EXECUTIVE SUMMARY
Setty & Associates International PLLC (SAI) has been contracted to perform a detailed condition assessment of the
Washington Highlands Branch Public Library. The assessment shall also take into consideration the cost of
replacement to systems and elements of the building to bring the library up to the current DCPL standards. A cost
analysis was also run for comparison of constructing a brand new library.
The Washington Highlands Branch Public Library is located at 115 Atlantic St., SW, Washington, DC. This area is a
medium density residential neighborhood. This building is a single story with a full basement. Construction of
building is brick and CMU. The building was built prior to any ADA requirements. As part of our assessment a
detailed survey was performed by SAI on March 6, 2008 following heavy rains on March 5, 2008. Water intrusion
from the ground and roof was apparent and has damaged the site and building. Each subsystem within the building
was surveyed analyzed and this has been presented in this report.
The tables below present the costs for renovating the existing 17,000 SF structure and incorporating a new 3,000 SF
addition. This will bring the building up to the programming requirements of a new library.
The purpose of this estimate is to provide an opinion of the building construction cost in today’s dollars on a cost per
square foot basis. The building construction cost excludes land costs and interior furnishings, fixtures, and
equipment not associated with the building. The costs are based on a gross building area of 20,000 square feet, as
provided by the owner. These estimates are based upon RS Means estimating manuals and from knowledge of
historic construction costs in the Washington, DC, area.
In summary, based on the facility’s overall infrastructure and the cost associated with the renovation of the existing
49-year old facility, SAI views demolishing and removing the existing library as feasible. By renovating the existing
library, the overall look may not meet the expectations of the new DCPL format. Costs for major changes to the skin
and façade reconfigurations were not considered.
The existing site is located in Ward 8, Square No. 6172, Lot 813, at the corner of 115 Atlantic Street, SW and South
Capital Terrace, SW. The parcel is identified on the DC Zoning Map as R-2. Prior to proceeding with any designs for
a new building, the zoning should be confirmed by obtaining a zoning certification. R-2 districts are designed to
selectively restrict development in quiet residential areas while allowing for non residential uses that would support
desirable neighborhood activities such as schools, churches, community centers and libraries.
The R-2 zone permits matter-of-right development of single-family residential uses for detached and semi-detached
structures, with a minimum lot width of 40 feet and lot area of 4000 square feet for detached structures, and 30 feet
and 3000 square feet for semi-detached structures; a maximum lot occupancy of 60% for church and public school
use and 40% for all other structures, and a maximum height of three (3) stories/forty (40) feet.
The current Highlands Library site area is approximately 29, 793 sf. Maximizing the lot occupancy at the 40%
maximum allowable coverage yields a building footprint of 11,905 gsf. At the maximum height of three stories, this
would yield a hypothetical building area of 35,715 gsf. However, if the .9 FAR requirement is applied to the site as if
it were a school, the maximum building area would be 26, 813 gsf. The two-story plus basement structure on this
site would occupy less than 40% of the site and fall within the 8’ side yard and 20’ rear yard setbacks.
In considering the potential for a new facility in this community, the desired square footage is in the 20,000 gsf, range
according to the facility space program provided. A new building of this size could be of two story plus service
basement configuration with parking to be provided in the existing rear parking lot. This would leave sufficient space
for the required 18 parking spaces (1 space per 1,000 gsf except first 2,000 gsf require no spaces). However, the
existing parking lot in the rear of the building creates an undesirable dual public entry and /or long walk to the front
door for patrons. A single public entry from the parking area would be preferred for both security and access control
and monitoring. Reorganizing the site to provide a more accessible entry from the patron parking area should be a
high priority in a new replacement facility design.
The New Facility Construction Cost in the Estimated Cost Comparison chart represents the rough Square Foot Cost
for a new 20,000 S.F. facility based on the value derived from 2008 RS MEANS Square Foot Costs Book 29th
Annual Edition. The estimate is the raw building cost and does not include contingencies, Furnishings, Fixtures, and
Equipment (FF&E), and development “Soft Costs” other than the Architectural and Engineering fee.
A. Purpose
The purpose of this assessment is to evaluate the condition of the existing building and site and provide a
cost-benefit analysis of renovation verses demolition and new construction. The report is based on those
conditions observed on the days the field assessment was accomplished and from information obtained
from our review of the available construction documents. This report is by no means a guarantee of the
overall condition of the facility.
B. Scope of Services
• Architectural Assessment
• Structural Assessment
2. The Scope of Services for this assignment does not include the following:
• Concealed or inaccessible areas of the building that require the use of destructive investigations
beyond that proposed in the Scope of Services.
• Work requiring the use of special consultants beyond that noted in the Scope of Services.
• Furniture, fixtures, and process equipment not part of the building structure.
• Utility rooms and power vaults, which are the property of the utility company.
• A definitive opinion concerning compliance with all codes/regulations, due to the existence of
literally thousands of local and model codes, and regulations pertaining to design and
construction. Setty & Associates, International, PLLC, shall exercise usual and customary
professional care, as architects and engineers, in its efforts to obtain available information and to
assess building code/regulation compliance.
