You are on page 1of 55

BASIS AND CONSIDERATION Contractor's profit Overhead expenses VAT Foreman Head mason Mason Skilled labour /Helper

Ordinary labour Machine operator Lime Bamboo Bailing-out water Palisading Bamboo driving G.I. wire Sal ballah Nails and gazals etc Wooden plank Garjan size timber 40 grade rod Bricks Fine sand 1.2 F.M sand 2.5 Sylhet sand Cement Formwork place & remove Breaking brick chips Bitumenous coating Crushed stone chips Roylty of earth Truck fare: Dhaka city Truckfare: Narayanganj Truck fare: Ctg. Truck fare: other area Scaffolding 10 holes machine made ceramic brick 9.5" x 4.5" x 2.75" size machine made solid klinker facing bricks 9.5" x 4.5" x 2.75" size 10 hole machine made Rock-face/textured klinker facing bricks 9.5" x 4.5" x 2.75" size 3 hole machine made reinforced klinker facing bricks 200 x 100 x 50 mm machine made hard pressed klinker facing bricks 200 x 50 x 50 mm machine made klinker facing strips 200 x 62 x 50 mm machine made klinker red strips 4'' x 4'' x 4'' design block Colour pigment 6.5'' x 4.75'' x 4'' design block 10.00% 4.00% 5.00% Tk. 250.00 Tk. 180.00 Tk. 150.00 Tk. 120.00 Tk. 100.00 Tk. 160.00 Tk. 20.00 Tk. 4.00 Tk. 1,000.00 Tk. 17.08 Tk. 6.63 Tk. 50.00 Tk. 30.00 Tk. 40.00 Tk. 360.00 Tk. 710.00 Tk. 22,660.00 Tk. 3,100.00 Tk. 625.00 Tk. 990.00 Tk. 1,330.00 Tk. 250.00 Tk. 6.00 Tk. 550.00 Tk. 150.00 Tk. 6,500.00 Tk. 250.00 Tk. 475.00 Tk. 450.00 Tk. 400.00 Tk. 375.00 Tk. 3.00 Tk. 7,000.00 Tk. 6,380.00 Each Each Each Each Each Each kg. rft. day sft. rft. kg. rft. kg. cft. cft. ton % 0 Nos. % cft. % cft. % cft. bag sft. % cft. % sft. % cft. % 0 cft. Trip Trip Trip Trip sft. % 0 Nos. % 0 Nos.

Tk. 7,670.00 % 0 Nos. Tk. 7,100.00 % 0 Nos. Tk. 7,630.00 % 0 Nos. Tk. 4,973.00 Tk. 12,783.00 Tk. 9,520.00 Tk. 30.00 Tk. 11,970.00 % 0 Nos. % 0 Nos. % 0 Nos. Ibs. % 0 Nos.

6.5" x 6" x 4" design block 25 mm thick patent stone (1:2:4) with brick/chips for mosaic work 25 mm thick patent stone (1:1.5:3) with stone/chips for mosaic work Mosaic chips: India Mosaic chips: Pakistan White cement Minar stone 5 mm glass strip Mosaic machine operator Hire charge of mosaic cutting machine Pumic stone Labour cost of mosaic with glass strip Labour cost of mosaic without glass strip 1/2" plaster on walls (1:4) Marble dust / powder Machine made pre-polished double layer terrazo tiles (Conpac production): 10" x 10" size Silver mixed Machine made pre-polished double layer terrazo tiles (Conpac production): 10" x 10" size White special Machine made pre-polished re-constituted homogeneous natural marble slab: 13" x 13" size Italian Travertino. Machine charge for cutting tiles 20 mm thick marble stone 18 mm thick marble stone 16 mm thick marble stone 12 mm thick marble stone 20 mm thick colored/ grey marble stone Marble cutting & shaping machine in/c cutting disc. Marble polishing machine in/c polishing stone White wall tiles of dufferent sizes Coloured wall tiles of different sizes Special design coloured wall tiles White floor tiles of dufferent sizes Coloured floor tiles of different sizes Special design coloured floor tiles GP(Homogeneous) 305 x 305 mm floor tiles GP(Homogeneous) 400 x 400 mm floor tiles GP (Mirror polished) 300 x 300 mm floor tiles GP (Mirror polished) 396 x 396 mm floor tiles GP (Mirror polished) 300 x 600 mm floor tiles GP 305 x 305 mm floor (stair) tiles 140 x 140 x 8.5 mm acid proof floor tiles 100 x 100 x 8.5 mm acid proof floor tiles Quartz Homogeneous tiles Embossed Homogeneous tiles Special Quality Fibrous floor tiles Water pump for concreting or similar purpose Supplying & fixing Rupban or equivalent sheet and hessian tape (where necessary) for making water-tight sufficiently

Tk. 15,530.00 % 0 Nos. Tk. 1,034.41 % sft. Tk. 1,366.37 % sft. Tk. 9.33 kg. Tk. 9.00 kg. Tk. 16.75 kg. Tk. 200.00 Each Tk. 3.00 rft. Tk. 160.00 Each Tk. 70.00 day Tk. 140.00 Each Tk. 1,482.50 % sft. Tk. 1,295.00 % sft. Tk. 6.95 sft. Tk. 12.00 Per kg. Tk. 42.79 Per sft. Tk. Tk. 53.24 Per sft. 101.00 Per sft.

Tk. 100.00 % sft. Tk. 440.00 Per sft. Tk. 400.00 Per sft. Tk. 360.00 Per sft. Tk. 310.00 Per sft. Tk. 300.00 Per sft. Tk. 1,025.00 Per day Tk. 290.00 Per day Tk. 36.00 Per sft. Tk. 40.00 Per sft. Tk. 42.00 Per sft. Tk. 38.00 Per sft. Tk. 42.00 Per sft. Tk. 45.00 Per sft. Tk. 48.00 Per sft. Tk. 54.00 Per sft. Tk. 88.00 Per sft. Tk. 103.50 Per sft. Tk. 115.00 Per sft. Tk. 60.00 Per sft. Tk. 90.00 Per sft. Tk. 96.00 Per sft. Tk. 50.00 Per sft. Tk. 60.00 Per sft. Tk. 75.00 Per sft. Tk. 150.00 Per day Tk. 1.00 Per sft.

Analysis of Rates of P.W.D. Schedule (10th Edition), 16th October, 2002

01. EARTHWORK, BFS, MASS CONCRETE, DPC, SAND FILLING, KHOA CONSOLIDATION, EARTH FILLING 02. SITE IMPROVEMENT 03. BRICK WORK 04. FLOORING & FLOOR FINISH 05. MOSAIC WORK 06. TILES/MARBLE STONE WORK
ANALYSIS FOR ITEM NO. 1(a) Earth work in foundation trenches up to 1.5 m depth and 60 m lead including protecting and maintaining the trench. Considering 1000 cft. work 1. Mason 2. Ordinary labour 3. Skilled labour 4. For Layout purpose i) ii) iii) 5. Head mason Lime for marking Bamboo for spikes Tools and plant, 0.5 No. @ 10 Nos. @ 2.5 Nos. @ 0.25 No. 0.5 kg. 5 rft. @ @ @ Tk. Tk. Tk. Tk. Tk. Tk. L.S. 150.00 100.00 120.00 180.00 20.00 4.00 each = Tk. each = Tk. each = Tk. 75.00 1,000.00 300.00

Contractor's profit Overhead expenses

each = Tk. 45.00 Per kg. = Tk. 10.00 Per rft. = Tk. 20.00 = Tk. 25.00 Total = Tk. 1,475.00 10.00% = Tk. 147.50 4.00% = Tk. 59.00 Tk. 1,681.50 VAT 5.00% = Tk. 84.08 Grand total = Tk. 1,765.58 Rate per cft. = Tk. 1.77 Rate per cum. = Tk. 62.51 63 .00 Per cum.

Say ,

Tk.

ANALYSIS FOR ITEM NO. 1(b)

Extra rate for each additional 1 meter depth exceeding 1.5 meter

Considering 1000 cft. work 1. 2. Mason Ordinary labour 0.125 No. @ 3 Nos. @ Tk. Tk. 150.00 100.00 each = Tk. each = Tk. Total = Tk. 10.00% = Tk. 4.00% = Tk. Tk. 5.00% = Tk. Grand total = Tk. Rate per cft. = Tk. Rate per cum. = Tk. 18.75 300.00 318.75 31.88 12.75 363.38 18.17 381.55 0.38 13.42

Contractor's profit Overhead expenses VAT

Say ,

Tk.

13 .00 Per cum.

ANALYSIS FOR ITEM NO. 1(c) Extra rate for each 30 m additional lead beyond 60 m Considering 1000 cft. work 1. 2. Mason Ordinary labour 0.125 No. @ 1 Nos. @ Tk. Tk. 150.00 100.00 each = Tk. each = Tk. Total = Tk. 10.00% = Tk. 4.00% = Tk. Tk. 5.00% = Tk. Grand total = Tk. Rate per cft. = Tk. Rate per cum. = Tk. 18.75 100.00 118.75 11.88 4.75 135.38 6.77 142.15 0.14 4.94

Contractor's profit Overhead expenses VAT

Say ,

Tk.

5 .00 Per cum.

ANALYSIS FOR ITEM NO. 1(d) Extra rate for earth work in excavation in foundation trenches, all around protected by palisading and dewatering up to 1.5 m depth and 60 m lead. (condition and quantity of the soil must be supported by sub-soil

investigation report and approved by concerned S.E. before commencing the work)
Considering: 1 x 22'-" x 12'-0" x 5'-0" = 1320 cft. of work 1. 2. De-watering/bailing 1 day @ Tk. 1,000.00 Per day out water Shore protection: Palisading (rate from item No. 173) 2 x 22'-0" x 5'-0"= ### sft. 2 x 12'-0" x 5'-0"= ### sft. ### sft. Bamboo for driving (rate from item 2 x 5 x 8'-0"= 2 x 1 x 8'-0"= 4. 1/8" G.I. wire for 2 x 2 x 5 x 7'-0"= 2 x 2 x 1 x 7'-0"= = 80.00 rft. 16.00 rft. 96.00 rft. ### rft. 28.00 rft. ### rft. 3.21 kg. = Tk. 1,000.00

Tk.

17.08 Per sft.

= Tk.

5,807.20

3.

Tk.

6.63 Per rft.

= Tk.

636.48

= Tk. 160.50 Total = Tk. 7,604.18 Contractor's profit 10.00% = Tk. 760.42 Overhead expenses 4.00% = Tk. 304.17 Tk. 8,668.77 VAT 5.00% = Tk. 433.44 Grand total = Tk. 9,102.21 Rate per cft. = Tk. 6.90 Rate per cum. = Tk. 243.67 Tk. 244 .00 Per cum.

Tk.

50.00 Per kg.

Say

ANALYSIS FOR ITEM NO. 1(e) Extra rate for earth work in excavation in foundation trenches, protected by palisading and de-watering for depth exceeding 1.5 m (condition of the soil must be supported by sub-soil investigation report and

approved by concerned S.E. before commencing the work).


Considering: 1 x 22'-0" x 12'-0" x 8'-0" = 2112 cft. of work 1. 2. Bailing out water 2 days @ Shore protection: Palisading (rate from item 2 x 22'-0" x 8'-0"= 2 x 12'-0" x 8'-0"= 3. Ballah driving for 2 x 5 x 12'-0"= 2 x 1 x 12'-0"= Ballah post for tieing: 2 x 5 x 5'-0"= 2 x 1 x 5'-0"= ### sft. ### sft. ### sft. ### rft. 24.00 rft. ### rft. Tk. 1,000.00 Per day = Tk. 2,000.00

Tk.

17.08 Per sft.

= Tk.

9,291.52

Tk.

30.00 Per rft.

= Tk.

4,320.00

4.

5.

50.00 rft. 10.00 rft. 60.00 rft. 3/8" dia M.S. rod for anchoring 2 x 5 x 5'-0"= 2 x 1 x 5'-0"= =

Tk.

30.00 Per rft.

= Tk.

1,800.00

(a (b 6.

Skilled labour Head mason Wooden plank 2 x 11 x 4" x 2" x 8'-6"= 2 x 5 x 4" x 2" x 8'-6"= = Add wastage 5%

50.00 rft. 10.00 rft. 60.00 rft. 22.56 Ibs @ 3.75 Nos. @ 1.875 Nos. @ 10.39 cft. 4.72 cft. 15.1 cft. 0.8 cft. 15.9 cft.

Tk. Tk. Tk.

10.28 Per Ib. 120.00 each 180.00 each

= Tk. = Tk. = Tk.

231.92 450.00 337.50

Tk. 360.00 Per cft. Using 6 times

= Tk.

954.00

7.

Ballah for runner 2 x 3 x 22'-0"= 2 x 3 x 12'-0"=

132 rft. 72 rft. 204 rft. 18 kg.

@ @

8.

Nails, gazals etc. L.S.

Tk. 30.00 Per rft. Using 6 times Tk. 40.00 Per kg.

Contractor's profit Overhead expenses

= Tk. 1,020.00 = Tk. 720.00 Total = Tk. 21,124.94 10.00% = Tk. 2,112.49 4.00% = Tk. 845.00 Tk. 24,082.43 VAT 5.00% = Tk. 1,204.12 Grand total = Tk. 25,286.55 Rate per cft. = Tk. 11.97 Rate per cum. = Tk. 422.72 423 .00 Per cum.

Say

Tk.

ANALYSIS FOR ITEM NO. 2(a) One layer brick flat soling in foundation or in floor. Considering 100 sft of work 1. 2. 3. 4. 5. 6. Bricks 300 Nos. @ Fine sand 5 cft. @ Head mason 0.125 No. @ Mason 0.25 No. @ Skilled labour 1 No. @ Local carriage, sundries, T & Tk. 3,100.00 Tk. 625.00 Tk. 180.00 Tk. 150.00 Tk. 120.00 Per % Nos. = Tk. 930.00 Per % cft. = Tk. 31.25 each = Tk. 22.50 each = Tk. 37.50 each = Tk. 120.00 L.S. = Tk. 30.00 Total = Tk. 1,171.25 10.00% = Tk. 117.13 4.00% = Tk. 46.85 Tk. 1,335.23 5.00% = Tk. 66.76 Grand total = Tk. 1,401.99 Rate per sft. = Tk. 14.02 Rate per sqm. = Tk. 150.91

Contractor's profit Overhead expenses VAT

Say ,

Tk.

151 .00 Per sqm.

