You are on page 1of 22

Drilling and Production Technology

QAB3012 Fitri Ismail

Rig Components

What we learnt previously


Introduction to Drilling engineering ? ? ?

Todays objective
Generally: To learn the basic systems found on a rig, and the functions

What is required?

The Basic Systems

The Basic Systems


1. 2. 3. 4. 5. 6. Power system Hoisting system Circulating system Rotary system Well Control system Monitoring system

1. The Power System


Drawworks

Motor HP (100 HP/1000 ft) Depth of well Drum size Breaking Overall size Weight ( > 10 tonnes)

1. The Power System


Rotary Table
Provide rotary power Typical torque > 1000 ft lbs

Pumps

1. The Power System

2. The Hoisting system


Drawworks Drilling Line Crown & travelling block Hook and elevators

2. The Hoisting system

2. The Hoisting system

3. The Circulating system


Mud pits & pumps Standpipe Kelly hose Drillstring & annulus Solids transport & removal

3. The Circulating system

3. The Circulating system

Mud pumps Duplex Triplex

4. The Rotary system


Swivel Kelly & bushing Rotary table

4. The Rotary system

4. The Rotary system

Procedures for adding a joint

4. The Rotary system

Procedures for pulling a joint

4. The Rotary system

Enables complete 90' stands of pipe to be added to the string. Saves rig time Coring operations more efficient Power swivel can be easily stabbed into the string to allow circulation, while pulling out

Topdrive

5. The Well Control system


Ram type preventer

Kicks Closing in a well


Annular preventer

6. The Monitoring system


WOB RPM Pump rate & pressure Mudlogging Etc.

End of Lecture - Recap


Described the six basic systems found on a rig, and the functions Power system - equipments Hoisting system equipments and calculations Circulating system brief mud functions, type of pumps Rotary system components and fuctions, running and pulling out of hole Well Control and Monitoring basic methods

You might also like