 7 0. 16

Overflow weir chamber


0 4 0. 16

3 6 0. 16

1 5 0. 16

4 2 0. 16

n et nm ak mb E e s l a h C e
6 7 0. 15 8 6 0. 15

1 1 0. 16 2 0 0. 16

0 9 0. 15

6 5 0. 15

Sheet Layout:
Sheet 2 Sheet 1

1 4 0. 15

0 3 0. 15 4 2 0. 15 7 1 0. 15

9 0 0. 15 5 0 0. 15 0 0 0. 15

10m

10m

Scale 1:200 at A1 1:400 if reproduced at A3

ILLUSTRATIVE

Location

Chelsea Embankment Foreshore Royal Borough of Kensington & Chelsea


Mean low water Document Information

Section 48 publicity Permanent works layout


Zone within which Work No. 12c would be located

Sheet 2 of 2 Book of plans - section 12


S48-PP-12X-CHEEF-000136 July 2012

M a c l e Sh e 1 thi : e t n

2.5m internal dia. connection culvert to interception chamber

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan: This drawing Royal Hospital South Grounds

Brass studs or a flush kerb to define bus stop and car parking spaces Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Kerbs to junction with Chelsea Embankment realigned to define shape better. All subject to agreement with TfL Future position of tree planting on replacement of adjacent mature tree
R o y a l H o s p i t a l a x i s

Key:
Limits of land to be acquired or used (LLAU) Zone within which permanent above ground structures would be located

+ 105.60m

+ 104.43m + 104.28m + 105.40m "Bull Ring" gates + 104.28m + 104.24m

Zone within which required landscape would be located Thames Path Existing levels (shown in metres above tunnel datum) Proposed levels (shown in metres above tunnel datum) Listed buildings/structures

105.40

+ 104.34m + 104.28m

+ 104.67m + 104.54m + 104.77m + 104.65m

Approximate position of CSO outlet Existing trees within surveyed area

+ 104.52m Existing bus stop retained Paving treatment continues into "Bull Ring" to tie foreshore structure into existing space Sculptured paving slightly raised + 104.53m + 104.63m

Proposed trees

Existing pedestrian island relocated east

Notes:
1. All dimensions and levels are approximate.

+ 104.65m + 104.72m

2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and the topographic survey base, both of which have been used Start of new river wall in the preparation of this drawing. 3. Access covers not shown on this drawing. Refer

n et nm ak mb E e sa hl C e
104.40

Fixed ladder access to terrace for periodic maintenance to terraces (to be used in conjunction with portable platform) Stone clad electrical and control kiosk 1.5m high marks intervention in existing parapet wall

Ventilation column 6m high

to the Permanent works layout for an indication of the extent of access covers required.

Sheet Layout:

104.90 Parish boundary marker stone Stone clad electrical and control kiosk 1.5m high marks intervention in existing parapet wall Sheet 1

Sheet 2

Brick facing to wall peels out to create inter-tidal terrace and blend new structure into river wall Inter-tidal terrace above Ranelagh interception structure 104.90 105.45 Simple stone bench marks end of space without impeding views

10m

10m

Scale 1:200 at A1 1:400 if reproduced at A3

104.40

ILLUSTRATIVE
Save for the scale of above ground structures which is indicative

Start of new river wall Exsiting stone parapet to river wall reinstated along the back of pavement edge Fixed ladder access to intertidal terrace for periodic maintenance (to be used in conjunction with portable platform)

106.00

Ranelagh CSO Paving flush at junction with surrounding finish

Location

Chelsea Embankment Foreshore Royal Borough of Kensington & Chelsea


Document Information

Section 48 publicity

Landscape key:
Floral motif pattern in grey and cream granite sets Surface of footway reinstated to match existing (concrete slab / pimple paving)

Proposed landscape plan Sheet 1 of 2 Book of plans - section 12


S48-PP-12X-CHEEF-000137 July 2012

Inter-tidal terrace between embankment and foreshore structure 2 No. ventilation columns of 4m minimum to 8m maximum height

AA

Grooves in scuptured paving marks historic axis

w o l n a e M

r e t a w

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Ranelagh Gardens

Keyplan: This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn. Low level planting. Extent and species to be agreed with aborist and Royal Hospital + 104.18m

Key:
Limits of land to be acquired or used (LLAU) Zone within which permanent above ground structures would be located Zone within which required landscape would be located Thames Path Planting around works to reinstate green screening to road + 107.31m Gates for utility company maintenance access Proposed trees + 105.40m Existing levels (shown in metres above tunnel datum) Existing trees within surveyed area

Extent of root barrier around utility diversions Lamp post repositioned adjacent to interception structure

Notes:
Lamp post repositioned around new interception structure 1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on + 106.30m Ventilation column 6m high Wall and railing reinstated after construction to match existing Tree positions reconfigured around the works Semi mature London planes planted on embankment replacing trees removed for construction + 105.90m
n et nm ak mb E s l a e e h C

the drawings are due to differences between the Ordnance Survey base and the topographic survey base, both of which have been used in the preparation of this drawing. 3. Access covers not shown on this drawing. Refer to the Permanent works layout for an indication of the extent of access covers required.

Sheet Layout:

Sheet 2 Sheet 1

10m

10m

Scale 1:200 at A1 1:400 if reproduced at A3

ILLUSTRATIVE
Save for the scale of above ground structures which is indicative

tr ae ww o nl a Me

Location

Chelsea Embankment Foreshore Royal Borough of Kensington & Chelsea


Document Information

Section 48 publicity

Landscape key:
Native shrub tree planting (Yew, Box, Holly) Grass seeding to construction site Root barrier Paving stone reinstated

Proposed landscape plan Sheet 2 of 2 Book of plans - section 12


S48-PP-12X-CHEEF-000138 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 Ventilation columns 6m high 2 No. ventilation columns of 4m minimum to 8m maximum height Inter-tidal terrace 2 No. new trees on foreshore structure Chelsea Bridge Grosvenor Rail Bridge (beyond)

Keyplan: This drawing

New tree to "Bull Ring" area

"Bull Ring" roundabout reconfigured

Electrical and control kiosk 1.5m high

Curved brick wall

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Notes :
1. All dimensions and levels are approximate. 2. The purpose of this section is to illustrate the scale of the below ground infrastructure to be provided.

Curved stone parapet

2020 flood defence level 105.41m ATD

Mean high water springs 103.91m ATD

Mean low water springs 97.81m ATD

10m

10m

CSO drop shaft

Scale 1:200 at A1 1:400 if reproduced at A3

ILLUSTRATIVE

Location

Chelsea Embankment Foreshore Royal Borough of Kensington & Chelsea


A
Document Information

Section 48 publicity Section AA Book of plans - section 12


S48-PP-12X-CHEEF-000139 July 2012

Section AA

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 Existing Ranelagh CSO outfall Brick flood wall Planted slope retaining bridge ramp Railings at back of pavement ramping up to Chelsea Bridge

Keyplan: This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Notes :
1. All dimensions and levels are approximate.

2020 flood defence level 105.41m ATD Mean high water springs 103.91m ATD

Mean low water springs 97.81m ATD

Royal Hospital South Grounds

Ranelagh Gardens

As existing South (river) elevation

Electrical and control kiosk 1.5m high

2 No. ventilation columns of 4m minimum to 8m maximum height Curved brick wall New CSO outfall

Electrical and control kiosk 1.5m high

Ventilation column 6m high (behind tree)

Inter-tidal terrace

Ventilation column 6m high

Curved stone parapet

2020 flood defence level 105.41m ATD Mean high water springs 103.91m ATD

Mean low water springs 97.81m ATD

New foreshore structure

Proposed South (river) elevation

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

ILLUSTRATIVE

Location

Chelsea Embankment Foreshore Royal Borough of Kensington & Chelsea


Document Information

Section 48 publicity As existing and proposed South (river) elevation


n o i vt ea l e e) vr i hr t( o Su

Book of plans - section 12


S48-PP-12X-CHEEF-000140 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 Treelines to perimeter of South Gardens Western Pumping Station beyond Brick upstand with railings above to Royal Hospital Gardens perimeter Chelsea Bridge Keyplan: This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Notes :
1. All dimensions and levels are approximate.
2020 flood defence level 105.41m ATD Mean high water springs 103.91m ATD

Mean low water springs 97.81m ATD

Royal Hospital South Gardens

"Bull Ring"

Chelsea Embankment

As existing West elevation

2 No. ventilation columns of 4m minimum to 8m maximum height Electrical and control kiosks 1.5m high

Inter-tidal terrace

Stone parapet

2 No. ventilation columns 6m high

Brick wall

2020 flood defence level 105.41m ATD Mean high water springs 103.91m ATD

Mean low water springs 97.81m ATD

New foreshore structure

Proposed West elevation

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

ILLUSTRATIVE

Location

Chelsea Embankment Foreshore Royal Borough of Kensington & Chelsea


Document Information

Section 48 publicity As existing and proposed West elevation


o a in v t t l s ee We

Book of plans - section 12


S48-PP-12X-CHEEF-000141 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Royal Hospital
(Army Pensioners)

Keyplan: This drawing

Ranelagh Gardens

Utility diversion works to be undertaken in advance of main works

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

War Memorial

One lane closed but two way traffic maintained throughout works

Signalised temporary pedestrian crossing on diversion

Key:
Limits of land to be acquired or used (LLAU) Hoarding Maximum extent of working area
I C ) 3 (6 1 94

Existing public right of way Route of temporary diversion of right of way Intermittent lane closure Site access Access / haul route Existing sewers Sheet piles Thames Path Traffic barriers One lane closed but two way traffic maintained throughout works
Stn 1401 104.739
I C ) 3 (6 1 94

Construction access, left turn out

Removal of traffic island

GV

GV UTT

Intermittent lane closure two way traffic maintained throughout the works

Extent of temporary working area over the foreshore

Notes :
1. These construction phasing plans have been prepared to illustrate possible site layouts for the principal construction phases. Contractors

Construction access, left turn in


6 1 0. 15

Stn 1405 104.881

9 1 0. 15

may choose to lay sites out differently during construction depending on their preferred construction methods subject to any controls on layout imposed through the planning Permanent cofferdam submission and approval process. 2. Traffic management plans for construction phases of the work would be submitted to the Rounded edge to temporary cofferdam in river to reduce scour impact appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown. 3. Utility supplies for the construction of the works would be agreed with the relevant utility company. 4. Additional noise mitigation including noise barriers may be required but is not shown Authorised channel on this drawing. 5. Gate position to alter to suit construction progress. 6. Existing flood defence levels to be maintained at all times.