ANALYSIS FOR ITEM NO. 2(b) One layer herrring bone bond soling in foundation or in floor. Considering 100 sft of work 1. 2. 3. 4. 5. 6. Bricks 500 Nos. @ Fine sand 10 cft. @ Head mason 0.125 No. @ Mason 0.5 No. @ Skilled labour 1 No. @ Local carriage, sundries, T & Tk. 3,100.00 Tk. 625.00 Tk. 180.00 Tk. 150.00 Tk. 120.00 = Tk. = Tk. = Tk. = Tk. = Tk. = Tk. = Tk. = Tk. = Tk. Tk. 5.00% = Tk. Grand total = Tk. Rate per sft. = Tk. Rate per sqm. = Tk. Per % 0 Nos. Per % cft. each each each L.S. Total 10.00% 4.00% 1,550.00 62.50 22.50 75.00 120.00 50.00 1,880.00 188.00 75.20 2,143.20 107.16 2,250.36 22.50 242.19

Contractor's profit Overhead expenses VAT

Say ,

Tk.

242 .00 Per sqm.

ANALYSIS FOR ITEM NO. 2(c) Brick on end edging Considering 100 rft of work 1. 2. 3. 4. 5. 6. Bricks 250 Nos. @ Fine sand 2 cft. @ Head mason 0.125 No. @ Mason 0.25 No. @ Skilled labour 0.75 No. @ Local carriage, sundries, T & Tk. 3,100.00 Tk. 625.00 Tk. 180.00 Tk. 150.00 Tk. 120.00 Per % 0 Nos. = Tk. 775.00 Per % cft. = Tk. 12.50 each = Tk. 22.50 each = Tk. 37.50 each = Tk. 90.00 L.S. = Tk. 30.00 Total = Tk. 967.50 10.00% = Tk. 96.75 4.00% = Tk. 38.70 Tk. 1,102.95 5.00% = Tk. 55.15 Grand total = Tk. 1,158.10 Rate per rft. = Tk. 11.58 Rate per rm. = Tk. 37.99

Contractor's profit Overhead expenses VAT

Say

Tk.

38 .00 Per rm.

ANALYSIS FOR ITEM NO. 3(a) (i) Mass concrete in foundation (1:3:6) with brick chips & 100% local sand of F.M. 1.2 Considering 100 cft. of work 1. 2. 3. 4. 5. i) ii) iii) iv) 6. 7. 8. Bricks for 90 cft chips 765 Nos. @ Tk. 3,100.00 Sand (F.M. 1.2) 45 cft. @ Tk. 990.00 Cement 12 bags @ Tk. 250.00 Breaking chips in/c 90 cft. @ Tk. 550.00 screening Labour for casting: Head mason 0.25 No. @ Tk. 180.00 Mason 0.75 No. @ Tk. 150.00 Skilled labour 2 Nos. @ Tk. 120.00 Ordinary labour 2 Nos. @ Tk. 100.00 Curing Mixture machine, pump, local carriage, sundries, T & P Extra cost of wood for side shutter: for 2 x 60'-0" x 4" x 1"= 2 x 5'-0" x 4" x 1"= 10 x 6" x 2" x 1" = Add 5% wastage 3.33 cft. 0.28 cft. 0.07 cft. 3.68 cft. 0.18 cft. 3.86 cft. Per %0 Nos. = Tk. Per % cft. = Tk. Per bag. = Tk. Per % cft. = Tk. each = Tk. each = Tk. each = Tk. each = Tk. L.S. = Tk. L.S. = Tk. 2,371.50 445.50 3,000.00 495.00 45.00 112.50 240.00 200.00 50.00 165.00

Tk. 360.00 Using 6 times

Per cft. = Tk. 231.60

9.

Labour for side 2 x 40'-0" x 6" = 2 x 5' - 0" x 6" =

40.00 sft. 5.00 sft. 45.00 sft.

Tk.

3.00

Contractor's profit Overhead expenses VAT

Per sft. = Tk. 135.00 Total = Tk. 7,491.10 10.00% = Tk. 749.11 4.00% = Tk. 299.64 Tk. 8,539.85 5.00% = Tk. 426.99 Grand total = Tk. 8,966.84 Rate per cft. = Tk. 89.67 Rate per cum. = Tk. 3,166.70

Say

Tk.

3,167 .00 Per cum.

(ii Mass concrete in floor (1:3:6) with brick chips & 100% local sand of F.M. 1.2 ) Considering 100 cft. of work 1. 2. 3. 4. 5. i) ii) iii) iv) 6. 7. Bricks for 90 cft chips 765 Nos. @ Tk. 3,100.00 Sand (F.M. 1.2) 45 cft. @ Tk. 990.00 Cement 12 bags @ Tk. 250.00 Breaking chips in/c 90 cft. @ Tk. 550.00 screening Labour for casting: Head mason 0.25 No. @ Tk. 180.00 Mason 0.75 No. @ Tk. 150.00 Skilled labour 2 Nos. @ Tk. 120.00 Ordinary labour 2 Nos. @ Tk. 100.00 Curing Mixture machine, pump, local carriage, sundries, T & P Per %0 Nos. = Tk. Per % cft. = Tk. Per bag. = Tk. Per % cft. = Tk. each each each each L.S. L.S. Total 10.00% 4.00% 2,371.50 445.50 3,000.00 495.00

= Tk. 45.00 = Tk. 112.50 = Tk. 240.00 = Tk. 200.00 = Tk. 50.00 = Tk. 165.00 = Tk. 7,124.50 Contractor's profit = Tk. 712.45 Overhead expenses = Tk. 284.98 Tk. 8,121.93 VAT 5.00% = Tk. 406.10 Grand total = Tk. 8,528.03 Rate per cft. = Tk. 85.28 Rate per cum. = Tk. 3,011.66 Tk. 3,012 .00 Per cum.

Say

ANALYSIS FOR ITEM NO. 3(b) (i) Mass concrete in foundation (1:2:4) with brick chips & 100% local sand of F.M. 1.2 Considering 100 cft. of work 1. 2. 3. 4. 5. i) ii) iii) iv) 6. 7. 8. Bricks for 90 cft chips 765 Nos. @ Tk. 3,100.00 Sand (F.M. 1.2) 45 cft. @ Tk. 990.00 Cement 18 bags @ Tk. 250.00 Breaking chips in/c 90 cft. @ Tk. 550.00 screening Labour for casting: Head mason 0.25 No. @ Tk. 180.00 Mason 0.75 No. @ Tk. 150.00 Skilled labour 2 Nos. @ Tk. 120.00 Ordinary labour 2 Nos. @ Tk. 100.00 Curing Mixture machine, pump, local carriage, sundries, T & P Extra cost of wood for side shutter: for 100 cft 2 x 60'-0" x 4" x 1"= 3.33 cft. 2 x 5'-0" x 4" x 1"= 0.28 cft. 10 x 6" x 2" x 1" = 0.07 cft. 3.68 cft. Add 5% wastage 0.18 cft. 3.86 cft. @ Tk. 360.00 Using 6 times Labour for side 2 x 40'-0" x 6" = 40.00 sft. 2 x 5'-0" x 6" = 5.00 sft. 45.00 sft. @ Tk. 3.00 Contractor's profit Overhead expenses VAT Per %0 Nos. = Tk. Per % cft. = Tk. Per bag. = Tk. Per % cft. = Tk. each = Tk. each = Tk. each = Tk. each = Tk. L.S. = Tk. L.S. = Tk. 2,371.50 445.50 4,500.00 495.00 45.00 112.50 240.00 200.00 50.00 165.00

Per cft. = Tk. 231.60

9.

Per sft. = Tk. 135.00 Total = Tk. 8,991.10 10.00% = Tk. 899.11 4.00% = Tk. 359.64 Tk. 10,249.85 5.00% = Tk. 512.49 Grand total = Tk. 10,762.34 Rate per cft. = Tk. 107.62 Rate per cum. = Tk. 3,800.60

Say (ii )

Tk.

3,801 .00 Per cum.

Mass concrete in floor (1:2:4) with brick chips & 100% local sand of F.M. 1.2 Considering 100 cft. of work

1. 2. 3. 4. 5.

6. 7.

Bricks for 90 cft chips 765 Nos. @ Tk. 3,100.00 Sand (F.M. 1.2) 45 cft. @ Tk. 990.00 Cement 18 bags @ Tk. 250.00 Breaking chips in/c 90 cft. @ Tk. 550.00 Labour for casting: i) Head mason 0.25 No. @ Tk. 180.00 ii) Mason 0.75 No. @ Tk. 150.00 iii) Skilled labour 2 Nos. @ Tk. 120.00 iv) Ordinary labour 2 Nos. @ Tk. 100.00 Curing Mixture machine, pump, local carriage, sundries, T & P

Per %0 Nos. = Tk. Per % cft. = Tk. Per bag. = Tk. Per % cft. = Tk. each each each each L.S. L.S. Total 10.00% 4.00%

2,371.50 445.50 4,500.00 495.00 45.00 112.50 240.00 200.00 50.00 165.00 8,624.50 862.45 344.98 9,831.93 491.60 10,323.53 103.24 3,645.92

= Tk. = Tk. = Tk. = Tk. = Tk. = Tk. = Tk. Contractor's profit = Tk. Overhead expenses = Tk. Tk. VAT 5.00% = Tk. Grand total = Tk. Rate per cft. = Tk. Rate per cum. = Tk. Tk. 3,646 .00 Per cum.

Say

ANALYSIS FOR ITEM NO. 4(a) 75 mm or 3" thick damp proof course (1:1.5:3) with 50% Sylhet sand (F.M. 2.5) & 50% local sand (F.M. 1.2) and brick chips Considering 100 cft. of work (covering area = 100/3"= 400 sft) 1. Cost for concrete: i) Bricks for chips 706 Nos. @ Tk. 3,100.00 ii) Sand (F.M. 2.5) 20.75 cft. @ Tk. 1,330.00 iii) Sand (F.M 1.2) 20.75 cft. @ Tk. 990.00 iv) Cement 22 bags @ Tk. 250.00 v) Breaking chips in/c 83 cft. @ Tk. 550.00 vi) Curing vii Mixture machine, pump, local carriage, sundries, T & P ) 2. i) ii) iii) iv) 3.

Per % 0 Nos. = Tk. Per % cft. = Tk. Per % cft. = Tk. Per bag. = Tk. Per % cft. = Tk. L.S. = Tk. L.S. = Tk. Total = Tk. Cost for 100 sft. = Tk. Labour for casting Head mason 0.50 No. @ Tk. 180.00 each = Tk. Mason 1 No. @ Tk. 150.00 each = Tk. Ordinary labour 3 Nos. @ Tk. 100.00 each = Tk. Bitumenous coating 100 sft. @ Tk. 150.00 Per % sft. = Tk. Cost of wood for side shutter (considering 10" width & 120 rft long wall): 5.00 cft. 0.33 cft. 1.39 cft. 6.72 cft. 0.34 cft. 7.06 cft.

2,188.60 275.98 205.43 5,500.00 456.50 50.00 165.00 8,841.51 2,210.38 90.00 150.00 300.00 150.00

2 x 120'-0" x 3" x 1"= 25 x 1'-3" x 1.5" x 1"= 2 x 25 x 1'-0" x 2" x 1"= Add 5% wastage = 4. Labour for side 2 x 120'-0" x 3" =

Tk. 360.00 Using 6 times Tk. 6.00

Per cft. = Tk. 423.60

60.00 sft.

Contractor's profit Overhead expenses VAT

Per sft. = Tk. 360.00 Total = Tk. 3,683.98 10.00% = Tk. 368.40 4.00% = Tk. 147.36 Tk. 4,199.74 5.00% = Tk. 209.99 Grand total = Tk. 4,409.73 Rate per sft. = Tk. 44.10 Rate per sqm. = Tk. 474.69 .00 Per sqm.

Say

Tk.

475

ANALYSIS FOR ITEM NO. 4(b) 75 mm or 3" thick damp proof course (1:1.5:3) with Sylhet sand (F.M. 2.5) and stone chips Considering 100 cft. of work (covering 400 sft. area) 1. i) ii) iii) iv) vii ) 2. i) ii) iii) iv) 3. Cost for concrete: Crushed stone chips 83 cft. @ Tk. 6,500.00 Sand (F.M. 2.5) 41.5 cft. @ Tk. 1,330.00 Cement 22 bags @ Tk. 250.00 Curing. Mixture machine, pump, local carriage, sundries, T & P

Per % cft. = Tk. 5,395.00 Per % cft. = Tk. 551.95 Per bag. = Tk. 5,500.00 L.S. = Tk. 50.00 L.S. = Tk. 165.00 Total = Tk. 11,661.95 Cost for 100 sft. = Tk. 2,915.49 = Tk. = Tk. = Tk. = Tk. 90.00 150.00 300.00 150.00

4.

Labour for casting Head mason 0.50 No. @ Tk. 180.00 each Mason 1 No. @ Tk. 150.00 each Ordinary labour 3 Nos. @ Tk. 100.00 each Bitumenous coating 100 sft. @ Tk. 150.00 Per % sft. Cost of wood for side shutter (considering 10" width & 120 rft long wall): 2 x 120'-0" x 3" x 1"= 5.00 cft. 25 x 1'-3" x 2" x 1"= 0.43 cft. 2 x 25 x 1'-0" x 2" x 1"= 1.39 cft. 6.82 cft. Add 5% wastage 0.34 cft. = 7.16 cft. @ Tk. 360.00 Using 6 times Labour for side 2 x 120'-0" x 3" = 60.00 sft. @ Tk. 6.00 Per sft. Total Contractor's profit 10.00% Overhead expenses 4.00% VAT

= Tk.

429.60

= Tk. 360.00 = Tk. 4,395.09 = Tk. 439.51 = Tk. 175.80 Tk. 5,010.40 5.00% = Tk. 250.52 Grand total = Tk. 5,260.92 Rate per sft. = Tk. 52.61 Rate per sqm. = Tk. 566.29 .00 Per sqm.

Say

Tk.

566

ANALYSIS FOR ITEM NO. 5(a) Sand filling in foundation and plinth with local sand (F.M. 0.80) Considering 100 cft. 1. Sand (F.M. 0.8) considering 30% for compaction 130 cft.

Tk.

625.00

Per % cft. = Tk.

812.50

- 46 -

Analysis of Rates of P.W.D. Schedule (10th Edition), 16th October, 2002

2. 3. 4.

Head mason 1/8 No. @ Labour for levelling, compacting, watering 2/3 No. Sundries, T & P @

Tk. Tk.

180.00 100.00

each = Tk.

22.50

Contractor's profit Overhead expenses VAT

each = Tk. 66.67 L.S. = Tk. 10.00 Total = Tk. 911.67 10.00% = Tk. 91.17 4.00% = Tk. 36.47 Tk. 1,039.31 5.00% = Tk. 51.97 Grand total = Tk. 1,091.28 Rate per cft. = Tk. 10.91 Rate per cum. = Tk. 385.29 .00 Per cum.

Say ,

Tk.

385

ANALYSIS FOR ITEM NO. 5(b) Sand filling in foundation and plinth with local sand (F.M. 1.2) Considering 100 cft. 1. 2. 3. 4. Sand (F.M. 1.2) considering 30% for compaction 130 cft. @ Head mason 1/8 No. @ Labour for levelling, compacting, watering 2/3 No. Sundries, T & P Contractor's profit Overhead expenses VAT @

Tk. Tk. Tk.

