You are on page 1of 6

TANGEDCO

NAME OF WORK : Charges for replacing the poor condition of oil seal in WEG no. 3,4 and 9 at Muppandal wind farm site

ABSTRACT SL.NO. DESCRIPTION

ESTIMATE QTY RATE PER AMOUNT

1.

Charges for replacing the poor condition of oil seal by new one in the hydro spring unit including the cost of oil seal ,tools and plants charges and all leads and lifts etc complete. Charges for checking the back pressure for brake cylinder with hydraulic oil including the cost of new oil(One litre per brake cylinder) tools and plants charges and all leads and lifts etc complete. Charges for the Nitrogen gas filling in the accumulator tank with 40 bar pressure including cost of Nitrogen gas , tools and plants charges and all leads and lifts etc complete. Charges for dismantling and assembling the hydro spring unit in nacelle including tools and plants charges and all leads and lifts etc complete

3 set

2500.00

set

7500.00

2.

3 Nos.

600.00

1800.00

3.

3 Nos.

750.00

2250.00

4.

3 Nos. operation

800.00

2400.00

Sub total Contingencies 1% TOTAL

13950.00 140.00 14090.00

TANGEDCO

REPORT TO ACCOMPANY THE ESTIMATE ESTIMATE AMOUNT : Rs.14695 /This estimate is evolved for charges for replacing the poor condition of oil seal in WEG no. 3,4 and 9 by new one in the hydro spring unit including the cost of oil seal and checking back pressure for brake cylinder with oil and filling of Nitrogen gas in the accumulator tank with 40 bar pressure at Muppandal wind farm. The WEG No. 3 , 4 and 9 in Muppandal Wind farm are frequently stopped by indicating brake oil low and this is restarted by topping up the brake oil .While checking the WEGs it was found that the oil seal in the hydro spring unit are in poor condition. Due to this the brake oil is leaked from moving piston whenever the hydraulic unit is running. So the replacement of oil seal in the hydro spring unit is necessary to avoid unnecessary stoppage of WEGs and also to avoid free wheeling of W EGs. Hence this estimate is evolved. The rates adopted in this estimate are as per lowest rate prevailing in the local market . Hence it is requested that this estimate may kindly be sanctioned and communicated early.

TANGEDCO

From

To The firms

Lr No : SIR,

AEE / WF / MPD L / F- 7 / D-

/12 DT

02 - 06-2012

Sub :Elecy WF Mpdl - Charges for replacing the poor condition of oil seal in WEG no. 3,4 and 9 at Muppandal wind farm quotation Called for reg.

Please quote your lowest offer for the following works and quotation may be sent To this office as early as possible. SL.NO. DESCRIPTION QTY RATE PER AMOUNT

1.

Charges for replacing the poor condition of oil seal by new one in the hydro spring unit including the cost of oil seal at Muppandal wind farm. Charges for checking the back pressure for brake cylinder with hydraulic oil including the cost of new oil. charges for the Nitrogen gas filling in the accumulator tank with 40 bar pressure. Charges for dismantling and assembling the hydro spring unit in nacelle TOTAL

3 set

2.

3 Nos.

3.

3 Nos.

4.

3 Nos.

TANGEDCO From , To, The Assistant Executive Engineer Wind Farm, Muppandal TANGEDCO Lr. No : Sir , Sub :Elecy WF Mpdl Labour charges for replacing the poor condition of oil seal in WEG no. 5,10 and 16 at Muppandal wind farm estimate sub reg. JE / WF / MPD L / F- DOC / D/12 DT -2012

I submit here with an estimate for the labour charges for replacing the poor condition of oil seal in WEG no. 3,4 and 9 by new one in the hydro spring unit including the cost of new oil seal and checking back pressure for cylinder and Nitrogen gas filling in the accumulator tank with 40 bar pressure at Muppandal wind farm for favour of further action please.

Encl. Estimate : 2 sets Quotation called for letter 1 No. Quotation in original 1 No.

The details of 200 KW Micon WEG No. 3 is listed below Sr.No. Description 1. Make, Capacity, date of commissioning and service period 2. Generation yield so far 3. Maintenance expenditure so for incurred 4. Date on which the recent maintenance work was carried out with details of work Details Micon 200KW 31-3-1990 22Years 73,72,698 KWH Rs.22,980/( from the period January 2001 to April 2012 by estimate) Name of the estimate : Charges for replacing the poor condition of battery in MM00 PCB in the control system of WEG No. 1,2,3,4,5,6,7,8, 9,10,11&12 by new one at MPDL WF.Rate approval : SE/NCES/Tin/Tech/F.ESt-10/10- 11/ D.385/10/Dt.24-7-10 Date of completion : 5-08-2010 5,04,856 KWH Name of the estimate : Charges for replacing two set of oil seal in the hydro spring unit of weg no.3 & 12 at mpdl Rate approval : SE/WEDC/TIN/Tech/F.Est-18/ 09-10/D.334/ 09 /dT22-06-09 Date of completion : 11-09-2009 Within 3 days during wind season

5. 6.

Generation yield there after the recent maintenance work When was the work carried out previously now similarly proposed to be carried out.

7.

The period of realization of the proposed expenditure.

The details of 200 KW Micon WEG No. 4 is listed below Sr.No. Description 1. Make, Capacity, date of commissioning and service period 2. Generation yield so far 3. Maintenance expenditure so for incurred 4. Date on which the recent maintenance work was carried out with details of work Details Micon 200KW 31-3-1990 22Years 65,53,876 KWH Rs.1,01,798/( from the period January 2001 to April 2012 by estimate) Name of the estimate : Charges for replacing the poor condition of battery in MM00 PCB in the control system of WEG No. 1,2,3,4,5,6,7,8, 9,10,11&12 by new one at MPDL WF.Rate approval : SE/NCES/Tin/Tech/F.ESt-10/10- 11/ D.385/10/Dt.24-7-10 Date of completion : 5-08-2010 5,54,958 KWH Name of the estimate : Charges for replacing one set of oil seal in the

5. 6.

Generation yield there after the recent maintenance work When was the work carried out

previously now similarly proposed to be carried out.

7.

The period of realization of the proposed expenditure.

hydro spring unit of weg no.4 at mpdl : EE/WFP/Tin/DM/FRA.03/D-268/2008-09 Dt 26-5-2008 Date of completion : 24-07-2008 Within 3 days during wind season Rate approval

The details of 200 KW Micon WEG No. 9 is listed below Sr.No. Description 1. Make, Capacity, date of commissioning and service period 2. Generation yield so far 3. Maintenance expenditure so for incurred 4. Date on which the recent maintenance work was carried out with details of work Details Micon 200KW 31-3-1990 22Years 69,29,924 KWH Rs. 1,13,423/( from the period January 2001 to April 2012 by estimate) Name of the estimate : Charges for replacing the poor condition of battery in MM00 PCB in the control system of WEG No. 1,2,3,4,5,6,7,8, 9,10,11&12 by new one at MPDL WF.Rate approval : SE/NCES/Tin/Tech/F.ESt-10/10- 11/ D.385/10/Dt.24-7-10 Date of completion : 5-08-2010 5,08,177 KWH Name of the estimate : Charges for replacing one set of oil seal in the hydro spring unit of weg no.9 at mpdl Rate approval : EE/WFP/ABY/DM/FRATE APP/R.26/D-2025/ 03Dt 13-10-2003 Date of completion : 13-11-2003 Within 3 days during wind season

5. 6.

Generation yield there after the recent maintenance work When was the work carried out previously now similarly proposed to be carried out.

7.

The period of realization of the proposed expenditure.