Construction of Check dam

Computation of Bed slope for U/s


U/s Bed level @ 1000 m

165.900

Bed level at the proposed site

164.200

1.700

Difference in elevation

165.9 - 164.2

Distance between the U/s and proposed site

1
=

Bed fall

1.7 / 1000 =

say

1000
0.0017

1 in

588.2

in

600

146912493.xlsx.ms_office146912493.xlsx.ms_office

m
m

Km
m

146912493.xlsx.ms_office146912493.xlsx.ms_office

Construction of Check dam


Computation of Bed slope for D/s
Bed level at the proposed site

164.200

D/s Bed level @ 1000 m

162.200

2.000

Difference in elevation

164.2 - 162.2

Distance between the proposed site and D/s

1
=

Bed fall

1000

2 / 1000 =

0.002
1 in

say

in

500.000
500

146912493.xlsx.ms_office146912493.xlsx.ms_office

m
m

m
Km
m

146912493.xlsx.ms_office146912493.xlsx.ms_office

CALCULATION OF REAR WATER LEVEL (RWL)


Base width of the canal
Side slope of the canal
Bed level of the canal
Bed slope of the canal
Rugosity coefficient
Rear Water Level

b
1 in
+
1 in
n

20
1.5
164.200
500
0.025
164.775

m
(z)
m

RWL = + 164.775
1

0.572 m

1.5
+ 164.200
20.00
Area of flow

Wetted Perimeter P =

Hydraulic Radius R =

Bed slope

S =

Velocity of flow

V =

Discharge

Q =

(b+zy) y

=
=

b+2y (1+z^2) ^0.5 =


=
A/P

=
=

1 / 500

1 / n x R2/3 x S1/2 =
=
A*V

=
=

( 20 + 1.5 * 0.572 ) * 0.572


2
11.927 m
20 + 2 * 0.572 * ( 1 + 1.5 ^2 ) ^0.5
22.062 m
11.927 / 22.062
0.541 m
0.0020
1/ 0.025 x 0.541 ^ (2/3) x 0.0020 ^ (1/2)
1.187 m /sec
11.927 x 1.187
14.158 cumecs

OR
500 cusecs

Rear Water Level

Bed level + y

164.2 + 0.572

164.775 m

Gwall/lnattar/rwl

Construction of Check dam


Fixing the FMFL (Using Drowned weir formula)
3
14.16 m /sec

Design Discharge

Crest Level

165.100 m

Assume FMFL

165.882 m

RWL (calculated from the regraded section of river)

164.625 m

Upstream Bed Level

164.200 m

Downstream Bed Level


Head over crest

165.885 m

164.200 m

165.882 - 165.1

Total width of river


Length of check dam

500 c/s

0.78 m

20 m

20 m

Width of check dam

0.45 m

1.5 times width of weir

0.675 m
Hence provide Narrow crested weir

Drowned weir formula


Q

= L * h^0.5 ( 1.84* h + 3.54 *h1)


FMFL+165.885
RWL+164.625

h
crest+165.1

NC Weir

Where L =
h

h1

bed level+164.2

effective length

FMFL - RMFL

h1 = depth of d/s water level above crest


Q

20 m
165.882 - 164.625 =
=

164.625 - 165.1

1.257 m
-0.475 m

= L * h^0.5 ( 1.84* h + 3.54 *h1)


= 20 * 1.257 ^0.5 ( 1.84* 1.257 + 3.54 * -0.475 )
=

3
14.158 m /sec

Total discharge over checkdam


Required Discharge

3
14.158 m /sec
3
14.158 m /sec

146912493.xlsx.ms_officeFMFL(drown)

Construction of Check dam

Fixing the FMFL (Using Free flow formula)


3
14.16 m /sec

Design Discharge

Crest Level

165.100 m

Assume FMFL

165.332 m

RWL (calculated from the regraded section of river)

164.775 m

Upstream Bed Level

164.200 m

Downstream Bed Level


Head over crest

165.335 m

164.200 m

165.332 - 165.1

Length of check dam

500 c/s

0.23 m

20 m

Width of check dam

0.45 m

1.5 times width of weir

0.675 m
Hence provide Broadcrested weir

Free flow formula


Q

= 1.704 * L * h^1.5
FMFL+165.335
h
crest+165.1
RWL+164.775

BC Weir

Where L =
h
Q

bed level+164.2

effective length
=

Head over crest

20 m
165.332 - 165.1 =

0.557 m

= 1.704 * L * h^1.5
= 1.704 * 20 * 0.557 ^1.5
=

3
14.158 m /sec

Total discharge over checkdam


Required Discharge

3
14.158 m /sec
3
14.158 m /sec

146912493.xlsx.ms_officeFMFL(free)

Construction
of Check dam
146912493.xlsx.ms_office
Stability Analysis of bodywall
(For Drowned weirs)
HYDRAULIC PARTICULARS
Maximum flood discharge
Top of crest
FMFL
RWL
Upstream bed level
Downstream Bed level
Down stream side slope
Upstream side slope
Top width
Unit weight of concrete

+
+
+
+
+

14.16
165.100
165.885
164.625
164.200
164.200
0.3
0
0.45
2.4

m3/sec
m
m
m
m

500 c/s

H to 1 V
H to 1 V
m
t/m2

The stability of body wall of the anicut was checked for the following conditions
1 Reservoir empty
2 Reservoir at MWL,with tailwater
3 Reservoir at FRL, no tail water
165.885
0.785

164.625
165.100

a
165.1
0
i

0.3
1

0.9 1

ii

3
O

0.9

0.785

0.000

0.45

164.200

0.270

0.450
0.720
Stability analysis:
1.Reservoir empty
S.NO
DESCRIPTION
Co-eff
Length
Depth
Area

Unit wt.