• A guarantee of the accuracy and/or the completeness of information provided to Setty &
Associates, International, PLLC, by others.
• A legal opinion regarding our findings or recommendations. Setty & Associates, International,
PLLC, does not engage legal counsel to assist in our due-diligence process or to review our
findings and recommendations.
• An Environmental Site Assessment (Including asbestos, lead paint, and mold assessments).
C. Documents Reviewed
D. Representation
This property condition assessment report was prepared by Setty & Associates, International, PLLC, for the
exclusive use of District of Columbia Public Library and its investors, lenders, assignees, designees,
successors, and assigns. The aforementioned parties intend to rely upon this report as an assessment of
the existing physical condition of the subject property for the purpose of deciding whether, and under what
conditions, to proceed with a renovation regarding the subject property. The work does not constitute or
imply a guarantee or warranty of the subject property, building, or improvements. Setty & Associates
International, PLLC, is not responsible or liable for any claims that are associated with the interpretation of
the available information. In the event the client requires this report to be assigned, a new contract will need
to be signed between Setty & Associates International, PLLC, and the Assignee.
E. Condition Ratings
Where deficiencies are observed, the current condition categories are ranked on five condition values from
worst to best. The categories are failed or failing, poor, fair, good, and new/excellent.
1.0 Substructure
Description
Item Description
Building Construction Date 1959
BUILDING
1.1 Foundations
Type Reinforced cast-in-place concrete.
Concrete pier footings at columns.
Spread footings at exterior and interior walls.
Footings Spread: Not provided
Strip: 12” x 22”
Exterior Footing Depth 1-8’ below slab-on-grade
Bearing Capacity Not provided
1.2 Slabs-on-grade
Construction, Joints, etc. 6” thick cast-in-place reinforced concrete
1.3 Basement Excavations/Walls
Exterior Walls 12” thick reinforced concrete masonry units or concrete walls
Condition
BUILDING
1.1 Foundations
The overall condition of the substructure system was good. Our site observations did not reveal any areas of
excessive settlement of the foundation. No distress or overstressing of the visible basement walls was observed.
Unusual or suspect cracking that may be evidence of structural related concerns was not observed.
1.2 Slabs-on-grade
The slab-on-grade was in good condition with some minor cracks observed. The cracks were not reported to affect
the current operations.
Recommendations
No expenditures are anticipated.
2.1 Superstructure
Description
Item Description
Building Construction Date 1959
BUILDING
Floor Framing
Floor Deck 2-way cast-in-place reinforced concrete
Structure Reinforced cast-in-place concrete beams and columns
Roof Framing
Roof Deck Reinforced concrete slab
Structure Reinforced concrete beams and columns
Typical Bay Size (approximate) Not applicable
Other Features
Exterior Walls 4” face brick with steel lintels, cracking and rotation at the southwest corner
Stairs Cast-in-place reinforced concrete
Condition
BUILDING
The overall condition of the structural system(s) was good. Our observations did not reveal any distress or
overstressing of supporting members. Unusual or suspect cracking that may be evidence of structural related
concerns was not observed in the interior or exterior walls except at the southwest corner of the building. See Section
2.2, Exterior Walls, for issues and recommendations.
Overall, based on our visual observations and drawing review, the building appeared to be designed and constructed
in accordance with industry-standard practices.
Recommendations
Repair the southeast masonry corner and parapet wall. The face brick of the parapet is separated from the backup
wall along the top edge and is leaning outward. Repair by mechanically pinning the parapet face brick back to the
backup. Opinion of Cost: $50,000.00.
Prep and paint the steel lintels supporting the masonry openings. Opinion of Cost: $13,440.00.
Photo A-1: View of the Rotated Southwest Corner Photo A-2: View of the Reinforced Concrete
of the Building Structural Frame
Condition
BUILDING
The exterior walls consist of brick veneer on a concrete block back-up. The masonry walls are in fair to poor
condition with numerous repairs and repointing required (see photos A-3 to A-10). Several areas of masonry veneer
are cracked and damaged. Provide an allowance to repair and repoint all masonry on the exterior of the building.
Budget for the prep and repainting of all exterior trim and soffits. Large aluminum framed single pane windows are
provided. The windows are fixed glazing except for the lower awning portions provided for ventilation. Each large
bank of windows has a cast concrete trim at the perimeter. The majority of the concrete trim pieces are spalled and
should be replaced (see photo A-4). The windows are in poor condition. The windows should be replaced with a
modern insulated glazing system set in an anodized aluminum frame. Provide an allowance to remove all the
glazing, frames, and cast concrete trim. Provide a new aluminum framing system with insulated glazing units.
Provide an allowance to replace all the existing deteriorated exterior doors.
Recommendations
1. Provide an allowance to repair and repoint all masonry on the exterior of the building. Opinion of cost:
$221,025.00.
