Daily Progress Report ( Civil Work)

Project Name :Client


:Consultant :Contractor :SR.N
O.

10

Contractor
RRC

600 TPD POWDER & GRANULATED SSP PLANT


ZUARI FERTILIZERS AND CHEMICALS LTD.
SIMON INDIA LTD.
R.R.CONSTRUCTIONS.
Work Progress

Location & Activity

Unit

Page no :- 1
3.8.13
2.8.13
Plant Area

Actual Work Progress


%
Total Qty Previous Today's Cumulat
Progress
Total
Qty
ive Qty

Remark

0.00
0.00
0.00
0.00
12.00
0.00
0.00

2928.00 92.78
211.02
72.77
320.00 100.00
117.30
18.17
1273.76 59.30
320.50
41.68
12.08
29.46

In Progress
In Progress
Completed
In Progress
In Progress
In Progress
In Progress

0.00
0.00
0.38
120.00

58.00
16.00
0.38
120.00

100.00
100.00
1.52
80.00

Completed
Completed
In Progress
In Progress

84.50
9.53
118.00
30.45
13.42
31.79

93.89
59.56
97.52
42.29
31.21
24.45

In Progress
In Progress
In Progress
In Progress
In Progress
In Progress

17.32
50.00
210.00
60.00
23.56

75.30
66.67
52.24
66.67
65.44

Hold due to Erection


Hold due to Erection
In Progress
Hold due to Erection
Hold due to Erection

0.00

0.00

ROCK &SUPER PHOSPHTE STORAGE GODOWN


a]Excavation for R.Wall
Cum.
3156.00 2928.00
b]Plum concreting
Cum.
290.00 211.02
c] Footing casting
Cum.
320.00 320.00
d] Pcc for R.Wall
Cum
645.60 117.30
e] R.wall solling
Cum
2148.00 1261.76
f]R.wall Raft foundation
Cum
769.00 320.50
g]Tie beam
Cum.
41.00
12.08
ACIDULATION & GRANDING PLANT
a]Ball Mill Raft
Cum
58.00
58.00
b)Reinforcment
M.T.
16.00
16.00
c] Ball mill foundation
Cum
25.00
0.00
d] Excavation for Hopper
Cum
150.00
0.00

GSSP PLANT BAGGING SECTION/ PACKED MATERIAL SHED.


a]Plum concreting
Cum.
90.00
84.50
0.00
b] Pcc for beam
Cum.
16.00
9.53
0.00
c] Footing casting
Cum.
121.00 118.00
0.00
d] Columns
Cum.
72.00
30.45
0.00
e]Plinth Beam
Cum.
43.00
13.12
0.30
f]Brick work Up to plinth
Cum
130.00
31.79
0.00
ACID STORAGE TANK
a]Plum concreting
Cum.
23.00
17.32
0.00
b] Raft casting
Cum.
75.00
50.00
0.00
c] Inside Boulder Filling
Cum
402.00 210.00
0.00
d)Pardi casting
Cum
90.00
60.00
0.00
e)Pcc
Cum.
36.00
23.56
0.00
UG TANK
UG tank top slab
Cum
25.00
0.00
0.00
Acid Day Tank
a)Pcc
b] raft casting
1 CHIMNEY 50 m ht.
a]Excavation
b)Plum concreting
c)Chimney raft concreting
2 CHIMNEY 40m ht.
a]Excavation
b] Plum concreting
WBM ROAD
a)Formation Level
b)Murum fiiling
c)Metalling
ADMIN.BLDG.
a)External Plaster
b)Brickwork 100 mm thk
c)Int plaster
e)Window marbal frame
f)Dado
g)Door & window marble
Pop
h)Dispensary pcc

Weather:Rainy.
Date of Report :Working Date :Name Of work :-

Cum.
Cum

4.24
7.5

4.24
7.5

0.00
0

4.24
7.50

100.00
100.00

Completed
Completed

Cum.
Cum
Cum

143.50
18.69
35.00

143.00
18.69
35.00

0.00
0.00
0.00

143.00
18.69
35.00

99.65
100.00
100.00

Completed
Completed
Completed

Cum.
Cum

150.00
0.00

87.00
0.00

0.00
0.00

87.00
0.00

58.00

HOLD
HOLD

Sqm
Cum
Cum

5539.00 4210.00
5539.00 4929.00
1950.00 1250.00

0.00
0.00
0.00

4210.00
4929.00
1250.00

76.01
88.99
64.10

In Progress
In Progress
In Progress

Sqm
Sqm
Sqm
Rmt
Sqm
Sqm
Sqm
Cum

550.00
35.35
747.00
130.50
101.25
51.78
747.00
2.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

