JOB SAFETY ANALYSIS FOR

EARTHWORKS IN EXCAVATION, BACKFILLING AND FILLING

Common Cooling Seawater System Phase 2


SEQUENCE OF BASIC ACTIVITY STEPS 1.0 Cutting POTENTIAL HAZARDS 1.1 Personal Injury HAZARDS CONTROL 1.1.1 All persons shall be safety inducted and all persons shall wear PPE. and tool box talk will be conducted daily before starting the job 1.2.1 Diverson Signal will be displayed Benksman will give signal to operator RESPONSIBLE Site supervisor

1.2 Accident

Site supervisor

1.3 Movement of Machine 1.3.1 Excavator must be equiped with swing/reverse alarms 1.4 Dehydration due to heat 2.0 Filling 2.1 Dust Allergy 1.4.1 Sufficient quantity of drinking water should be available with personel 1.1 During offloading of filling material persons shall wear dust mask

Site supervisor

Site supervisor

Site supervisor

3.0 Compaction

3.1 Noise

3.1 All persons shall wear ear muf

Site supervisor

JOB SAFETY ANALYSIS FOR CAMP CONSTRUCTION AND INSTALLATION OF ASSOCIATED FACILITIES TO THE CAMP Common Cooling Seawater System Phase 2
SEQUENCE OF BASIC ACTIVITY STEPS POTENTIAL HAZARDS HAZARDS CONTROL RESPONSIBLE

1.0 Cutting

1.1 Personal Injury 1.2 Hit by machine

1.3 Dehydration due to heat 2.0 Filling 3.0 Compaction 4.0 Excavation 2.1 Dust Allergy 3.1 Noise 3.2 Vibration 4.1 Collapse of Excavation 4.2 Fall and hit 4.3 Movement of Machinery 4.4 Deep Fall 5.0 Construction of Fencing 5.1 Injury from sharp edge 5.2 Fall of person and material

1.1.1 All persons shall be safety inducted and all persons shall wear PPE. 1.2.1 Diversion Signal shall be displayed Benksman shall give signal to operator 1.2.2 Excavator must be equiped with reverse alarm and revolving warning light and area to be barricaded 1.3.1 Sufficient quantity of drinking water shall be made available 2.1.1 During offloading or filling material, persons shall wear dust mask. 3.1.1 All persons shall wear ear muff. 3.2.1 Rotation of workers to avoid prolonged vibration. 4.1.1 Sloping,shoring benching shall be applied as applicable 4.2.1 Excavated materials should be kept away from the edge of excavation. 4.3.1 Equipment will be equipped with Reverse alarm and revolving warning light 4.4.1 Excavated area must be barricaded with crash barrier and deep excation board shall be displayed. Proper access and egress shall be kept available 5.1.1 Using adequate PPEs 5.2.1 Area to be barricaded with relevant sign board

Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor

Dodsal Site Supervisor Dodsal Site Supervisor

JOB SAFETY ANALYSIS FOR CAMP CONSTRUCTION AND INSTALLATION OF ASSOCIATED FACILITIES TO THE CAMP Common Cooling Seawater System Phase 2
SEQUENCE OF BASIC ACTIVITY STEPS POTENTIAL HAZARDS HAZARDS CONTROL RESPONSIBLE

6.1.1 Certified and colour coded equipments and tackles will be used. 6.1.2 Operator shall be certified by QP approved third party and trained signal man shall be deployed 6.2.1 Area shall be barricaded and no person shall be allow 6.2 Fall of material / Injury to go under lifted suspended load 7.0 Welding and Cutting 7.1.1 No flammable materials shall be kept in the area 7.1 Fire and explosion 7.1.2 Calibrated equipment and defect free cables and hosepipe shall be used 7.1.3 Skilled and competent workers shall be engaged 7.1.4 D A and O2 cyinders shall be stored seperately 7.1.5 Flash back arrestor shall be fitted between hose and pressure gauge and between hose and torch 7.2.1 Proper earthing shall be provided for all equipment 7.2 Electrocution 7.2.2 ELCB shall be incorporated with equipments and tools 8.0 Electrical works and 8.1 Roll down of cable drum and 8.1.1 Adequate and certified lifting equipment shall be used laying of cables and 8.1.2 Drum will be palced and secured in a level injury when unloading installation of Generator and firm ground 8.2 Manual handling of material 8.2.1 Sufficient number of skilled and experienced workers shall be engaged for easy handling of cables and material 8.3.1 Skilled and competent workers shall be engaged 8.3 Electric shock 8.3.2 Only rated and caliberated equipments and hand tools shall be used 8.3.3 Proper earthing and ELCB shall be incorporated with every equipments and electrical installation 8.4.1 Keep the generators away from residential area. 8.4 Noise from Generator 8.5 Air Pollution due to generator 8.5.1 Exhaust ventilation shall be taken to height. 8.5.2 Proper grade of fuel shall be used 6.0 Lifting 6.1 Failure of Equipment and

Dodsal Site Supervisor Dodsal Site Supervisor

Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor

JOB SAFETY ANALYSIS FOR CAMP CONSTRUCTION AND INSTALLATION OF ASSOCIATED FACILITIES TO THE CAMP Common Cooling Seawater System Phase 2
SEQUENCE OF BASIC ACTIVITY STEPS POTENTIAL HAZARDS HAZARDS CONTROL RESPONSIBLE

9.0 Storage of Fuel

10.0 Erection of Telecom Tower

9.1.1 Storage area shall be adequately seperated from other facilities and any source of ignition 9.1.2 Shade shall be provided to prevent direct sun light 9.1.3 Spark proof electrical switch gears and rated pumping system shall be provided 9.1.4 Barricading and Fencing will be provided with sign boards 9.1.5 Adequate Fire fighting Equipments including sand buckets will be provided 9.1.6 Bund wall / Dyke wall to be provided 9.2.1 Adequate earthing will be provided to the vessel. 9.2 Static electricity 9.3.1 Any source of leakage and spillage will be arrested 9.3 Spillage and cleaned properly and provision of dip tray and sand will be made available 10.1 Fall of personel and material 10.1.1 Skilled and competent workers will be engaged from height and injury 10.1.2 Full body harness/ fall arrestor system will be used 10.1.3 Barricading with relevant sign boards will be provided to cover the area 10.1.4 Certified equipments, slings and tackles with colour code will be provided 10.1.5 Personnel working at height shall be provide with access ladder, platform or suitable scaffolding. 9.1 Fire and Explosion

Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor Dodsal Site Supervisor

Remarks: 1- Prior to start any work it will be made sure that personnel are safety inducted. 2- Prior to start any work Tool Box Talk will be carried out. 3- Personnel will wear applicable PPE. 4- Adequate First Aid facility will be provided. Prepared By: M P Gupta ( Civil Engineer ) Reviewed By: Solayappan ( HSE Officer )

JOB SAFETY ANALYSIS FOR CAMP CONSTRUCTION AND INSTALLATION OF ASSOCIATED FACILITIES TO THE CAMP Common Cooling Seawater System Phase 2
SEQUENCE OF BASIC ACTIVITY STEPS POTENTIAL HAZARDS HAZARDS CONTROL RESPONSIBLE