2. Budget for the prep and repainting of all exterior trim and soffits. Opinion of cost: $80,000.00.
Setty & Associates International, PLLC Section 2.2 – Exterior Walls, Windows and Doors Page 1
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 2.0 Shell
3. Provide an allowance to remove all the glazing, frames, and cast concrete trim. Provide a new aluminum
framing system with insulated glazing units. Opinion of cost: $460,800.00.
4. Provide an allowance to replace all the existing deteriorated exterior doors. Opinion of cost: $10,000.00.
Photo A-3: View of Brick Veneer along Front Elevation Photo A-4: View of Spalled Concrete Window Trim
Photo A-5: Repair and Repoint Brick Veneer Photo A-6: Repair and Repoint Brick Veneer
Setty & Associates International, PLLC Section 2.2 – Exterior Walls, Windows and Doors Page 2
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 2.0 Shell
Photo A-7: Repair and Repoint Brick Veneer Photo A-8: Evidence of Masonry Efflorescence
Photo A-9: Evidence of Cracked Masonry Photo A-10: Replace Damaged Bricks
Setty & Associates International, PLLC Section 2.2 – Exterior Walls, Windows and Doors Page 3
Section 2.3 Exterior Roofing
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 2.0 Shell
Description
Item Description
Building Construction Date 1959
ROOF
System Age Unknown
Total Roof Area 11,500 sf
Number of Sections 2
Surfacing N/A
Membrane Spray foam over built-up
Insulation Unable to observe
Attachment Unable to observe
Deck Type Concrete
Deck Slope < 1/8” per ft.
Flashings Pre-fab metal flashing and counter flashing, spray foam
Perimeter Masonry parapet wall
Perimeter Treatment Metal coping
Drainage Interior drains with strainers (main roof)
Overflow Protection Thru wall scuppers
Warranty Information not available
Manufacturer Information not available
Other Features N/A
Condition
ROOF
The roofing consists of built-up roof membrane installed in 1981 by KC Home Improvement. The membrane has a
white spray foam coating which was reportedly installed in 1990. The roof does not have proper drainage and is
currently leaking in several areas. Water damage to interior finishes has occurred many times in several areas over
the years. All of the internal roof drains and thru-wall scuppers are clogged with leaves and debris (see Photo A-13).
Several areas of ponding water were observed (see photo A-14). The roof membrane is approximately 27 years old,
is in failing condition and should be replaced. Damage to the concrete deck below the roof could not be verified but
should be anticipated when the roof membrane is replaced. Budget for the annual maintenance and inspection of the
roof membrane. Clean all roof drains. Budget for the replacement of the aged and deteriorated roof system. Provide
a new membrane roof including insulation, flashing, and a roof gutter system. Provide an allowance for damage to
the concrete roof deck. Engage a roofing consultant to specify the roof membrane, obtain bids, and monitor the
installation. This should include the roof over the front entrance vestibule and the rear entrance.
Recommendations
The following is a summary of our recommendations and opinion of cost.
1. Budget for the annual maintenance and inspection of the roof membrane. Clean all roof drains. Opinion of
cost: $6,000.00.
2. Budget for the replacement of the aged and deteriorated roof system. Provide a new membrane roof
including insulation, flashing, and a roof gutter system. Provide an allowance for damage to the concrete
roof deck. Engage a roofing consultant to specify the roof membrane, obtain bids, and monitor the
installation. This should include the roof over the front entrance vestibule and the rear entrance. Opinion
of cost: $300,000.00.
Setty & Associates International, PLLC Section 2.3 – Exterior Roofing Page 1
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 2.0 Shell
Photo A-12: View of Roof Access Hatch Photo A-13: View of Typical Clogged Roof Drain
Photo A-14: View of Ponding Water Photo A-15: View of Typical Clogged Scupper
Setty & Associates International, PLLC Section 2.3 – Exterior Roofing Page 2
Section 3.0 Interiors
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 3.0 Building Interiors
3.0 Interiors
Description
Item Description
Building Construction Date 1959
3.1 Interior Construction
Walls Painted CMU block walls
Doors Flush wood veneer with knobs. Metal doors at stairs, mechanical rooms and
electrical rooms.
Interior Specialties Not applicable.
3.2 Stairways
Construction Type Cast-in-place concrete with metal nosed treads, CMU block walls, painted
metal railings
Stair Finishes Composition tile floors, painted CMU walls
Railings 2-inch diameter metal pipe railings
3.3 Interior Finishes
Wall Finishes Painted CMU block. Minor exposed brick walls.
Floor Finishes 12” x 12” resilient vinyl tile in meeting rooms. Carpet (tight loop-pile
broadloom) in reading room. 2” x 2” ceramic tile in public restrooms.
Ceiling Finishes Standard 2’ x 4’ acoustical ceiling tiles, painted plaster, and painted gypsum
board.
Condition
3.2 Stairways
There is one set of stairs in the building. The stairs are constructed of cast-in-place concrete. Stair finishes include
painted composition tile treads and landings, painted CMU walls and painted plaster ceilings. Lighting of the
stairways is generally adequate. Finishes are in fair to poor condition.
