PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS

(CL09) ITEM Soil investigation The contractor shall implemented of exploratory drilling and mechanical test in all types of soil with on site testing and the issuance of the final report which contain the test results and recommendations of the foundation work. 01 Research and treatment for cavities Implementation through a perforating exploratory(cavity probing) In all types of rock to determined the horizontal and vertical elongation of cavities, the contractor will be responsible for treatment all cavities By injection and treatment for all cavities and voids of rock with all necessary work accordance with the technical specifications and instructions of the Supervising engineer EXTERNAL WORKS The bidder is advised to visit the site before quoting the rates in order to get himself familiarized with the present site conditions SITE GRADING Bulk excavate over site on unclassified ground including all hard and rock layers to reduced levels generally in cutting profiles the work shall include clear away to approved disposals. All additional excavation required for temporary works and spaces, shoring, dewatering, removal of surplus excavated materials, support, temporary spoil heaps and general compaction EXCAVATION AND EARTHWORK Necessary moving or transportation about the site excavation material including handling to temporary stockpile or ultimate disposal off site is to be included in the unit rate of excavation SITE PREPARATION AND GRADING 02 Excavation oversite on unclassified ground including all hard and rock layers (if any) to reduced levels generally in cutting profiles and forming depressions, falls and the like and clear away to approved disposal tip. Fill oversite with approved imported fill material according to site soil report recommendation including compaction in making up levels to required formations, embankments, contouring and the like as per drawings and spec. To Collection Note Note DESCRIPTION QTY UNIT RATE AMOUNT SR

M3

Note

27175

M3

03

40037

M3

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

1 / 26 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL09) ITEM DESCRIPTION PAVING AND SURFACING 01 Supply and install 400x400x60mm thk. Precast conc. Paving w./ photocatalytic titanium dioxide coating( biege and brown colors) w./ dark grey precast band including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, moisture barrier on compacted subgrade as per detail no. A1 on drawing CL9-XL301 precast concrete shotblasted pavers (beige and brown color) size 400x400x60mm thk. including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, moisture barrier on compacted subgrade as per detail no. A8 on drawing CL9-XL301 precast concrete shotblasted pavers (light grey and grey color) brown color) size 400x400x60mm thk. including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, moisture barrier on compacted subgrade as per detail no. A7 on drawing CL9-XL301 Supply and install 400x400x40mm thk. Precast conc. Paving w./ photocatalytic titanium dioxide coating( biege and light beige colors) w./ grey granite band including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, moisture barrier on compacted subgrade as per detail no. 5 on drawing CL9-XL301 Supply and install rubber pavement 50mm thick with various colors, including adhesive mixture, cast in place concrete base with A193 W.W.F. reinforcement mesh , moisture barrier on compacted subgrade as per detail no. E6 on drawing CL9-XL-301 Supply and install polished shotblasted granite paving (beige and light beige color) size 400x400x30mm with granite band (grey color) size 200x200x30 mm, including 20mm thick setting mortar bed, cast in place concrete base with A193WWF reinforcement mesh, moisture barrier, on compacted subgrade as per detail no.C4 on drawing CL9-XL-301 Supply and install asphalt paving comprising 80mm bituminous wearing course, bituminous prime coat, including granular base course, 3mm water proofing membrane on R.C. slab as per detail no. F on drawing CL09-XL301 to suit required locations as shown on drawing CL09-XL101 To Collection QTY UNIT RATE AMOUNT SR