FORCE
V
H

L.A
+

MOMENT
+
-

Weight of masonry
1
2
3

0.5
1
0.5

0.000
0.45
0.270

0.900
0.900
0.900

0.000
0.405
0.122

2.4
2.4
2.4
SV=

Base width
X=

Eccentricity

Maximum stress

b =

0.720 m

SM / SV

e = b/2-X
6e/b

= SV

0
0.972
0.29
1.264

2/3 *b =

0.720
0.495
0.180
SM=

0.48 m

1/3 *b =

0.000
0.481
0.052
0.534
0.24 m

0.534 / 1.264 =
0.422 m
Falls within the middle third
0.72 /2 - 0.422
6 * -0.062 / 0.72

=
=

-0.062 m
0.519 m

/ b * (1 + 6e/b)

146912493.xlsx.ms_officeweir stability (drown)

= 1.264 / 0.72
* ( 1 + 0.519 )
=
146912493.xlsx.ms_office
= SV/ b * (1 - 6e/b)
= 1.264 / 0.72 * ( 1 - 0.519 )
=

Minimum stress

2
2.666 t/m
2
0.844 t/m

2.Reservoir at MWL, with tailwater


S.NO

DESCRIPTION
Co-eff
Length
Depth
Area
Weight of masonry
1
2
3

0.5
1
0.5

0.000
0.45
0.270

0.900
0.900
0.900

Water Pressure
i
1
ii
0.5

0.785
0.9

0.9
0.9

Unit wt.

0.000
0.405
0.122

1.4
1.4
1.4

0
0.567
0.17

1
1

b =

X=

Eccentricity

0.720 m

SM / SV

e = b/2-X
6e/b

Maximum stress

=
=
=
=

Minimum stress

2/3 *b =

0.48 m

( 0.311 - 0.439 )/ 0.737 =


Not safe

SV / b * (1 + 6e/b)
1.264 / 0.72 * ( 1 + 4.449 )
SV/ b * (1 - 6e/b)
1.264 / 0.72 * ( 1 - 4.449 )

MOMENT
+
-

0.720
0.495
0.180

0
0.281
0.031

0.45
0.3
SM=

0.737

0.72 /2 - -0.174
6 * 0.534 / 0.72

L.A

0.71
0.41

SV=
Base width

FORCE
H

0.318
0.122
0.311

1/3 *b =

0.439

0.24 m

-0.174 m

=
=

0.534 m
4.449 m

2
9.563 t/m

2
-6.053 t/m

3.Reservoir at FRL, no tailwater


0.720
0.900

Uplift

DESCRIPTION

S.NO

Co-eff
Length
Weight of masonry
1
0.5
2
1
3
0.5
weight of water
a
0.5
Water Pressure
i
0.5
Uplift

0.5

Depth

0.000
0.45
0.270

0.900
0.900
0.900

0.000

Area

Unit wt.

0.000
0.405
0.122

FORCE
H

L.A

MOMENT
+
-

2.4
2.4
2.4

0
0.972
0.29

0.720
0.495
0.180

0.000
0.481
0.052

0.9

0.000

0.000

0.0000

0.9

0.9

0.720

0.900

0.324

1
SV=

0.41
-0.324
0.940

0.3

0.122

0.48

0.156

SM=

0.534

0.277

146912493.xlsx.ms_officeweir stability (drown)

146912493.xlsx.ms_office
Base width

b =

X=

Eccentricity

Maximum stress
Minimum stress

S.No

0.720 m

SM / SV

e = b/2-X
6e/b

=
=
=
=

2/3 *b =

1/3 *b =

( 0.534 - 0.277 )/ 0.94 =


Falls within the middle third

0.273 m

0.72 /2 - 0.273
6 * 0.087 / 0.72

=
=

0.087 m
0.724 m

2
3.026 t/m

2
0.484 t/m

SV / b * (1 + 6e/b)
1.264 / 0.72 * ( 1 + 0.724 )
SV/ b * (1 - 6e/b)
1.264 / 0.72 * ( 1 - 0.724 )

Condition

0.48 m

Maximum
stress in t/m2

Minimum
stress in t/m2

Empty condition

2.666

0.844

MWL condition

9.563

-6.053

FRL condition

3.026

0.484

0.24 m

146912493.xlsx.ms_officeweir stability (drown)

146912493.xlsx.ms_office

Cond. 1
Cond. 2
Cond. 3

empty
MWL
FRL

max
2.666
9.563
3.026

min
0.844
-6.053
0.484

146912493.xlsx.ms_officeweir stability (drown)

Construction
of Check dam
146912493.xlsx.ms_office
Stability Analysis of bodywall ( for Free flow weirs)
HYDRAULIC PARTICULARS
Maximum flood discharge
Top of crest
FMFL
RWL
Upstream bed level
Downstream Bed level
Down stream side slope
Upstream side slope
Top width
Unit weight of concrete

+
+
+
+
+

14.16
165.100
165.335
164.775
164.200
164.200
0.4
0
0.45
2.4

m3/sec
m
m
m
m

500 c/s

H to 1 V
H to 1 V
m
t/m2

The stability of body wall of the anicut was checked for the following conditions
1 Reservoir empty
2 Reservoir at MWL,with tailwater
3 Reservoir at FRL, no tail water
165.335
0.235
165.100

x
a
165.1
0
i

0.325
z

164.775
0.4
1

0.9 1

ii

3
O

0.9

0.235

0.000

0.45

164.200

0.360

0.450
0.810
Stability analysis:
1.Reservoir empty
S.NO
DESCRIPTION
Co-eff
Length
Depth
Area

Unit wt.

FORCE
V
H

L.A
+

MOMENT
+
-

Weight of masonry
1
2
3

0.5
1
0.5

0.000
0.45
0.360

0.900
0.900
0.900

0.000
0.405
0.162

2.4
2.4
2.4
SV=

Base width
X=

Eccentricity

Maximum stress

b =

0.810 m

SM / SV

e = b/2-X
6e/b

= SV

0
0.972
0.39
1.361

2/3 *b =

0.810
0.585
0.240
SM=

0.54 m

1/3 *b =

0.000
0.569
0.093
0.662
0.27 m

0.662 / 1.361 =
0.486 m
Falls within the middle third
0.81 /2 - 0.486
6 * -0.081 / 0.81

=
=

-0.081 m
0.603 m

/ b * (1 + 6e/b)

146912493.xlsx.ms_officeweir stability (Free)

= 1.361 / 0.81
* ( 1 + 0.603 )
=
146912493.xlsx.ms_office
= SV/ b * (1 - 6e/b)
= 1.361 / 0.81 * ( 1 - 0.603 )
=

Minimum stress

2
2.693 t/m
2
0.667 t/m

2.Reservoir at MWL, with tailwater


S.NO

DESCRIPTION
Co-eff
Length
Depth
Area
Weight of masonry
1
0.5
0.000
2
1
0.45
3
0.5
0.360
Add Weight of masonry
x
0.5
0
y
1
0.45
z
0.5
0.13
Water Pressure
i
1
ii
0.5

Unit wt.