Interior walls consist primarily of painted concrete masonry units. Some areas of painted gypsum board or exposed
brick are also provided. The walls are in fair condition with some repairs and repainting required. Floors consist of
vinyl tile or carpet. The floors are in fair condition with replacements recommended. Ceilings consist of painted
plaster, painted gypsum board, or 2’ x 4’ suspended acoustical ceiling tiles. The ceilings are in fair to poor condition
and should be repaired, repainted, or replaced. Repair and replace the water damaged plaster, gypsum board, and
acoustical tiles at the library ceilings see photo I-1). Restrooms have ceramic tile floors, glazed concrete block
wainscoting, painted concrete block walls, and painted plaster ceilings. The finishes are dated and should be
replaced. Provide an allowance to replace all interior finishes including carpet, vinyl tile, paint, and ceiling tiles. As
an optional improvement to comply with the current library design specifications, provide an allowance to add an
additional 6,000 square feet of space for library program requirements. It should be understood that due to the
current site restraints this additional square footage may not be feasible. Restrooms are in fair to poor condition.
Restroom finish upgrades should be coordinated with any ADA upgrades (refer to Section 8.0).
Meeting rooms provided in the basement do not have two means of egress.
Recommendations
The following is a summary of our recommendations and opinion of cost.
3.2 Stairways
No expenditures are anticipated.
1. Repair and replace the water damaged plaster, gypsum board, and acoustical tiles at the library ceilings.
Opinion of cost: $5,000.00.
2. Provide an allowance to replace all interior finishes including carpet, vinyl tile, paint, and ceiling tiles.
Opinion of cost: $684,760.00.
3. Provide two means of egress from each of the two lower level meeting rooms. Provide the proper exit
signs, panic hardware, and devices. Opinion of cost: $60,000.00.
4. Remove the security bars at the windows to provide for egress or provide an operable window security bar
system. Opinion of cost: $46,080.00.
5. Provide a handrail for the stairs to the basement mechanical room. Opinion of Cost: $1,500.00.
6. Provide two means of egress from each of the two lower level meeting rooms. Provide the proper exit
signs, panic hardware, and devices. Opinion of cost: $60,000.00.
7. Remove the security bars at the windows to provide for egress or provide an operable window security bar
system. Provide the proper exit signs, panic hardware, and devices. Opinion of cost: $46,080.00.
As an optional improvement to comply with the current library design specifications, provide an allowance to add an
additional 3,000 to 6,000 square feet of space for library program requirements. It should be understood that due to
the current site restraints this additional square footage may not be feasible. Opinion of cost: $864,000.00.
Photo I-1: Water Damaged Ceiling Tiles Photo I-2: Water Damaged Carpeting
Photo I-3: Water Damaged Plaster Ceilings Photo I-4: Acoustical Ceiling Tiles that have Fallen
Description:
Item Description
Building Construction Date 1959
Passenger Elev. #1 1,200 lb Capacity
Machines Hydraulic, Rotary Lift Company S/N 15014
Controllers Installed 1959
Door equipment GAL car and hoistway
ADA compliance Missing telephone and audible tones
Condition
One two-stop hydraulic elevator manufactured by Rotary Unit Company is provided. The elevator is original to the
building and has not been modernized. The overall condition of the elevator system is poor. The elevator operated
normally within its design parameters at the time of our observations, but the library manager stated that it does jam
on occasion while in use. Generally, the interior of the elevator appeared to be dirty and worn. Some interior signage
was damaged or missing, and the light fixture cover was missing. The elevator has a 36” wide door and a cab size of
55” x 39” which does not meet the current requirements for the ADA. The elevator does not have an emergency
communication device, audible signals, floor passing tones, and accessible controls. The elevator is not accessible
and repair parts may be expensive and difficult to find. A new accessible elevator would require a larger shaft than
what is currently provided. Provide a new accessible hydraulic elevator in a larger shaft. Engage an elevator
consultant to specify the elevator, obtain bids, and monitor the installation.
The machine room was not air-conditioned, but the temperature at the time of our observations was within the design
parameters for the equipment currently installed. However, either due to the leaking roof or a leaking foundation, the
elevator machine room appeared to have significant water damage. Metal component covers and shields had rust
damage from standing water and the floor appeared to be wet at the time with water and hydraulic fluid. Overall
condition appeared poor but operational.
If properly maintained, the elevator equipment (exclusive of the hydraulic cylinder) may have an estimated remaining
useful life of two years. With continued water infiltration to the machine room, life expectancy may be reduced.
The elevator is key operated from the hall buttons and is currently not ADA compliant.
Specific ADA deficiencies noted were:
• Missing telephones.
• Improperly marked telephone cabinets, hall buttons key operated.
• No hoistway entrance Braille or audible tones.
• Non conforming cab size and configuration.
Updating the elevator would be required to meet the ADA Accessibility Guidelines (ADAAG) for the elevator to be
considered accessible to the handicapped.