932

M2

02

382

M2

03

6043

M2

04

1240

M2

05

532

M2

06

1021

M2

07

11611

M2

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

2 / 26 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL09) ITEM DESCRIPTION PAVING AND SURFACING 01 Supply and install cast in place paving smooth finish light grey with 200x200x60mm thick brick edge band including A193WWF mesh reinforcement, setting mortar bed for brick, moisture barrier, compacted subgrade as per detail no. D5 on drawing CL9-XL301 Supply and install 200x400x80 mm interlocking concrete pavers beige and grey color with brick band size 200x100x80 mm dark grey brick including 20mm thik cement ,mortar setting bed for brick , compacted sand leveling course 50mm thick, compacted aggregate base course 150mm thick, cast in place concrete foundation, on compacted subgrade complete as per detail F2 on drawing CL9 - XL301 Tensile Structure 03 Supply and install tensile staructure comprising columns, tent fabric, foundation, earthwork, and all required to compleet and fix the work as per manufacturer's recommendations and subject to engineer's approoval to cover an area of 28 m2 . Contractor shall submitt shop drawings for approval before supply subgrade as per detail no. 4 on drawing CL09-XL-301 CURBS AND EDGING 04 Supply and install precast concrete road curb, size 300X500X150 mm with exposed aggregate finish including bedding, haunching, cast in place concrete base and concrete grout behind curb, 20mm thick cement mortar setting bed, on R.C. slab as per detail no.1 on drawing CL09-XL302 to suit required locations as shown on drawing CL09-XL101 Supply and install Precast concrete mowing edge, size 200X100X65 mm including concrete base, 20mm thick cement mortar setting bed, cast in place concrete base on compacted subgrade, as per detail no. 2 on drawing CL09-XL302 QTY UNIT RATE AMOUNT SR

417

M2

02

1552

m2

11

No.

3300

05

25

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

3 / 26 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL09) ITEM DESCRIPTION PAVING AND SURFACING RAISED CONC. PLANTER & WOODEN BENCH 01 Supply and install concrete raised planter with granite cladding, and wooden bench, 50x75 mm interior wooden rails,comprising concrete walls, reinforced concrete slab with A 193 W.W.F reinforcement mesh smooth finished, soil mix, drainage layer, filter membrane, water proofing membrane, protection board, sealant and all required to compleet and finish the work as per detail no.5 on drawing CL09- XL302, to suit required locations as shown on drawing CL09- XL101 Raised Planter 02 Supply and install concrete raised planter with granite cladding, including soil mix, drainage layer, filter , membrane, sealant and all required to compleet and finish the work as per detail no. 3 on drawing CL09-XL302 Raised planter to suit required locations as shown on drawing CL09- XL101 SUNDRIES 03 Supply and install tree-palm pit ,comprising cast iron grate size with concrete pavers edages 200x100x60 mm, 120x120x50mm including planting soil mixture (area measured elese where) as per detail no. 6 on drawing CL09-XL301 Manufacturer's standard outdoor sings, letters and plaques including fixings, finishes, accessories complete as per details on drawing CL9-XL606 and as per specifications 04 05 06 07 Ref. type 1 (RESIDENTIAL SIGN) Ref. type 2 (DIRECTIONAL SIGN) Ref. type 3 (DIRECTIONAL SIGN) Ref. type 4 (ADVERTISING PANEL) QTY UNIT RATE AMOUNT SR

246

M2

935

M2

31

No.

212 4 5 1

No. No. No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

4 / 26 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL09) ITEM DESCRIPTION PAVING AND SURFACING Manufacturer's standard outdoor sings, letters and plaques including fixings, finishes, accessories complete as per details on drawing CL09-XC-05 and as per specifications 01 02 03 Ref. type I1 (PARKING) Ref. type R2-1 (GIVE WAY ) Ref. type W11-1 ( PEDESTRAIN CROSSING ) Manufacturer's standard outdoor sings, letters and plaques including fixings, finishes, accessories complete as per details on drawing CL09-XC-04 and as per specifications 04 05 06 07 08 09 10 11 12 13 14 White stop line Pedestrain crossing White edge line Dotted line marking Direction separation lines (passing prohlblted) Direction separation lines (passing permltted) Through traffic arrow Right turn arrow Through&right turn arrow Right&left turn arrow Through&left&righ turn arrow QTY UNIT RATE AMOUNT SR

2 16 16

No. No. No.