990.00 180.00 100.00

Per % cft. = Tk. each = Tk.

1,287.00 22.50

each = Tk. 66.67 L.S. = Tk. 10.00 Total = Tk. 1,386.17 10.00% = Tk. 138.62 4.00% = Tk. 55.45 Tk. 1,580.24 5.00% = Tk. 79.01 Grand total = Tk. 1,659.25 Rate per cft. = Tk. 16.59 Rate per cum. = Tk. 585.88 .00 Per cum.

Say

Tk.

586

ANALYSIS FOR ITEM NO. 5(c) Sand filling in foundation and plinth with local sand (F.M. 2.5) Considering 100 cft. 1. 2. 3. 4. Sand (F.M. 2.5) considering 30% for compaction 130 cft. @ Head mason 1/8 No. @ Labour for levelling, compacting, watering 2/3 No. Sundries, T & P Contractor's profit Overhead expenses VAT @

Tk. 1,330.00 Tk. 180.00 Tk. 100.00

Per % cft. = Tk. each = Tk.

1,729.00 22.50

each = Tk. 66.67 L.S. = Tk. 10.00 Total = Tk. 1,828.17 10.00% = Tk. 182.82 4.00% = Tk. 73.13 Tk. 2,084.12 5.00% = Tk. 104.21 Grand total = Tk. 2,188.33 Rate per cft. = Tk. 21.88 Rate per cum. = Tk. 772.69 .00 Per cum.

Say ,

Tk.

773

ANALYSIS FOR ITEM NO. 5(d) Khoa consolidation in foundation trenches or floor: 60% brick-chips and 40% sand (F.M. 1.2) Considering 100 cft. of work Picked jhama or 1st class bricks for 90 cft. khoa 765 Nos. @ Tk. 3,100.00 Breaking 19 to 12 mm 90 cft. @ Tk. 550.00 chips Sand (F.M. 1.2) 45 cft. @ Tk. 990.00 Labour for mixing, spreading, levelling, compacting, Head mason 1/4 No. @ Mason 3/4 No. @ Skilled labour 2 Nos. @ Ordinary labour 2 Nos. @ local carriage, T & P, sundries etc. Tk. Tk. Tk. Tk. 180.00 150.00 120.00 100.00 L.S.

1. 2. 3. 4. (a ) (b ) (c ) (d ) 5.

Per % 0Nos. = Tk. Per % cft. = Tk. Per % cft. = Tk.

2,371.50 495.00 445.50 45.00 112.50 240.00 200.00 50.00 3,959.50 395.95 158.38 4,513.83 225.69 4,739.52 47.40 1,673.93

Contractor's profit Overhead expenses

each = Tk. each = Tk. each = Tk. each = Tk. = Tk. Total = Tk. 10.00% = Tk. 4.00% = Tk. Tk. VAT 5.00% = Tk. Grand total = Tk. Rate per cft. = Tk. Rate per cum. = Tk. 1,674 .00 Per cum

Say

Tk.

ANALYSIS FOR ITEM NO. 6 Earth filling in foundation trenches and plinth (earth available at site) Considering 1000 cft. of work 1. 2. 3. 4. Labour for filling including local carriage 12 Nos. @ Head mason for 1/8 No. @ supervision Skilled labour for dressing & consolidation 2 Nos. @ Sundries, T & P Tk. Tk. Tk. 100.00 180.00 120.00 L.S. each = Tk. each = Tk. 1,200.00 22.50

Contractor's profit Overhead expenses VAT

each = Tk. 240.00 = Tk. 75.00 Total = Tk. 1,537.50 10.00% = Tk. 153.75 4.00% = Tk. 61.50 Tk. 1,752.75 5.00% = Tk. 87.64 Grand total = Tk. 1,840.39 Rate per cft. = Tk. 1.84 Rate per cum. = Tk. 64.98 .00 Per cum.

Say

Tk.

65

2. SITE IMPROVEMENT
ANALYSIS FOR ITEM NO. 7(a) Site improvement/earth filling with carted earth carried by truck or any other means Considering 1000 cft. of work in/c consolidation, dressing and local carriage a) For Dhaka Metropolitan Area Loose earth required in/c 15% 1. 2. a) b) 3. 4. a) b) 5. = 1,150.00 cft. Per % 0 cft. = Tk. each = Tk. each = Tk. Per truck = Tk. 287.50 700.00 120.00 3,325.00

Royalty for earth 1150 cft. @ Tk. 250.00 Labour for cutting in/c loading & unloading the truck/cart Ordinary labour 7 Nos. @ Tk. 100.00 Skilled labour 1 No. @ Tk. 120.00 Truck hire charge 7 Tru @ Tk. 475.00 Labour for local carriage, levelling & compacting etc. Ordinary labour 6 Nos. @ Tk. 100.00 Skilled labour 1 No. @ Tk. 120.00 Sundries, T & P L.S. Contractor's profit Overhead expenses

each = Tk. 600.00 each = Tk. 120.00 = Tk. 50.00 Total = Tk. 5,202.50 10.00% = Tk. 520.25 4.00% = Tk. 208.10 Tk. 5,930.85 VAT 5.00% = Tk. 296.54 Grand total = Tk. 6,227.39 Rate per cft. = Tk. 6.23 Rate per cum. = Tk. 220.01 220 .00 Per cum.

Say

Tk.

ANALYSIS FOR ITEM NO. 7(b) Site improvement/earth filling with carted earth carried by truck or any other means Considering 1000 cft. of work in/c consolidation, dressing and local carriage b) 1. 2. a) b) 3. 4. a) b) 5. For Narayanganj Area Loose earth required in/c 15%

= 1,150.00 Royalty for earth 1150 cft. @ Tk. 250.00 Labour for cutting in/c loading & unloading the truck/cart Ordinary labour 7 Nos. @ Tk. 100.00 Skilled labour 1 No. @ Tk. 120.00 truc Truck hire charge 7 @ Tk. 450.00 ks Labour for local carriage, levelling & compacting etc. Ordinary labour 6 Nos. @ Tk. 100.00 Skilled labour 1 No. @ Tk. 120.00 Sundries, T & P L.S. Contractor's profit Overhead expenses

cft. Per % 0 cft. = Tk. each = Tk. each = Tk. Per truck = Tk.

287.50 700.00 120.00 3,150.00

each = Tk. 600.00 each = Tk. 120.00 = Tk. 50.00 Total = Tk. 5,027.50 10.00% = Tk. 502.75 4.00% = Tk. 201.10 Tk. 5,731.35 VAT 5.00% = Tk. 286.57 Grand total = Tk. 6,017.92 Rate per cft. = Tk. 6.02 Rate per cum. = Tk. 212.60 213 .00 Per cum.

Say ,

Tk.

ANALYSIS FOR ITEM NO. 7(c) Site improvement/earth filling with carted earth carried by truck or any other means Considering 1000 cft. of work in/c consolidation, dressing and local carriage c) For Chittagong Loose earth required in/c 15% 1. 2. a) b) 3. 4. a) b) 5. = 1,150.00 Royalty for earth 1150 cft. @ Tk. 250.00 Labour for cutting in/c loading & unloading the truck/cart Ordinary labour 7 Nos. @ Tk. 100.00 Skilled labour 1 No. @ Tk. 120.00 truc Truck hire charge 7 @ Tk. 400.00 ks & compacting etc. Labour for local carriage, levelling Ordinary labour Skilled labour Sundries, T & P 6 Nos. @ 1 No. @ Tk. Tk. 100.00 120.00 L.S. cft. Per % 0 cft. = Tk. each = Tk. each = Tk. Per truck = Tk.

287.50 700.00 120.00 2,800.00

Contractor's profit Overhead expenses

each = Tk. 600.00 each = Tk. 120.00 = Tk. 50.00 Total = Tk. 4,677.50 10.00% = Tk. 467.75 4.00% = Tk. 187.10 Tk. 5,332.35 VAT 5.00% = Tk. 266.62 Grand total = Tk. 5,598.97 Rate per cft. = Tk. 5.60 Rate per cum. = Tk. 197.76 198 .00 Per cum.

Say

Tk.

ANALYSIS FOR ITEM NO. 7(d) Site improvement/earth filling with carted earth carried by truck or any other means Considering 1000 cft. of work in/c consolidation, dressing and local carriage d) For other than Dhaka, N'ganj, Ctg. metropolitan area Loose earth required in/c 15% 1. 2. a) b) 3. 4. a) b) 5. = 1,150.00 Royalty for earth 1150 cft. @ Tk. 250.00 Labour for cutting in/c loading & unloading the truck/cart Ordinary labour 7 Nos. @ Tk. 100.00 Skilled labour 1 No. @ Tk. 120.00 truc Truck hire charge 7 @ Tk. 375.00 ks Labour for local carriage, levelling & compacting etc. Ordinary labour 6 Nos. @ Tk. 100.00 Skilled labour 1 No. @ Tk. 120.00 Sundries, T & P L.S. cft. Per % 0 cft. = Tk. each = Tk. each = Tk. Per truck = Tk.

287.50 700.00 120.00 2,625.00

each = Tk. 600.00 each = Tk. 120.00 = Tk. 50.00 Total = Tk. 4,502.50 Contractor's profit 10.00% = Tk. 450.25 Overhead expenses 4.00% = Tk. 180.10 Tk. 5,132.85 VAT 5.00% = Tk. 256.64 Grand total = Tk. 5,389.49 Rate per cft. = Tk. 5.39 Rate per cum. = Tk. 190.35 Tk. 190 .00 Per cum.

Say

3. BRICK WORK & FANCY SCREEN BRICK WORK


ANALYSIS FOR ITEM NO. 8 Brick work with first class bricks in foundation (1:6) Considering 100 cft. work 1. 2. 3. 4. 5. 6. 7. 8. 9. 10 . Bricks 1100 Nos. @ Sand (F.M 1.2) in/c 36 cft. @ Cement 4 bags @ Head mason 0.10 No. @ Mason 1 No. @ Skilled labour 1 No. @ Ordinary labour 1.5 Nos. @ Labour for soaking & cleaning 2 Nos. @ Labour for 7 days curing @ 1/4 labour per day: 1.75 Nos. @ Local carriage, sundries, T & P Tk. 3,100.00 Tk. 990.00 Tk. 250.00 Tk. 180.00 Tk. 150.00 Tk. 120.00 Tk. 100.00 Tk. Tk. 100.00 100.00 L.S. Per % 0 Nos. = Tk. Per % cft. = Tk. Per bag = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk. 3,410.00 356.40 1,000.00 18.00 150.00 120.00 150.00 200.00

each = Tk. 175.00 = Tk. 50.00 Total = Tk. 5,629.40 Contractor's profit 10.00% = Tk. 562.94 Overhead expenses 4.00% = Tk. 225.18 Tk. 6,417.52 VAT 5.00% = Tk. 320.88 Grand total = Tk. 6,738.40 Rate per cft. = Tk. 67.38 Rate per cum. = Tk. 2,379.52 Tk. 2,380 .00 Per cum

Say

ANALYSIS FOR ITEM NO. 9 Brick work with first class bricks in superstructure (1:6) Considering 100 cft. of work 1. 2. 3. 4. 5. Materials and labour as per item No. 8 Scaffolding Extra labour for Extra labour for Screening & washing 25 sft. 1 No. 1/2 No. 1 No. @ @ @ @ Tk. Tk. Tk. Tk. 3.00 100.00 100.00 100.00 = Tk. Per sft. = Tk. each = Tk. each = Tk. each = Tk. Total = Tk. 10.00% = Tk. 4.00% = Tk. Tk. 5.00% = Tk. Grand total = Tk. Rate per cft. = Tk. 5,629.40 75.00 100.00 50.00 100.00 5,954.40 595.44 238.18 6,788.02 339.40 7,127.42 71.27

Contractor's profit Overhead expenses VAT

(a

Ground floor

Rate per cft. = Tk. 71.27 Rate per cum. = Tk. 2,517.05 Say Tk. 2,517 .00 Per cum.
Per cum Per cum Per cum = = = Tk. Tk. Tk. 52.36 73.30 83.77

(b) (c) (d)

Add for each addl. floor upto 5th floor (@ 1.25 Nos. lab per % cft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 1.75 Nos. lab per % Add for each addl. floor for 10th floor and above (@ 2.0 Nos. lab per % cft.)

ANALYSIS FOR ITEM NO. 10 Brickwork with 1st class bricks in superstructure (1:4) Considering 100 cft. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10 . 11. 12. Bricks Sand (F.M 1.2) in/c Cement Head mason Mason Skilled labour Ordinary labour Labour for soaking & cleaning bricks 1100 Nos. @ 40 cft. @ 6 bags @ 0.10 No. @ 1 No. @ 1 No. @ 2.5 Nos. @ Tk. 3,100.00 Tk. 990.00 Tk. 250.00 Tk. 180.00 Tk. 150.00 Tk. 120.00 Tk. 100.00 Tk. Tk. Tk. Tk. 100.00 100.00 100.00 3.00 L.S. Per % 0 Nos. = Tk. Per % cft. = Tk. Per bag = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk. 3,410.00 396.00 1,500.00 18.00 150.00 120.00 250.00 200.00 100.00 175.00 75.00 50.00 6,444.00 644.40 257.76 7,346.16 367.31 7,713.47 77.13 2,723.85

2 Nos. @ Screening and 1 No. @ Labour for 7 days curing @ 1/4 labour per day: 1.75 Nos. @ Scaffolding 25 sft. @ Local carriage,

Contractor's profit Overhead expenses

(a

Ground floor

each = Tk. Per sft. = Tk. = Tk. Total = Tk. 10.00% = Tk. 4.00% = Tk. Tk. VAT 5.00% = Tk. Grand total = Tk. Rate per cft. = Tk. Rate per cum. = Tk. 2,724 .00 Per cum
Per cum Per cum Per cum = = = Tk. Tk. Tk.

Say
(b) (c) (d)

Tk.

Add for each addl. floor upto 5th floor (@ 1.25 Nos. lab per % cft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 1.75 Nos. lab per % Add for each addl. floor for 10th floor and above (@ 2.0 Nos. lab per % cft.)