Recommendations
Provide a new accessible hydraulic elevator in a larger shaft. The existing cab size, controls, and communication
device are not accessible. Engage an elevator consultant to specify the elevator, obtain bids, and monitor the
Setty & Associates International, PLLC Section 4.1 – Conveying Systems Page 1
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 4.1 Conveying Systems
Photo CS-3: Elevator Light Fixture Photo CS-4: Elevator Machine Room Damage
Setty & Associates International, PLLC Section 4.1 – Conveying Systems Page 2
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 4.1 Conveying Systems
Photo CS-5: Elevator Hydraulic Equipment Photo CS-6: Elevator Control Panel
Setty & Associates International, PLLC Section 4.1 – Conveying Systems Page 3
Section 4.2 Mechanical Systems
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 4.2 Mechanical Systems
Description
Item Description
BUILDING
Building Construction Date 1959
Chilled Water System The chilled water system consists of two Trane Intellipak air-cooled chillers on
the roof. These chillers are both 25 tons (Trane model CGAFC25EADA).
One Bell & Gossett chilled water pump located in the ground floor boiler room
circulates the chilled water in the cooling system to the air handling units and
fan coil units via an insulated black-steel piping system.
Heating Water System Weil McLain Model 688 Series 1, 1028 MBH steam, 1358 MBH gross output
boiler, Riello RS50 burners, steam to hot water converter, two hot water
circulating pumps, steam condensate receiver with one boiler feedwater
pumps, automatic boiler chemical feeder with pumps.
Air Handling Units American Blower central air handling unit serves main library space on the
first floor, as well as various offices and other spaces on the first floor and
basement floor. The main, first floor library space is served by approximately
twenty-four round ceiling diffusers.
Fan and Coil Units Some perimeter zones are heated by wall-mounted, fully enclosed radiators,
and supplemental heating and cooling is provided to other perimeter and
interior zones through fan coil units. Supplemental units serving areas are as
follows:
Basement Floor – Small meeting room – three (3) fan coil units, one radiator
Large meeting room – three (3) radiators only
Hallway – fan coil unit
Additionally, there are hot water radiators and convectors located at various
perimeter locations on the first floor. Total radiators is 25.
Exhaust Fans There are five roof-mounted exhaust fans on the roof of the building. These
fans serve as exhaust for bathrooms, kitchen, etc.
Heating & Ventilating One basement heating and ventilating unit provides outside air ventilation to
the basement areas including the machine room, storage rooms, and
bathrooms.
HVAC Controls Building controls for mechanical equipment are pneumatic, with compressed
air supplied by a compressor located in the basement boiler room. Individual
space temperature is controlled by local thermostats or equipment mounted
controls and sensors as with radiators and fan coil units.
Miscellaneous Equipment An incinerator, Joseph Gooder model, is located in the basement boiler room.
Setty & Associates International, PLLC Section 4.2 – Mechanical Systems Page 1
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 4.2 Mechanical Systems
Condition
BUILDING
Exhaust Fans
The exhaust fans appear to be in fair to poor condition but operability could not be determined at the time of survey.
They have all reached the end of their useful life and should be replaced.
Setty & Associates International, PLLC Section 4.2 – Mechanical Systems Page 2
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 4.2 Mechanical Systems
HVAC Controls
No central building automation system exists and while the existing pneumatic controls appear operational, they are
old and should be upgraded to a modern DDC system. The accuracy and function of the existing controls system
could not be fully determined at the time of survey. It is likely that service and calibration are necessary.
Other Conditions
• Preventative maintenance procedures appeared to be fair.
• The existing incinerator in the basement appeared to be unused.
Recommendations
2. Contract with a testing and balancing contractor to measure and adjust the air distribution and hydronic
systems throughout the building. The results of the Testing and Balancing report should be used to
determine modifications, repairs required for a comfortable environment. Opinion of cost: $28,500.00.
3. Repaint or replace rusted diffusers and grilles. Opinion of cost: $6,300.00.
4. Repair insulation on chilled water piping. Opinion of cost: $1,800.00.
5. Install fire dampers where AHU supply and return ductwork penetrates rated walls. Opinion of cost:
$15,320.00.
6. Provide additional cooling and heating for added square footage of new building. Tie into existing chilled
and hot water plants. Opinion of cost: $55,000.00.
7. Demolish and remove incinerator. Opinion of cost: $5,500.00.
8. Replace air handler. Opinion of cost: $35,000.00.
9. Clean and replace old ductwork, re-insulate. Opinion of cost: $125,000.00.
10. Replace duplex condensate pump. Opinion of cost: $9,000.00.
11. Bring building up to current energy and mechanical codes. Opinion of cost: $115,000.00.
12. Install new DDC control system comparable to DCPL specifications. Opinion of cost: $200,000.00.
13. Provide new fan coils, control valves, balancing valves, piping connections for existing units. Opinion of
cost: $25,000.00.