92 108 2169 1239 784 1411 42 3 9 5 7

M M M M M M No. No. No. No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

5 / 26 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL09) ITEM LANDSCAPING Trees/palms including pit excavation, stakes and ties, soil planting mix, mulching, filter membrane and drainage layer all as details and planting schedule as per detail P1, on drawing CL09-XL-401 01 P/Wf Trees/palms including pit excavation, stakes and ties, soil planting mix, mulching, filter membrane and drainage layer all as details and planting schedule as per detail P2 on drawing CL09-XL-401 02 03 04 05 06 07 T/Aa T/Af T/Po T/Fm T/To T/TP Shrubs and ground cover including planting, site excavation as required, soil planting mix, mulching, filter membrane and drainage layer all as per details and planting schedule as per detail P3, on drawing CL09-XL-401 08 09 10 11 12 13 14 15 S/Iha S/Io S/Ob S/Hs S/Cc S/Ld S/MI S/PaV To Collection DESCRIPTION QTY UNIT RATE AMOUNT SR

37

No.

88 39 2 37 6 36

No. No. No. No. No. No.

105 35 53 55 14 70 31 22

No. No. No. No. No. No. No. No.


SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

6 / 26 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL09) ITEM LANDSCAPING Shrubs and ground cover including planting, site excavation as required, soil planting mix, mulching, filter membrane and drainage layer all as per details and planting schedule as per detail P3, on drawing CL09-XL-401 01 02 03 G/Ad G/As G/Lm (W) Lawn planting, including soil planting mix, filter membrane and drainage layer all as per details and planting schedule as per detail P4, on drawing CL09-XL-401 04 L/Cd DESCRIPTION QTY UNIT RATE AMOUNT SR

636 1606 552

No. No. No.

5130

M2

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

7 / 26 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL09) ITEM DESCRIPTION DIVISION 14 - CONVEYING SYSTEMS AUTOMATED WASTE COLLECTION SYSTEM Supply and provide all required to construct, test and operate automated waste collection system, consisting of the following items:01 Outdoor Load station. including required earthworks, concrete works, masonry and electromechanical works for the vacuum room and PAI service box and all required works as detailed on drawing no. STM - ITCCP2 - TD -013 and 014 Contractor shall perform all required coordination with other trades to ensure proper installation and operation of the complete system to transport waste from villas and playgrounds to pipenetworks as shown on drawings STM ITCCP2 - TD - 001 to 007 and 015, 016 and according to manufacturer's standards and specifications Outdoor Multi Load station including required earthworks, concrete works, masonry and electromechanical works for the vacuum room including all required works as detailed on drawings. Contractor shallperform all required coordination with other trades to ensure proper installation and operation of the system complete to transport waste from villas to pipe networks as shown on drawings STM - ITCCP2 - TD - 001 to 007 and 015, 016 and according to manufacturer's standards and specifications Outdoor Single Load station including required earthworks, concrete works, masonry and electromechanical works for the vacuum room including all required works as detailed on drawing no. STM ITCCP2 - TD - 012. Contractor shall perform all required coordination with other trades to ensure proper installation and operation of the complete system to transport waste from villas to pipenetworks as shown on drawings STM - ITCCP2 - TD - 001 to 007 and 015, 016 and according to manufacturer's standards and specifications Full Vacuum Load station including required earthworks, concrete works, masonry and electromechanical works for the vacuum room and PAI service box located at the end of pipe work including all required works as detailed on drawing no. STM - ITCCP2 - TD - 010 and 011. Contractor shall perform all required coordination with other trade to ensure proper installation and operation of the complete system to transport waste kitchen areas to pipenetworks as shown on drawings STM - ITCCP2 - TD - 001 to 007 and according to manufacturer's standards and specifications 5 No. QTY UNIT RATE AMOUNT SR

02

60

No.

03

No.