52.36 73.30 83.77

ANALYSIS FOR ITEM NO. 11 Exposed brick work in exterior wall in superstructure (1:4) Considering 100 cft. 1. Bricks 1100 Nos. @ Extra cost for special quality 1st class bricks in/c sorting out the bricks @ Sand (F.M. 1.2) in/c 40 cft. @ Cement in/c pointing 6.5 bags @ Head mason 1/2 No. @ Mason 1.5 Nos. @ Skilled labour 1.5 Nos. @ Ordinary labour 2 Nos. @ Labour for soaking & cleaning bricks 2 Nos. @ Labour for screening & washing 1 No. 10 11 12 . @ Labour for 7 days curing @ 1/4 labour per day 1.75 Nos. @ Scaffolding 25 sft. @ Local carriage, storage & sundries Tk. 3,100.00 20% 990.00 250.00 180.00 150.00 120.00 100.00 100.00 100.00 100.00 3.00 Per % 0 Nos. = Tk. = Tk. Per % cft. = Tk. Per bag = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk. Per sft. = Tk. L.S. = Tk. Total = Tk. 10.00% = Tk. 4.00% = Tk. Tk. 5.00% = Tk. Grand total = Tk. Rate per cft. = Tk. Rate per cum. = Tk. .00 Per cum
Per cum Per cum Per cum = = = Tk. Tk. Tk. 52.36 73.30 83.77

3,410.00 682.00 396.00 1,625.00 90.00 225.00 180.00 200.00 200.00 100.00 175.00 75.00 50.00 7,408.00 740.80 296.32 8,445.12 422.26 8,867.38 88.67 3,131.38

2. 3. 4. 5. 6. 7. 8. 9.

Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk.

Contractor's profit Overhead expenses VAT (a ) Ground floor Say ,


(b) (c) (d)

Tk.

3,131

Add for each addl. floor upto 5th floor (@ 1.25 Nos. lab per % cft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 1.75 Nos. lab per % Add for each addl. floor for 10th floor and above (@ 2.0 Nos. lab per % cft.)

ANALYSIS FOR ITEM NO. 12(a) Brick work with 10 holes machine made bricks (1:4) Considering 100 cft. work 1. 2. 3. 4. 5. 6. 7. 8. Bricks 1100 Nos. @ Sand (F.M 1.2) in/c 40 cft. @ Cement 6.5 bags @ Head mason 0.50 No. @ Mason 1.5 No. @ Skilled labour 1.5 No. @ Ordinary labour 2 Nos. @ Labour for soaking & cleaning bricks Tk. 7,000.00 Tk. 990.00 Tk. 250.00 Tk. 180.00 Tk. 150.00 Tk. 120.00 Tk. 100.00 Tk. Tk. Tk. Tk. 100.00 100.00 100.00 3.00 L.S. Per % 0 Nos. = Tk. Per % cft. = Tk. Per bag = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk. 7,700.00 396.00 1,625.00 90.00 225.00 180.00 200.00 200.00 100.00

2 Nos. @ 9. Labour for screening and washing sand 1.00 No. @ 10 Labour for 7 days curing @ 1/4 labour per day: . 1.75 Nos. @ 11. Scaffolding 25 sft. @ 12. Local carriage,

Contractor's profit Overhead expenses VAT (a Ground floor

each = Tk. 175.00 Per sft. = Tk. 75.00 = Tk. 50.00 Total = Tk. 11,016.00 10.00% = Tk. 1,101.60 4.00% = Tk. 440.64 Tk. 12,558.24 5.00% = Tk. 627.91 Grand total = Tk. 13,186.15 Rate per cft. = Tk. 131.86 Rate per cum. = Tk. 4,656.64 .00 Per cum
Per cum Per cum Per cum = = = Tk. Tk. Tk. 52.36 73.30 83.77

Say
(b) (c) (d)

Tk.

4,657

Add for each addl. floor upto 5th floor (@ 1.25 Nos. lab per % cft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 1.75 Nos. lab per % Add for each addl. floor for 10th floor and above (@ 2.0 Nos. lab per % cft.)

ANALYSIS FOR ITEM NO. 12(b) Brick work with 9.5" x 4.5" x 2.75" size machine made solid klinker facing bricks (1:4)

Considering 100 cft. work 1. 2. 3. 4. 5. 6. 7. 8. 9. 10 11. 12. Bricks 1100 Nos. @ Tk. 6,380.00 Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. 990.00 250.00 180.00 150.00 120.00 100.00 100.00 100.00 100.00 3.00 L.S. Per % 0 Nos. = Tk. Per % cft. = Tk. Per bag = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk. 7,018.00 396.00 1,625.00 45.00 300.00 180.00 200.00 100.00 50.00

Sand (F.M 1.2) in/c 40.0 cft. @ Cement 6.5 bags @ Head mason 0.25 No. @ Mason 2.0 No. @ Skilled labour 1.5 No. @ Ordinary labour 2.0 Nos. @ Labour for soaking & cleaning bricks 1.0 Nos. @ Labour for screening and washing 1/2 No. @ Labour for 7 days curing 1.75 Nos. @ @ 1/4 labour per day: Scaffolding 25 sft. @ Local carriage,

(a

Ground floor

each = Tk. 175.00 Per sft. = Tk. 75.00 = Tk. 50.00 Total = Tk. 10,214.00 Contractor's profit 10.00% = Tk. 1,021.40 Overhead expenses 4.00% = Tk. 408.56 Tk. 11,643.96 VAT 5.00% = Tk. 582.20 Grand total = Tk. 12,226.16 Rate per cft. = Tk. 122.26 Rate per cum. = Tk. 4,317.61 Tk. 4,318 .00 Per cum
Per cum Per cum Per cum = = = Tk. Tk. Tk. 52.36 73.30 83.77

Say
(b) (c) (d)

Add for each addl. floor upto 5th floor (@ 1.25 Nos. lab per % cft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 1.75 Nos. lab per % Add for each addl. floor for 10th floor and above (@ 2.0 Nos. lab per % cft.)

ANALYSIS FOR ITEM NO. 12(c) Brick work with 9.5" x 4.5" x 2.75" size 10 hole machine made rock-face/textured klinker facing bricks (1:4) Considering 100 cft. work 1. 2. 3. 4. 5. 6. 7. 8. 9. 10 . Bricks 1100 Nos. @ Sand (F.M 1.2) in/c 40 cft. @ Cement 6.5 bags @ Head mason 0.25 No. @ Mason 2 No. @ Skilled labour 1.5 No. @ Ordinary labour 2.0 Nos. @ Labour for soaking & cleaning bricks 1 No. Screening and 1/2 No. washing sand Labour for 7 days curing @ @ Tk. 7,670.00 Tk. 990.00 Tk. 250.00 Tk. 180.00 Tk. 150.00 Tk. 120.00 Tk. 100.00 Tk. Tk. 100.00 100.00 Per % 0 Nos. = Tk. Per % cft. = Tk. Per bag = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk. 8,437.00 396.00 1,625.00 45.00 300.00 180.00 200.00 100.00 50.00

- 47 -

Analysis of Rates of P.W.D. Schedule (10th Edition), 16th October, 2002

11. 12.

@ 1/4 labour per day: 1.75 Nos. @ Scaffolding 25 sft. @ Local carriage, sundries, T & P

Tk. Tk.

100.00 3.00 L.S.

Contractor's profit Overhead expenses VAT (a Ground floor

each = Tk. 175.00 Per sft. = Tk. 75.00 = Tk. 50.00 Total = Tk. 11,633.00 10.00% = Tk. 1,163.30 4.00% = Tk. 465.32 Tk. 13,261.62 5.00% = Tk. 663.08 Grand total = Tk. 13,924.70 Rate per cft. = Tk. 139.25 Rate per cum. = Tk. 4,917.61 .00 Per cum
Per cum Per cum Per cum = = = Tk. Tk. Tk. 52.36 73.30 83.77

Say
(b) (c) (d)

Tk.

4,918

Add for each addl. floor upto 5th floor (@ 1.25 Nos. lab per % cft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 1.75 Nos. lab per % Add for each addl. floor for 10th floor and above (@ 2.0 Nos. lab per % cft.)

ANALYSIS FOR ITEM NO. 12(d) Brick work with 9.5" x 4.5" x 2.75" size 3 hole machine made reinforced klinker facing bricks (1:4)

Considering 100 cft. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10 . 11. 12. Bricks 1100 Nos. @ Tk. 7,100.00 Tk. 1,330.00 Tk. 990.00 Tk. 250.00 Tk. 180.00 Tk. 150.00 Tk. 120.00 Tk. 100.00 Tk. Tk. Tk. Tk. s 100.00 100.00 100.00 3.00 L.S. Per % 0 Nos. = Tk. Per % cft. = Tk. Per % cft. = Tk. Per bag = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk. 7,810.00 319.20 396.00 1,625.00 45.00 300.00 180.00 200.00 100.00 50.00

Sand (F.M 2.5) in/c 24 cft. @ Sand (F.M 1.2) in/c 40 cft. @ Cement 6.5 bags @ Head mason 0.25 No. @ Mason 2 No. @ Skilled labour 1.5 No. @ Ordinary labour 2 Nos. @ Labour for soaking & cleaning bricks 1 Nos. @ Screening and 1/2 No. @ washing sand Labour for 7 days curing @ 1/4 1.75 Nos. @ Scaffolding 25 @ Local carriage,

Contractor's profit Overhead expenses VAT (a Ground floor

each = Tk. 175.00 Per sft. = Tk. 75.00 = Tk. 50.00 Total = Tk. 11,325.20 10.00% = Tk. 1,132.52 4.00% = Tk. 453.01 Tk. 12,910.73 5.00% = Tk. 645.54 Grand total = Tk. 13,556.27 Rate per cft. = Tk. 135.56 Rate per cum. = Tk. 4,787.30 .00 Per cum
Per cum Per cum Per cum = = = Tk. Tk. Tk. 52.36 73.30 83.77

Say
(b) (c) (d)

Tk.

4,787

Add for each addl. floor upto 5th floor (@ 1.25 Nos. lab per % cft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 1.75 Nos. lab per % Add for each addl. floor for 10th floor and above (@ 2.0 Nos. lab per % cft.)

ANALYSIS FOR ITEM NO. 13 Extra rate (for per meter increase of height) over the rate of item No. 9, 10, 11 & 12 where free height of the structure exceeds 4 meter. Considering 100 cft. of work 1. 2. 3. 4. 5. 6. Extra head mason 0.05 No. @ Extra mason 0.2 No. @ Extra skilled labour 0.1 No. @ Extra ordinary labour 0.3 No. @ Extra for scaffolding 12.5 sft. @ Extra for local carriage, storage & sundries Tk. Tk. Tk. Tk. Tk. 180.00 150.00 120.00 100.00 3.00 = Tk. = Tk. = Tk. = Tk. = Tk. = Tk. = Tk. = Tk. = Tk. Tk. 5.00% = Tk. Grand total = Tk. Rate per cft. = Tk. Rate per cum. = Tk. each each each each Per sft. L.S. Total 10.00% 4.00% 9.00 30.00 12.00 30.00 37.50 10.00 128.50 12.85 5.14 146.49 7.32 153.81 1.54 54.39

Contractor's profit Overhead expenses VAT

Say

Tk.

54 .00 Per cum.

ANALYSIS FOR ITEM NO. 14(a) Facing brick work with 200 x 100 x 50 mm machine made hard pressed klinker facing bricks (1:4) with out side pointing. Considering 100 sft. of work 1. 2. 3. 4. 5. 6. 7. 8. 9. 10 200 x 100 x 50 mm facing bricks (facing 200 x 100 mm) in/c 5% wastage 452 Nos. @ Tk. 7,630.00 Per % 0 Nos. Sand (F.M. 1.2) in/c 12 cft. @ Tk. 990.00 Per % cft. Cement in/c for 2.26 bags @ Tk. 250.00 Per bag Head mason 1 Nos. No Tk. 180.00 each Mason 2.25 Nos. @ Tk. 150.00 each Skilled labour 1.5 Nos. @ Tk. 120.00 each Ordinary labour 1.5 Nos. @ Tk. 100.00 each Labour for 7 days curing @ 1/4 labour per 1.75 Nos. @ Tk. 100.00 each Scaffolding 25 sft. @ Tk. 3.00 Per sft. Washing of sand, local carriage, storage & L.S. Total Contractor's profit 10.00% Overhead expenses 4.00% = Tk. = Tk. = Tk. = Tk. = Tk. = Tk. = Tk. 3,448.76 118.80 565.00 180.00 337.50 180.00 150.00

(i)

Ground floor

= Tk. 175.00 = Tk. 75.00 = Tk. 50.00 = Tk. 5,280.06 = Tk. 528.01 = Tk. 211.20 Tk. 6,019.27 VAT 5.00% = Tk. 300.96 Grand total = Tk. 6,320.23 Rate per sft. = Tk. 63.20 Rate Per sqm. = Tk. 680.28 680 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 9.58 12.77 15.96

Say
(ii) (iii ) (iv )

Tk.

Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.)

ANALYSIS FOR ITEM NO. 14(b) Facing brick work with 200 x 50 x 50 mm machine made klinker facing strips (1:4) with outside pointing.

Considering 100 sft. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10 200 x 50 x 50 mm facing bricks (facing 200 x 50 mm) in/c 5% wastage 856 Nos. @ Tk. 4,973.00 Sand (F.M. 1.2) in/c 14 cft. @ Tk. 990.00 Cement in/c for 2.75 bags @ Tk. 250.00 Head mason 1 Nos. No Tk. 180.00 Mason 2 1/3 Nos. @ Tk. 150.00 Skilled labour 1.5 Nos. @ Tk. 120.00 Ordinary labour 1.5 Nos. @ Tk. 100.00 Labour for 7 days curing @ 1/4 labour per day 1.75 Nos. @ Tk. 100.00 Scaffolding 25 sft. @ Tk. 3.00 Washing of sand, local carriage, storage & L.S. Per % 0 Nos. = Tk. Per % cft. = Tk. Per bag = Tk. each = Tk. each = Tk. each = Tk. each = Tk. 4,256.89 138.60 687.50 180.00 350.00 180.00 150.00

(i)

Ground floor

each = Tk. 175.00 Per sft. = Tk. 75.00 = Tk. 100.00 Total = Tk. 6,292.99 Contractor's profit 10.00% = Tk. 629.30 Overhead expenses 4.00% = Tk. 251.72 Tk. 7,174.01 VAT 5.00% = Tk. 358.70 Grand total = Tk. 7,532.71 Rate per sft. = Tk. 75.33 Rate Per sqm. = Tk. 810.85 Tk. 811 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 9.58 12.77 15.96

Say
(ii) (iii ) (iv )

Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.)

ANALYSIS FOR ITEM NO. 14(c) Facing brick work with 200 x 62 x 50 mm machine made klinker red strips (1:4) with out side pointing. Considering 100 sft. of work 1. 200 x 62 x 50 mm machine made klinker facing red strips (facing 200 x 62 mm) in/c 5% wastage 704 Nos. @ Tk.12,783.00 Sand (F.M. 1.2) in/c 14 cft. @ Tk. 990.00 Cement in/c for 2.75 bags @ Tk. 250.00 Head mason 1 Nos. No Tk. 180.00 Mason 2 Nos. @ Tk. 150.00 Skilled labour 1.5 Nos. @ Tk. 120.00 Ordinary labour 1.5 Nos. @ Tk. 100.00 Labour for 7 days curing @ 1/4 labour per day 1.75 Nos. @ Tk. 100.00 Scaffolding 25 sft. @ Tk. 3.00 Washing of sand, local carriage, storage & L.S.