14. Replace piping for both heating and chilled water systems. Opinion of cost: $250,000.00.
Setty & Associates International, PLLC Section 4.2 – Mechanical Systems Page 3
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 4.2 Mechanical Systems
Photo M-1: Existing Steam Boiler Photo M-2: Existing Air Handling Unit and Piping
Photo M-5: Condensate Receiver and Feedwater Pumps Photo M-6: Hot Water Circulation Pumps
Setty & Associates International, PLLC Section 4.2 – Mechanical Systems Page 4
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 4.2 Mechanical Systems
Photo M-8: Compressor and Controls Panel Photo M-9: Ceiling Mounted Fan Coil Unit
Setty & Associates International, PLLC Section 4.2 – Mechanical Systems Page 5
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 4.2 Mechanical Systems
Photo M-10: Hot Water Radiator Photo M-11: Round Ceiling Diffuser
Setty & Associates International, PLLC Section 4.2 – Mechanical Systems Page 6
Section 4.3 Electrical Systems
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 4.3 Electrical Systems
Description:
Item Description
BUILDING
Building Construction Date 1959
Service, Switchgear The electrical service to the facility is provided by Potomac Electric Power
Company (PEPCO). Secondary service conductors are routed through
underground ducts to the 400-ampere, 208/120-volt, three-phase, four-wire main
distribution panel board service via the wall mounted C/T cabinet with PEPCO
metering. There is a central KWH meter, which is used to record electrical
energy consumption by the building for billing purposes
Power Distribution Electrical power is distributed throughout the building from the 400-ampere,
208/120-volt, three-phase, four-wire, panel board which is located inside the
electrical equipment room in the basement. Typically, branch circuit panel
boards are located on each floor. The majority of all the branch circuit panel
boards were rated for 100-ampere with between 30 to 42 pole with 20-amps
circuit breakers serving lighting, general receptacles and small miscellaneous
mechanical load. Large mechanical equipment are served at 208 volts, 3
phase, others are served at 208 volts, single phase. Power was distributed using
wiring in conduits. All wiring conductors are copper with thermoplastic insulation.
Conduits that were visible were either galvanized rigid steel or galvanized
electrical metallic tubes (EMT). Most feeders and branch circuits are installed
concealed conduit system throughout the building. The entire power distribution
system, which includes the panels, disconnect switches, enclosed circuit
breakers, feeders and branch circuit wiring is nearly 50 years old. The reliability
of the system is however dependent on good maintenance.
Recommendations
The following is a summary of our recommendations. Opinion of cost for total Electrical Renovation: $220,000.00.
A. The main panel board and associated branch circuit panel boards should be replaced with new panel
boards. There was no evidence of damage from short circuits or overloads. No action is required by
PEPCO for upgrading the electrical service.
B. The wiring appeared to be in good condition. No problems were noted. Conduits, where visible, were in
good condition.
C. The elevator disconnect switch located in the elevator machine room should be replaced with a new shunt
trip type disconnect switch.
D. Replace existing lighting fixtures 1’x4’ and 2’x 4’ with new lighting fixtures with energy saving lamps and
ballast (T8 & electronic ballast)
F. Generally, the branch circuit wiring can be reused and extended to new device locations as required.
Emergency Lighting (Refer to Section 4.5 Fire Detection, Alarm and Suppression System for pricing)
A. All emergency fluorescent lighting fixtures in the egress path should be provided with emergency ballast as
required by code.
B. Replace all existing exit sign lighting fixtures with LED type and battery pack unit lighting fixtures. Upon loss
of the local white light circuit, the DC powered exit sign lamps and the emergency egress lights illuminate
and provide at least one foot-candle maintained illumination.
Fire Alarm System (Refer to Section 4.5 Fire Detection, Alarm and Suppression System for pricing)
We recommend replacing the entire existing Fire Alarm System to meet the current code is as follows:
A. Provide all the visual devices with new devices that are ADA compliant per current code requirements.
C. Provide a heat detector in the elevator machine room and duct-mounted smoke detectors shall be installed
in the return and supply ducts of all air handling systems having air flow greater than 2000 cubic feet per
minute.
A. Replace all existing 2’x 4’, 1’x 4’, and industrial strip lighting fixture lamps and magnetic ballast with type T8
and electronic ballasts.
C. Replace existing incandescent lamp with new fluorescent lamp at all areas.
D. Properly secure all existing wiring/conduit as required throughout the entire building.
Photo E-1: C/T Cabinet Meter and Distribution Photo E-2: Main Distribution Service Panel
Service Panel
Photo E-3: Branch Circuit Panel Photo E-4: Lighting – Main Level
Description
Item Description
BUILDING
Building Construction Date 1959
Domestic Hot and Cold Water System City water enters the building and is distributed to each plumbing fixture via a
copper piping system. A 2” cold water service to the building is tapped from
an 8” city water main on South Capitol Terrace. The building water meter is
located adjacent to the building in a grassy area between the building and
the street. Domestic water lines appear to be original to the building.
Domestic hot water for the building is generated by a State Select natural
gas water heater of 73 gallon storage capacity. Recovery rate of the water
heater is 76.8 gallons per hour with a 75MBH input. Water heater
installation is circa 2003.