04

No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

8 / 26 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL09) ITEM DESCRIPTION DIVISION 14 - CONVEYING SYSTEMS PIPE WORK Supply and installation of Automated waste collection system piping. Item shall include the earth works, insulation, ,concentric reducer, puddle flanges ,inspection covers and all required materials and equipments to complete the transport pipe line from DV rooms , outdoor load stations and full vacuum load stations to waste plant 01 508mm under/above ground transport pipe RC MANHOLE Supply and install cast insitu or precast reinforced concrete manhole ,the item shall include excavation, backfill insulation ,inspection cover and all required to complete the work. 02 RC manhole to suit required location in sitesas shown on drawings STM - ITCCP2 - TD 001 to 016 16 No. 1570 M QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

9 / 26 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL09) ITEM DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATION WASTE AND DRAINAGE INSTALLATION Supply, install and testing pipework, UPVC schedule 40, the work shall include but not limited to fittings, supports, cast iron pipes on roof for vent with caps, installation, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 01 160 mm dia. Construction work for briks inspection chamber, the work shall include bit not limited to earth work, plain concrete for foundation BED, concrete channel at chamber DED with standard cast iron manhole frame and double cover and all materials and equipments required to complete and finish the work according to specifications, drawings and code of practice 02 Inspection chamber, ref. (IC) 600x600mm 31 No 2055 M QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

10 / 26 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL09) ITEM DESCRIPTION DIVISION 15 - MECHANICAL MANHOLE AND COVERS Supply , install, testing and commissioning precast concrete sewer manholes with standard traffic (heavy duty) type cast iron manhole covers and frames, access ladders, concrete channel at manhole bed, foundation bed, drop pipe to manhole where required, all associated earthworks, damp proofing, and all materals, equipments required to complete and finish. the work according to specifications section 02605, 02730, drawings and code of practices 01 Sewer manhole, ref. (SMH) PLUMBING INSTALLATION STORM DRAINAGE INSTALLATION Supply, install and testing pipework, UPVC schedule 40, the work shall include but not limited to fittings, supports, cast iron pipes on roof for vent with caps, installation, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 02 03 04 05 06 07 100 mm dia. 150 mm dia. 200 mm dia. 300 mm dia. 400 mm dia. 500 mm dia. Accesssories 08 09 10 Ground cleanout 100 mm dia, ref. GCO Ground cleanout 150 mm dia, ref. GCO Ground cleanout 200 mm dia, ref. GCO 16 2 15 No No No 890 580 310 20 830 60 M M M M M M 20 No. QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

11 / 26 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL09) ITEM DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATION STORM DRAINAGE INSTALLATION Supply, install, test and commissioning precast concrete catch basin with grate cover and frame, foundation bed, all associated earthworks, damp proofing and all materials, equipments required to complete and finish the work according to specifications and drawing 01 Catch basin 600x600mm MANHOLE AND COVERS Supply , install, testing and commissioning precast concrete sewer manholes with standard traffic (heavy duty) type cast iron manhole covers and frames, access ladders, concrete channel at manhole bed, foundation bed, drop pipe to manhole where required, all associated earthworks, damp proofing, and all materals, equipments required to complete and finish. the work according to specifications section 02605, 02730, drawings and code of practices 02 Sewer manhole, ref. (SMH) POTABLE WATER INSTALLATION Supply, install and testing pipework, UPVC Schedule 80 for potable water the work shall include but not limited to fittings, supports, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 03 04 05 06 40 mm dia. 50 mm dia. 100 mm dia. 150 mm dia. 1135 295 550 710 M M M M 26 No. 34 No QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

12 / 26 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL09) ITEM DESCRIPTION Drainage installation to the external drainage network Construction work for briks inspection chamber, the work shall include bit not limited to earth work, plain concrete for foundation BED, concrete channel at chamber DED with standard cast iron manhole frame and double cover, UPVC pipework schedule 40 to nearest main sewer manhole and all materials and equipments required to complete and finish the work according to specifications, drawings and code of practice 01 Inspection chamber, ref. (IC) 600x600mm 4 No QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