Existing pedestrian crossing


1 2 0. 15
8 2 0. 15

0 2 0. 15

0 3 0. 15

t m n k e bn m a e E sa hl Ce

10m

40m

Piling rig

Scale 1:500 at A1 1:1000 if reproduced at A3

Jack up barge servicing piling operations

ILLUSTRATIVE

Barge on campshed Location

Chelsea Embankment Foreshore


Temporary working area

Royal Borough of Kensington & Chelsea


Document Information

Section 48 publicity

Rounded edge to temporary cofferdam in river to reduce scour impact

s a e hm eT vr i R

Construction phases - phase 1 Site setup Book of plans - section 12


S48-PP-12X-CHEEF-000142 July 2012

ah ec e R s l a h C e
c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Royal Hospital
(Army Pensioners)

Keyplan: This drawing

Ranelagh Gardens

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

War Memorial

One lane closed but two way traffic maintained throughout works

Signalised temporary pedestrian crossing on diversion

Key:
Limits of land to be acquired or used (LLAU) Hoarding Maximum extent of working area Existing public right of way Route of temporary diversion of right of way Site access Access / haul route Existing sewers

Site power structure

Construction access, left turn out

Intermittent lane closure

Construction access, left turn in

Existing pedestrian crossing Sheet piles Thames Path Extent of temporary working area over the foreshore
GV

Crane

Crane

Shaft

GV UTT

Notes :
Stn 1401 104.739

Security office

1. These construction phasing plans have been prepared to illustrate possible site layouts for the principal construction phases. Contractors

Stn 1405 104.881

may choose to lay sites out differently during Concrete batching plant and aggregate stotage area Workshop buildings construction depending on their preferred construction methods subject to any controls on layout imposed through the planning submission and approval process. 2. Traffic management plans for construction phases of the work would be submitted to the Permanent cofferdam appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown. 3. Utility supplies for the construction of the works would be agreed with the relevant utility company. 4. Additional noise mitigation including noise Authorised channel Rounded edge to temporary cofferdam in river to reduce scour impact Storage (open area or containerised) 10m 0 40m barriers may be required but is not shown on this drawing. 5. Gate position to alter to suit construction progress. 6. Existing flood defence levels to be maintained at all times.

t m n k e bn m a e E sa hl Ce

Offices/welfare building

Scale 1:500 at A1 1:1000 if reproduced at A3 Segment storage

ILLUSTRATIVE
Barge on campshed Working area allows for ground treatment from jack up barge during construction of connection tunnel. Excavated material storage and handling area Location

Chelsea Embankment Foreshore Royal Borough of Kensington & Chelsea


Document Information

Section 48 publicity

Rounded edge to temporary cofferdam in river to reduce scour impact

s a e hm eT vr i R

Construction phases - phase 2 Shaft construction & tunnelling Book of plans - section 12
S48-PP-12X-CHEEF-000143 July 2012

ah ec e R s l a h C e
c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Royal Hospital
(Army Pensioners)

Keyplan: This drawing

Ranelagh Gardens

One lane closed but two way traffic maintained throughout works
War Memorial

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU) Hoarding Maximum extent of working area
I C ) 3 (6 1 94

Signalised temporary pedestrian crossing on diversion

Existing public right of way


Oil Valve Pit

CL 105.49 Pit IL 104.49 UTT

construction access, gate position can alter to suit construction, left turn in, left turn out Intermittent lane closure Lane closure during construction of overflow weir chambers but two way traffic maintained throughout works Thames Path Crane Shaft
GV GV UTT

Route of temporary diversion of right of way Site access Access / haul route Existing sewers Sheet piles Extent of temporary working area over the foreshore

Piling rig

Site power structure

Notes :
Stn 1401 104.739
I C ) 3 (6 1 94

One lane closed but two way traffic maintained throughout works
4 8 0. 14

1. These construction phasing plans have been Security office


Stn 1405 104.881

prepared to illustrate possible site layouts for the principal construction phases. Contractors

6 8 0. 14

may choose to lay sites out differently during construction depending on their preferred construction methods subject to any controls Workshop buildings on layout imposed through the planning submission and approval process.

Existing pedestrian crossing


2 7 0. 14
9 8 0. 14

6 7 0. 14

0 9 0. 14

3 9 0. 14

1 8 0. 14

4 8 0. 14

6 9 0. 14

6 9 0. 14

5 9 0. 14

7 8 0. 14

7 9 0. 14

Rounded edge to temporary cofferdam in river to reduce scour impact

2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where appropriate, outline traffic management

9 8 0 . 1 4

7 9 0 . 1 4

t m n k e bn m a e E sa hl Ce

.4 49 0 1

5 9 0. 14

4 9 0. 14

Permanent cofferdam

arrangements are shown. 3. Utility supplies for the construction of the works would be agreed with the relevant utility company. 4. Additional noise mitigation including noise barriers may be required but is not shown

8 8 0. 14

3 9 0. 14

Crane

Authorised channel

on this drawing. 5. Gate position to alter to suit construction progress.

Offices/welfare building Storage (open area or containerised)

6. Existing flood defence levels to be maintained at all times.

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

ILLUSTRATIVE
Rounded edge to temporary cofferdam in river to reduce scour impact Barge on campshed Location

Chelsea Embankment Foreshore


Excavated material storage and handling area

Royal Borough of Kensington & Chelsea


Document Information

Section 48 publicity

s a e hm eT vr i R

Construction phases - phase 3 Construction of other structures Book of plans - section 12


S48-PP-12X-CHEEF-000144 July 2012

ah ec e R s l a h C e
c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Royal Hospital
(Army Pensioners)

Keyplan: This drawing

Ranelagh Gardens

Park reinstated

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Temporary traffic restrictions removed


War Memorial

Key:
Limits of land to be acquired or used (LLAU) Hoarding Maximum extent of working area
I C ) 3 (6 1 94

Shaft

Temporary Thames Path diversion removed

Existing public right of way


Oil Valve Pit

CL 105.49 Pit IL 104.49 UTT

Route of temporary diversion of right of way Site access Existing sewers Sheet piles Extent of temporary working area over the foreshore

Hoarding removed

GV

GV UTT

Stn 1401 104.739


I C ) 3 (6 1 94

Thames Path reinstated

Stn 1405 104.881

Mean low water

Permanent foreshore structure

t m n k e bn m a e E sa hl Ce

Authorised channel

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

Construction facilities removed, cofferdam piling and fill removed and foreshore reinstated Campshed removed and foreshore reinstated

ILLUSTRATIVE

Outfall apron constructed prior to foreshore to foreshore reinstatement

Location

Chelsea Embankment Foreshore Royal Borough of Kensington & Chelsea


Document Information

Section 48 publicity

s a e hm eT vr i R

Construction phases - phase 4 Site demobilisation Book of plans - section 12


S48-PP-12X-CHEEF-000145 July 2012

ah ec e R s l a h C e
c Thames Water Utilities Ltd 2008

s t s o P

s t s o P

Leicester Square
Temple

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

S O T P S

Keyplan:
re s ad n o G Hp

This drawing
y a w b u S

t or Cu as M y

Piccadilly Circus

Savoy Hotel
Posts
c l Pa e d s r e By g

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn. Main tunnel

t ss Po
t ss Po t ss Po

s t s o P

National Gallery
P l a c e

Key:
W
Y or k

Mean low water


k l a s W en ue h Q Te

Local authority boundary

oo l er at e dg i Br

k l s Wa en ue Q h Te

Order limits

at er ga t e

al k

S ub w

ay

S u b w

a y

N r ot hm u br el ad n Ae vn u e

S u b w

ay

ST S N BA AL ST
P s

Tunnel

Charing Cross

C h S a t r a i t n i g o n C r o s s
H u n g e r f o r d
L a n e

Shaft

Charing Cross

Embankment

y a w b u S

h t a P

Regent Street connection tunnel


h t a P

H u n g e r fr o dB r ig d e

London Borough of Lambeth

y a w b u S

y wa b Su

y wa Sub

Posts
Post

e d i R e s r o H
t ss Po
Subway

Sba uw y

h t a P

h t Pa

Sutton Walk
S u b w a y

Posts

Posts

City of Westminster
s g sa e e s r Tr a u y Pa

Vit r co i a Em b a k e n m n t

Ministry of Defence

Sub way

Su wa b y

Waterloo

100m Waterloo Station

100m

Scale 1:2500 at A1 1:5000 if reproduced at A3

FOR INFORMATION
Westminster

Location
Subway

Victoria Embankment Foreshore City of Westminster


We t i t Bi e s n e rg m s r d
w ub S ay

Sba uw y

Document Information
P o s t s

Section 48 publicity Location plan Book of plans - section 16


Po t ss

S48-PP-16X-VCTEF-000190
Po t ss

July 2012
St.James Park
Posts

Posts

Posts

Posts

Lambeth North

c Thames Water Utilities Ltd 2008

G
V

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

.6 54 0 1

46 05. 1
.8 54 0 1

.8 54 0 1

E C L
1 3 4 05.

9 0 . 05 1

10 52 .5

GV

Underground Railway
) s d r o c e R in o m tt a o r f tS n o en i t i m s k o P an b d n a Em t n e t x E (
G

.8 54 0 1

Keyplan: This drawing

T R U O C L L A H E T I H

.9 54 0 1

NATIONAL LIBERAL CLUB


7 7 . 5 0 1

0 9 . 5 0 1

7 8 . 5 0 1

1 8 . 5 0 1

5 4 0. 14

.3 48 0 1

.7 52 0 1

3 5 0. 14

5 8 . 5 0 1

2 8 . 5 0 1

5 8 . 5 0 1

9 8 . 5 0 1

5 9 . 5 0 1

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
R O U
TE

WHITEHALL COURT

Key:
Limits of land to be acquired or used (LLAU)
N O
R

O
F

N TH

R A

ER

Authorised channel Listed buildings/structures Approximate position of CSO outlet Existing trees within surveyed area
LO BE

G U AR D S EN AV U E
y a w ) l i ds a or R Rec d n rm o u o i f r ion g r Post e d n and U tnt e
Ex (

N LI

EMBANKMENT GARDENS

R A

0 6 as G G I P

10

5. 26

Northumberland Street CSO

Notes:
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and the topographic survey base, both of which have been used in the preparation of this drawing.

