Feasibility Study and Detailed Project Report for Six Bypasses on Gurgaon - Kotputli - Jaipur Section of NH-8

PROGRESS REPORT
1.0 Introduction

The Ministry of Road Transport & Highways (MoRT&H) acting through the National Highways Authority of India (NHAI) has decided to provide 6-lane divided carriageway configuration bypasses for Manesar, Dharuhera, Behror, Kotputli, Paota and Shahpura towns on Gurgaon-Kotputli-Jaipur Section of NH-8. RITES has been entrusted with Consultancy services for preparation of Feasibility Study and Detailed Project Report for 6-Bypass for Manesar, Dharuhera, Behror, Kotputli, Paota and Shahpura towns on Gurgaon-Kotputli-Jaipur Section of NH-8 by National Highways Authority of India. The letter of Acceptance has been issued by National Highways Authority of India vide letter No. NHAI/12011/1/Bypasses/2010/ Raj/550 dated 9th July 2011. The Contract Agreement for the services has been signed on 7th September 2011, subsequently the letter of commencement has been issued by the Client, NHAI vide letter no. NHAI/12011/1/Bypasses/2010/Raj/2694 dated 7th September 2011. The project is located in two states namely Haryana and Rajasthan. The location of bypasses and relevant details are mentioned below.
Sl. No. 1. 2. 3. 4. 5. 6. Name Town Manesar Dharuhera Behror Kotputli Paota Shahpura of Tentative extent of Towns Northing (N) 28-21-18 28-12-30 27-53-30 27-42-43 27-35-09 27-22-01 Easting (E) 76-56-16 76-47-30 76-16-46 76-12-11 76-04-24 75-57-42 From (km) 47.500 67.000 131.050 153.170 174.400 199.800 To (km) 50.000 73.850 135.570 159.520 176.000 203.500 2.50 6.85 4.52 6.35 1.60 3.70 50.0 Length (km)

Total Length (km)

2.0

Report Submission

Quality Assurance Plan (QAP)


The Quality Assurance Plan was discussed during a meeting with PIU Jaipur officials and accordingly QAP was submitted by the Consultant vide letter No. RITES/HW/NHAI/9014-30/6-BYPASSES/DPR/2011 dated 12th September 2011.

Inception Report (IR)


The Inception Report have been prepared satisfying the ToR as well as the valuable suggestions deliberated and discussed at PIU Jaipur. The Inception Report had already been submitted by the Consultant vide letter No. RITES/HW/NHAI/9014-30/6BYPASSES/DPR/2011 dated 16th September 2011. 3.0 3.1 Status of the Project Mobilization

Upon signing of contract Agreement between NHAI and RITES Ltd., the Consultants mobilized the teams for conducting different aspects of the study. The team for the present study comprising of the Senior Highway Engineer/Team Leader, Highway Engineer, Pavement Specialist, Bridge Engineer, Traffic Engineer, Material-cumGeotechnical Engineer, Senior Survey Engineer, Financial Analyst, Environmental Specialist and Resettlement & Rehabilitation Specialist Quantity Surveyor/Documentation Expert. These personnel were assembled in Gurgaon, the head quarters, to formulate an effective work programme for the successful completion of the project to the entire satisfaction of the client. Several Meetings were also held with NHAI officials at Delhi office and Jaipur, PIU to streamline the work programme and effective completion of the work. Presently the project status is as under: 3.2 Survey instruments mobilized at site
Sl. No. Instrument Quantity

1. 2.

Hand Held GPS Lap top Computers

4 nos. 4 nos.

3.

Axle Load Pad

4 nos.

3.3

Progress of Field Work


1. Traffic survey: 7 days Classified Traffic locations: (i) Toll 211) (ii) (iii) Shahajahan Manesar pur (km 116) (Kherki Daula at km 42) Manoharpur Plaza (km Volume Count Study at 3 Date 14.10.201 1 To 22.10.201 1 Status Complete d

3 confirmatory

days

22.10.201 1 To 25.10.201 1

Complete d

Classified Traffic Volume Study locations: (i) (ii) (iii) Dharuhera Kotputli Paota (km (km 64/860) (km 152/050) 179/950) Count at 3

2.

Origin Survey locations: (i) Toll 211) (ii) (iii) at

and 3 17.10.201 1 To 23.10.201 1 (km

Complete d

Destination (O-D)

Manoharpur Plaza

Shahajahan Manesar

pur (km 116) (Kherki Daula at km 42)

3.

Axle Load Survey at 2 locations: (i) Toll 211) (ii) Shahajahan pur (km 116) Manoharpur Plaza (km 17.10.201 1 1 to 20.10.201

Complete d

3.4

Meetings and Discussions

The consultants have made various meetings/discussions with NHAI and other government officials to formulate the entire work for successful completion of the project. The details of such meetings are as follows:
Sl. No 1 Date 14.7.2011 Location/ Place Shahpura Tehsildar, Shahpura and Tehsil Revenue Accountant (TRA) Contact Official RITES Representative RITES representatives S. Vishu Vijay Ishwar Kumar, Kumar, Singh, Discussed land maps regarding rates, apprised issues, and Remarks

availability of khasara about the project.