2. 3. 4. 5. 6. 7. 8. 9. 10 .

Per % 0 Nos. = Tk. Per % cft. = Tk. Per bag = Tk. each = Tk. each = Tk. each = Tk. each = Tk.

8,999.23 138.60 687.50 180.00 300.00 180.00 150.00

(i)

Ground floor

each = Tk. 175.00 Per sft. = Tk. 75.00 = Tk. 100.00 Total = Tk. 10,985.33 Contractor's profit 10.00% = Tk. 1,098.53 Overhead expenses 4.00% = Tk. 439.41 Tk. 12,523.27 VAT 5.00% = Tk. 626.16 Grand total = Tk. 13,149.43 Rate per sft. = Tk. 131.49 Rate Per sqm. = Tk. 1,415.36 Tk. 1,415 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 9.58 12.77 15.96

Say
(ii) (iii ) (iv )

Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.)

ANALYSIS FOR ITEM NO. 15(a) 125 mm brick work with first class bricks (1:6) in superstructure Considering 100 sft. work 1. 2. 3. 4. 5. 6. 7. 8. 9. 10 11 12 Bricks 480 Nos. @ Sand (F.M. 1.2) 18 cft. @ Cement 1.75 bags @ Head mason 0.1 No. @ Mason 3/4 No. @ Skilled labour 1/2 No. @ Ordinary labour 1/2 No. @ Labour for soaking & cleaning bricks 1 No. @ Labour for screening & washing sand Tk. 3,100.00 Tk. 990.00 Tk. 250.00 Tk. 180.00 Tk. 150.00 Tk. 120.00 Tk. 100.00 Tk. 100.00 100.00 100.00 3.00 L.S. Per % 0 Nos. = Tk. Per % cft. = Tk. Per bag = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk. 1,488.00 178.20 437.50 18.00 112.50 60.00 50.00 100.00 50.00

1/2 No. @ Tk. Labour for 7 days curing @ 1/4 No. labour per day 1.75 Nos. @ Tk. Scaffolding 25 sft. @ Tk. Local carriage, storage &

Contractor's profit Overhead expenses VAT

each = Tk. 175.00 Per sft. = Tk. 75.00 = Tk. 50.00 Total = Tk. 2,794.20 10.00% = Tk. 279.42 4.00% = Tk. 111.77 Tk. 3,185.39 5.00% = Tk. 159.27 Grand total = Tk. 3,344.66 Rate per sft. = Tk. 33.45 Rate per sft. = Tk. Rate per sqm. = Tk. 33.45 360.06

(i)

Ground floor

Say
(ii) (iii ) (iv )

Tk.

360

.00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 9.58 12.77 15.96

Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.)

ANALYSIS FOR ITEM NO. 15(b) 125 mm brick work with first class bricks (1:4) in superstructure Considering 100 sft. work 1. 2. 3. 4. 5. 6. 7. 8. 9. 10 . 11 12 Bricks 480 Nos. @ Sand (F.M. 1.2) 17 cft. @ Cement 2.6 bags @ Head mason 0.1 No. @ Mason 3/4 No. @ Skilled labour 1/2 No. @ Ordinary labour 1/2 No. @ Labour for soaking & cleaning bricks 1 No. @ Labour for screening & washing sand Tk. 3,100.00 Tk. 990.00 Tk. 250.00 Tk. 180.00 Tk. 150.00 Tk. 120.00 Tk. 100.00 Tk. 100.00 100.00 100.00 3.00 L.S. Per % 0 Nos. = Tk. Per % cft. = Tk. Per bag = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk. 1,488.00 168.30 650.00 18.00 112.50 60.00 50.00 100.00 25.00

1/4 No. @ Tk. Labour for 7 days curing @ 1/4 No. labour per day 1.75 Nos. @ Tk. Scaffolding 25 sft. @ Tk. Local carriage, storage &

Contractor's profit Overhead expenses VAT

each = Tk. 175.00 Per sft. = Tk. 75.00 = Tk. 50.00 Total = Tk. 2,971.80 10.00% = Tk. 297.18 4.00% = Tk. 118.87 Tk. 3,387.85 5.00% = Tk. 169.39 Grand total = Tk. 3,557.24 Rate per sft. = Tk. 35.57 Rate per sft. = Tk. Rate per sqm. = Tk. 35.57 382.88

(i)

Ground floor

Say
(ii) (iii ) (iv )

Tk.

383

.00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 9.58 12.77 15.96

Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.)

ANALYSIS FOR ITEM NO. 15(c) 125 mm brick work with 10 hole machine made ceramic bricks (1:4) in superstructure Considering 100 sft. work 1. 2. 3. 4. 5. 6. 7. 8. 9. 10 11 12 Bricks 480 Nos. @ Sand (F.M. 1.2) 18 cft. @ Cement 2.8 bags @ Head mason 0.1 No. @ Mason 1 No. @ Skilled labour 1/2 No. @ Ordinary labour 1 No. @ Labour for soaking & cleaning bricks 1 No. Labour for screening & washing @ Tk. 7,000.00 Tk. 990.00 Tk. 250.00 Tk. 180.00 Tk. 150.00 Tk. 120.00 Tk. 100.00 Tk. 100.00 100.00 100.00 3.00 L.S. Per % 0 Nos. = Tk. Per % cft. = Tk. Per bag = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk. 3,360.00 178.20 700.00 18.00 150.00 60.00 100.00 100.00 25.00

1/4 No. @ Tk. Labour for 7 days curing @ 1/4 No. labour per day 1.75 Nos. @ Tk. Scaffolding 25 sft. @ Tk. Local carriage, storage &

Contractor's profit Overhead expenses VAT

each = Tk. 175.00 Per sft. = Tk. 75.00 = Tk. 50.00 Total = Tk. 4,991.20 10.00% = Tk. 499.12 4.00% = Tk. 199.65 Tk. 5,689.97 5.00% = Tk. 284.50 Grand total = Tk. 5,974.47 Rate per sft. = Tk. 59.74 Rate per sft. = Tk. Rate per sqm. = Tk. 59.74 643.04

(i)

Ground floor

Say
(ii) (iii ) (iv )

Tk.

643

.00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 9.58 12.77 15.96

Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.)

ANALYSIS FOR ITEM NO. 16(a) Fancy screen work in wall with 4'' x 4'' x 4'' design block in all floors (1:3). Considering 100 sft. of work A. Cost of materials 4" x 4" x 4" design block in/c wastage 1. 990 Nos. 2. Sand (F.M. 1.2) 3.75 cft. 3. Cement 1 bag 4. Colour pigment 1 Ib B. Cost of labour 1. Head mason 1 Nos. 2. Mason 2.25 Nos. 3. Skilled labour 2.5 Nos. 4. Ordinary labour 1 No. Labour for soaking & cleaning 5. 6. 7. 8.

@ @ @ @ @ @ @ @

Tk. 9,520.00 Tk. 990.00 Tk. 250.00 Tk. 30.00 Tk. Tk. Tk. Tk. 180.00 150.00 120.00 100.00 100.00 100.00 3.00 L.S.

Per % 0 Nos. = Tk. Per % cft. = Tk. Per bag = Tk. Per Ib = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk.

9,424.80 37.13 250.00 30.00 180.00 337.50 300.00 100.00 100.00

1 No. @ Tk. Labour for 7 days curing @ 1/4 No. labour per day 1.75 Nos. @ Tk. Scaffolding 25 sft. @ Tk. Washing of sand, local carriage &

Contractor's profit Overhead expenses

(i)

Ground floor Say ,

each = Tk. 175.00 Per sft. = Tk. 75.00 = Tk. 50.00 Total = Tk. 11,059.43 10.00% = Tk. 1,105.94 4.00% = Tk. 442.38 Tk. 12,607.75 VAT 5.00% = Tk. 630.39 Grand total = Tk. 13,238.14 Rate per sft. = Tk. 132.38 Rate per sqm = Tk. 1,424.94 1,425 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 9.58 12.77 15.96

Tk.

(ii) (iii ) (iv )

Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.)

ANALYSIS FOR ITEM NO. 16(b) Fancy screen work in wall with 6.5'' x 4.75'' x 4'' design block in all floors (1:3) facing 6.5" x 4" Considering 100 sft. of work A. Cost of materials 6.5" x 4.75" x 4" design block in/c wastage 1. 525 Nos. @ 2. Sand (F.M. 1.2) 3.75 cft. @ 3. Cement 1 bag @ 4. Colour pigment 1 Ib @ B. Cost of labour 1. Head mason 1 Nos. @ 2. Mason 2 Nos. @ 3. Skilled labour 2 Nos. @ 4. Ordinary labour 1 No. @ Labour for soaking & cleaning blocks. 5. 6. 7. 8. 0.50 No. @ Labour for 7 days curing @ 1/4 No. labour 1.75 Nos. @ Scaffolding 25 sft. @ Washing of sand, local carriage &

Tk.11,970.00 Tk. 990.00 Tk. 250.00 Tk. 30.00 Tk. Tk. Tk. Tk. Tk. Tk. Tk. 180.00 150.00 120.00 100.00 100.00 100.00 3.00 L.S.

Per % 0 Nos. = Tk. Per % cft. = Tk. Per bag = Tk. Per Ib = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk.

6,284.25 37.13 250.00 30.00 180.00 300.00 240.00 100.00 50.00 175.00 75.00 50.00 7,771.38 777.14 310.86 8,859.38 442.97 9,302.35 93.02 1,001.27

(i)

Ground floor

each = Tk. Per sft. = Tk. = Tk. Total = Tk. Contractor's profit 10.00% = Tk. Overhead expenses 4.00% = Tk. Tk. VAT 5.00% = Tk. Grand total = Tk. Rate per sft. = Tk. Rate per sqm = Tk. Tk. 1,001 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk.

Say
(ii) (iii ) (iv )

Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.)

9.58 12.77 15.96

ANALYSIS FOR ITEM NO. 16(c) Fancy Screen work with 6'' x 6'' x 4'' design block in all floors (1:3) Considering 100 sft. of work A. Cost of materials 6.5" x 6" x 4" design block in/c wastage 1. 440 Nos. @ 2. Sand (F.M. 1.2) 3.75 cft. @ 3. Cement 1 bag @ 4. Colour pigment 1 Ib @ B. Cost of labour 1. Head mason 1 Nos. @ 2. Mason 2 Nos. @ 3. Skilled labour 2 Nos. @ 4. Ordinary labour 1 No. @ Labour for soaking & cleaning blocks. 5. 6. 7. 8. 0.50 No. @ Labour for 7 days curing @ 1/4 No. labour 1.75 Nos. @ Scaffolding 25 sft. @ Washing of sand, local

Tk.15,530.00 Tk. 990.00 Tk. 250.00 Tk. 30.00 Tk. Tk. Tk. Tk. Tk. Tk. Tk. 180.00 150.00 120.00 100.00 100.00 100.00 3.00 L.S.

Per % 0 Nos. = Tk. Per % cft. = Tk. Per bag = Tk. Per Ib = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk.

6,833.20 37.13 250.00 30.00 180.00 300.00 240.00 100.00 50.00

(i)

Ground floor

each = Tk. 175.00 Per sft. = Tk. 75.00 = Tk. 50.00 Total = Tk. 8,320.33 Contractor's profit 10.00% = Tk. 832.03 Overhead expenses 4.00% = Tk. 332.81 Tk. 9,485.17 VAT 5.00% = Tk. 474.26 Grand total = Tk. 9,959.43 Rate per sft. = Tk. 99.59 Rate per sqm = Tk. 1,071.99 Tk. 1,072 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 9.58 12.77 15.96

Say
(ii) (iii ) (iv )

Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.)

ANALYSIS FOR ITEM NO. 17(a) 50 mm thick flat brick pavement with 200 x 100 x 50 mm klinker paving bricks (1:4) Considering 100 sft. of work A. Cost of materials 1. 200 x 100 x 50 mm klinker paving bricks (facing 200 x 50 mm) in/c 5% wastage 856 Nos. @ 2. Sand (F.M. 1.2) 16 cft. @ Cement (in/c for flush 3. 3.25 bags @ pointing) B. Cost of labour 1. Head mason 1/4 No. @ 2. Mason 1.5 Nos. @ 3. Skilled labour 3 Nos. @ 4. Ordinary labour 1.5 Nos. @ Labour for soaking & cleaning bricks 5. 6. 7. 1 No. @ Labour for 7 days curing @ 1/4 labour per 1.75 Nos. @ Local carriage & storage,

Tk. 7,630.00 Tk. 990.00 Tk. 250.00 Tk. Tk. Tk. Tk. Tk. Tk. 180.00 150.00 120.00 100.00 100.00 100.00 L.S.

Per % 0 Nos. = Tk. Per % cft. = Tk. Per bag = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk.

6,531.28 158.40 812.50 45.00 225.00 360.00 150.00 100.00

Contractor's profit Overhead expenses

each = Tk. 175.00 = Tk. 50.00 Total = Tk. 8,607.18 10.00% = Tk. 860.72 4.00% = Tk. 344.29 Tk. 9,812.19 VAT 5.00% = Tk. 490.61 Grand total = Tk. 10,302.80 Rate per sft. = Tk. 103.03 Rate per sqm. = Tk. 1,109.01 1,109 .00 Per sqm.

Say

Tk.

ANALYSIS FOR ITEM NO. 17(b) 100 mm thick brick on edge pavement with 200 x 100 x 50 mm klinker paving bricks (1:4) Considering 100 sft. A. 1. Cost of materials 200 x 100 x 50 mm klinker paving bricks (facing 200 x 100 mm) in/c 5% wastage

- 48 -

Analysis of Rates of P.W.D. Schedule (10th Edition), 16th October, 2002

2. 3. B. 1. 2. 3. 4. 5. 6. 7.

452 Nos. @ Sand (F.M. 1.2) 13 cft. @ Cement (in/c for flush 2.5 bags @ Cost of labour Head mason 1/4 No. @ Mason 1 No. @ Skilled labour 2.5 Nos. @ Ordinary labour 1.5 Nos. @ Labour for soaking & cleaning bricks 0.50 No. @ Labour for 7 days curing @ 1/4 labour per Local carriage & storage, 1.75 Nos. @

Tk. 7,630.00 Tk. 990.00 Tk. 250.00 Tk. Tk. Tk. Tk. Tk. Tk. 180.00 150.00 120.00 100.00 100.00 100.00 L.S.

Per % 0 Nos. = Tk. Per % cft. = Tk. Per bag = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk.