A I R O T C I V

T N E M K N A B M E

Metal stairs to ramp structures over flood defence wall Regent Street CSO Steamer pier gives access to Hispanola

Restaurant Ship Hispaniola (Fixed mooring) to be retained in current position Bazalgette Memorial on pavement edge

GO OO EF L IE UB NJ DE L

HU NG

South Elev.

Sphinx benches to be relocated during relocation

Metal stairs to ramp structures over flood defence wall

Tattershall Castle floating bar & restaurant to be relocated permanently

R FO ER

GO OO EF L IE UB NJ DE L

D RI TB

D RI LB AI DR GE

S GE

Mooring to be removed permanently


W O L E B

D RI TB S GE

T C I R T S I D

E N I L

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3 River Elev.

FOR INFORMATION
Listed embankment wall including listed catenary and sturgeon lamp posts along roadside

Location

lw eo n o i b r e lo l e ue f k Ro t o Ba

RAF Memorial (Whitehall Stairs)

Victoria Embankment Foreshore City of Westminster


Document Information

Mooring to be relocated during construction

Section 48 publicity As existing Site features plan Book of plans - section 16


S48-PP-16X-VCTEF-000191 July 2012

d e s i r o h t u A

l e n n a h c

l e n n a h dc e s i r to uh A
c Thames Water Utilities Ltd 2008

Navigation Lights

S
TCBs

(fixed red)

Ga nr t y S L

Metropole Buildings

Thames Path

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Ministry of Defence

Existing signalised pedestrian crossings

Ga nr t y

Keyplan:
B r
Navigation Lights
(fixed red)

This drawing
MLW Memorial

DW

Statue

H u n g e r fr o dB r ig d e( fo o t )
Navigation Lights
(fixed red)

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

National Liberal

I E A MB AN KM EN T

E C A L LP L A H E T I H

Club

Key:
SL

Limits of land to be acquired or used (LLAU) Existing public right of way Route of temporary diversion of right of way

Navigation Lights
(fixed red)

VI CT OR

York Place
(site of)

H u n g e r fr o dB r ig d e( Ap fo o t )

Existing right of way temporarily stopped up Area of highway to be temporarily stopped up Access to permanent works Length along which access to construction would be located

b n a k me n G t a re d n s

Ap

Notes:
1. This plan does not show stopping up and diversions of limited duration (eg hoarding erection, minor utility diversions and minor highway works). 2. Only rights of way in or close to worksites are shown. The full extents of rights of way are not shown where they cease to be relevant to the project.

URT

Statue

2 a

WH I EH T AL L CO

Wh i h t a e lCo l ut r

Ap

Vit co i r E a m

W ae tr

Whitehall Stairs
(site of)

Statue

H R E O S G A U R D SA V N E U E
The Great Hall
(site of)

Me n a

Hi h g

Statue

Un e d rr go n u dR al a i y w

Ki g n sR

e c a h

Area of highway to be temporarily stopped up for major utility diversion(s) in carriageway and to provide construction site working area

Ap
ML W

Rie v r Th a e m s

Chapel
(site of)

LB

Co s & n t L B Bd y

Statue

Bo o Co r n t GL A s, sy l

CCL W

Mu d

Ministry of Defence
Victoria

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

Queen Marys Steps

FOR APPROVAL

Location

Victoria Embankment Foreshore City of Westminster


Document Information

Existing signalised pedestrian crossings

Section 48 publicity Access plan Book of plans - section 16


S48-AC-16X-VCTEF-000015 July 2012

Thames Path

Statue

Authorised channel
W ML
c Thames Water Utilities Ltd 2008

1 50 0 .4

1 4 0 . 6 3

1 0 42 .4

1 5 0 . 9 0

1 0 44 .1

1 0 42 .8

1 5 0 . 3 7

1 5 0 . 1 1

1 0 47 .0

1 0 46 .5 1 0 44 .8

1 0 45 .5

105.58

N
1 0 43 .9

105.35

IC

1 5 0 . 7 7

CL 105.26
1 0 49 .0

1 0 45 .6

1 0 45 .6

105.28
1 0 54 .6

1 4 0 . 3 1 4 7 0 . 2 6

1 0 5 . 1 0

1 0 . 5 0 1

1 4 0 . 5 8

IC CL 105.04

1 0 4 . 5 6

1 0 1 4. 0 4 63 . 4 7

IC CL 104.42

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

1 0 45 .9

1 0 42 .3

1 0 45 .6

8 2 0 . 1 5

Keyplan:
2203
1 4 0 . 5 6

1 5 0 . 3 3

9 0. 14 8

1 4 0 . 7 2

1 4 0 . 5 6

1 0 5 . 1 3

This drawing
1 0 42 .6 1 0 43 .8 1 0 46 .3

1 5 0 . 0 1

Subway Access CL 104.53

1 5 0 . 8 7

0 0. 15 4

1 5 0 . 4 6

1 4 0 . 5 5

1 5 0 . 4 7

1 4 0 . 8 4

1 4 0 . 3 8 1 4 0 . 2 8

1 5 0 . 8 1

1 4 0 . 8 9

1 4 0 . 5 6

1 4 0 . 4 1

1 4 0 . 8 8

CL 105.01

1 4 0 . 6 8

1 4 0 . 5 8

IC

1 4 0 . 5 3

1 4 0 . 2 5

1 4 0 . 5 4

1 5 0 . 8 5

1 5 0 . 4 7

1 5 0 . 5 4

105.50

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

1 4 0 . 8 3

1 4 0 . 5 1

1 4 0 . 3 6

105.21

1 4 0 . 2 8

1 4 0 . 1 9

1 4 0 . 3 6

1 4 0 . 8 3 1 4 0 . 5 0

1 4 0 . 5 9

1 4 0 . 8 9

1 5 0 . 8 2

1 4 0 . 5 3

IC CL 104.37

Key:
1 4 0 . 6 3

1 4 0 . 6 7

1 4 0 . 5 6

1 4 0 . 8 1

1 5 0 . 5 8

1 4 0 . 5 3

1 4 0 . 5 3

Limits of land to be acquired or used (LLAU) Trees to be removed

1 5 0 . 4 9

105.54

1 4 0 . 3 8

1 5 0 . 8 5

105.22

1 4 0 . 2 6

1 4 0 . 6 4

Vi co tr i E a mb a k n m e t n

1 4 0 . 7 2

1 5 0 . 8 9

1 5 0 . 4 9

1 4 0 . 5 8

1 No. listed Catenary Lamp Standard to be removed and reinstated post-construction

1 4 0 . 2 6

1 4 0 . 4 2

1 4 0 . 4 2

1 4 0 . 5 7

Above ground structures to be removed Below ground structures to be removed

1 4 0 . 8 2

1 4 0 . 8 0

1 4 0 . 5 5

1 5 0 . 9 5

1 5 0 . 5 7

105.53

1 4 0 . 3 8 1 4 0 . 2 5

105.17

1 4 0 . 8 0

3 No. London Plane trees to be felled


3 4 0. 15
15 6 0. 3

1 5 0 . 5 2

1 4 0 . 7 1

IC CL 104.93 IC CL 104.26
1 4 0 . 5 5 1 4 0 . 5 6

Steps to be removed and relocated post-construction


Subway Access CL 104.56

1 4 0 . 3 1 4 2 0 . 4 4

1 4 0 . 6 4

Structure to be removed and relocated or reinstated

2212

1 0 51 .9

1 4 0 . 5 1

1 4 0 . 2 7

1 5 0 . 5 9

1 5 0 . 9 5

1 4 0 . 2 7

1 0 4 . 9 7

.5 54 0 1

1 0 52 .1

1 4 0 . 4 0

1 4 0 . 5 8

1 5 0 . 6 0

IC CL 104.45

Festoon lighting to be removed and reinstated post-construction

Notes:
1. All lamp standards and benches to be carefully removed and stored securely off site until reinstatement. 2. Minor items to be removed (e.g. barriers, bollards etc.) are not shown.

1 4 0 . 7 1

1 5 0 . 5 9

1 4 0 . 4 0

1 4 0 . 5 8

1 4 0 . 5 8

1 4 0 . 7 6

1 4 0 . 6 4

1 5 0 . 9 5

1 4 0 . 5 4

1 4 0 . 5 6

1 4 0 . 7 0

1 5 0 . 5 6

1 5 0 . 4 9

1 5 0 . 5 4

1 4 0 . 6 7

15 0. 6 9

2206
1 4 0 . 2 1 1 4 0 . 3 5

1 4 0 . 4 4

1 4 0 . 3 1

1 4 0 . 5 4

1 4 0 . 4 5

1 4 0 . 6 4

1 4 0 . 6 4

83 4. 10

105.62

1 4 0 . 5 3

105.14

1 5 0 . 9 2

14 0. 5 9

1 4 0 . 5 5

1 4 0 . 2 9

1 4 0 . 4 0

1 4 0 . 6 5

1 4 0 . 4 6

1 5 0 . 4 4

1 4 0 . 5 6

Rie v r Th a e m s

1 5 0 . 9 5

1 9 . 4 0 1

1 4 0 . 6 0

1 5 0 . 6 0

1 No. listed camel bench to be removed and reinstated post-construction

1 4 0 . 5 7

1 4 0 . 7 0

1 4 0 . 6 9

1 4 0 . 5 3

1 4 0 . 6 0

2 No. junction boxes to be removed and relocated Steps to be demolished

.8 46 0 1

46 5. 10

1 4 0 . 5 7

1 45 0 .6

1 4 0 . 4 4

1 4 0 . 7 3

1 0. 15 1

1 4 0 . 5 4

1 4 0 . 8 9

1 4 0 . 2 5

1 4 0 . 4 1

1 4 0 . 8 1 1 4 0 . 5 3

1 4 0 . 6 2

54 5. 10

1 0 5 . 2 4

Sheet Layout

1 0 53 .1

105.26

1 5 0 . 5 3

105.17

River wall, utility subway and Northern Low Level Sewer No. 1 to be demolished and re-built
1 4 0 . 7 0