X=

Eccentricity

0
0.567
0.23

0.810
0.585
0.240

0
0.332
0.054

0.325
0.325
0.325

0.000
0.146
0.021

1
1
1

0
0.146
0.021

0.81
0.585
0.317

0.000
0.086
0.007

0.9
0.9

1
1

0.810 m
=

e = b/2-X
6e/b

=
=
=
=

Minimum stress

MOMENT
+
-

1.4
1.4
1.4

SM / SV

Maximum stress

L.A

0.000
0.405
0.162

0.235
0.9

b =

FORCE
H

0.900
0.900
0.900

SV=
Base width

0.21
0.41

SM=

0.961

2/3 *b =

0.45
0.3

0.54 m

0.272 m

0.81 /2 - 0.272
6 * 0.133 / 0.81

=
=

0.133 m
0.983 m

2
3.332 t/m

2
0.028 t/m

SV / b * (1 + 6e/b)
1.361 / 0.81 * ( 1 + 0.983 )
SV/ b * (1 - 6e/b)
1.361 / 0.81 * ( 1 - 0.983 )

0.478

1/3 *b =

( 0.478 - 0.217 )/ 0.961 =


Falls within the middle third

0.095
0.122
0.217

0.27 m

3.Reservoir at FRL, no tailwater


0.810
0.900

S.NO

Uplift

DESCRIPTION

Co-eff
Length
Weight of masonry
1
0.5
2
1
3
0.5
weight of water
a
0.5
Water Pressure
i
0.5

Depth

0.000
0.45
0.360

0.900
0.900
0.900

0.000

0.9

Area

0.000
0.405
0.162

Unit wt.

FORCE
H

L.A

MOMENT
+
-

2.4
2.4
2.4

0
0.972
0.39

0.810
0.585
0.240

0.000
0.569
0.093

0.9

0.000

0.000

0.0000

0.9

0.41

0.3

0.122

146912493.xlsx.ms_officeweir stability (Free)

Uplift

0.5

0.810

0.900146912493.xlsx.ms_office
0.3645
1
-0.3645
SV=

Base width

b =

X=

Eccentricity

Maximum stress
Minimum stress

S.No

0.810 m

SM / SV

e = b/2-X
6e/b

=
=
=
=

SM=

0.996

2/3 *b =

0.54 m

1/3 *b =

( 0.662 - 0.318 )/ 0.996 =


Falls within the middle third

0.345 m

0.81 /2 - 0.345
6 * 0.06 / 0.81

=
=

0.06 m
0.445 m

2
2.428 t/m

2
0.932 t/m

SV / b * (1 + 6e/b)
1.361 / 0.81 * ( 1 + 0.445 )
SV/ b * (1 - 6e/b)
1.361 / 0.81 * ( 1 - 0.445 )

Condition

0.54

Maximum
stress in t/m2

Minimum
stress in t/m2

Empty condition

2.693

0.667

MWL condition

3.332

0.028

FRL condition

2.428

0.932

0.197
0.662

0.318

0.27 m

146912493.xlsx.ms_officeweir stability (Free)

146912493.xlsx.ms_office

Cond. 1
Cond. 2
Cond. 3

empty
MWL
FRL

max
2.693
3.332
2.428

min
0.667
0.028
0.932

146912493.xlsx.ms_officeweir stability (Free)

146912493.xlsx.ms_office
Construction Checkdam
Surface Flow Condition
Design Data:
Top of Check dam

165.1 m

Rear Water Level

164.775 m

FMFL

165.335 m

Maximum Flood Discharge

U/s bed level

164.2 m

D/s bed level

164.2 m

Total width of canal


Length of Checkdam

=
=

20 m
20 m

Concentration factor

0%

Exit gradient 1 in 6
=
Depth of U/s water (FMFL - U/s bed level)
Thickness of cut-off wall

0.17
1.135 m
0.45 m

500 c/s =

14.158 Cumecs

Design of structure for surface flow considerations:


Discharge intensity/Unit discharge

Total discharge / Length of check dam


3
q = 14.158 / 20
=
0.708 m /s/m

Regime Width:
= 4.83 Q

Regime width of the canal

Looseness factor

= 4.83 X sqrt ( 14.158 )

18.17 m

say

19 m

= Existing Over all length of check dam/ Regime width

= 20 / 19
=
Hence, the scour depth may be calculated as follows

1.053

>

Scour depth:
Assume silt factor

Scour depth (R)

= 1.25
= 0.475 (Q / f) ^(1/3)
= 0.475 X ( 14.158 / 1.25 )^(1/3)
1.06675 m say

1.067 m

Energy level:
Depth of water in front of weir

Velocity of approach (Va)

1.135 m

Q/A

Page 16

surface flow

146912493.xlsx.ms_office

14.158 / ( 20 x 1.135 )

Approach Velocity head (hva) = Va2/2g

0.624 m/sec

0.624 ^2 / (2 X 9.81)
=

0.019846 m

say

0.020 m

= U/s F.S.L + hva

U/s Energy Line(U/s E.L)

= 165.335 + 0.02
D/s velocity (Vd)

D/s Velocity head (hvd) = Vd2/2g

= 1.187 ^2 / ( 2 X 9.81)
=

D/s Energy Line (D/s E.L)

1.187 m/sec

0.07181 m

165.355 m

(From RWL calculation)

say

0.072 m

D/s W.L + hvd

=
=

164.775 + 0.072

164.847 m

Fixation of Stilling basin level:


Hydraulic jump calculations:
Sl.No.