Rahul Kr. Tewary, Manoj Kr. Sahani, 2 15.7.2011 Shahpura Shri. Meena, Shahpura Madan Lal RITES representatives S. Vishu Vijay Ishwar Kumar, Kumar, Singh, Information regarding land appraised issues. rate about and the Patwari,

project for land related

Rahul Kr. Tewary, Manoj Kr. Sahani,

Sl. No 3

Date 16.7.2011

Location/ Place Kotputli and Paota

Contact Official Tehsil Accountant Kotputli Revenue (TRA),

RITES Representative RITES representatives S. Vishu Vijay Ishwar Kumar, Kumar, Singh,

Remarks Information regarding land appraised issues. rate about and the

project for land related

Rahul Kr. Tewary, Manoj Kr. Sahani, 4 27.7.2011 Jaipur Sri Rakesh Gupta, Rahul Kr. Tewary, AM/HW Meeting with the PD, PIU, Jaipur Project Director, PIU, Jaipur and appraised about the project. 5 08.08.2011 Manesar Sri R K Manchanda GM Office Design & PECPL Construction RITES representatives Ishwar Singh, R K Tewary Requested about the design and drawings of existing project to interface the proposal of proposed bypasses with existing road. 6 19.08.2011 Kotputli Sri Vivek Mehta RITES representatives Ishwar singh, RK Tewary, JK Yadav, MK Sahani, Harsh Kr., Singh, Singh 7 01.09.2011 Manesar Sri R K Manchanda PECPL Office RITES representatives Ishwar Singh, K Tewary R Requested about the design and drawings of existing project to interface the proposal of proposed bypasses with existing road. 8 15.09.2011 Jaipur Sri Rakesh Gupta, Ishwar Singh, Meeting with the PD, PIU, Jaipur Rahul Kr. Tewary Project Director, PIU, Jaipur and discussion on alignment corridor of proposed bypasses. 9 10.10.2011 Jaipur Sri P R Patelia, CGM, RO, Rajasthan, Jaipur RITES representatives S. Vishu Vijay K Yadav 10 10.10.2011 Jaipur Sri Rakesh Gupta, RITES representatives S. Vishu Vijay Yadav. Kumar, Kumar, Meeting with the PD, PIU, Jaipur Project Director, PIU, Jaipur and discussion on modified alignment corridor of proposed bypasses as suggested by the Project Director in 11 12.10.2011 Shahpura Patwaris of Shahpura Tehsil RITES representatives S. the last meeting Khasara held on 15.09.2011. Requested maps for transfer of Kumar, Kumar, J Meeting with theCGM, RO, Rajasthan, at Jaipur, and appraised the alignment corridor of proposed bypasses. Prashant Bharat Discussed source and available locations. of about the data Toll materials at

available

Ishwar Singh,

Ishwar Singh, J K

Sl. No

Date

Location/ Place

Contact Official 1. Sri Madan Lal

RITES Representative Vishu Vijay Yadav. Kumar, Kumar,

Remarks proposed alignment

Meena 2. Sri Rajendra Kr. Sharma 3. Sri Shravan Lal Kumawat 4. Sri Sharma 5. Sri Yadav 6. Sri Prithvi Singh Sekhawat 7. Sri 12 14.10.2011 Kotputli Kalu Ram Chaudhary Patwaris of Kotputli Tehsil 1. Sri Phool Chand Verma 2. Sri Hardan Singh Chaudhary 3. Sri Sharma 4. Sri Mukkar 5. Sri Rajmal Meena Satyavir Naresh Kr Ram Pal Ashok Kr

corridors on khasara maps and information regarding Panth Shahpura. Road Delhi at

Ishwar Singh, J K

RITES representatives Ishwar Singh, J K Yadav, R K Tewary

Requested proposed

Khasara alignment

maps for transfer of corridors on Khasara map of each affected village

During the meeting held with Tehsildar of Shahpura, Kotputli and Behror, it was informed that the Khasara maps of each village will be provided against the payment of each khasara falling in each village map. At this stage of work, the consultant requires the copy of the revenue map only for transfer of alignment corridor on the khasara maps. The Project Director, NHAI, PIU, Jaipur is requested to help in this matter in obtaining Khasara maps at a nominal fee for desk study purposes, because unless otherwise without transferring proposed alignment corridor on the Khasara maps, affected khasaras will not be identified. For the affected khasaras required for preparation of 3D Gazette notification informations, the payment would be made for each affected khasaras accordingly.
3.5 Way Forward

Presentation of proposed alignment corridor options at NHAI (HQ) and subsequent approval of alignment corridors shall enable the Consultant to proceed further for design and preparation of Quality Report and submission of various submittals.

3.6

Reasons for Delay, if any

The project progress was hampered due to the following reasons: i) Road alignment study was hampered due to rainy season and sowing of crops. ii) Remaining field study could not be completed due to pending harvesting of crops. iii) The important activity of traffic study was not completed during SeptemberOctober months due to important festival seasons which would affect the normal traffic by the induced traffic due to festival seasons. 3.7 Project Report Submission

The schedule of submission of the project report is as under: Sl. No. 1. 2. 3. 3.8 Content Feasibility Report Preliminary Project Report Detailed Project Report Schedule of Submission 20.11.2011 30.11.2011 01.12.2011

Outstanding Issues

(a) Approval on Inception Report (IR) (b) Technical Presentation 3.9 Conclusion

Even though, initial delay has been seen in the project, RITES is committed to complete the study in time. The project completion would be within the stipulated time period. 3.10 Contact Details

M/s RITES Ltd. ROC Gurgaon 4th Floor, Highway Division Plot-1, Sector-29 Gurgaon-122001 (Haryana) Ph. #: 0124-2818418, 2818416, 2818426, 2818410, 2818483 Fax #: 0124-2571645