2202

1 No. listed Catenary Lamp Standard to be removed and reinstated post-construction Stone parapet on listed Embankment wall to be dismantled - wall below to be demolished but covered by proposed foreshore structure and new river walls 3 No. listed Sturgeon Lamp Standards and stone plinths on listed Embankment river wall to be removed , lamp standards to be relocated in agreement with Local Planning Authority

Sheet 1

1 5 0 . 4 9

1 4 0 . 8 2

1 5 0 . 8 8

1 45 0 .9

4 No. London Plane trees to be felled


105.48

1 4 0 . 4 4

1 4 0 . 5 6

1 4 0 . 3 0

1 4 0 . 7 5

1 4 0 . 5 4

Sheet 2 Vessel Tattershall Castle including access gangways and mooring piles to be permanently relocated (anchor chains to be removed)

Subway Access (Multiple Services)

1 45 0 .5

CL 104.60

1 4 0 . 1 8

1 4 0 . 3 8

105.21
1 5 0 . 5 1 1 4 0 . 7 2

1 5 0 . 9 0

1 5 0 . 5 5

1 4 0 . 8 1

1 4 0 . 6 1

1 4 0 . 4 5

1 4 0 . 5 7

1 4 0 . 3 3

1 4 0 . 7 6

1 45 0 .4

1 4 0 . 5 5

10m

10m

1 5 0 . 9 8

1 4 0 . 7 0

1 4 0 . 2 5

105.53

1 4 0 . 5 0

1 55 0 .3

1 4 0 . 4 5

105.26

1 4 0 . 8 3

1 5 0 . 5 5

1 6 0 . 0 2

1 46 0 .7

1 45 0 .2

1 4 0 . 5 6

10 4. 60

1 4 0 . 6 1

Scale 1:250 at A1 1:500 if reproduced at A3

1 4 0 . 5 9

1 4 0 . 7 6

Matchline: Sheet 2 Stone parapet on listed Embankment wall to be demolished

1 45 0 .2

1 4 0 . 4 5

1 43 0 .6

1 4 0 . 5 5

FOR APPROVAL

1 4 0 . 3 0

1 55 0 .9

1 45 0 .4

1 4 0 . 4 5

105.51

1 4 0 . 6 8

1 55 0 .9

105.18

1 4 0 . 5 4

1 4 0 . 6 1

2207
1 45 0 .5
1 44 0 .5
1 48 0 .0

1 45 0 .4

Location

3 6 0 . 1 4

Subway access cover to be removed and reinstated post-construction


3 0. 15 8
1 55 0 .6

1 47 0 .8

1 43 0 .5

Victoria Embankment Foreshore City of Westminster


Document Information 1 No. listed Camel Bench to be removed and reinstated post-construction 1 No. listed Catenary Lamp Standard to be removed and reinstated post-construction
1 4 0 . 6 0

1 4 0 . 6 2

1 4 0 . 7 7

1 5 0 . 9 0

104.85

1 4 0 . 5 1

1 45 0 .5

1 5 0 . 9 8

1 56 0 .4

.3 55 0 1

1 46 0 .5

1 45 0 .4

15 7 0. 1

1 42 0 .4

1 44 0 .4

1 4 0 . 5 2

1 0 50 .7

Section 48 publicity Demolition and site clearance Sheet 1 of 2


Service mooring

1 4 0 . 6 0

2213
15 0. 1 7
.1 54 0 1

1 45 0 .7

1 44 0 .6

1 47 0 .6

1 47 0 .7

1 46 0 .3

1 43 0 .3

1 45 0 .6

1 0 4 . 8 8

1 45 0 .3

1 56 0 .3

Book of plans - section 16


S48-PP-16X-VCTEF-000192 July 2012

81 4. 10

10 5. 58

1 6 0 . 1 0

1 46 0 .0

1 47 0 .6

1 45 0 .6

1 41 0 .9

1 43 0 .9

1 45 0 .9
Subway Access CL 104.52

104.95

3 9 . 4 0 1

1 56 0 .2

1 45 0 .5

1 45 0 .9

1 44 0 .8

Authorised channel
1 43 0 .4

1 56 0 .1

15 0. 5 1

1 46 0 .8

Subway Access CL 104.57


1 42 0 .4

0 .0 1 47

1 6 0 . 2 1

1 4 0 . 7 5

IC CL 104.48

1 43 0 .9

1 45 0 .3

1 4 0 . 5 9

1 45 0 .9

104.74

1 45 0 .6

1 45 0 .9

0 .2 1 56

2201

c Thames Water Utilities Ltd 2008

1 5 0 . 5 5

1 6 0 . 0 2

1 46 0 .7

1 45 0 .2

1 4 0 . 5 9

1 4 0 . 7 6

1 4 0 . 5 6

10 4. 60

1 4 0 . 5 5

1 45 0 .2

N
1 4 0 . 3 0 1 4 0 . 4 5 1 4 0 . 6 1

105.51

1 4 0 . 6 8

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

1 4 0 . 4 5

1 55 0 .9

1 45 0 .4

1 55 0 .9

105.18

1 4 0 . 5 4

1 43 0 .6

2207
1 45 0 .5
1 48 0 .0

1 45 0 .4

1 44 0 .5

1 47 0 .8

1 43 0 .5

1 4 0 . 6 2

1 4 0 . 7 7

3 6 0 . 1 4

Keyplan: This drawing

1 5 0 . 9 0

104.85

1 4 0 . 5 1

1 45 0 .5

1 5 0 . 9 8

1 55 0 .6

1 56 0 .4

1 0 50 .7

1 4 0 . 6 0

2213
15 0. 1 7
.1 54 0 1

1 45 0 .7

1 44 0 .6

1 47 0 .6

1 47 0 .7

1 46 0 .3

1 43 0 .3

1 45 0 .6

1 0 4 . 8 8

1 4 0 . 6 0

.3 55 0 1

1 46 0 .5

1 45 0 .4

3 0. 15 8

15 7 0. 1

1 42 0 .4

1 44 0 .4

1 4 0 . 5 2

1 56 0 .3

1 45 0 .3

Service mooring Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
1 45 0 .9
Subway Access CL 104.52

81 4. 10

10 5. 58

104.95

1 6 0 . 1 0

1 46 0 .0

1 47 0 .6

1 45 0 .6

1 56 0 .2

1 45 0 .9

1 45 0 .5

1 44 0 .8

1 56 0 .1

15 0. 5 1

1 46 0 .8

1 43 0 .4

1 41 0 .9

1 43 0 .9

1 42 0 .4

3 9 . 4 0 1
0 .0 1 47

Subway Access CL 104.57

Key:
Limits of land to be acquired or used (LLAU) Matchline: Sheet 1 Trees to be removed Above ground structures to be removed

IC CL 104.48
1 4 0 . 7 5

1 43 0 .9

0 .2 1 56

2201
1 45 0 .3

1 6 0 . 2 1

1 4 0 . 5 9

1 45 0 .9

104.74

10 4. 73

1 46 0 .0

1 44 0 .9 1 42 0 .9

1 45 0 .6

1 48 0 .4

1 6 0 . 5 3

1 4 0 . 5 7

1 43 0 .0

1 45 0 .3

1 0 5 . 3 9

1 45 0 .5

1 45 0 .2

.4 49 0 1

1 46 0 .0

1 45 0 .9

52 5. 10

1 45 0 .6

1 45 0 .7

15 0. 1 3

1 45 0 .8

1 44 0 .4

8 8 0. 14
1 5 0 . 4 8

1 0 4 . 7 4

1 43 0 .1

1 47 0 .2

1 44 0 .1

1 5 0 . 4 8

105.18

1 46 0 .0

9 5 0 . 1 5

Structure to be removed and relocated or reinstated

0 .5 1 55
.1 54 0 1

2 6 . 4 0 1

15 3 0. 3

Notes:
1. All lamp standards and benches to be carefully removed and stored securely off site until reinstatement. 2. Minor items to be removed (e.g. barriers, bollards etc.) are not shown.
1 42 0 .6 1 44 0 .1

1 0 4 . 6 6
105.93

14 0. 6 0

14 0. 5 5

1 43 0 .3

14 0. 5 9

1 47 0 .1

105.61

1 46 0 .2

1 45 0 .3

105.55

1 44 0 .7

14 0. 7 9

1 45 0 .8

14 0. 4 7 14 0. 3 6

105.29

14 0. 4 3
0. 2214 1 43 2

14 0. 4 7

14 0. 2 6 14 0. 3 7 14 0. 2 0

1 45 0 .6 1 44 0 .2

14 0. 4 7

IC CL 104.43
1 45 0 .3

1 45 0 .5

14 0. 5 3

1 42 0 .5 1 44 0 .0

14 0. 3 7

14 0. 4 6

1 45 0 .4

105.04

1 45 0 .6

14 0. 5 1

1 45 0 .4

1 46 0 .2

1 45 0 .9
Subway Access (Multiple Services) CL 104.55

14 0. 6 6

2208
14 0. 3 4 14 0. 3 3

1 4 0 . 7 3

14 0. 3 9 14 0. 2 8

1 4 0 . 5 6

IC CL 104.51

1 43 0 .0 1 43 0 .9

1 45 0 .3

1 45 0 .4

1 45 0 .5

2209
1 46 0 .0

Rie v r Th a e m s

Sheet Layout

Sheet 1

Sheet 2

10m

10m

Scale 1:250 at A1 1:500 if reproduced at A3

FOR APPROVAL
Service mooring

Location

Victoria Embankment Foreshore City of Westminster


Document Information Authorised channel

Section 48 publicity Demolition and site clearance Sheet 2 of 2 Book of plans - section 16
S48-PP-16X-VCTEF-000193 July 2012

c Thames Water Utilities Ltd 2008

Navigation Lights

Table 1
TCBs

(fixed red)

Ga nr t y S L

Metropole Buildings
Above ground permanent structure Maximum height above finished ground level (Minimum heights are in brackets where applicable)
S

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Ministry of Defence

Ventilation column(s) serving the shaft Ventilation column(s) serving the interception chamber

8.0m (4.0m)

Ga nr t y

Keyplan:
B r
Navigation Lights
(fixed red)

This drawing 6.0m


DW
MLW Memorial

Electrical and control kiosk(s)

6.0m

Statue

H u n g e r fr o dB r ig d e( fo o t )
Navigation Lights
(fixed red)

H u n g e r fr o dB r ig d e( F o o) t
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

National Liberal

T I H

I E A MB AN KM EN T

E C A L LP L A H

Club

Key:
SL

Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located (those listed in Table 1) Zone within which required landscaping would be located Maximum extent of top of river/ parapet wall or terracing

Navigation Lights

Zone within which Work No. 16a would be located

(fixed red)

VI CT OR

York Place
(site of)

Zone within which electrical and control kiosk(s) may be located

b n a k me n G t a re d n s

Maximum extent of top of river/parapet wall (See Typical Section A) Maximum extent of top of river/parapet wall

H u n g e r fr o dB r ig d e( fo o t )

URT

Notes:
1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.