Item

1 Discharge intensity

2
0.708 m /sec

(q)

2 D/s Water level

in m

164.775 m

3 U/s Water level

in m

165.335 m

4 D/s Total Energy Level ( D/s E.L)

in m

164.847 m

5 U/s Total Energy Level ( U/s E.L)

in m

165.355 m

6 Head Loss (HL) in m (U/s E.L - D/s E.L)

0.508 m

7 Postjump Depth D2

(Assume)

0.760 m

8 Velocity (V2) = q / D2

= 0.7079 / 0.76

0.931 m/sec

9 D/s specific energy

Ef2 = D2 + V22/2g
0.76 + 0.931 ^2 / (2 * 9.81)

10 Froude's Number F2

0.804 m

=V2 / sqrt(g D2)


= 0.931 / sqrt( 9.81 * 0.76 )

11 Prejump Depth

0.003

0.341

D1 = D2 / 2 ( -1+ sqrt(1+ 8 F22))

Page 17

surface flow

146912493.xlsx.ms_office
= 0.76 / 2 * ( -1 + sqrt (1+ 8 * 0.3411 ^2 ) )
12 Velocity (V1 ) = q / D1

0.148 m

= 0.7079 / 0.148

4.786 m/sec

2
13 U/s specific energy Ef1 = D1 + V1 / 2g

1.315 m

14 Ef1 - Ef2 - HL = 0

0.003 ~ 0

15 Level at which jump would form ( D/s Total Energy Lvl - Ef2)

164.040 m

16 Length of concrete floor required beyond the jump


Floor length =
5 * (D2 - D1)

3.06 m

Existing Floor level


The Stilling Basin level(Required)
Depth of stilling basin
Provide a depth of stilling basin
The Stilling Basin level is
Total horizontal floor length:
U/S floor level
D/S floor level

=
=
=
=
=
=
=

164.2 m
164.2 m

1.D/s floor length /Basin length+cutoff


2. D/s glacis length with
0.4
:
3. U/s glacis length with
0
:
4.Width of the body wall
5. Length of U/s floor ( Assumed ) + cutoff

4.00 m
0.44
0.00
0.45 m
0.91 m

1 slope
1 slope
=
=
=
=

Total Floor length required


However provide a length of

164.2
164.04
0.16
0.2
164.000

m
m
m
m
m

5.80 m
5.80 m

Page 18

surface flow

146912493.xlsx.ms_office
Construction of Check dam
DESIGN OF CHECKDAM ON PERMABLE FOUNDATION
Sub surface Flow Condition (Koshla's Theory)
Design Data:
Maximum Flood Discharge
Crest level
MWL
Rear Water Level
Exit gradient 1 in
U/s bed level

14
165.100
165.335
164.775
6

164.200
20
0.45
0.45

Assume D/s floor thickness as


Unit weight of the floor material
Unit weight of water

Normal Scour depth (R)


=
1.067 m
U/s cut-off level :
U/S scour level
= U/s Water level - 1.25 R
= 165.335 - 1.25 * 1.067
U/s bed level - U/s scour level
= 164.2 - 164
Yu =

Minimum depth of U/s cutoff


= 1.135 / 3 + 0.6
Depth of U/s cut off to be provided=
Provide a depth of U/s cutoff as
Bottom of U/s cut off
Bottom of U/s cut off
D/s cut-off level :
D/s scour level

Depth of D/s cut off

Depth of D/s water

165.100 m
165.335 m

164 m

0.2 m

1.14 m
Yu /3 + 0.6

Rear Water level - 1.5 R


164.775 - 1.5 X 1.067
= D/s bed level - D/s scour level
164.2 - 163.175
Yd =

0.978 m

1m
1m

= U/s bed level - Depth of U/s cutoff


= 164.2 - 1
=

m
m
m
m

0.6 m
3
2.4 t/m
3
1 t/m

For static condition the FTL has been taken as FMFL =


For dynamic condition the MWL has been taken as FMFL =

Depth of U/s water

500 Cusecs

0.17
164.200 m

D/s bed level


Length of Check dam
Thickness of cut-off wall
Assume U/s floor thickness as

Depth of U/s cut off =

Cumecs or
m
m
m

163.200 m

163.175 m

1.025 m

0.58 m

Page 19

sub surface flow

146912493.xlsx.ms_office
Minimum depth of D/s cutoff
= 0.575 / 2 + 0.6
Depth of D/s cut off to be provided=
Provide a depth of D/s cutoff as

Yd /2 + 0.6

0.888 m

1.6 m
1.6 m

Bottom of D/s cut off = D/s bed level - Depth of D/s cutoff
Bottom of D/s cut off =
164.2 - 1.6
=

162.600 m

To draw Hydraulic Gradient Line


165.1
0

5.35

0.685

0.890

3.78

1
0.45

164.2

0.4
1

164.2
164

163.75

0.6

1m

163.4
1.6 m
0.910

4.44

162.6
2

163.2
1

Proposed Floor
Floor Length Required From Exit Gradient Considerations
Exit gradient
Taking head upto MFL
Static head H = FRL - D/S Bed level = 165.1 - 164.2
d = Depth of d/scutoff
Ge =
H
d

0.17
=

0.900 m
1.6 m

1.1541

_____
= (2 -1)2 -1
a
Length of floor required from exit gradient a d
=
Length of floor required (Exit gradient criteria)
Length of floor provided (hydraulic jump criteria)

