Vantage Point Computing

MEMORANDUM Date: May 18, 2009 To: Professor Amy Hornat-Kaval From: Ben Dahl, President Benny Leung, Chief Technology Officer Tony James, Chief Network Security Officer Subject: Security Manual Progress Report 1) ACCOMPLISHED

202 69th Street, Darien, IL, 60561 (630)887.8980

a. Project Proposal Information First topic (Penetration testing) rejected due to time and scope constraints Second topic (Wireless Security) accepted and approved b. Audience Analysis Information Address the target audience for the Security Manual Select a medium for the best results Vantage Point Computing chose Security Manual Vantage Point Computing explored digital option Decided client will need to have basic computer knowledge Address the need for the Security Manual c. Progress Report Information Document what has been created. Document all revisions Verify all issues have been resolved before presentation Update Professor with progress of project d. Usability Testing of Manual 90% of test subjects found technical manual useful Subjects found pictures helpful 20% of subjects wanted an index page Subjects would like a Table of Contents Information about specific settings was requested Page numbers need to be revised e. Security Manual First draft finished (5/05/2009) First revision (5/07/2009) Second revision after usability testing (5/14/09) Final Security Manual (6/01/09) Final presentation (6/02/09)
Vantage Point Computing Progress Report Page 1

Vantage Point Computing


2) PROJECTS AIM AND GOAL

202 69th Street, Darien, IL, 60561 (630)887.8980

f. Proposal Revision First project proposal rejected due to time constraint and scope. Focused on a specific router for security set up. Too many routers are available, so we chose the most common. Our focus is to have the client set up their own secured wireless network. g. Audience Analysis Minor changes to specify what was required of the client. The target is to small business owners in their mid 20s - 40s. h. Usability Test Positive feedback with Usability Testing. Most test subjects found manual complete and informative. Our aim is to have clients with little computer knowledge set up their own secure wireless network. Add index and reference page. Our goal is 100% approval from all test subjects. i. Technical Manual First draft of manual had too much white space. Revised format to be smaller and more convenient. Second draft included pictures to make the manual easier to follow. Final draft includes Table of Contents and Reference. Our goal is for the manual to be the only reference for router setup. 3) DEPLOYMENT DAY j. Usability Test More test subjects needed for unbiased results. All suggestions considered Usability Test completion (5/14/09) k. Security Manual Added Table of Contents and Reference (5/15/09) Revisions completed (5/31/09) l. Completion Dates Usability Test Information completed by two group members (5/14/09) Completed Index and reference page for Security Manual (5/15/09) Group meeting to review material for errors. All revisions completed (6/1/09) Final Security Manual and presentation (6/2/09)
Vantage Point Computing Progress Report Page 2