Statue

WH I EH T AL L CO

Wh i h t a e lCo l ut r

Top of river/parapet wall 105.41m minimum Zone within which Work No. 16c would be located

Vit co i r E a m

2 a

Rie v r Th a e m s

Zone within which ventilation column(s) serving the interception chamber may be located
Un e d rr go n u dR al a i y w

W ae tr

Ki g n sR

e c a h
Zone within which ventilation column(s) serving the shaft may be located

Me n a

Hi h g

Maximum extent of terracing (See Typical Section B)

ML W

Statue

River foreshore (level varies)

O S R E G U R A D SA V N E U E
Chapel
(site of)

LB

Zone within which Work No. 16c would be located

Co s & n t L B Bd y

Statue

Bo o Co r n t GL A s, sy l

CCL W

Mu d

Ministry of Defence
Victoria

Foreshore structure

Whitehall Stairs
(site of)

Statue

Maximum extent of top of river/parapet wall (See Typical Section A)

Typical Section A
1

(Not to scale) 10m Maximum extent of terracing 0 40m

Scale 1:500 at A1 1:1000 if reproduced at A3

105.55m minimum

Queen Marys Steps

FOR APPROVAL

Location

Victoria Embankment Foreshore City of Westminster


Document Information River foreshore (level varies)

Section 48 publicity Site works parameter plan Book of plans - section 16

Zone within which relocated steps and replacement ramp may be located Mean low water

Foreshore structure

S48-PP-16X-VCTEF-000194 July 2012

Statue

W ML

Typical Section B
(Not to scale)
c Thames Water Utilities Ltd 2008

Dolphin
TCB

Dolphin
TCB

Dolphin
TCB

T e l h ue h Pa o s y
EM BA NK ME NT PL AC E

T e l h ue h Pa o s y
EM BA NK ME NT PL AC E

T e l h ue h Pa o s y
EM BA NK ME NT PL AC E

MLW TCBs
1 1t o1 4

H u n g e r f o r d B ( r F ig o o) d e t

MLW TCBs
1 1t o1 4

H u n g e r f o r d B ( r F ig o o) d e t

MLW TCBs
1 1t o1 4

H u n g e r f o r d B ( r F ig o o) d e t

B r

B r

B r

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Navigation Lights

Navigation Lights

Navigation Lights

S
TCBs

(fixed red)

Ga nr t y S L

S
TCBs

(fixed red)

Ga nr t y S L

S
TCBs

(fixed red)

Ga nr t y S L
N

Keyplan:
S Ga nr t y S S B r
Navigation Lights
(fixed red)

Ga nr t y

S B r
Navigation Lights
(fixed red)

Ga nr t y

B r

Navigation Lights
(fixed red)

DW

DW

Memorial

Statue

H u n g e r fr o dB r ig d e( fo o t )
Navigation Lights
(fixed red)

Memorial

Statue

H u n g e r fr o dB r ig d e( fo o t )
Navigation Lights
(fixed red)

DW

MLW

MLW

MLW Memorial

This drawing
H u n g e r fr o dB r ig d e( fo o t )
Navigation Lights
(fixed red)

Statue

National Liberal Club

National Liberal Club

National Liberal Club

I E A MB AN KM EN T

I E A MB AN KM EN T

SL

SL

I E A MB AN KM EN T

SL

Navigation Lights
(fixed red)

Navigation Lights
(fixed red)

Navigation Lights
(fixed red)

VI CT OR

VI CT OR

b n a k me n Ga t re d n s

b n a k me n Ga t re d n s

Statue

Statue

Statue

Wh i h t a e lCo l ut r

Wh i h t a e lCo l ut r

Wh i h t a e lCo l ut r

b n a k me n Ga t re d n s

VI CT OR

H u n g e r fr o dB r ig d e( fo o t )

H u n g e r fr o dB r ig d e( fo o t )

H u n g e r fr o dB r ig d e( fo o t )

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Rie v r Th a e m s

Vit co i r Em a

Vit co i r Em a

Vit co i r Em a

Rie v r Th a e m s

Rie v r Th a e m s

e c a h

e c a h

e c a h

Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located (those listed in Table 1) Zone within which required landscaping would be located

Hi h g W ae tr

Hi h g W ae tr

Ki g n sR

Ki g n sR

Hi h g W ae tr

Un e d rr go n u d Ra i y l wa

Un e d rr go n u d Ra i y l wa

Statue

Statue

Statue

Un e d rr go n u d Ra i y l wa

Whitehall Stairs
(site of)

Statue

Whitehall Stairs
(site of)

Statue

Whitehall Stairs
(site of)

Statue

Zone within which Work No. 16c would be located


Queen Marys Steps
Co s & n t L B Bd y

Zone within which Work No. 16a would be located


Queen Marys Steps
Co s & n t L B Bd y

Queen Marys Steps


Co s & n t L B Bd y

Ki g n sR

ML W
Me n a

ML W

ML W

Me n a

Me n a

LB

LB

LB

Maximum extent of top of river/ parapet wall

Bo o Co r n t GL A s, sy l

Bo o Co r n t G L As s, l y

Statue

Statue

Statue

Bo o Co r n t G L As s, l y

CCL W

CCL W

CCL W

Notes:
1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.

Statue
Mu d

Statue
Mu d

Statue
Mu d

W ML

W ML

W ML

Victoria Embankment Gardens

Victoria Embankment Gardens

Victoria Embankment Gardens

Memorial

Memorial

Memorial

Whitehall Stairs

Whitehall Stairs

Whitehall Stairs

Dolphin
TCB

Dolphin
TCB

Dolphin
TCB

T e l h ue h Pa o s y
EM BA NK ME NT PL AC E

T e l h ue h Pa o s y
EM BA NK ME NT PL AC E

T e l h ue h Pa o s y
EM BA NK ME NT PL AC E

MLW TCBs
1 1t o1 4

H u n g e r f o r d B ( r F ig o o) d e t

MLW TCBs
1 1t o1 4

H u n g e r f o r d B ( r F ig o o) d e t

MLW TCBs
1 1t o1 4

H u n g e r f o r d B ( r F ig o o) d e t

B r

B r

B r

Navigation Lights

Navigation Lights

Navigation Lights

S
TCBs

(fixed red)

Ga nr t y S L

S
TCBs

(fixed red)

Ga nr t y S L

S
TCBs

(fixed red)

Ga nr t y S L

Ga nr t y

S B r
Navigation Lights
(fixed red)

Ga nr t y

S B r
Navigation Lights
(fixed red)

Ga nr t y

B r

Navigation Lights
(fixed red)

DW

DW

Memorial

Statue

H u n g e r fr o dB r ig d e( fo o t )
Navigation Lights
(fixed red)

Memorial

Statue

H u n g e r fr o dB r ig d e( fo o t )
Navigation Lights
(fixed red)

DW

MLW

MLW

MLW Memorial

Statue

H u n g e r fr o dB r ig d e( fo o t )
Navigation Lights
(fixed red)

National Liberal Club

National Liberal Club

National Liberal Club

I E A MB AN KM EN T

I E A MB AN KM EN T

SL

SL

I E A MB AN KM EN T

SL

Navigation Lights
(fixed red)

Navigation Lights
(fixed red)

Navigation Lights
(fixed red)

VI CT OR

VI CT OR

VI CT OR

H u n g e r fr o dB r ig d e( fo o t )

H u n g e r fr o dB r ig d e( fo o t )

H u n g e r fr o dB r ig d e( fo o t )

b n a k me n Ga t re d n s

b n a k me n Ga t re d n s

Statue

Statue

Statue

b n a k me n Ga t re d n s

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3


Rie v r Th a e m s

100m

Wh i h t a e lCo l ut r

Wh i h t a e lCo l ut r

Wh i h t a e lCo l ut r

Vit co i r Em a

Vit co i r Em a

Rie v r Th a e m s

Rie v r Th a e m s

Vit co i r Em a

e c a h

e c a h

e c a h

Hi h g W ae tr

Hi h g W ae tr

Hi h g W ae tr

Ki g n sR

Ki g n sR

Un e d rr go n u d Ra i y l wa

Un e d rr go n u d Ra i y l wa

Statue

Statue

Statue

Un e d rr go n u d Ra i y l wa

Whitehall Stairs
(site of)

Statue

Zone within which electrical and control kiosk(s) may be located

Ki g n sR

ML W
Me n a

ML W

ML W

Zone within which relocated steps and replacement ramp may be located

FOR INFORMATION

Me n a

Me n a

Whitehall Stairs
(site of)

Statue

Whitehall Stairs
(site of)

Statue

Location

Victoria Embankment Foreshore City of Westminster

Queen Marys Steps

Co s & n t L B Bd y

Co s & n t L B Bd y

Co s & n t L B Bd y

Zones within which ventilation column(s) serving the interception chamber may be located
LB