Storm Water Drainage System Interior roof drains pipe to a gravity cast iron piping system. There are five
(5) interior roof drains, one each of 6”, 5”, and 4” diameter as well as two of
3” diameter. Additionally, there are three downspouts at the edges of the
roof which drain through downspouts to splash blocks on the ground.
The storm drains combine to form a 10” storm sewer line that ties into a 24”
city storm sewer line on Atlantic Street, SW, at invert elevation approximately
83’.
Sanitary Drainage System A gravity cast iron piping system consisting of pipe sizes 2”, 3”, 4” and 6”.
The 6” building sanitary discharge pipe connects to 10” city sanitary sewer
main on South Capitol Street at approximate invert elevation of 81’.
Natural Gas System Natural gas service is provided to the building via connection along South
Capitol Terrace, also where the gas meter is located.
Condition
BUILDING
Domestic Hot and Cold Water System:
The domestic hot and cold water piping was in fair condition. No problems were noted. The building domestic hot
water heater is four to five years old. The heater is in good operating condition. The water heater will reach the end
of its life cycle within the next fifteen years and replacement should be anticipated at that time. The plumbing
fixtures, while most were old and not of the newer, water conservation type, appeared to be in good, working
condition. The public and staff bathrooms do not meet ADA requirements. Some of the water coolers appeared to
be newer and were in good condition, others needed replacement.
Storm Water Drainage System:
The building storm water drainage system was in fair to poor condition and some repair work is necessary.
Significant roof leakage was noted throughout the building, and is likely to be at least partially the result of significant
water pooling on roof during and after a rain event. Almost all roof drains were clogged to some extent, and in some
areas the lowest level of the roof had sunk below the level of roof drain, which caused pooling around many of the
drains.
Sanitary Drainage System:
No problems were noted or brought to our attention.
Setty & Associates International, PLLC Section 4.4 – Plumbing Systems Page 1
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 4.4 Plumbing Systems
Recommendations
1. Replace entire plumbing piping systems. Opinion of cost: $85,000.00.
2. Replace all fixtures. Opinion of cost: $25,000.00.
3. Upgrade water heaters for new spaces and current codes. Opinion of cost: $10,000.00.
4. Replace all roof drains and storm water piping. Opinion of cost: $65,000.00.
Photo P-1: Water Heater Photo P-2: Typical Storm & Sanitary Piping
Setty & Associates International, PLLC Section 4.4 – Plumbing Systems Page 2
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 4.4 Plumbing Systems
Photo P-9: Rooftop Water Pooling Photo P-10: Rooftop Water Pooling
Setty & Associates International, PLLC Section 4.4 – Plumbing Systems Page 3
Section 4.5 Fire Detection, Alarm and Suppression System
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 4.5 Fire Detection, Alarm and Suppression Systems
Description
Item Description
Building Construction Date 1959
CONSTRUCTION
Occupancy Public Use
Footprint Area Approx 11,500 SF
Height Basement + 1 Story
Total Area Approx 17,200 SF
Exterior Walls Masonry brick and masonry block
Interior Walls Concrete masonry unit
Shafts Concrete masonry unit
Floor Slabs Reinforced concrete
Ceiling Suspended acoustical tile and painted plaster
Roof Built up
FIRE PROTECTION SYSTEMS
Fire Alarm Model Manual
Addressable (Y/N) No
Power source 120 Volts
Notification Appliances Bells
ADA Compliant (Y/N) No
Pull Stations (Y/N) Yes
Waterflow (Y/N) No
Tampers (Y/N) No
HVAC Detection (Y/N) No
Elevator Recall (Y/N) No
Elevator Shutdown (Y/N) No
Smoke Detection (locations) Yes, kitchenette, various corridors, basement meeting room
Heat Detection (locations) No
Other Local signal only, not tied to Fire Dept
Sprinkler System None
Fire Extinguishers 10 lb. ABC or equivalent
Note: Corridors used as return air plenum. For conditions and recommendations, see Mechanical.
Condition
Setty & Associates International, PLLC Section 4.5 – Fire Detection, Alarm and Suppression System Page 1
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 4.5 Fire Detection, Alarm and Suppression Systems
LIFE SAFETY
The following deficiencies were noted regarding the building’s life safety features:
• Missing posted emergency plan.
• Exit signs with battery backup.
Recommendations
The following is a summary of our recommendations and opinion of cost.
1. Install a fire protection system for entire building with fire pump to bring building up to current codes.
Opinion of cost: $125,000.00.
2. Install a new fire alarm system. Opinion of cost: $80,000.00.
Photo F-1: Typical Pull Station Photo F-2: Typical Fire Extinguisher
Photo F-3: Typical Exit Signage Photo F-4: Typical Fire Alarm Bell
Setty & Associates International, PLLC Section 4.5 – Fire Detection, Alarm and Suppression System Page 2
Section 5.0 Building Site Improvements
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 5.0 Building Site Improvements
Condition
Setty & Associates International, PLLC Section 5.0 – Building Site Improvements Page 1
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 5.0 Building Site Improvements
5.6 Landscaping
The landscaped area (13,400 sf) was composed mainly of established trees and grass ground cover. Both the
existing trees and the grass areas were in fair condition.