Hence provide a floor length of

0.843474
1.350
2
2
5.80

m
m
m
m

5.80 m

Page 20

sub surface flow

146912493.xlsx.ms_office

Uplift Pressures:
for Pile
1
Total length of floor (b) =
Depth of pile (d)
=

5.80 m
1m

a = b/d
5.8 / 1
5.8
_____
=( 1 + 1+ a2 )/ 2
=
( 1 + sqrt(1 + 5.8 ^2) ) / 2
=
3.443
a =
a =

f c = 1 / p cos-1 (( - 2)/)
fc =

36.235 %

f D = 1 / p cos-1 (( - 1)/)
fD =
f C1 =
f C1 =
f D1 =

24.890 %
100-f c
63.765 %
100-f D

f D1 =

75.110 %

f E1 =

100 %

f E1 =

100 %

f D1 =

75 %

f C1 =

74 % (add 10% cor correction)

for Pile
2
Total length of floor (b) =
Depth of pile (d)
=

5.80 m
1.6 m

a = b/d
a =
5.8 / 1.6
a =
3.625
=( 1 + 1+ a2 )/ 2
=
( 1 + sqrt(1 + 3.625 ^2) ) / 2
=
2.3802
f E = 1 / p cos-1 (( - 2)/)
fE =

44.894 %

Page 21

sub surface flow

146912493.xlsx.ms_office
f D = 1 / p cos-1 (( - 1)/)
fD =

Pile No

30.310 %

f C2 =

0%

f D2 =

30.310 %

f E2 =

44.894 %

f E2 =

45 %

f D2 =

30 %

f C2 =

0%

Pressure

1
Upstream pile
f E1 =

at the pt

f D1 =

2
Downstream pile
100 f E2 =
75 f D2 =

f C1 =

30

74 f C2 =

U/S water

D/S water

Unbalanced

Level

Level

Head

Static condition
165.100

45
0

Elevation of HGL
Pile1

f E1

f D1

f C1

Pile2

f E2

f D2

f C2

100

75

74

45

30

164.200

0.900

0.9
165.1

0.68
164.88

0.66
164.86

0.40
164.60

0.27
164.47

0
164.2

Dymanic condition
165.335
164.775

0.560

0.56
165.34

0.42
165.20

0.41
165.19

0.25
165.03

0.17
164.94

0.00
164.78

165.19
164.86

Dynamic HGL
165.14

165.335

Static HGL
164.79

165.1
0.953

Page 22

165.03
164.60

sub surface flow

146912493.xlsx.ms_office
0.587
164.2

0.45
0.148
164.04

164.2
164

0.6
1m
0.02

1.6 m
162.6

163.2

2
1
0.685

0.89
5.35

3.78

Proposed Floor
Uplift Pressures

74
100

45 0
64
45

2 30
75 1
FLOOR THICKNESS
(Dynamic head)
At the point of formation of jump
Dynamic head unbalance
2/3 rd of head
Thickness required
Provide a depth of

3.80 m from the centre of d/s pile


0.953 m
0.635 m
0.454
0.454 m
0.500 m

(Static head)
the static head is calculated from d/s basin level.
Maximum ordinate for static condition is at toe of the anicut.
3.78 m
(a)
Unbalanced head at
2
m from center of d/s pile
0.701
Thickness required
0.501 m
Provide a depth of
0.600 m

(d)

Unbalanced head at
Thickness required

3.78

m from center of d/s pile


0.787
0.562 m

Page 23

sub surface flow

146912493.xlsx.ms_office
Provide a depth of
Static dominates the flow
Provided thickness at toe