Queen Marys Steps

Queen Marys Steps

Document Information
LB

LB

Section 48 publicity Site works parameter key plan Book of plans - section 16
S48-PP-16X-VCTEF-000195

Bo o Co r n t GL A s, sy l

Bo o Co r n t G L As s, l y

Statue

Statue

Statue

Bo o Co r n t G L As s, l y

CCL W

CCL W

Zone within which ventilation column(s) serving the shaft may be located
Statue Statue
Mu d Mu d

CCL W

Statue
Mu d

July 2012
W ML

W ML

W ML

Victoria Embankment Gardens

Victoria Embankment Gardens

Victoria Embankment Gardens

Memorial

Memorial

Memorial

Whitehall Stairs

Whitehall Stairs

Whitehall Stairs

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan: This drawing

Existing Regent Street Sewer

Existing overflow weir chamber Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Existing Regent St storm overflow

Works No.1c 7.2m internal dia. main tunnel to Chambers Wharf

Key:
Limits of land to be acquired or used (LLAU)

River wall parapet

River wall with handrail

Existing sewers Proposed access cover 104.50 Proposed level (shown in metres above tunnel datum) Zone within which all permanent site structures would be located Zone within which Works No. 16c would be located Authorised channel Zone within which the shaft would be located Zone within which permanent above ground structures would be located

Ventilation outlet 0.3m internal dia. (from kiosk) 104.50

105.10

105.70

0.3m internal dia. ventilation column, 6m high

104.65

105.55 Connection culvert 2 No. 0.9m internal dia. ventilation columns, 4m minimum to 8m maximum height 105.10

Notes:
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan. 4. Access for external inspection of tidal flap gates in foreshore to be by boat.

Zone within which electrical and control kiosk may be located

Passive filter chamber Overflow weir and interception chamber

Hispaniola to remain in original position

Electrical and control kiosk 9.5m x 4m x 4m high 105.55 Zone within which ventilation column(s) serving the interception chamber may be located Works No.16b 3m internal dia. connection tunnel Existing Northumberland St Sewer Existing Northumberland St Storm Overflow

104.65

Scour protection

Access for maintenance vehicles

104.20 104.50 Works No. 16a CSO drop shaft (13m internal dia.)

River wall / terrace with handrail

b n a k me t n

10m Zone within which Works No. 16a would be located

10m

Vit co i r E a m

Storm overflow

Scale 1:200 at A1 1:400 if reproduced at A3

New ramp Outfall apron River wall reinstated Relocated steps

ILLUSTRATIVE

Location

Victoria Embankment Foreshore


River wall parapet Zone within which ventilation column(s) serving the shaft may be located Tattershall Castle to be permanently relocated to this position

City of Westminster
Document Information

Section 48 publicity Permanent works layout Book of plans - section 16

Existing northern Low Level Sewer No. 1 Zone within which relocated steps and new ramp may be located Plan View Scale 1:200 Works No.1c 7.2m internal dia. main tunnel to Kirtling Street Mean low Water line

S48-PP-16X-VCTEF-000196 July 2012

Inset View Scale 1:1000


c Thames Water Utilities Ltd 2008

N
1 5 0 . 8 5

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

1 5 0 . 8 2

Keyplan: This drawing

1 5 0 . 8 5

Restaurant ship Hispanola (fixed mooring) to be retained in original position Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

1 5 0 . 9 5

1 5 0 . 8 9

Key:
Pavement resurfacing to match existing post construction Limits of land to be acquired or used (LLAU) Zone within which permanent above ground structures would be located Zone within which required landscape would be located Authorised channel 105.40 Proposed levels (shown in metres above tunnel datum) Listed buildings/structures

Existing Regent Street CSO

Victoria Embankment Gardens

Storage kiosk
se tp s

Approximate position of CSO outlet Existing trees within surveyed area

Open balustrade

Vit co i r E a m b n a k me n t
104.5
105.26

Ramped access to upper levels Electrical and control kiosk 105.70

Proposed trees

Notes:
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and the topographic survey base, both of which have been used in the preparation of this drawing. 3. Access covers not shown on this drawing. Refer to the Permanent works layout for an indication of the extent of access covers required. River Elev.

Ventilation column 6m high 104.80


s p t s e

Pergola above - planted with Jasmine 2 No. ventilation columns 4m minimum to 8m maximum height

105.55

104.20

Floodable public realm lower terrace floods approximately 3 times per year New replacement semi-mature London Planes along embankment Electrical and control kiosk Open balustrade Seating terraces orientated to principal views

104.65

105.10

AA

Raised planter over overflow chamber

10m

10m

Commercial kiosk New storm overflow outlet (below) 105.70 Seating area for commercial kiosk

Scale 1:200 at A1 1:400 if reproduced at A3

Pleached trees in planter


Au h to r e i d s c a h n n l e

ILLUSTRATIVE
Save for scale of above ground structures which is indicative

Outfall apron

Location

Victoria Embankment Foreshore City of Westminster


Document Information

Recess to emphasise separation from Bazalgette embankment

Section 48 publicity Proposed landscape plan


South Elev. "Sphinx" seats reinstated Location for relocated Tattershall Castle Floating Bar & Restaurant

Book of plans - section 16


S48-PP-16X-VCTEF-000197 July 2012

c Thames Water Utilities Ltd 2008

EMBANKMENT STATION
E C L 9 0 . 05 1

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan: This drawing NATIONAL LIBERAL CLUB

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
R O U
TE

WHITEHALL COURT

Key:
Limits of land to be acquired or used (LLAU) Zone within which permanent above ground structures would be located Zone within which required landscape would be located Authorised channel
LO BE N LI

EMBANKMENT PIER EMBANKMENT GARDENS

O
F

N O
R

TH

ER

N E
W

Northumberland Street CSO

Thames Path Listed buildings/structures Approximate position of CSO outlet Existing trees within surveyed area

A I R O T C I V R A

T N E M K N A B M E

Proposed trees

T C I R T S I D

H O R
RAF Memorial (Whitehall Stairs)

E S
E N I L

G U
W O L E B

Regent Street CSO

Bazalgette Memorial on pavement edge

D S N E V A U E
New storm overflow outlet
y a w ) l i ds a or R Rec d n rm o u o i f r ion g r Post e d n and U tnt e
Ex (

GO OO EF L IE UB NJ DE L

HU

Steamer pier gives access to Hispanola

NG R FO ER

GO OO EF L IE UB NJ DE L

"Sphinx" bench reinstated after construction

D RI LB AI DR GE

D RI TB S GE

South Elev. The Restaurant Ship Hispaniola (fixed mooring) to be retained in original position 2 No. ventilation columns 4m minimum to 8m maximum high Ventilation column 6m high

D RI TB S GE
10m 0 40m Scale 1:500 at A1 1:1000 if reproduced at A3

Location for relocated Tattershall Castle Floating Bar & Restaurant "Sphinx" bench reinstated after construction

River Elev.

ILLUSTRATIVE
Save for scale of above ground structures which is indicative

Location

lw eo n o i b r e lo l e ue f k Ro t o Ba

Tattershall Castle access arrangements to be agreed with local authority Mooring reinstated AA

Victoria Embankment Foreshore City of Westminster


Document Information

d e s i r o h t u A

l e n n a h c

Section 48 publicity Proposed site features plan


l e n n a h dc e s i r to uh A

Book of plans - section 16


S48-PP-16X-VCTEF-000198 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 Electrical and control kiosk, 4m high 2 No. ventilation columns 4m minimum to 8m maximum height Open balustrade guarding to foreshore edge

Keyplan: This drawing

Pergolas spanning between kiosks

New semi-mature London Plane trees

Pleached trees in raised planter

New foreshore structure steps down to offer river views Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Notes:
1. All dimensions and levels are approximate. 2. The purpose of this section is to illustrate the scale of the below ground infrastructure to be provided.

Hungerford Bridge

Victoria Embankment
.. CITROEN

2020 Flood Defence Level 105.41

Mean High Water Springs 103.9

District Line tunnel

Pipe Subway

Northern Low Level Sewer No.1

Mean Low Water Springs 97.5

10m

10m

Section AA

CSO drop shaft

Scale 1:200 at A1 1:400 if reproduced at A3

ILLUSTRATIVE

Location

Victoria Embankment Foreshore City of Westminster


Document Information Connection tunnel
A

Main tunnel

Section 48 publicity Section AA Book of plans - section 16


S48-PP-16X-VCTEF-000199 July 2012

c Thames Water Utilities Ltd 2008

Whitehall Place abandoned and sealed CSO (behind boat)

Regent Street CSO (behind boat)

National Liberal Club

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345 Golden Jubilee Foot Bridge Bazalgette memorial Northumberland Avenue

RAF Memorial (Whitehall Stairs)

Ministry of Defence

Horse Guards Avenue

Whitehall Court

The Restaurant Ship Hispaniola (fixed mooring) to be retained in current position

Keyplan: This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Handrail

2020 Flood Defence Level 105.41 Mean High Water Springs 103.9

Mean Low Water Springs 97.5

Tattershall Castle

Hungerford Rail Bridge

Embankment wall

As existing river elevation

Location for relocated Tattershall Castle Floating Bar & Restaurant

Festoon lighting Pleached trees in terminates adjacent to raised planter foreshore structure Commercial kiosk 4m high with pergola above

Electrical and control kiosk, 4m high with pergola above New storm overflow outlet

2 No. ventilation columns 4m minimum to 8m maximum height

New semi-mature London Plane trees

The Restaurant Ship Hispaniola (fixed mooring) to be retained in current position

Electrical and control kiosk, 4m high with pergola above

2020 Flood Defence Level 105.41 Mean High Water Springs 103.9

10m

40m

Mean Low Water Springs 97.5

Scale 1:500 at A1 1:1000 if reproduced at A3 Relocated Tattershall Castle New foreshore structure

Abandoned CSO (sealed)