3,448.76 128.70 625.00 45.00 150.00 300.00 150.00 50.00

each = Tk. 175.00 = Tk. 50.00 Total = Tk. 5,122.46 Contractor's profit 10.00% = Tk. 512.25 Overhead expenses 4.00% = Tk. 204.90 Tk. 5,839.61 VAT 5.00% = Tk. 291.98 Grand total = Tk. 6,131.59 Rate per sft. = Tk. 61.32 Rate per sqm. = Tk. 660.05 Tk. 660 .00 Per sqm.

Say

ANALYSIS FOR ITEM NO. 17(c) 50 mm thick flat brick pavement with 200 x 50 x 50 mm klinker paving bricks (1:4) facing 200 mm x 50 mm

Considering 100 sft. of work A. Cost of materials 1. 200 x 50 x 50 mm klinker paving bricks (facing 200 x 50 mm) in/c 5% wastage 856 Nos. @ 2. Sand (F.M. 1.2) 10 cft. @ 3. Cement (in/c for flush 2.5 bags @ B. Cost of labour 1. Head mason 1/4 No. @ 2. Mason 1.25 Nos. @ 3. Skilled labour 2.5 Nos. @ 4. Ordinary labour 1.5 Nos. @ Labour for soaking & cleaning bricks 5. 6. 7. 1 No. @ Labour for 7 days curing @ 1/4 labour per 1.75 Nos. @ Local carriage & storage, sundries

Tk. 4,973.00 Tk. 990.00 Tk. 250.00 Tk. Tk. Tk. Tk. Tk. Tk. 180.00 150.00 120.00 100.00 100.00 100.00 L.S.

Per % 0 Nos. = Tk. Per % cft. = Tk. Per bag = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk.

4,256.89 99.00 625.00 45.00 187.50 300.00 150.00 100.00

each = Tk. 175.00 = Tk. 50.00 Total = Tk. 5,988.39 Contractor's profit 10.00% = Tk. 598.84 Overhead expenses 4.00% = Tk. 239.54 Tk. 6,826.77 VAT 5.00% = Tk. 341.34 Grand total = Tk. 7,168.11 Rate per sft. = Tk. 71.68 Rate per sqm. = Tk. 771.56 Tk. 772 .00 Per sqm.

Say

ANALYSIS FOR ITEM NO. 18(a) 115 mm thick brick pavement with 1st class bricks (1:4) Considering 100 sft. A. 1. 2. 3. B. 1. 2. 3. 4. 5. 6. 7. Cost of materials 1st class bricks in/c 480 Nos. @ Sand (F.M. 1.2) 15 cft. @ Cement (in/c for flush 3 bags @ Cost of labour Head mason 1/4 No. @ Mason 1.25 Nos. @ Skilled labour 2.25 Nos. @ Ordinary labour 1.5 Nos. @ Labour for soaking & cleaning bricks 1/2 No. @ Labour for 7 days curing @ 1/4 labour per 1.75 Nos. @ local carriage, storage & Tk. 3,100.00 Tk. 990.00 Tk. 250.00 Tk. Tk. Tk. Tk. Tk. Tk. 180.00 150.00 120.00 100.00 100.00 100.00 L.S Per % 0 Nos. = Tk. Per % cft. = Tk. Per bag = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk. 1,488.00 148.50 750.00 45.00 187.50 270.00 150.00 50.00

each = Tk. 175.00 = Tk. 50.00 Total = Tk. 3,314.00 Contractor's profit 10.00% = Tk. 331.40 Overhead expenses 4.00% = Tk. 132.56 Tk. 3,777.96 VAT 5.00% = Tk. 188.90 Grand total = Tk. 3,966.86 Rate per sft. = Tk. 39.67 Rate per sqm. = Tk. 427.01 Tk. 427 .00 Per sqm.

Say

ANALYSIS FOR ITEM NO. 18(b) 115mm thick brick pavement with 10 holes ceramic bricks (1:4) Considering 100 sft. of work Cost of materials 10 holes ceramic 480 Nos. @ bricks Sand (F.M. 1.2) 15 cft. @ Cement (in/c for flush 3.25 bags @ pointing) Cost of labour Head mason 1/4 No. @ Mason 1.25 Nos. @ Skilled labour 2.25 Nos. @ Ordinary labour 1.5 Nos. @ Labour for soaking & cleaning bricks 1/2 No. @ Labour for 7 days curing @ 1/4 labour per local carriage, storage & 1.75 Nos. @

A. 1. 2. 3. B. 1. 2. 3. 4. 5. 6. 7.

Tk. 7,000.00 Tk. 990.00 Tk. 250.00 Tk. Tk. Tk. Tk. Tk. Tk. 180.00 150.00 120.00 100.00 100.00 100.00 L.S

Per % 0 Nos. = Tk. Per % cft. = Tk. Per bag = Tk. each = Tk. each = Tk. each = Tk. each = Tk. each = Tk.

3,360.00 148.50 812.50 45.00 187.50 270.00 150.00 50.00

Contractor's profit Overhead expenses

each = Tk. 175.00 = Tk. 50.00 Total = Tk. 5,248.50 10.00% = Tk. 524.85 4.00% = Tk. 209.94 Tk. 5,983.29 VAT 5.00% = Tk. 299.16 Grand total = Tk. 6,282.45 Rate per sft. = Tk. 62.82 Rate per sqm. = Tk. 676.19 676 .00 Per sqm.

Say

Tk.

4. FLOORING AND FLOOR FINISH


ANALYSIS FOR ITEM NO. 19 3" thick cement concrete (C.C.) in floor (1:3:6) Considering 100 sft. From item No. 3(a) cost of concrete = 1. 2. For 3" thick Add extra for floor 100 sft of work 1 No. @ Tk. 150.00 Tk. 7,491.10 = Tk. 1,872.78 each = Tk. 150.00 Total = Tk. 2,022.78 10.00% = Tk. 202.28 4.00% = Tk. 80.91 Tk. 2,305.97 5.00% = Tk. 115.30 Grand total = Tk. 2,421.27 Rate Per sft = Tk. 24.21 Rate Per sqm. = Tk. 260.60 .00 Per sqm.

Contractor's profit Overhead expenses VAT

Say

Tk.

261

ANALYSIS FOR ITEM NO. 20(a) 25 mm thick artificial patent stone flooring (1:2:4) with brick chips Considering 100 cft. of work covering 1200 sft. area 1. 2. 3. 4. 5. 6. 7. Bricks @ 8.5 Nos. per 765 Nos. @ Tk. 3,100.00 cft. chips Sand (F.M. 1.2) 22.5 cft. @ Tk. 990.00 Sand (F.M. 2.5) 22.5 cft. @ Tk. 1,330.00 Cement 18 bags @ Tk. 250.00 Breaking chips in/c 90 cft. @ Tk. 550.00 screening for 7 days curing @ 1/4 labour per Labour 1.75 Nos. @ Tk. 100.00 local carriage, sundries, T & P and washing of sand Per % 0 Nos. = Tk. Per % cft. = Tk. Per % cft. = Tk. Per bag = Tk. Per % cft. = Tk. 2,371.50 222.75 299.25 4,500.00 495.00

8. 9. i) ii) iii) iv) 10 .

Extra cement for 1/2 bag Labour cost: Head mason 1/5 No. Mason 3/4 No. Skilled labour 1 No. Ordinary labour 1 No. Extra cost of Garjan batten for side 2 x 4 x 5'-0" x 1" x 3/4" = 0.21 cft. Add 5% wastage 0.01 cft. 0.22 cft. Using 10 times Labour for shuttering 2 x 4 x 5'-0" x 1" = 3.33 sft.

@ @ @ @ @

Tk. Tk. Tk. Tk. Tk.

each = Tk. 175.00 L.S. = Tk. 150.00 Sub-total = Tk. 8,213.50 For 100 sft. of work = Tk. 684.46 250.00 Per bag = Tk. 125.00 180.00 150.00 120.00 100.00 each = Tk. each = Tk. each = Tk. each = Tk. 36.00 112.50 120.00 100.00

@ @ @

Tk. Tk. Tk.

710.00 71.00 1.00

Per cft. Per cft. = Tk.

15.62

11

Contractor's profit Overhead expenses

(i)

Ground floor

Per sft. = Tk. 3.33 Total = Tk. 1,196.91 10.00% = Tk. 119.69 4.00% = Tk. 47.88 Tk. 1,364.48 VAT 5.00% = Tk. 68.22 Grand total = Tk. 1,432.70 Rate per sft. = Tk. 14.33 Rate per sqm. = Tk. 154.25 154 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 9.58 12.77 15.96

Say
(ii) (iii ) (iv )

Tk.

Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.)

ANALYSIS FOR ITEM NO. 20(b) 38 mm thick artificial patent stone flooring (1:2:4) with brick chips Considering 100 cft. of work covering 800 sft. 1. 2. 3. 4. 5. 6. 7. Bricks @ 8.5 Nos. per 765 Nos. @ Tk. 3,100.00 Sand (F.M. 1.2) 22.5 cft. @ Tk. 990.00 Sand (F.M. 2.5) 22.5 cft. @ Tk. 1,330.00 Cement 18 bags @ Tk. 250.00 Breaking brick chips in/c screening 90 cft. @ Tk. 550.00 Labour for 7 days curing @ 1/4 labour per day. 1.75 Nos. @ Tk. 100.00 local carriage, sundries, T & P and washing of sand Per % 0 Nos. = Tk. Per % cft. = Tk. Per % cft. = Tk. Per bag = Tk. Per % cft. = Tk. 2,371.50 222.75 299.25 4,500.00 495.00

8. 9. i) ii) iii) iv) 10

Extra cement for 1/2 bag Labour cost: Head mason 1/5 No. Mason 3/4 No. Skilled labour 1 No. Ordinary labour 1 No. Extra cost of Garjan batten for side 2 x 4 x 5'-0" x 1.5" x 3/4" = 0.31 cft. Add 5% wastage 0.02 cft. 0.33 cft. Using 10 times Labour for shuttering 2 x 4 x 5'-0" x 1.5" = 5 sft.

@ @ @ @ @

Tk. Tk. Tk. Tk. Tk.

each = Tk. 175.00 L.S. = Tk. 150.00 Sub-total = Tk. 8,213.50 For 100 sft. of work = Tk. 1,026.69 250.00 Per bag = Tk. 125.00 180.00 150.00 120.00 100.00 each = Tk. each = Tk. each = Tk. each = Tk. 36.00 112.50 120.00 100.00

@ @ @

Tk. Tk. Tk.

710.00 71.00 1.00

Per cft. Per cft. = Tk.

23.43

11

(i)

Ground floor

Per sft. = Tk. 5.00 Total = Tk. 1,548.62 Contractor's profit 10.00% = Tk. 154.86 Overhead expenses 4.00% = Tk. 61.94 Tk. 1,765.42 VAT 5.00% = Tk. 88.27 Grand total = Tk. 1,853.69 Rate per sft. = Tk. 18.54 Rate per sqm. = Tk. 199.56 Tk. 200 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 9.58 12.77 15.96

Say
(ii) (iii ) (iv )

Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.)

ANALYSIS FOR ITEM NO. 20(c) 25 mm thick artificial patent stone flooring (1:2:4) with 1/2" down graded stone chips Considering 100 cft. of work covering 1200 sft. area 1. 2. 3. 4. 5. 6. Crushed stone chips 90 cft. @ Tk. 6,500.00 Sand (F.M. 1.2) 22.5 cft. @ Tk. 990.00 Sand (F.M. 2.5) 22.5 cft. @ Tk. 1,330.00 Cement 18 bags @ Tk. 250.00 Labour for 7 days curing @ 1/4 labour per day. 1.75 Nos. @ Tk. 100.00 local carriage, sundries, T & P and Fo @ @ @ @ @ Tk. 100.00 Tk. 250.00 Tk. Tk. Tk. Tk. 180.00 150.00 120.00 100.00 Per % cft. = Tk. Per % cft. = Tk. Per % cft. = Tk. Per bag = Tk. 5,850.00 222.75 299.25 4,500.00

7. 8. i) ii) iii) iv) 10 .

Extra cement for 1/2 bag Labour cost: Head mason 1/5 No. Mason 3/4 No. Skilled labour 1 No. Ordinary labour 1 No. Extra cost of Garjan batten for side 2 x 4 x 5'-0" x 1" x 3/4" = Add 5% wastage 0.21 cft. 0.01 cft. 0.22 cft. Using 10 times 3.33 sft.

each = Tk. 175.00 L.S. = Tk. 150.00 Sub-total = Tk. 11,197.00 sft. cost = Tk. 933.08 Per bag = Tk. 125.00 each = Tk. each = Tk. each = Tk. each = Tk. 36.00 112.50 120.00 100.00

@ @ @

Tk. Tk. Tk.

710.00 71.00 1.00

Per cft. Per cft. = Tk.

15.62

11

Labour for shuttering 2 x 4 x 5'-0" x 1" =

(i)

Ground floor

Per sft. = Tk. 3.33 Total = Tk. 1,445.53 Contractor's profit 10.00% = Tk. 144.55 Overhead expenses 4.00% = Tk. 57.82 Tk. 1,647.90 VAT 5.00% = Tk. 82.40 Grand total = Tk. 1,730.30 Rate per sft. = Tk. 17.30 Rate per sqm. = Tk. 186.22 Tk. 186 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 9.58 12.77 15.96

Say
(ii) (iii ) (iv )

Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.)

ANALYSIS FOR ITEM NO. 20(d) 38 mm thick artificial patent stone flooring (1:2:4) with 1/2" down graded stone chips Considering 100 cft. of work covering 800 sft. 1. 2. 3. 4. 5. 6. Crushed stone chips 90 cft. @ Sand (F.M. 1.2) 22.5 cft. @ Sand (F.M. 2.5) 22.5 cft. @ Cement 18 bags @ Labour for 7 days curing @ 1/4 labour per 1.75 Nos. @ local carriage, sundries, T & P and Tk. 6,500.00 Tk. 990.00 Tk. 1,330.00 Tk. 250.00 Tk. 100.00 Per % cft. = Tk. Per % cft. = Tk. Per % cft. = Tk. Per bag = Tk. 5,850.00 222.75 299.25 4,500.00

7. 8. i) ii) iii) iv) 10 .

11 .

Extra cement for 1/2 bag @ Labour cost: Head mason 1/5 No. @ Mason 3/4 No. @ Skilled labour 1 No. @ Ordinary labour 1 No. @ Extra cost of Garjan batten for side shutter 2 x 4 x 5'-0" x 1.5" x 3/4" = 0.31 cft. Add 5% wastage 0.02 cft. 0.33 cft. @ Using 10 times @ Labour for shuttering 2 x 4 x 5'-0" x 1.5" = 5 sft. @

Tk. Tk. Tk. Tk. Tk.

250.00 180.00 150.00 120.00 100.00

each = Tk. 175.00 L.S. = Tk. 150.00 Sub-total = Tk. 11,197.00 Cost for 100 sft. = Tk. 1,399.63 Per bag = Tk. 125.00 each = Tk. each = Tk. each = Tk. each = Tk. 36.00 112.50 120.00 100.00

Tk. Tk. Tk.