0.600 m
0.600 m

Page 24

sub surface flow

146912493.xlsx.ms_office

Page 25

sub surface flow

146912493.xlsx.ms_office

Page 26

sub surface flow

146912493.xlsx.ms_office

Page 27

sub surface flow

146912493.xlsx.ms_office

Page 28

sub surface flow

146912493.xlsx.ms_office

Page 29

sub surface flow

146912493.xlsx.ms_office

Page 30

sub surface flow

146912493.xlsx.ms_office

Page 31

sub surface flow

146912493.xlsx.ms_office

Page 32

sub surface flow

146912493.xlsx.ms_office

Page 33

sub surface flow

146912493.xlsx.ms_office

Page 34

sub surface flow

146912493.xlsx.ms_office

Page 35

sub surface flow

146912493.xlsx.ms_office

Page 36

sub surface flow

146912493.xlsx.ms_office

Page 37

sub surface flow

146912493.xlsx.ms_office

Page 38

sub surface flow

146912493.xlsx.ms_office

Page 39

sub surface flow

146912493.xlsx.ms_office

Page 40

sub surface flow

146912493.xlsx.ms_office

Page 41

sub surface flow

146912493.xlsx.ms_office

Page 42

sub surface flow

146912493.xlsx.ms_office

Page 43

sub surface flow

146912493.xlsx.ms_office

Page 44

sub surface flow

146912493.xlsx.ms_office

Page 45

sub surface flow

146912493.xlsx.ms_office

Page 46

sub surface flow

146912493.xlsx.ms_office

Page 47

sub surface flow

146912493.xlsx.ms_office

Page 48

sub surface flow

146912493.xlsx.ms_office

Page 49

sub surface flow

146912493.xlsx.ms_office

Page 50

sub surface flow

146912493.xlsx.ms_office

Page 51

sub surface flow

146912493.xlsx.ms_office

Page 52

sub surface flow

146912493.xlsx.ms_office

Page 53

sub surface flow

146912493.xlsx.ms_office

Page 54

sub surface flow

146912493.xlsx.ms_office

Page 55

sub surface flow

146912493.xlsx.ms_office

Page 56

sub surface flow

146912493.xlsx.ms_office

Page 57

sub surface flow

146912493.xlsx.ms_office

Page 58

sub surface flow

146912493.xlsx.ms_office

Page 59

sub surface flow

146912493.xlsx.ms_office

Page 60

sub surface flow

146912493.xlsx.ms_office

Page 61

sub surface flow

146912493.xlsx.ms_office

Page 62

sub surface flow

146912493.xlsx.ms_office

Page 63

sub surface flow

146912493.xlsx.ms_office

Page 64

sub surface flow

146912493.xlsx.ms_office

Page 65

sub surface flow

146912493.xlsx.ms_office

Page 66

sub surface flow

146912493.xlsx.ms_office

Page 67

sub surface flow

146912493.xlsx.ms_office

Page 68

sub surface flow

146912493.xlsx.ms_office

Page 69

sub surface flow

146912493.xlsx.ms_office

Page 70

sub surface flow

146912493.xlsx.ms_office

Page 71

sub surface flow

146912493.xlsx.ms_office

Page 72

sub surface flow

146912493.xlsx.ms_office

Page 73

sub surface flow

146912493.xlsx.ms_office

Page 74

sub surface flow

146912493.xlsx.ms_office

Page 75

sub surface flow

146912493.xlsx.ms_office

Page 76

sub surface flow

146912493.xlsx.ms_office

Page 77

sub surface flow

146912493.xlsx.ms_office

Page 78

sub surface flow

146912493.xlsx.ms_office

Page 79

sub surface flow

146912493.xlsx.ms_office

Page 80

sub surface flow

146912493.xlsx.ms_office

Page 81

sub surface flow

146912493.xlsx.ms_office

Page 82

sub surface flow

146912493.xlsx.ms_office

Page 83

sub surface flow

146912493.xlsx.ms_office

Page 84

sub surface flow

146912493.xlsx.ms_office

Page 85

sub surface flow

146912493.xlsx.ms_office

Page 86

sub surface flow

146912493.xlsx.ms_office

Page 87

sub surface flow

146912493.xlsx.ms_office

Page 88

sub surface flow

146912493.xlsx.ms_office

Page 89

sub surface flow

146912493.xlsx.ms_office

Page 90

sub surface flow

146912493.xlsx.ms_office

Page 91

sub surface flow

146912493.xlsx.ms_office

Page 92

sub surface flow

146912493.xlsx.ms_office

Page 93

sub surface flow

146912493.xlsx.ms_office

Page 94

sub surface flow

146912493.xlsx.ms_office

Page 95

sub surface flow

146912493.xlsx.ms_office

Page 96

sub surface flow

146912493.xlsx.ms_office

Page 97

sub surface flow

146912493.xlsx.ms_office

Page 98

sub surface flow

146912493.xlsx.ms_office

Page 99

sub surface flow

146912493.xlsx.ms_office

Page 100

sub surface flow

146912493.xlsx.ms_office

Page 101

sub surface flow

146912493.xlsx.ms_office

Page 102

sub surface flow

146912493.xlsx.ms_office

Page 103

sub surface flow

146912493.xlsx.ms_office

Page 104

sub surface flow

146912493.xlsx.ms_office

Page 105

sub surface flow

146912493.xlsx.ms_office

Page 106

sub surface flow

146912493.xlsx.ms_office

Page 107

sub surface flow

146912493.xlsx.ms_office

Page 108

sub surface flow

146912493.xlsx.ms_office

Page 109

sub surface flow

146912493.xlsx.ms_office

Page 110

sub surface flow

146912493.xlsx.ms_office

Page 111

sub surface flow

146912493.xlsx.ms_office

Page 112

sub surface flow

146912493.xlsx.ms_office

Page 113

sub surface flow

146912493.xlsx.ms_office

Page 114

sub surface flow

146912493.xlsx.ms_office

Page 115

sub surface flow

146912493.xlsx.ms_office

Page 116

sub surface flow

146912493.xlsx.ms_office

Page 117

sub surface flow

146912493.xlsx.ms_office

Page 118

sub surface flow

146912493.xlsx.ms_office

Page 119

sub surface flow

146912493.xlsx.ms_office

Page 120

sub surface flow

146912493.xlsx.ms_office

Page 121

sub surface flow

146912493.xlsx.ms_office

Page 122

sub surface flow

146912493.xlsx.ms_office

Page 123

sub surface flow

146912493.xlsx.ms_office

Page 124

sub surface flow

146912493.xlsx.ms_office

Page 125

sub surface flow

146912493.xlsx.ms_office

Page 126

sub surface flow

146912493.xlsx.ms_office

Page 127

sub surface flow

146912493.xlsx.ms_office

Page 128

sub surface flow

146912493.xlsx.ms_office

Page 129

sub surface flow

146912493.xlsx.ms_office

Page 130

sub surface flow

146912493.xlsx.ms_office

Page 131

sub surface flow

146912493.xlsx.ms_office

Page 132

sub surface flow

146912493.xlsx.ms_office

Page 133

sub surface flow

146912493.xlsx.ms_office

Page 134

sub surface flow

146912493.xlsx.ms_office

Page 135

sub surface flow

146912493.xlsx.ms_office

Page 136

sub surface flow

146912493.xlsx.ms_office

Page 137

sub surface flow

146912493.xlsx.ms_office

Page 138

sub surface flow

146912493.xlsx.ms_office

Page 139

sub surface flow

146912493.xlsx.ms_office

Page 140

sub surface flow

146912493.xlsx.ms_office

Page 141