Existing Regent Street CSO

ILLUSTRATIVE

Proposed river elevation


Location

Victoria Embankment Foreshore City of Westminster


Document Information

Section 48 publicity As existing and proposed


Rie v rE lv t e ai o n

River elevation Book of plans - section 16


S48-PP-16X-VCTEF-000200 July 2012

c Thames Water Utilities Ltd 2008

Charing Cross Station

National Liberal Club

Embankment Gardens

Victoria Embankment

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Golden Jubilee Foot Bridge

Keyplan: This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

2020 Flood Defence Level 105.41


.. CITROEN

Mean High Water Springs 103.9

Mean Low Water Springs 97.5

District Line Tunnel

Pipe Subway

Northern Low Level Sewer No.1

Defence press & broadcasting committee building

Whitehall Court Rd Whitehall Court (hotel & residential)

Embankment Gardens

Victoria Embankment

Tattershall Castle Hungerford Rail & Golden Jubilee foot bridges

As existing South elevation


Pleached trees in raised planter 2 No. ventilation columns 4m minimum to 8m maximum height New foreshore structure steps down to offer river views

Electrical and control kiosk, 4m high with pergola on top

New semi-mature London Plane trees

.. CITROEN

2020 Flood Defence Level 105.41 Mean High Water Springs 103.9

Mean Low Water Springs 97.5

District Line Tunnel

Pipe Subway

Northern Low Level Sewer No.1 New foreshore structure

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

Proposed South elevation


N

ILLUSTRATIVE
N r ot hm u b el rn ad Ae vn u e

Location

Victoria Embankment Foreshore


e a lc P l al h e i ht

City of Westminster
Document Information

Wh i h t a e lCo l ut r

Section 48 publicity As existing and proposed South elevation Book of plans - section 16
Su ot h l Ee vt ao i n
S48-PP-16X-VCTEF-000201 July 2012

Hr os e G a ur d A s v eu ne

c Thames Water Utilities Ltd 2008

15 0. 8 3

1 0 52 .3
15 0. 6 2

15 0. 4 2
MH(U)

1 0 52 .1
15 0. 3 9

1 0 45 .2

IC CL 105.25

15 0. 5 2

IC CL 105.47

1 0 54 .0

1 0 41 .0 1 0 41 .2

CL 105.48

Navigation Lights

1 0 50 .6

0 6 . 4 0 1

1 0 45 .5

1 0 46 1 .7 0 45 .2

1 0 5 . 95

15 0. 4 2

15 0. 3 3

15 0. 3 3
1 0 48 .7

S
1 0 40 .9 1 0 42 .7

1 0 46 .9

(fixed red)

.3 47 0 1

15 0. 4 7

Metropole Buildings

15 0. 1 9

15 0. 2 1
15 0. 2 9 15 0. 0 0

1 0 4 . 1 0 7 4 3 . 6 0

1 0 45 .6

1 0 46 .9

15 0. 3 7

15 0. 2 9

15 0. 2 3

Ga nr t y S L

105 . 41

IC CL 104.76
1 0 42 .1 1 0 43 .5

10 5. 36

1 0 51 .1

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

1 0 50 .2

1 0 43 .0

Ministry of Defence

10 5. 24

IC CL 104.72
1 0 4 . 8 7

1 4 0 . 6 7

1 0 51 .4

14 0. 7 5

1 4 0 . 6 8

5 4 . 5 0 1
0 .7 1 53
1 05 . 25

15 0. 0 1
1 0 52 .0

14 0. 7 6

N
Subway Access CL 104.38

IC CL 105.30

.9 51 0 1

5 2 5. 0 1

1 0 4 . 9 9

1 0 47 .2
1 0 4 . 7 5

.7 51 0 1

1 2 . 5 0 1

1 0 4 . 8 7

14 0. 6 14 9 0. 8 2

Ga nr t y

B r

Navigation Lights
(fixed red)

Keyplan: This drawing

.6 51 0 1

.0 52 0 1

1 0 46 .5

Existing Northumberland Street Sewer


IC
CL 105.14
.5 52 0 1

1 0 47 .7 1 0 46 .2

IC CL 104.44

1 4 0 . 3 3 1 0 44 .4

0 2 . 5 0 1

1 0 45 .5 1 0 47 .1

87 . 104 . 76 4 10

70 4. 10

104.55 104.69

1 0 45 .5

1 0 43 .1 1 0 44 .2

1 0 45 .1

1 0 44 .6

1 0 44 .1

1 0 45 .3

1 0 47 .1

1 0 45 .0

1 0 46 .6

1 5 0 . 7 7

1 0 45 .6

Victoria Embankment Gardens


IC CL 105.26 IC CL 105.04
1 4 0 . 3 1 4 7 0 . 2 6

1 5 0 . 9 0

1 0 44 .1

1 0 42 .8

1 0 44 .8

1 0 42 .3

1 0 43 .9

1 0 42 .4

1 0 4. 4 7

1 0 4 . 5 6

9 5 . 4 73 0 1 4. 10
.3 45 0 1 1 6 0 . 1 4

.3 46 0 1

MLW Memorial

IC
CL 104.42

H u n g e r fr o dB r ig d e( fo o t )
Hispaniola restaurant ship
Navigation Lights
(fixed red)

1 5 0 . 8 5

E C A L LP L A H E T I H

National Liberal Intermittent closure of one lane but two way traffic maintained Club
1 5 0 . 8 7
1 4 0 . 3 8 1 4 0 . 2 8
1 5 0 . 8 1

1 4 0 . 5 6

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

1 4 0 . 5 6

1 0 42 .6

1 0 43 .8

Subway Access CL 104.53

1 4 0 . 5 6

1 4 0 . 4 1

1 4 0 . 5 8

throughout works - coach parking suspended

IC CL 105.01

1 4 0 . 5 3

1 4 0 . 2 5

Key:
SL

Limits of land to be acquired or used (LLAU) Hoarding Maximum extent of working area

1 4 0 . 3 6

1 4 0 . 2 8

1 4 0 . 1 9

IC

1 5 0 . 8 2

1 4 0 . 5 3

CL 104.37

Existing Regent Street Sewer


1 4 0 . 3 8
1 5 0 . 8 5

1 4 0 . 2 6

1 4 0 . 5 6

1 4 0 . 3 6

1 4 0 . 5 9

1 4 0 . 2 6

1 4 0 . 4 2

Navigation Lights
(fixed red)

1 4 0 . 5 7

1 5 0 . 8 9

1 4 0 . 5 8

Existing public right of way

IC CL 104.93 IC CL 104.26
1 4 0 . 5 6

Subway Access
CL 104.56

Jack up barge servicing piling operations

1 4 0 . 2 7

IC CL 104.45

York Place
(site of)

1 4 0 . 2 7

Support works for utilities diversions to be undertaken prior to foreshore works, requiring lane closure so that westbound traffic reduced to one lane only (part of phase only)

1 4 0 . 4 0

H u n g e r fr o dB r ig d e( fo o t )

1 4 0 . 3 8 1 4 0 . 2 5

1 4 0 . 3 1 4 2 0 . 4 4

Route of temporary diversion of right of way Site access Access / haul route Existing sewers Sheet piles Extent of temporary working area over the foreshore

1 5 0 . 9 5

1 4 0 . 4 0

1 4 0 . 5 8

1 4 0 . 5 6

1 4 0 . 4 4

1 4 0 . 3 1

1 4 0 . 5 4

1 4 0 . 2 1

URT

1 4 0 . 4 5

1 4 0 . 3 4

1 4 0 . 5 7

WH I EH T AL L CO

1 4 0 . 5 3

1 4 0 . 2 9

Wh i h t a e lCo l ut r

1 4 0 . 4 0

1 4 0 . 3 5

2
1 4 0 . 4 4 1 4 0 . 5 7 1 4 0 . 3 3 1 4 0 . 5 4 1 4 0 . 2 5 1 4 0 . 4 1

Piling rig

2 a

105.26

Temporary cofferdam to existing flood defence level

Secant piles installed

Notes :
1. These construction phasing plans have been prepared to illustrate possible site layouts for

1 4 0 . 4 4

1 4 0 . 5 6

Subway Access (Multiple Services) CL 104.60

Rie v r Th a e m s

1 4 0 . 3 0

1 4 0 . 5 4

1 4 0 . 1 8

1 4 0 . 3 8

1 4 0 . 4 5

1 4 0 . 3 3

1 4 0 . 5 7

1 4 0 . 5 5

e c a h

1 4 0 . 2 5

1 4 0 . 4 5

W ae tr

1 4 0 . 5 9

1 4 0 . 4 5

1 43 0 .6

1 4 0 . 5 5

1 4 0 . 3 0

1 4 0 . 4 5

Ki g n sR

Hi h g

1 44 0 .5

1 43 0 .5

1 4 0 . 6 2

1 45 0 .5

Me n a

Left turn in left turn out

Permanent cofferdam

the principal construction phases. Contractors may choose to lay sites out differently during construction depending on their preferred construction methods subject to any controls on layout imposed through the planning submission and approval process. 2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown. 3. Utility supplies for the construction of the works Authorised channel would be agreed with the relevant utility company. 4. Additional noise mitigation including noise

ML W

1 44 0 .6

1 4 0 . 6 0

1 43 0 .3

Offices / welfare building

1 46 0 .0

1 45 0 .6

1 45 0 .6

1 41 0 .9

1 42 0 .4

1 44 0 .4

1 45 0 .9

1 45 0 .6

Whitehall Stairs
(site of)

1 44 0 .9 1 42 0 .9

Intermittent closure of one lane but two way traffic maintained throughout works - coach parking suspended

1 44 0 .8

1 43 0 .4

1 42 0 .4

IC CL 104.48

1 43 0 .9

1 43 0 .0

1 45 0 .6

1 45 0 .7

1 44 0 .4

1 45 0 .3

14 0. 4 2
14 0. 4 7

1 43 0 .3

H R E O S G A U R D SA V N E U E
The Great Hall
(site of)

1 43 0 .1

1 44 0 .1

1 42 0 .6

14 0. 5 3 14 0. 3 6
14 0. 5 3

1 44 0 .7

1 44 0 .1

Chapel
(site of)