13 / 26 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL09) ITEM DESCRIPTION DIVISION 15 - MECHANICAL FIRE WATER INSTALLATION Supply, install and testing pipework, UPVC Schedule 80 for fire water the work shall include but not limited to fittings, supports, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 01 100 mm dia. Accessories Fire hydrant, ref. FH with valve box, ref. VB Accessories 02 03 04 Gate valve with valve box 40 mm dia., Gate valve with valve box 100 mm dia., Gate valve with valve box 150 mm dia., IRRIGATION WATER INSTALLATION Supply, install and testing pipework, UPVC Schedule 80 for Irrigataion water the work shall include but not limited to fittings, supports, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 05 06 07 08 09 10 11 20 mm dia. 25 mm dia. 32 mm dia. 40 mm dia. 50 mm dia. 75 mm dia. 100 mm dia. 4125 30 110 335 435 1190 260 M M M M M M M 51 8 8 No No No 5 No. 15 M QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

14 / 26 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL09) ITEM DESCRIPTION DIVISION 15 - MECHANICAL IRRIGATION WATER INSTALLATION Accessories 01 Supply and installation irrigation controller as detailed on drwings and as per specifications Supply and installation bubbler for shrubs, ground cover and succulents Supply and installation bubbler for trees and palm tree Supply and installation spray lawn sprinkler Gate valve W/valve box 20 mm dia., Gate valve W/valve box 50 mm dia., Gate valve W/valve box 75 mm dia., Gate valve W/valve box 100 mm dia., Supply and installation remote control valve assembly including piping complete with valve box, Y-strainer, accessories and all associated works as detail on drawing and as per specifications section 02810 09 10 11 12 13 Ref. RCV 20mm dia. Ref. RCV 25mm dia. Ref. RCV 32mm dia. Ref. RCV 40mm dia. Ref. RCV 50mm dia. 9 4 14 8 12 No. No. No. No. No. 1 No. QTY UNIT RATE AMOUNT SR

02

834

No.

03 04 05 06 07 08

295 109 2 3 17 4

No. No. No. No. No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

15 / 26 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL09) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS CHILLED WATER SYSTEM Under ground pipe work Supply, install and test black steel pipe work including fittings thermal insulation, trench work , flexible connections and accessories as per required drawings and spec. sections15050 to 15140 ,15510 01 02 03 04 05 06 07 08 09 300 mm dia. 250 mm dia. 200 mm dia. 150 mm dia. 100 mm dia. 80 mm dia. 65 mm dia. 50 mm dia. 40 mm dia. QTY UNIT RATE AMOUNT SR

240 150 25 1050 585 385 95 410 850

M M M M M M M M M

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

16 / 26 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL09) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS CHILLED WATER SYSTEM ETS room pipe work Supply, install and test black steel pipe work including fittings thermal insulation, flexible connections and accessories as per required drawings and spec. sections15050 to 15140 ,15510 01 02 03 04 300 mm dia. 250 mm dia. 150 mm dia. 25 mm dia. Supply, install and test reinforced concrete valve box including two isolating valves 40mm dia., as details on drawings, specifications and code of practices 05 Isolating valve box Supply and install heat exchanger including valves and short length piping as detailed on drawings and as per specifications 06 Ref. HEX-01 to 04, 1640 KW capacity QTY UNIT RATE AMOUNT SR

95 45 110 15

M M M M

106

No.