710.00 71.00 1.00

Per cft. Per cft. = Tk.

23.43

(i)

Ground floor

Per sft. = Tk. 5.00 Total = Tk. 1,921.56 Contractor's profit 10.00% = Tk. 192.16 Overhead expenses 4.00% = Tk. 76.86 Tk. 2,190.58 VAT 5.00% = Tk. 109.53 Grand total = Tk. 2,300.11 Rate per sft. = Tk. 23.00 Rate per sqm. = Tk. 247.57 Tk. 248 .00 Per sqm.

Say (ii) (iii ) (iv )

Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.)

Per sqm = Tk. Per sqm = Tk. Per sqm = Tk.

9.58 12.77 15.96

ANALYSIS FOR ITEM NO. 20(e) 25 mm thick artificial patent stone flooring (1 : 1.5 : 3) with 1/2" down graded stone chips Considering 100 cft. of work covering 1200 1. 2. 3. 4. 5. 6. Crushed stone chips 90 cft. @ Tk. 6,500.00 Sand (F.M. 1.2) 22.5 cft. @ Tk. 990.00 Sand (F.M. 2.5) 22.5 cft. @ Tk. 1,330.00 Cement 22 bags @ Tk. 250.00 Labour for 7 days curing @ 1/4 labour per 1.75 Nos. @ Tk. 100.00 local carriage, sundries, T & P and washing of sand Cost for 7. 8. i) ii) iii) iv) 10 Extra cement for 1/2 bag Labour cost: Head mason 1/5 No. Mason 3/4 No. Skilled labour 1 No. Ordinary labour 1 No. Extra cost of Garjan batten for side 2 x 4 x 5'-0" x 1" x 3/4" = 0.21 cft. Add 5% wastage 0.01 cft. 0.22 cft. Using 10 times Labour for shuttering 2 x 4 x 5'-0" x 1" = 3.33 sft. @ @ @ @ @ Tk. Tk. Tk. Tk. Tk. 100.00 250.00 180.00 150.00 120.00 100.00 Per % cft. = Tk. Per % cft. = Tk. Per % cft. = Tk. Per bag = Tk. 5,850.00 222.75 299.25 5,500.00

each = Tk. 175.00 L.S. = Tk. 150.00 Sub-total = Tk. 12,197.00 sft. = Tk. 1,016.42 Per bag = Tk. 125.00 each = Tk. each = Tk. each = Tk. each = Tk. 36.00 112.50 120.00 100.00

@ @ @

Tk. Tk. Tk.

710.00 71.00 1.00

Per cft. Per cft. = Tk.

15.62

11

(i)

Ground floor

Per sft. = Tk. 3.33 Total = Tk. 1,528.87 Contractor's profit 10.00% = Tk. 152.89 Overhead expenses 4.00% = Tk. 61.15 Tk. 1,742.91 VAT 5.00% = Tk. 87.15 Grand total = Tk. 1,830.06 Rate per sft. = Tk. 18.30 Rate per sqm. = Tk. 196.98 Tk. 197 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 9.58 12.77 15.96

Say
(ii) (iii ) (iv )

Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) Add for each addl. floor 10th floor and above (@ 1.25 Nos. lab per % sft.)

ANALYSIS FOR ITEM NO. 20(f) 38 mm thick artificial patent stone flooring (1: 1.5 : 3) with 1/2" down graded stone chips Considering 100 cft. of work covering 800 sft. 1. 2. 3. 4. 5. 6. Crushed stone chips 90 cft. @ Sand (F.M. 1.2) 22.5 cft. @ Sand (F.M. 2.5) 22.5 cft. @ Cement 22 bags @ Labour for 7 days curing @ 1/4 1.75 Nos. @ local carriage, sundries, T & P and Tk. 6,500.00 Tk. 990.00 Tk. 1,330.00 Tk. 250.00 Tk. 100.00 Per % cft. = Tk. Per % cft. = Tk. Per % cft. = Tk. Per bag = Tk. 5,850.00 222.75 299.25 5,500.00

7. 8. i) ii) iii) iv) 10

Extra cement for 1/2 bag Labour cost: Head mason 1/5 No. Mason 3/4 No. Skilled labour 1 No. Ordinary labour 1 No. Extra cost of Garjan batten for side 2 x 4 x 5'-0" x 1.5" x 3/4" = 0.31 cft. Add 5% wastage 0.02 cft. 0.33 cft. Using 10 times Labour for shuttering 2 x 4 x 5'-0" x 1.5" = 5 sft.

@ @ @ @ @

Tk. Tk. Tk. Tk. Tk.

250.00 180.00 150.00 120.00 100.00

each = Tk. 175.00 L.S. = Tk. 150.00 Sub-total = Tk. 12,197.00 Cost for 100 sft. = Tk. 1,524.63 Per bag = Tk. 125.00 each = Tk. each = Tk. each = Tk. each = Tk. 36.00 112.50 120.00 100.00

@ @ @

Tk. Tk. Tk.

710.00 71.00 1.00

Per cft. Per cft. = Tk.

23.43

11

Contractor's profit Overhead expenses VAT (i) Ground floor

Per sft. = Tk. 5.00 Total = Tk. 2,046.56 10.00% = Tk. 204.66 4.00% = Tk. 81.86 Tk. 2,333.08 5.00% = Tk. 116.65 Grand total = Tk. 2,449.73 Rate per sft. = Tk. 24.50 Rate per sqm. = Tk. 263.72 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 9.58 12.77 15.96

Say
(ii) (iii ) (iv )

Tk.

264

Add for each addl. floor upto 5th floor (@ 0.75 No. lab per % sft.) in/c Add for each addl. Floor for 6th floor to 9th floor (@ 1 No. lab per % sft.) Add for each addl floor for 10th floor and above (@ 1.25 Nos. lab per % sft.)

5. MOSAIC WORK
ANALYSIS FOR ITEM NO. 21(a)-I 10 mm thick (finished) mosaic in floor with Indian chips & glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (white cement : grey cement = 9 : 1) Considering 100 sft. of work A. 1. 2. 3. 4. 5. 6. Cost of materials White cement 109 kg. @ Grey cement 0.22 bag @ Mosaic chips (Indian: 125 kg. @ Deradun) Minar stone @ 300 1/3 No. @ sft/stone 5 x 20 mm glass strip 120 rft. @ Cost of patent stone excluding cost of 1/2 cement for neat finish & 1/4 No. mason 100 sft. @ Cost of labour For mixing, laying, compacting & curing: Head mason Skilled labour Ordinary labour For glass strip laying: 3/4 No. 3/4 No. 1 No. @ @ @ Tk. Tk. Tk. 180.00 120.00 100.00 each = Tk. each = Tk. each = Tk. = each = Tk. each = Tk. 135.00 90.00 100.00 112.50 75.00 Tk. Tk. Tk. Tk. Tk. 16.75 250.00 9.33 200.00 3.00 Per kg. = Tk. Per bag. = Tk. Per kg. = Tk. each = Tk. Per rft. = Tk. 1,825.75 55.00 1,166.25 66.67 360.00

Tk. 1,034.41

Per % sft. = Tk. 1,034.41 Sub-total = Tk. 4,508.08

B. 1. 2. 3. 1. 2. 1. 2. 3. 4. 5. 1.

Mason 3/4 No. @ Tk. 150.00 Ordinary labour 3/4 No. @ Tk. 100.00 Hire charge of mosaic cutting machine in/c operation: Hire charge in/c meter setting and electricity 1 day @ Machine operator 1 No. @ Helper/Skilled labour 1 No. @ Ordinary labour 1 No. @ Pumic stone 3 Nos. @ For spreading oxalic acid and washing: Ordinary labour 1 No. @ Tk. Tk. Tk. Tk. Tk. Tk. 70.00 160.00 120.00 100.00 140.00 100.00

Per day = Tk. each = Tk. each = Tk. each = Tk. each = Tk.

70.00 160.00 120.00 100.00 420.00

(i)

Ground floor

each = Tk. 100.00 Sub-total = Tk. 1,482.50 Total = Tk. 5,990.58 Contractor's profit 10.00% = Tk. 599.06 Overhead expenses 4.00% = Tk. 59.30 Tk. 6,648.94 VAT 5.00% = Tk. 332.45 Grand total = Tk. 6,981.39 Rate per sft. = Tk. 69.81 Rate per sqm. = Tk. 751.43 Tk. 751 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Say
(ii) (iii ) (iv )

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 21(a)-II

- 49 -

Analysis of Rates of P.W.D. Schedule (10th Edition), 16th October, 2002

10 mm thick (finished) mosaic in floor with Indian chips & glass strip in/c 25 mm thick patent stone (1:1.5:3) with STONE-CHIPS: (white cement : grey cement = 9 : 1) Considering 100 sft. of work A. B. Cost of mosaic excluding cost of patent stone (from item No. 21(a)-I) Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of cement for neat finish and and 1/4 No. mason: Item Contractor's profit Overhead expenses VAT (i) Ground floor = Tk. 4,956.17

= Tk. 1,366.37 Total = Tk. 6,322.54 10.00% = Tk. 632.25 4.00% = Tk. 252.90 Tk. 7,207.69 5.00% = Tk. 360.38 Grand total = Tk. 7,568.07 Rate per sft. = Tk. 75.68 Rate per sqm. = Tk. 814.62

Say
(ii) (iii ) (iv )

Tk.

815 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 21(b)-I 10 mm thick (finished) mosaic in floor with Pakistani chips & glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (white cement : grey cement = 9 : 1) Considering 100 sft. A. 1. 2. 3 4. 5. 6. Cost of materials White cement 109 kg. @ Tk. 16.75 Grey cement 0.22 bag. @ Tk. 250.00 Pakistani onix mosaic 125 kg. @ Tk. 9.00 Minar stone 1/3 No. @ Tk. 200.00 5 x 20 mm glass strip 120 rft. @ Tk. 3.00 Cost of patent stone excluding cost of cement for neat finish and 100 sft. @ Tk. 1,034.41 Cost of labour Same as 21(a)-I

Per kg. = Tk. Per bag = Tk. Per kg. = Tk. each = Tk. Per rft. = Tk.

1,825.75 55.00 1,125.00 66.67 360.00

Per % sft. = Tk. 1,034.41 Sub-total = Tk. 4,466.83

B.

100 sft.

Tk. 1,482.50

Contractor's profit Overhead expenses

(i)

Ground floor

Per % sft. = Tk. 1,482.50 Total = Tk. 5,949.33 10.00% = Tk. 594.93 4.00% = Tk. 237.97 Tk. 6,782.23 VAT 5.00% = Tk. 339.11 Grand total = Tk. 7,121.34 Rate per sft. = Tk. 71.21 Rate per sqm. = Tk. 766.50 767 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Say
(ii) (iii ) (iv )

Tk.

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 21(b)-II 10 mm thick (finished) mosaic in floor with Pakistani chips & glass strip in/c 25 mm thick patent stone (1:1.5:3) with STONE-CHIPS: (white cement : grey cement = 9 : 1) Considering 100 sft. A. B. Cost of mosaic excluding cost of patent stone: from item No. 21(b)-I Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of cement for neat finish and 1/4 No. mason: Item No. Contractor's profit Overhead expenses VAT (i) Ground floor = Tk. 4,914.92

= Tk. 1,366.37 Total = Tk. 6,281.29 10.00% = Tk. 628.13 4.00% = Tk. 251.25 Tk. 7,160.67 5.00% = Tk. 358.03 Grand total = Tk. 7,518.70 Rate per sft. = Tk. 75.19 Rate per sqm. = Tk. 809.35

Say
(ii) (iii ) (iv )

Tk.

809 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 21(c)-I 10 mm thick (finished) mosaic in floor with Indian chips & without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (white cement : grey cement = 9 : 1) Considering 100 sft. A. 1. 2. 3. 4. 5. Cost of materials White cement 109 kg. @ Tk. 16.75 Grey cement 0.22 bag. @ Tk. 250.00 Indian Deradun 125 kg. @ Tk. 9.33 Minar stone 1/3 No. @ Tk. 200.00 Cost of patent stone excluding cost of cement for neat finish and 100 sft. @ Tk. 1,034.41

Per kg. = Tk. Per bag = Tk. Per kg. = Tk. each = Tk.

1,825.75 55.00 1,166.25 66.67

Per % sft = Tk. 1,034.41 Sub-Total = Tk. 4,148.08

B. Cost of labour For mixing, laying, compacting and curing: 1. Head mason 3/4 No. 2. Skilled labour 3/4 No. 3. Ordinary labour 1 No. Hire charge of mosaic cutting machine and operation: Hire charge in/c meter 1. 1 day setting 2. Machine operator 1 No. 3. Helper/Skilled labour 1 No. 4. Ordinary labour 1 No. 5. Pumic stone 3 Nos. Pumic stone oxalic acid and washing: Ordinary labour 1 No. @ @ @ @ @ @ @ @ @ Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. 180.00 120.00 100.00 70.00 160.00 120.00 100.00 140.00 100.00 each = Tk. each = Tk. each = Tk. Per day = Tk. each = Tk. each = Tk. each = Tk. each = Tk. 135.00 90.00 100.00 70.00 160.00 120.00 100.00 420.00

(i)

Ground floor

each = Tk. 100.00 Sub-total = Tk. 1,295.00 Total = Tk. 5,443.08 Contractor's profit 10.00% = Tk. 544.31 Overhead expenses 4.00% = Tk. 217.72 Tk. 6,205.11 VAT 5.00% = Tk. 310.26 Grand total = Tk. 6,515.37 Rate per sft. = Tk. 65.15 Rate per sqm = Tk. 701.27 Tk. 701 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Say
(ii) (iii ) (iv )

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 21(c)-II 10 mm thick (finished) mosaic in floor with Indian chips & without glass strip in/c 25 mm thick patent stone (1:1.5:3) with STONE-CHIPS: (white cement : grey cement = 9 : 1) Considering 100 sft. A. B. Cost of mosaic excluding cost of patent stone: from item No. 21(c)-I Cost of patent stone (1 : 1.5 : 3) with stone chips cement for neat finish and 1/4 No. mason: Item No. Contractor's profit Overhead expenses VAT (i) Ground floor = Tk. 4,408.67

= Tk. 1,366.37 Total = Tk. 5,775.04 10.00% = Tk. 577.50 4.00% = Tk. 231.00 Tk. 6,583.54 5.00% = Tk. 329.18 Grand total = Tk. 6,912.72 Rate per sft. = Tk. 69.13 Rate per sqm = Tk. 744.12

Say
(ii) (iii ) (iv )

Tk.