sub surface flow

146912493.xlsx.ms_office

Page 142

sub surface flow

146912493.xlsx.ms_office

Page 143

sub surface flow

146912493.xlsx.ms_office

Page 144

sub surface flow

146912493.xlsx.ms_office

Page 145

sub surface flow

146912493.xlsx.ms_office

Page 146

sub surface flow

146912493.xlsx.ms_office

Page 147

sub surface flow

146912493.xlsx.ms_office

Page 148

sub surface flow

146912493.xlsx.ms_office

Page 149

sub surface flow

146912493.xlsx.ms_office

Page 150

sub surface flow

146912493.xlsx.ms_office

Page 151

sub surface flow

146912493.xlsx.ms_office

Page 152

sub surface flow

146912493.xlsx.ms_office

Page 153

sub surface flow

146912493.xlsx.ms_office

Page 154

sub surface flow

146912493.xlsx.ms_office

Page 155

sub surface flow

146912493.xlsx.ms_office

Page 156

sub surface flow

146912493.xlsx.ms_office

Page 157

sub surface flow

146912493.xlsx.ms_office

Page 158

sub surface flow

146912493.xlsx.ms_office

Page 159

sub surface flow

146912493.xlsx.ms_office

Page 160

sub surface flow

146912493.xlsx.ms_office

Page 161

sub surface flow

146912493.xlsx.ms_office

Page 162

sub surface flow

146912493.xlsx.ms_office

Page 163

sub surface flow

146912493.xlsx.ms_office

Page 164

sub surface flow

146912493.xlsx.ms_office

Page 165

sub surface flow

146912493.xlsx.ms_office

Page 166

sub surface flow

146912493.xlsx.ms_office

Page 167

sub surface flow

146912493.xlsx.ms_office

Page 168

sub surface flow

146912493.xlsx.ms_office

Page 169

sub surface flow

146912493.xlsx.ms_office

Page 170

sub surface flow

146912493.xlsx.ms_office

Page 171

sub surface flow

146912493.xlsx.ms_office

Page 172

sub surface flow

146912493.xlsx.ms_office

Page 173

sub surface flow

146912493.xlsx.ms_office

Page 174

sub surface flow

146912493.xlsx.ms_office

Page 175

sub surface flow

146912493.xlsx.ms_office

Page 176

sub surface flow

146912493.xlsx.ms_office

Page 177

sub surface flow

146912493.xlsx.ms_office

Page 178

sub surface flow

146912493.xlsx.ms_office

Page 179

sub surface flow

146912493.xlsx.ms_office

Page 180

sub surface flow

146912493.xlsx.ms_office

Page 181

sub surface flow

146912493.xlsx.ms_office

Page 182

sub surface flow

146912493.xlsx.ms_office

Page 183

sub surface flow

146912493.xlsx.ms_office

Page 184

sub surface flow

146912493.xlsx.ms_office

Page 185

sub surface flow

146912493.xlsx.ms_office

Page 186

sub surface flow

146912493.xlsx.ms_office

Page 187

sub surface flow

146912493.xlsx.ms_office

Page 188

sub surface flow

146912493.xlsx.ms_office

Page 189

sub surface flow

146912493.xlsx.ms_office

Page 190

sub surface flow

146912493.xlsx.ms_office

Page 191

sub surface flow

146912493.xlsx.ms_office

Page 192

sub surface flow

146912493.xlsx.ms_office

Page 193

sub surface flow

146912493.xlsx.ms_office

Page 194

sub surface flow

146912493.xlsx.ms_office

Page 195

sub surface flow

146912493.xlsx.ms_office

Page 196

sub surface flow

146912493.xlsx.ms_office

Page 197

sub surface flow

146912493.xlsx.ms_office

Page 198

sub surface flow

146912493.xlsx.ms_office

Page 199

sub surface flow

146912493.xlsx.ms_office

Page 200

sub surface flow

146912493.xlsx.ms_office

Page 201

sub surface flow

146912493.xlsx.ms_office

Page 202

sub surface flow

146912493.xlsx.ms_office

Page 203

sub surface flow

146912493.xlsx.ms_office

Page 204

sub surface flow

146912493.xlsx.ms_office

Page 205

sub surface flow

Design of Flexible Protection for Check dam


Downstream Block Protection: ( As per clause 20.2. of IS 6966(part I) - 1989 )
Calculation for the length of D/s block protection required
D/s Bed level
164.200 m
U/s Bed level
164.200 m
Designed Front MFL
165.335 m
Designed Rear MFL
164.775 m
Scour depth ( R )
1.067 m
Width of toe wall
0.450 m
The likely extent of scour for downstream flexible protection =
1.75 x R
Design Depth of scour below the floor level
(D)=
1.292 m
Length of downstream block protection=
1.5 D
=
1.938
<
Hence provide
1
rows of CC block of size 1.5 X 1.5 X 0.9 m

2.1 m

Downstream Launching Apron: ( As per clause 20.3 of IS 6966(part I) - 1989 )


Length of launching apron =
1.5
to
2.5
D
Where
D
= Design Depth of scour below the floor level
D
=
1.292 m
Length of launching apron =
1.938
to
3.231
=
2m
say
2.00 m
Slope of the river = 1 in 500
River Slope in m/km
2.000 m
Restricted to 0.4
Thickness of pitching ( T )
1000 mm
(From Table 2 of IS 6966(part I) - 1989)
Thickness of pitching required for covering the launched slope=
1.25 T =
As per clause 20.3.3 of IS 6966, Provide a slope of
2.50 : 1

1.250 m

2
Length of launching =
2.154 m
Quantity of pitching required to be laid per m width in the launched
slope length of
2.154 m with thickness
1.25 m
=
3
2.693 m
This should be laid in the length of
2m
Quantity of pitching required for the thickness(T)=
Inner Thickness of loose apron =
Provide an inner thickness of
Balance quantity of pitching=
This should be laid in the wedge portion
Thickness of wedge portion=
Outer thickness required=
Provide an outer thickness=
Quantity of pitching provided =

1.10

?
2.154
2.5: 1

3
2.154 m
1.077 m
1.1 m

3
0.539 m

0.539 m
1.639 m
1.7 m
3
2.8 m

2
1.10
<

14

1.70

3
2.693 m

Pales/Prot

Hence O.K

15

Pales/Prot

16

Pales/Prot

17

Pales/Prot

Construction of Check dam


DESIGN OF ABUTMENT
HYDRAULIC PARTICULARS
Top level of abutment =
166.085 m Free board
Foundation level=
164.200 m
Height of abutment wall=
1.885 m
Top width=
0.450 m
Front slope=
1 in
0
Front slope starting point=
166.085 m
Front batter
0 m
Rear slope starting point=
166.085 m
Rear slope=
1 in
0.6
Rear batter=
1.131 m
b3=
Base width=
1.581 m
Height=
1.885 m
3
Unit weight of soil=
2 t/m
Top of earthfill=
166.085 m
f=
Angle of internal friction of soil
22 o
d=
f/2=
Angle of friction between the wall and earthfill
a=
Angle which earth face of wall makes with vertical
i=
Slope of earthfill
0
3
Unit weight of concrete=
2.4 t/m
3
Unit weight of water=
1 t/m

0.75

7.72
0.28

11
31

o
o

STRESS DUE TO EARTH PRESSURE (ACTIVE EARTH PRESSURE):


Cos^2(f-a)=
0.976
Cos^2a=
0.735
Cos(d+a)=
0.744
Sin(f+d)=
0.545
Sin(f-i)=
0.375
Cos(a-i)=
0.857
Cos(d+a)=
0.744
1+ Sin(f+d)*Sin(f-i)
Cos(a-i)*Cos(d+a)
1
Sin(f+d)*Sin(f-i)
1+
Cos(a-i)*Cos(d+a)