No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

17 / 26 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL09) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS CHILLED WATER SYSTEM Supply, install, test and commission, variable speed chilled water centrifugal inline pumps unit including valves, flexible connections, Y-striners, mounting and fixing to pads (measured separately) as detailed on drawing and specifications 01 Ref. SCWP-01 to 04, 38.7 L/S capacity 45 m TDH Supply, install and commission, expansion tank as detailed on drawings and specifications 02 Ref. ET, 800 liter capacity Supply, install and commission, air separator tank as detailed on drawings and specifications 03 Ref. AS Supply, install, test and commission automatic chemical dosing unit as detailed on drawings and specifications 04 Ref. ACDU Supply, install, test and commission, Fan coil units ducted type including control valves, pressure & temperature, gauge, Y-strainer mounting and fixing as per drawings and specifications section 15781 05 Ref. FCU-01, 16.5 KW cooling capacity Supply, install, test and commission, of electric works and motor control centers MCC C/W weather proof, magnetic starters, cabinets including power cables, wiring and conduits and cable trays from the MCC to HVAC equipment, interlocks, earthing ...etc, all materials and equipments required to complete and finish the work according to drawings, specifications and code of practices 06 Ref. MCC- CWP To Collection QTY UNIT RATE AMOUNT SR

No.

No.

No.

No.

No.

No.
SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

18 / 26 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL09) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL Smart Metering System Supply, installation , testing and commissioning of Smart Metering System comprising of M-bus master controller ,M-bus IP router, complete with soft ware, including electronic KWH meter, interface with water meter& digital BTU meter, M-bus & 1 pair twisted cable # 22 AWG for each meter, and the necessary connection to TCP/IP net work and all associated works required as shown on drawing and as described in specifications To suit Building Smart Metering System as required to form a complete and fully operative system to link all project buildings with the existing data center at phase (1) 01 02 03 Electronic KWH meters M-bus master controller complete with software M-bus IP router MAIN AND SUB-MAIN POWER Sub-Main Circuit: supply , install , testing and commissioning 600/1000V XLPE multicore copper cable in direct buried including junction boxes, connection for feeders and various power loads as shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 04 05 06 4C-16 mm2-CU/XLPE/STA/PVC+16 mm2 G/ direct buried 4C-120 mm2-CU/XLPE/STA/PVC/ direct buried 2(4C-150mm2-CU/XLPE/STA/PVC)+150mm2G/ direct buried Supply , install , testing and commissioning of panel boards including grounding, circuit breakers, grounding, fixings, and all associated works as required and shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications ETS ROOM 07 Ref. PP1-IP54 To Collection 1 No SR 155 17370 65 M M M 6 6 6 Note QTY UNIT RATE AMOUNT SR

No No No

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

19 / 26 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL09) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL OUTDOOR MAN/ HAND HOLE Supply, install, testing and commissioning reinforced concrete manholes and hand holes connected via UPVC conduit, complete with hand hole bolted type metal cover, drain pipe outlet, including trenching and backfilling for UPVC conduits for power and communication cables in UPVC conduit, tapes, , grounding, all as required to suit locations as shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 Communication hand hole (1250x1250x1250mm) ( Ref CHHtype (A)). Communication hand hole (1000X1000X1000mm) ( Ref CHHtype (B)). POWER INSTALLATION Supply , install, testing and commissioning of power and sockets accessories including all necessary boxes, faces(according to the engineer approval ) comprising cables, conduits, fittings, connections, from the outlets to Panel boards feeder associated works as required to suit the locations shown on drawings Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 03 04 Floor mounted ,Junction box, Disconnect switch non-fused with pilot light, weatherproof,16A, 1P, 230V for waste collection 1 14 No. No 12 No QTY UNIT RATE AMOUNT SR

02

67

No

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

20 / 26 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL09) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL POWER INSTALLATION ETS ROOM 01 Disconnect switch fused with pilot light, weatherproof,20A, 1P, 230V for FCU-01 Disconnect switch, non-fused , weatherproof, 320A, 3P, 400V for MCC-CWP Single phase socket outlet, weatherproof , 10 A, 230V, grounding type 1 No QTY UNIT RATE AMOUNT SR