Recommendations
The following is a summary of our recommendations and opinion of cost.
1. Waterproof basement. Opinion of cost: $20,000.00.
2. Resurface parking lots, resurface/restripe. Opinion of cost: $35,000.00.
3. Provide an allowance to upgrade the landscaping and fencing. Opinion of cost: $50,000.00.
4. Demolish and re-pour sidewalks. Opinion of cost: $25,000.00.
5. Corrective action to retaining wall. Opinion of cost: $10,500.00.
6. Provide an allowance to repair the damaged brick planters at the front entrance. Opinion of cost:
$45,000.00.
7. Paint all steel handrails, clean fencing and paint gate. Opinion of cost: $2,000.00.
8. Provide an allowance to repair the damaged brick planters at the front entrance. Opinion of cost:
$45,000.00.
9. Apply acid wash to the effected area to remove efflorescence. Apply silicon coating to cracks to avoid water
penetration in future and prevent efflorescence. Opinion of cost: $2,500.00.
Setty & Associates International, PLLC Section 5.0 – Building Site Improvements Page 2
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 5.0 Building Site Improvements
Photo BS-1: Cracking Asphalt Parking Lot Photo BS-2: Sloping Ground towards Building
Photo BS-3: Retaining Wall Cracking and Effervescence Photo BS-4: Sidewalk Cracking and Aging.
Photo BS-5: Brick Wall Cracking Photo BS-6: Sloping Ground towards Building
Setty & Associates International, PLLC Section 5.0 – Building Site Improvements Page 3
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 5.0 Building Site Improvements
Photo BS-7: Brick Wall Cracking Photo BS-8: Sidewalk Uneven, showing Aggregate.
Setty & Associates International, PLLC Section 5.0 – Building Site Improvements Page 4
Section 6.0 Accessibility Issues
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 6.0 Accessibility Issues
Setty & Associates International, PLLC Section 6.0 – Accessibility Issues Page 1
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 6.0 Accessibility Issues
Condition
Recommendations
The following is a summary of our recommendations and opinion of cost.
1. Provide standard accessible and van accessible parking spaces. Opinion of cost: $3,200.00.
2. Provide an accessible ramp to gain access to the library from the rear parking area. Opinion of cost:
$30,000.00.
3. Reconfigure the front entrance ramp to fully comply with the ADA including slope, handrails, curbs, and
railings. Opinion of cost: $18,000.00.
4. Provide an allowance to provide an accessible ramp from the flagpole and bike rack area adjacent to the
main entrance. Opinion of cost: $15,000.00.
Setty & Associates International, PLLC Section 6.0 – Accessibility Issues Page 2
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 6.0 Accessibility Issues
Photo A-1: View of the Accessible Main Entrance Doors Photo A-2: View of the Inaccessible Stair Handrails
Setty & Associates International, PLLC Section 6.0 – Accessibility Issues Page 3
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 6.0 Accessibility Issues
Photo A-3: View of the Inaccessible Elevator Photo A-4: View of the Inaccessible Drinking Fountain
Photo A-5: View of Inaccessible Door Knob Hardware Photo A-6: View of Inaccessible Public Toilet Stall
Photo A-7: View of The Inaccessible Fire Alarm Pull Photo A-8: View of the Typical Inaccessible Sink/Urinal
Station
Setty & Associates International, PLLC Section 6.0 – Accessibility Issues Page 4
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 6.0 Accessibility Issues
Photo A-9: View of The Inaccessible Flagpole/Bike Photo A-10: View of the Inaccessible Rear Entrance
Rack Area
Photo A-11: View of the Inaccessible Front Entrance Photo A-12: View of the Accessible Curb Cut
Setty & Associates International, PLLC Section 6.0 – Accessibility Issues Page 5
Section 7.0 Safety/Security
Washington Highlands Branch Public Library Condition Assessment Report
Washington, DC Section 7.0 Safety/Security
7.0 Safety/Security
Description
Item Description
Building Construction Date 1959
7.1 Intrusion Detection
Electronic Burglar Alarm Existing Senitrol system with control panel, keypad, magnetic door contacts
7.2 Steel Window Screens
Ground floor windows Windows located at ground level in rear of building are protected with steel
screens.
Condition
Recommendations:
New alarm system to incorporate latest technology and new additions. Opinion of cost: $25,000.00.
Condition
8.1 Building Materials
The condition of the suspect ACBM such as ceiling tile, floor tile, and wallboard is fair to good. It is understood that
OPM has in-hand, a HazMat study indicating the nature and status of potential materials in the building. Therefore
no recommendations are made in this report.
Recommendations
The following is a summary of our recommendations and opinion of cost.
1. Remove UST tank from site, grade and remediate any soil: $25,000.00.
Setty & Associates International, PLLC Section 8.0 - Hazardous Materials Page 1
SETTY & ASSOCIATES INTERNATIONAL, PLLC.
“Designing for the Next Generation of Building Systems”