14 0. 3 6
14 0. 4 3
14 0. 3 2

14 0. 2 6
14 0. 3 7
IC

1 45 0 .6 1 44 0 .2

1 45 0 .3

14 0. 2 0

CL 104.43 Subway Access (Multiple Services) CL 104.55

Queen Marys Steps

14 0. 2 8

1 4 0 . 5 6

14 0. 3 3

IC CL 104.51

1 42 0 .5 1 44 0 .0

14 0. 3 7

1 45 0 .4

LB

1 43 0 .0 1 43 0 .9

Mu d

Ministry of Defence
Victoria

4
Subway Access CL 104.57

Subway Access CL 104.52

barriers may be required but is not shown on this drawing. 5. Gate position to alter to suit construction progress. 6. Existing flood defence level to be maintained at all times. Barge on campshed 10m 0 40m

Scale 1:500 at A1 1:1000 if reproduced at A3

ILLUSTRATIVE

Location

Victoria Embankment Foreshore City of Westminster


Statue

"Tattershall Castle" relocated during construction

Document Information

Section 48 publicity Construction phases - phase 1 Site setup Book of plans - section 16
S48-PP-16X-VCTEF-000202

Authorised channel

July 2012

Statue

W ML
c Thames Water Utilities Ltd 2008

Navigation Lights
10 5. 9 5

(fixed red)

Ga nr t y S L

Metropole Buildings

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Ministry of Defence

Ga nr t y

B r

Keyplan: Navigation Lights


(fixed red)

This drawing
MLW
.5 52 0 1

Memorial

Existing Northumberland Street Sewer


1 5 0 . 9 0

Victoria Embankment Gardens

H u n g e r fr o dB r ig d e( fo o t )
Navigation Lights

Hispaniola restaurant ship

(fixed red)

National Liberal

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

1 5 0 . 8 5

E C A L LP L A H E T I H

Club

Intermittent closure of one lane but two way traffic maintained throughout works - coach parking suspended
1 5 0 . 8 1

1 5 0 . 8 7

1 5 0 . 7 7

Key:
SL

Limits of land to be acquired or used (LLAU) Hoarding Maximum extent of working area

Existing Regent Street Sewer


1 5 0 . 8 5

1 5 0 . 8 2

Navigation Lights
(fixed red)

1 5 0 . 8 9

Existing public right of way

Site power structure

Offices / welfare building

York Place
(site of)

H u n g e r fr o dB r ig d e( fo o t )

Route of temporary diversion of right of way Site access Access / haul route Existing sewers Sheet piles

URT

Segment storage

1 5 0 . 9 5

Extent of temporary working area over the foreshore Workshop buildings/storage (open area or containerised) Secant piles installed

2 a

WH I EH T AL L CO

Wh i h t a e lCo l ut r

Storage (open area or containerised)

Left turn in left turn out


ML W

Rie v r Th a e m s

e c a h

W ae tr

Security office

Ki g n sR

Me n a

Hi h g

Crane

Crane

H R E O S G A U R D SA V N E U E
The Great Hall
(site of)

Chapel
(site of)

Mu d

Ministry of Defence
Victoria Embankment

Authorised channel Intermittent closure of one lane but two way traffic maintained throughout works - coach parking suspended

Whitehall Stairs
(site of)

Barge on campshed

Vehicle turning area

Excavated material handling

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

Queen Marys Steps

Notes :
1. These construction phasing plans have been
LB

ILLUSTRATIVE

prepared to illustrate possible site layouts for the principal construction phases. Contractors may choose to lay sites out differently during construction depending on their preferred construction methods subject to any controls Location

Victoria Embankment Foreshore City of Westminster


Document Information

Statue

on layout imposed through the planning "Tattershall Castle" relocated during construction submission and approval process. 2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown. 3. Utility supplies for the construction of the works would be agreed with the relevant utility company. Authorised channel 4. Additional noise mitigation including noise barriers may be required but is not shown on this drawing. 5. Gate position to alter to suit construction progress. 6. Existing flood defence level to be maintained at all times.
W ML

Section 48 publicity Construction phases - phase 2 Shaft construction and tunnelling Book of plans - section 16
S48-PP-16X-VCTEF-000203 July 2012

Statue

c Thames Water Utilities Ltd 2008

Navigation Lights

(fixed red)

Ga nr t y S L

Metropole Buildings

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Ministry of Defence

Ga nr t y

B r

Navigation Keyplan: Lights


(fixed red)

This drawing Victoria Embankment Gardens


MLW Memorial

Existing Northumberland Street Sewer

H u n g e r fr o dB r ig d e( fo o t )
Navigation Lights

National Liberal

Hispaniola restaurant ship Intermittent closure of one lane but two way traffic maintained throughout works - coach parking suspended

(fixed red)

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

E C A L LP L A H E T I H

Club

Key:
SL

Limits of land to be acquired or used (LLAU) Hoarding Maximum extent of working area

Navigation Lights

Existing Regent Street Sewer Site power structure Offices / welfare building

(fixed red)

Existing public right of way

York Place
(site of)

H u n g e r fr o dB r ig d e( fo o t )

Route of temporary diversion of right of way Site access Access / haul route

Storage (open area or containerised)

Existing sewers Sheet piles Extent of temporary working area over the foreshore

URT

2 a

WH I EH T AL L CO

Wh i h t a e lCo l ut r

Workshop buildings/storage (open area or containerised)

Secant piles installed

Crane

Rie v r Th a e m s

W ae tr

Left turn in left turn out. Gate position to alter to suit construction progress.

Security office

Ki g n sR

Me n a

Hi h g

e c a h

Crane

ML W

H R E O S G A U R D SA V N E U E
Vehicle turning area (note 6)

The Great Hall


(site of)

Chapel
(site of)

Mu d

Ministry of Defence
Victoria Embankment

Whitehall Stairs
(site of)

Intermittent closure of one lane but two way traffic maintained throughout works - coach parking suspended

Authorised channel

Barge on campshed

10m

40m

Notes :
Excavated material handling 1. These construction phasing plans have been

Scale 1:500 at A1 1:1000 if reproduced at A3

Queen Marys Steps

prepared to illustrate possible site layouts for the principal construction phases. Contractors may choose to lay sites out differently during construction depending on their preferred
LB

ILLUSTRATIVE

construction methods subject to any controls on layout imposed through the planning submission and approval process. 2. Traffic management plans for construction phases of the work would be submitted to the Location

Victoria Embankment Foreshore City of Westminster


Document Information

Statue

appropriate authority for approval. Where "Tattershall Castle" relocated during construction appropriate, outline traffic management arrangements are shown. 3. Utility supplies for the construction of the works would be agreed with the relevant utility company. 4. Additional noise mitigation including noise barriers may be required but is not shown on this drawing. 5. Gate position to alter to suit construction progress. Authorised channel 6. Access on to site will be restricted once the cofferdam is emptied to allow construction of river wall cladding.
W ML

Section 48 publicity Construction phases - phase 3 Construction of other structures Book of plans - section 16
S48-PP-16X-VCTEF-000204 July 2012

Statue

During this works the adjacent lane will be closed. 7. Existing flood defence level to be maintained at all times.
c Thames Water Utilities Ltd 2008

Navigation Lights

(fixed red)

Ga nr t y S L

Metropole Buildings

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Ministry of Defence

Ga nr t y

B r

Navigation Keyplan: Lights


(fixed red)

This drawing Victoria Embankment Gardens


MLW Memorial

Existing Northumberland Street Sewer

H u n g e r fr o dB r ig d e( fo o t )
Navigation Lights

National Liberal

Hispaniola restaurant ship

(fixed red)

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

E C A L LP L A H E T I H

Club

Key:
SL

Limits of land to be acquired or used (LLAU) Maximum extent of working area Existing public right of way

Navigation Lights

Existing Regent Street Sewer

Existing outfall to be reinstated

(fixed red)

York Place
(site of)

H u n g e r fr o dB r ig d e( fo o t )

Route of temporary diversion of right of way Existing sewers Sheet piles Extent of temporary working area over the foreshore

Notes :
URT
Permanent forshore structure 1. These construction phasing plans have been prepared to illustrate possible site layouts for
2 a

WH I EH T AL L CO

Wh i h t a e lCo l ut r

the principal construction phases. Contractors may choose to lay sites out differently during construction depending on their preferred construction methods subject to any controls

Rie v r Th a e m s

Temporary traffic restrictions removed

on layout imposed through the planning Shaft submission and approval process. 2. Traffic management plans for construction phases of the work would be submitted to the

e c a h

W ae tr

Ki g n sR

Hi h g

Me n a

ML W

appropriate authority for approval. Where Cofferdam facilities removed, cofferdam sheet piles and fill removed, and foreshore reinstated appropriate, outline traffic management arrangements are shown. 3. Utility supplies for the construction of the works would be agreed with the relevant utility company. 4. Additional noise mitigation including noise Outfall apron to be constructed prior to foreshore reinstatement barriers may be required but is not shown on this drawing. 5. Gate position to alter to suit construction progress. 6. Access on to site will be restricted once the cofferdam is emptied to allow construction of river Campshed removed and foreshore reinstated wall cladding. Authorised channel During this works the adjacent lane will be closed. 7. Existing flood defence level to be maintained at

Thames Path reinstated and temporary diversion removed


4

Hoarding removed

Whitehall Stairs
(site of)

all times.

H R E O S G A U R D SA V N E U E
The Great Hall
(site of)

Construction access removed and parapet reinstated

10m

40m

Chapel
(site of)

Scale 1:500 at A1 1:1000 if reproduced at A3

Queen Marys Steps

ILLUSTRATIVE
LB

Location

Victoria Embankment Foreshore


"Tattershall Castle" to be moved to its permanent location. Refer to permanent works layout for new permanent position.

City of Westminster
Document Information

Statue

Section 48 publicity Construction phases - phase 4 Site demobilisation Book of plans - section 16
S48-PP-16X-VCTEF-000205 July 2012

Authorised channel
Statue

Mu d

Ministry of Defence
Victoria Embankment

W ML
c Thames Water Utilities Ltd 2008

For further information or to comment on our proposals please see our website: www.thamestunnelconsultation.co.uk It is very important that you understand the information we have provided. If you need further information in another language, braille, large print or audio format please contact us on 0800 0721 086.

You might also like