0.5

1.566

2
0.5

Cos2( f-a)
Cos a * Cos(d+a)

0.408

1.785

Ca=

Cos2( f-a)
Cos a *
Cos(d+a)
2

= 1.785 * 0.408

1
Sin(f+d)*Sin(f-i)
1+
Cos(a-i)*Cos(d+a)
=

2
^0.5

0.7280

146912493.xlsx.ms_officeus wing

Ca

0.7280

2
Pa = Pa =1/2*w*h *Ca =
0.5 * 2 * 1.885 ^2 * 0.728
=
Earth pressure:
Vertical component= Pa* Sin(a+d) =
2.587 * Sin ( 31 + 11 )
Horizontal component Pa* Cos(a+d)
2.587 * Cos( 31 + 11 )

2.587 t

t
t

Moments

(m)

t-m

0.450
a

1.730
1.923

=
=
166.085

0.6
d

Pa

1.885
O

Coeff.

0.450

Unit.wt.

1.131

Forces(t)
V

Weight of concrete
1
1
0.5
1
0.5
1

0.450
1.131
0

1.885
1.885
1.885

2.4
2.4
2.4

Static Earth pressure:


Vertical component=
Horizontal component=

X=

Eccentricity

Maximum stress
Minimum stress

Maximum stress=
Minimum stress=

2.036
2.558
0.000

1.730

SV=
Base width b =

1.581 m
SM / SV

2/3 *b =
=

e = b/2-X
6e/b
=
=
=
=

6.324
6.324

1.923
1.923

2.761
1.929
0.000

0.377
0.628

0.652
1.209
6.550
6.550

SM=

1.054 m

1/3 *b = 0.527

6.55 / 6.324 =
Falls within the middle third

1.036 m

1.581 /2 - 1.036
6 * -0.245 / 1.581

=
=

SV / b * (1 + 6e/b)
6.324 / 1.581 * ( 1 + 0.931 )
SV/ b * (1 - 6e/b)
6.324 / 1.581 * ( 1 - 0.931 )

1.356
0.754
1.581

-0.245 m
0.931 m

2
7.723 t/m

2
0.276 t/m

2
7.723 t/m
2
0.276 t/m

146912493.xlsx.ms_officeus wing

Construction of Check dam


DESIGN OF D/s WING WALL
HYDRAULIC PARTICULARS
Top level of D/s wing wall =
165.525 m Free board
Foundation level=
164.200 m
Height of wall=
1.325 m
Top width=
0.450 m
Front slope=
1 in
0
Front slope starting point=
165.525 m
Front batter
0 m
Rear slope starting point=
165.525 m
Rear slope=
1 in
0.5
Rear batter=
0.6625 m
b3=
Base width=
1.113 m
Height=
1.325 m
3
Unit weight of soil=
2 t/m
Top of earthfill=
165.525 m
f=
Angle of internal friction of soil
22 o
d=
f/2=
Angle of friction between the wall and earthfill
a=
Angle which earth face of wall makes with vertical
i=
Slope of earthfill
0
3
Unit weight of concrete=
2.4 t/m
3
Unit weight of water=
1 t/m

0.75

5.41
0.34

11
27

o
o

STRESS DUE TO EARTH PRESSURE (ACTIVE EARTH PRESSURE):


Cos^2(f-a)=
0.994
Cos^2a=
0.800
Cos(d+a)=
0.793
Sin(f+d)=
0.545
Sin(f-i)=
0.375
Cos(a-i)=
0.894
Cos(d+a)=
0.793
1+ Sin(f+d)*Sin(f-i)
Cos(a-i)*Cos(d+a)
1
Sin(f+d)*Sin(f-i)
1+
Cos(a-i)*Cos(d+a)

0.5

1.536

2
0.5

Cos2( f-a)
Cos a * Cos(d+a)

0.424

1.567

Ca=

Cos2( f-a)
Cos a *
Cos(d+a)
2

= 1.567 * 0.424

1
Sin(f+d)*Sin(f-i)
1+
Cos(a-i)*Cos(d+a)
=

2
^0.5

0.6638

146912493.xlsx.ms_officeds wing

Ca

0.6638

2
Pa = Pa =1/2*w*h *Ca =
0.5 * 2 * 1.325 ^2 * 0.664
=
Earth pressure:
Vertical component= Pa* Sin(a+d) =
1.165 * Sin ( 27 + 11 )
Horizontal component Pa* Cos(a+d)
1.165 * Cos( 27 + 11 )

1.165 t

t
t

Moments

(m)

t-m

0.450
a

0.710
0.924

=
=
165.525

0.5
d

Pa

1.325
O

Coeff.

0.450

Unit.wt.

0.663

Forces(t)
V

Weight of concrete
1
1
0.5
1
0.5
1

0.450
0.6625
0

1.325
1.325
1.325

2.4
2.4
2.4

Static Earth pressure:


Vertical component=
Horizontal component=

X=

Eccentricity

Maximum stress
Minimum stress

Maximum stress=
Minimum stress=

1.431
1.053
0.000

0.710

SV=
Base width b =

1.113 m
SM / SV

=
=
=
=

0.221
0.442

0.157
0.408
2.300
2.300

1/3 *b = 0.37083

2.3 / 3.195 =
Falls within the middle third

0.720 m

1.113 /2 - 0.72
6 * -0.164 / 1.113

=
=

SV / b * (1 + 6e/b)
3.195 / 1.113 * ( 1 + 0.883 )
SV/ b * (1 - 6e/b)
3.195 / 1.113 * ( 1 - 0.883 )

1.270
0.465
0.000

SM=

2/3 *b = 0.7416667 m
=

e = b/2-X
6e/b

3.195
3.195

0.924
0.924

0.888
0.442
1.113

-0.164 m
0.883 m

2
5.407 t/m

2
0.336 t/m

2
5.407 t/m
2
0.336 t/m

146912493.xlsx.ms_officeds wing