By G. C. Skipper
Mounted in the cab, the control box includes a monitor that helps the operator maneuver the bucket.
els, Womble explained. Because of the dry conditions in 2007 the machine could reach everything without us having to build a dike or any kind of spillway. If the water level had been higher, the job would have taken longer. Assisting as back up for the machine in the water was a D6 LGP Caterpillar (www.govbidspec.com) that worked on the beach itself, Womble said. Although low water levels helped the situation, Womble still faced the problem of knowing where and how much to excavate underneath the water. He had previously used lasers in grading operations, but he had never worked with GPS before, he said. That was about to change. He contacted John McCormick, branch manager and machine control specialist for Atlantic Laser Supply, a 2008
Topcon Positioning Systems (www.topconpositioning.com) dealer in Richmond, VA. McCormick, along with his co-worker Randy Blaine, who is also a machine control specialist from Atlantics Chesapeake office, went out to meet Womble at the beach project. We had to come up with an idea of how to dig through the bottom, put sand in there, and get it packed at the place where the plans said it was suppose to be, McCormick commented. In the past Virginia/Carolina Paving had been interested in using lasers, but before now no project had warranted it, McCormick noted. After reviewing the work site and its challenges, McCormick recommended equipping the excavator with a Topcon X63 positioning system (formerly branded as 3DXi). He explained the terwww.govengr.com
20
GOVERNMENT ENGINEERING
JULY-AUGUST
minology: X is for excavator, the 6 Womble said, and that enabled us to go Nevertheless, to keep the new sand indicates the GX-60 control box, and around and set up control points in dif- from washing away, Wombles crew used the 3 is for three dimensional, he said. ferent peninsulas and coves. a turbidity curtain that acted like a The operator, who controls the excaAs the operator dug the coarse matefence. The curtain was anchored around vator, said McCormick, sees different rial out of Smith Mountain Lake, he the perimeter of the job, where it floatviews of the work site, sort of a birds- dumped it into an articulated dump ed, reducing the silt transfer from the eye view, on a control box mounted in truck that had been backed out into the job to outside the job. Its more like a his cab. The monitor has an indicator water, said Womble. When the articuheavy fabric screen that we put around on the right hand side that shows you lated dump was fully loaded, the vehicle the worksite, Womble explained. where the bucket is going down the hauled the material out of the water. As with any job, the biggest challenge grade. That lets you know where you The beach is pretty shallow, he added, in rebuilding the beach at Smith want to go and how far to go to get with about 170 feet separating the most Mountain Lake was to come in on time there, he said. distant point where the water hits the and under budget. Womble accomIt was a learning experience, said sand on the beach from the point of dis- plished both, beating the schedule by 30 Womble. It was my first job with turbance in the water. days. From start to finish, he said, took Topcon. We had a surveyor on the job Meanwhile, regular road dump trucks about 60 days. who went out and checked the existing were used on the beach itself to bring in It was the Topcon Positioning grades to make sure the data on the sand. The trucks dumped the sand on System that enabled us to do it. It was CAD files were correct. Basically, we the beach, a bulldozer pushed the sand almost a two-man operation. We had an took the engineers CAD files and down to the water level, and the long- operator on the long-reach machine downloaded them into the Topcon sys- reach turned around, scooped up the with the Topcon and an operator in the tem. The work area shows up on a sand, turned back around, and dropped dozer to push the sand out to the excascreen in the excavator vator and to dress up the operators cab. The screen sand on the beach. shows the limits of the Without GPS, he project. If the operator explained, he would goes outside those limits, have had to call surveyhe doesnt have any elevaors out and manually tions on the screen. As mark underwater points long as he stays inside the with buoys. limits, he can take his We would have had bucket and place it anyto fill around the buoys, where on the ground and to verify the work, inside the job. The syswe would have had to tem tells him if he has to have a surveyor come fill three inches of materiback out and determine al, for example, or tells how much fill we had him if he has to cut a foot placed. Surveyors would of material out, Womble have been out there freexplained. quently. The excavator operator Topcons system, he lowers the bucket manusaid, completely elimially, Womble said, digs nated the surveying cost out the material, and Outfitted with spill kits to protect against oil leaks, the excavator waded out on this particular job. continues to check until until water reached the top of the tracks, but not the cab. Wombles first experihe has reached the desired ence with GPS worked elevation. it into the water, Womble said. Once so well, in fact, that now he is considerthe operator got close to where he ing a system for one of his bulldozers. wanted to be, he would take the bucket We will probably stay with Topcon, To install the Topcon system took and level, or smooth out, the sand under he said. We think there is good value in about a day and a half and called for set- the water, said Womble. the system we bought and more compating up a base station on the beach, Because the work site involved a lake nies are using Topcon than any other GE marking it with a rebar stob so the same beach, there wasnt much underwater system that I know of. position could be used every day. current, Womble said. Over time the Control points also were set up in ran- wind will stir up a little current. That Mr. Skipper is a freelance writer specializing dom locations around the job site. probably eroded the sand originally, he in the construction and trucking industries. He lives in Tuscaloosa, AL. The beach was located in a cove, said.
System Installation
www.govengr.com
GOVERNMENT ENGINEERING
JULY-AUGUST
2008
21