547.00
32.00
715.00
128.20
78.00
7.75
618.00
2.00

99.45
90.52
95.72
98.24
77.04
14.97
82.73
100.00

In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
Completed

547.00
32.00
715.00
128.20
78.00
7.75
618.00
2.00

Prepared By

SIL

11

12

CANTEEN.BLDG.
a)External Plaster
Sqm
b)Brickwork 100 mm thk
Sqm
c)Int plaster
Sqm
SECURITY CABIN & TIME OFFICE
a)Solling
Cum
b)Pcc

293.00
60.00
442.00

185.46
10.00
65.11

0.00
0.00
20.00

185.46
10.00
85.11

63.30
16.67
19.26

In Progress
In Progress
In Progress

8.73
3.80

24.00
3.80

0.00
0.00

24.00
3.80

100.00
100.00

Completed

Sqm
Completed
65.00
4.24
10.00
4.24
6.52
c)Int plaster
Sqm
In Progress
0.00
0.00
0.00
0.00
0.00
d)External Plaster
Sqm
Receipt and approximate consumption of Material In MT Except cement and Bricks
Material Name
sr.no
Receipt
Consumption
Balance Remark
Today'
Previous Today's Total Previous
Total
s
1 Cement
13003
0
13003
11125
11140
1863
15
0.25
2 Corase Aggregate 20 MM
803.13
7
810.13 689.75
690
120.13
3 Corase Aggregate 10 MM
931.895
14.15
946.05 769.40
769.65
176.395
0.25
4 Crush Sand
1041.98
14.15
1056.1 667.11
667.41
388.72
0.3
0.25
6 River Sand
82.995
0
82.995
56.89
57.14
25.855
0
7 Bricks
32400
0
32400
14671
14671
17729
8 Dado
200
0
200
155
155
45
0
sr.no

Dia.of bar in mm

1
2
3
4
5
6
7

8
10
12
16
20
25
28

sr.no
1
2
3
4
5
6
7
8
9
10
11
14

Contractor
RRC

Previous Today's
9.83
50.40
21.42
86.03
70.07
56.74
35.62

0
0
0
0
0
0
0

Total
9.83
50.40
21.42
86.03
70.07
56.74
35.62
330.11

Receipt
Today'
s
10.21
3.94
16.09
32.64
36.67
7.02
8.95
115.52
0.00

Upto 2nd
RA

Total
upto

Remark

156.72

Total
In
Deploy
Stand by Remark
Qty
Working ed @
4 Bag
1
1
2 Bag
2
2
1 Bag
1
1
Cosmos
2 Ton
5
3
2
Cosmos
1
1
Universal
1
1
100 TN
1
1
1
1
1
1
5hp
3
3
1
3
1
1
Staff Details
PM/APM
Sr. Engr. Site Engr. Q.C. Supervisor Store Safety
Support
1
2
4
1
10
2
1
9
Description
mechani
Electrician
Mason
Car
Fitter
M/C
F/C
Skilled
10
10
8
1
1 cs
UnSkilled
4
2
3
43
23
Total Labours=
Heavy Rain is start from 9.30.am to 4.00pm.so all work is stop.
Name
Batching Plant RM 1050
Batching Plant RM 800
Mixer RM 107
Tough Rider
Steel Cutting Machine
Steel Beding Machine
Cube Testing Machine
Dumpy Level With Stand
Theodolite With Stand
Diesel Pump 5hp
Submersible Pump
Earth Compactor

Make

Capacity

Prepared By

Total
30
Labours
30
75
105

SIL

Contractor
RRC

Prepared By

SIL

20mm

Qty.
Plum concret
Rcc
pcc
plaster
brickwork
0.00

Contractor
RRC

10mm

0.0

0.45
7
0
0

0.18
3.15

0.18
3.15

3.33

3.33

Sand

Cement

0.00
3.33
28.00
0.00
0.00
31.33

0.20
3.85
0
0
4.05

Prepared By

SIL

Contractor
RRC

Prepared By

SIL

Contractor
RRC

Prepared By

SIL

Contractor
RRC

Prepared By

SIL

Contractor
RRC

Prepared By

SIL

Contractor
RRC

Prepared By

SIL

Contractor
RRC

Prepared By

SIL