02

No

03

No

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

21 / 26 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL09) ITEM DESCRIPTION LIGHTING INSTALLATION Supply, install , testing and commissioning of switches lighting accessories including all necessary boxes, switches, faces, conduits, wires (according to the engineer approval ) associated works as required to suit the locations shown on drawings .Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications ETS ROOM 01 Single pole one-way switch weatherproof (13A) Supply, install , testing and commissioning of lighting fixture outlets and including conduits, wires and all boxes belong to Lighting Panel boards and associated works as required to suit the locations shown on drawings .Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications ETS ROOM 02 Lighting fixture outlets Supply ,install, testing and commissioning of lighting fixture (furnished with lamp and electronic blast, accessories and internal wires) mounting accessories. (according to the engineer approval ) associated works as required to suit the locations shown on drawings .Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications ETS ROOM 03 Ref, F1 8 No 8 No 1 No. QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

22 / 26 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL09) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL FIRE ALARM SYSTEM Supply, install, testing and commissioning of fire detection /alarm system comprising of detectors, pull stations, modules including associated cable /wires, conducting, interfacing works& connection to be connected @ UB02 , shall make arrangement and required coordination with supervising engineer to complete the work as shown on drawings and as described in specification To suit fire alarm system network equipped with: ETS ROOM 01 Ceiling mounted optical smoke detector, MAIN TELECOMMUNICATION SYSTEM NETWORK Supply, installation, testing and commissioning distribution network for data and telephone system to connect all buildings/floor distributers BD/FD to the primary/secondary active switch as shown on drawings. Item includes cables\ wires in conduits and all associated works as required for the whole network in the site. Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings by making arrangement with supervising engineer according to manufacturer's recommendations to achieve the complete work to the best possible 02 To suit all network system 1 Item 1 No QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

23 / 26 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL09) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN FIRE ALARM SYSTEM NETWORK Supply, installation, testing and commissioning distribution network for fire alarm system to connect all FACPs in all buildings with each other as shown on drawings. Item includes cables\ wires in conduits and all associated works as required for the whole network in the site. Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings by making arrangement with supervising engineer according to manufacturer's recommendations to achieve the complete work to the best possible 01 To suit all network system 1 Item QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

24 / 26 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL09) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL BUILDING MANAGEMENT SYSTEM (BMS) Supply, install, testing, commissioning and integrating the building / cluster BMS system or sub system items (equipment controllers, routers, cables inside the building between system items, conduits, boxes, fiber optic cables,..etc) with phase 1 main BMS system (located in the data center)via LAN network as shown on the building drawings, indicated in plumbing, HVAC and electrical input/ output schedules (all BMS schedules) and as described in the specifications, consisting of but not limited to: 01 To suit building BMS system network and the system should be applicable to linked with existing operating system in phase one after getting approval from service and operation team in phase one to complete the work to the best possible GROUNDING SYSTEM Supply, install, test and commissioning a grounding system for cluster comprising bare copper conductors for grounding all electrical and mechanical equipments in the cluster and all required works for connecting in one grounding system In addition to all earthwork, connections, clips, copper clad steel rods in ground test wells with cast iron covers situated around the building as required and all associated works as necessary to provide a complete grounding system, all as shown on drawing . Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 02 To suit grounding system for network of cluster 1 Item 1 Item QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

25 / 26 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL09) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL Collection Sheet - 1 Sheet - 2 Sheet - 3 Sheet - 4 Sheet - 5 Sheet - 6 Sheet - 7 Sheet - 8 Sheet - 9 Sheet - 10 Sheet - 11 Sheet - 12 Sheet - 13 Sheet - 14 Sheet - 15 Sheet - 16 Sheet - 17 Sheet - 18 Sheet - 19 Sheet - 20 Sheet - 21 Sheet - 22 Sheet - 23 Sheet - 24 Sheet - 25 To Bill Summary SR QTY UNIT RATE AMOUNT SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

26 / 26 REVISED PAGE

Date: MAY 2012

You might also like