744 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 21(d)-I 10 mm thick (finished) mosaic in floor with Pakistani chips & without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (white cement : grey cement = 9 : 1) Considering 100 sft. A. 1. 2. 3. 4. 5. Cost of materials White cement 109 kg. @ Tk. 16.75 Grey cement 0.22 bag. @ Tk. 250.00 Pakistani Onix mosaic 125 kg. @ Tk. 9.00 Minar stone 1/3 No. @ Tk. 200.00 Cost of patent stone excluding cost of cement for neat finish and 100 sft. B. Cost of labour Same as item No. 21(c) @ Tk. 1,034.41

Per kg = Tk. Per bag = Tk. Per kg. = Tk. each = Tk.

1,825.75 55.00 1,125.00 66.67

Per % sft = Tk. 1,034.41 Sub-total = Tk. 4,106.83

100 sft.

Tk. 1,295.00

Contractor's profit Overhead expenses

(i)

Ground floor

Per % sft. = Tk. 1,295.00 Total = Tk. 5,401.83 10.00% = Tk. 540.18 4.00% = Tk. 216.07 Tk. 6,158.08 VAT 5.00% = Tk. 307.90 Grand total = Tk. 6,465.98 Rate per sft. = Tk. 64.66 Rate per sqm = Tk. 696.00 696 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Say
(ii) (iii ) (iv )

Tk.

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 21(d)-II 10 mm thick (finished) mosaic in floor with Pakistani chips & without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (white cement : grey cement = 9 : 1) Considering 100 sft. A. B. Cost of mosaic excluding cost of patent stone: from item No. 21(d)-I Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of cement for neat finish and 1/4 No. mason: Item No. Contractor's profit Overhead expenses VAT (i) Ground floor Say ,
(ii) (iii ) (iv )

= Tk.

4,367.42

= Tk. 1,366.37 Total = Tk. 5,733.79 10.00% = Tk. 573.38 4.00% = Tk. 229.35 Tk. 6,536.52 5.00% = Tk. 326.83 Grand total = Tk. 6,863.35 Rate per sft. = Tk. 68.63 Rate per sqm = Tk. 738.73

Tk.

739 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 22(a)-I 12 mm thick (finished) mosaic in floor with Indian chips & glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (white cement : grey cement = 9 : 1) Considering 100 sft. A. 1. 2. 3. 4. 5. 6. Cost of materials White cement 126 kg. @ Tk. 16.75 Grey cement 0.28 bag. @ Tk. 250.00 Indian Deradun 140 kg. @ Tk. 9.33 Minar stone 1/3 No. @ Tk. 200.00 5 x 20 mm glass strip 120 rft. @ Tk. 3.00 Cost of patent stone excluding cost of cement for neat finish and 100 sft. @ Tk. 1,034.41 Cost of labour Same as item No. 21(a)-

Per kg. = Tk. Per bag. = Tk. Per kg. = Tk. each = Tk. Per rft. Tk.

2,110.50 70.00 1,306.20 66.67 360.00

Per % sft = Tk. 1,034.41 Sub-total = Tk. 4,947.78

B.

100 sft.

Tk. 1,482.50

Contractor's profit Overhead expenses

(i)

Ground floor

Per % sft. = Tk. 1,482.50 Total = Tk. 6,430.28 10.00% = Tk. 643.03 4.00% = Tk. 257.21 Tk. 7,330.52 VAT 5.00% = Tk. 366.53 Grand total = Tk. 7,697.05 Rate per sft. = Tk. 76.97 Rate per sqm = Tk. 828.51 829 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Say
(ii) (iii ) (iv )

Tk.

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 22(a)-II 12 mm thick (finished) mosaic in floor with Indian chips & glass strip in/c 25 mm thick patent stone (1:1.5:3) with STONE-CHIPS: (white cement : grey cement = 9 : 1) Considering 100 sft. A. B. Cost of mosaic excluding cost of patent stone (from item No. 22 (a)-I) Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of cement for neat finish and and 1/4 No. mason: Item Contractor's profit Overhead expenses VAT (i) Ground floor = Tk. 5,395.87

= Tk. 1,366.37 Total = Tk. 6,762.24 10.00% = Tk. 676.22 4.00% = Tk. 270.49 Tk. 7,708.95 5.00% = Tk. 385.45 Grand total = Tk. 8,094.40 Rate per sft. = Tk. 80.94 Rate per sqm. = Tk. 871.24

Say
(ii) (iii ) (iv )

Tk.

871 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 22(b)-I 12 mm thick (finished) mosaic in floor with Pakistani chips & glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (white cement : grey cement = 9 : 1) Considering 100 sft. A. 1. 2. 3 4. 5. 6. Cost of materials White cement 126 kg. @ Tk. 16.75 Grey cement 0.28 bag. @ Tk. 250.00 Pakistani onix mosaic 140 kg. @ Tk. 9.00 Minar stone 1/3 No. @ Tk. 200.00 5 x 20 mm glass strip 120 rft. @ Tk. 3.00 Cost of patent stone excluding cost of cement for neat finish and 1/4 No. mason100 sft. @ Tk. 1,034.41 Cost of labour Same as 21(a)-I

Per kg. = Tk. Per bag = Tk. Per kg. = Tk. each = Tk. Per rft. = Tk.

2,110.50 70.00 1,260.00 66.67 360.00

Per % sft. = Tk. 1,034.41 Sub-total = Tk. 4,901.58

B.

100 sft.

Contractor's profit Overhead expenses

(i)

Ground floor

Tk. 1,482.50 Per % sft. = Tk. 1,482.50 Total = Tk. 6,384.08 10.00% = Tk. 638.41 4.00% = Tk. 255.36 Tk. 7,277.85 VAT 5.00% = Tk. 363.89 Grand total = Tk. 7,641.74 Rate per sft. = Tk. 76.42 Rate per sqm. = Tk. 822.58 Tk. 823 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Say
(ii) (iii ) (iv )

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 22(b)-II 12 mm thick (finished) mosaic in floor with Pakistani chips & glass strip in/c 25 mm thick patent stone (1:1.5:3) with STONE-CHIPS: (white cement : grey cement = 9 : 1) Considering 100 sft. of work A. B. Cost of mosaic excluding cost of patent stone: from item No. 22(b)-I Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of cement for neat finish and 1/4 No. mason: Item No. Contractor's profit Overhead expenses VAT (i) Ground floor = Tk. 5,349.67

= Tk. 1,366.37 Total = Tk. 6,716.04 10.00% = Tk. 671.60 4.00% = Tk. 268.64 Tk. 7,656.28 5.00% = Tk. 382.81 Grand total = Tk. 8,039.09 Rate per sft. = Tk. 80.39 Rate per sqm. = Tk. 865.32

Say
(ii) (iii ) (iv )

Tk.

865 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 22(c)-I 12 mm thick (finished) mosaic in floor with Indian chips & without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (white cement : grey cement = 9 : 1) Considering 100 sft. of work A. 1. 2. 3. 4. 5. B. Cost of materials White cement 126 kg. @ Tk. 16.75 Grey cement 0.28 bag. @ Tk. 250.00 Indian Deradun 140 kg. @ Tk. 9.33 Minar Stone 1/3 No. @ Tk. 200.00 Cost of patent stone excluding cost of cement for neat finish and 1/4 No. mason. 100 sft. @ Tk. 1,034.41 Cost of labour Same as item No. 21(c)-I 100 sft. @ Tk. 1,295.00 Contractor's profit Overhead expenses

Per kg. = Tk. Per bag = Tk. Per kg. = Tk. each = Tk. Per % sft = Tk.

2,110.50 70.00 1,306.20 66.67 1,034.41

(i)

Ground floor

Per % sft. = Tk. 1,295.00 Sub-Total = Tk. 5,882.78 10.00% = Tk. 588.28 4.00% = Tk. 235.31 Tk. 6,706.37 VAT 5.00% = Tk. 335.32 Grand total = Tk. 7,041.69 Rate per sft. = Tk. 70.42 Rate per sqm = Tk. 758.00 758 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Say
(ii) (iii ) (iv )

Tk.

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 22(c)-II 12 mm thick (finished) mosaic in floor with Indian chips & without glass strip in/c 25 mm thick patent stone (1:1.5:3) with STONE-CHIPS: (white cement : grey cement = 9 : 1) Considering 100 sft. A. B. Cost of mosaic excluding cost of patent stone: from item No. 22(c)-I Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of cement for neat finish and 1/4 No. mason: Item No. Contractor's profit Overhead expenses VAT (i) Ground floor = Tk. 4,848.37

= Tk. 1,366.37 Total = Tk. 6,214.74 10.00% = Tk. 621.47 4.00% = Tk. 248.59 Tk. 7,084.80 5.00% = Tk. 354.24 Grand total = Tk. 7,439.04 Rate per sft. = Tk. 74.39 Rate per sqm = Tk. 800.73

Say
(ii) (iii ) (iv )

Tk.

801 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 22(d)-I 12 mm thick (finished) mosaic in floor with Pakistani chips & without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (white cement : grey cement = 9 : 1) Considering 100 sft. A. 1. 2. 3. 4. 5. Cost of materials: White cement 126 kg. @ Tk. 16.75 Grey cement 0.28 bag. @ Tk. 250.00 Pakistani onix mosaic 140 kg. @ Tk. 9.00 Minar stone 1/3 No. @ Tk. 200.00 Cost of patent stone excluding cost of cement for neat finish and 1/4 No. mason. 100 sft. @ Tk. 1,034.41 Cost of labour Same as item No. 21(c)-I

Per kg. = Tk. Per bag. = Tk. Per kg. = Tk. each = Tk.

2,110.50 70.00 1,260.00 66.67

Per % sft = Tk. 1,034.41 Sub-total = Tk. 4,541.58

B.

100 sft.

Tk. 1,295.00

Contractor's profit Overhead expenses

(i)

Ground floor

Per % sft. = Tk. 1,295.00 Total = Tk. 5,836.58 10.00% = Tk. 583.66 4.00% = Tk. 233.46 Tk. 6,653.70 VAT 5.00% = Tk. 332.69 Grand total = Tk. 6,986.39 Rate per sft. = Tk. 69.86 Rate per sqm = Tk. 751.97 752 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Say
(ii) (iii ) (iv )

Tk.

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 22(d)-II 12 mm thick (finished) mosaic in floor with Pakistani chips & without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (white cement : grey cement = 9 : 1) Considering 100 sft. of work A. B. Cost of mosaic excluding cost of patent stone: from item No. 22(d)-I Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of cement for neat finish and 1/4 No. mason: Item No. Contractor's profit Overhead expenses VAT (i) Ground floor = Tk. 1,366.37 Total = Tk. 6,168.54 10.00% = Tk. 616.85 4.00% = Tk. 246.74 Tk. 7,032.13 5.00% = Tk. 351.61 Grand total = Tk. 7,383.74 Rate per sft. = Tk. 73.84 Rate per sqm = Tk. 794.81 = Tk. 4,802.17

Say
(ii) (iii ) (iv )

Tk.

795 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 23(a)-I 10 mm thick (finished) silver grey situ mosaic in floor with Indian chips and with glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (white cement : grey cement = 1:1) Considering 100 sft of A. Cost of materials:

- 50 -

Analysis of Rates of P.W.D. Schedule (10th Edition), 16th October, 2002

1. 2. 3. 4. 5. 6.

White cement 62.5 kg. @ Tk. 16.75 Per kg. = Tk. Grey cement 1.25 bag @ Tk. 250.00 Per bag. = Tk. India Deradun 125 kg. @ Tk. 9.33 Per kg. = Tk. Minar stone 1/3 No. @ Tk. 200.00 each = Tk. 5 x 20 mm glass strip 120 rft. @ Tk. 3.00 Per rft. = Tk. Cost of patent stone excluding cost of cement for neat finish and 1/4 No. mason. 100 sft. @ Tk. 1,034.41

1,046.88 312.50 1,166.25 66.67 360.00

Per % sft. = Tk. 1,034.41 Sub-total = Tk. 3,986.71

B.

Cost of labour Same as item No.21(a)-I

100 sft.

(i)

Ground floor

Per % sft. = Tk. 1,482.50 Total = Tk. 5,469.21 Contractor's profit 10.00% = Tk. 546.92 Overhead expenses 4.00% = Tk. 218.77 Tk. 6,234.90 VAT 5.00% = Tk. 311.75 Grand total = Tk. 6,546.65 Rate per sft. = Tk. 65.47 Rate per sqm = Tk. 704.72 Tk. 705 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Tk. 1,482.50

Say
(ii) (iii ) (iv )

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 23(a)-II 10 mm thick (finished) silver grey situ mosaic in floor with Indian chips and with glass strip in/c 25mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (white cement : grey cement = 1:1) Considering 100 sft. A. B. Cost of mosaic excluding cost of patent stone: from item No. 23(a)-I Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of cement for neat finish and 1/4 No. mason: Item No. Contractor's profit Overhead expenses VAT (i) Ground floor = Tk. 4,434.80

= Tk. 1,366.37 Total = Tk. 5,801.17 10.00% = Tk. 580.12 4.00% = Tk. 232.05 Tk. 6,613.34 5.00% = Tk. 330.67 Grand total = Tk. 6,944.01 Rate per sft. = Tk. 69.44 Rate per sqm = Tk. 747.45

Say (ii (iii ) ) (iv )

Tk.

747 .00 Per sqm. Per sqm = Tk. Per sqm = Tk. Per sqm = Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) Add for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges Add for 10th floor and above (@ 0.75 No. lab per % sft.) in/c

ANALYSIS FOR ITEM NO. 23(b)-I 10 mm thick (finished ) silver grey situ mosaic in floor with Pakistani chips and with glass strip in/c 25mm thick patent stone with BRICK-CHIPS: (white cement : grey cement = 1:1) Considering 100 sft. A. 1. 2. 3. 4. 5. 6. Cost of materials: White cement 62.5 kg. @ Tk. 16.75 Grey cement 1.25 bag @ Tk. 250.00 Pakistani Onix mosaic 125 kg. @ Tk. 9.00 Minar stone 1/3 No. @ Tk. 200.00 5 x 20 mm glass strip 120 rft. @ Tk. 3.00 Cost of patent stone excluding cost of cement for neat finish and 1/4 No. mason. 100 sft. @ Tk. 1,034.41 Cost of labour: same as item No.21(a)-I

Per kg. = Tk. Per bag. = Tk. Per kg. = Tk. each = Tk. Per rft. = Tk.

1,046.88 312.50 1,125.00 66.67 360.00

Per % sft. = Tk. 1,034.41 Sub-total = Tk. 3,945.46

B.

100 sft.

(i)

Ground floor

Per % sft. = Tk. 1,482.50 Total = Tk. 5,427.96 Contractor's profit 10.00% = Tk. 542.80 Overhead expenses 4.00% = Tk. 217.12 Tk. 6,187.88 VAT 5.00% = Tk. 309.39 Grand total = Tk. 6,497.27 Rate per sft. = Tk. 64.97 Rate per sqm = Tk. 699.34 Tk. 699 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Tk. 1,482.50

Say
(ii) (iii ) (iv )

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM No 23(b)-II 10 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and with glass strip in/c 25mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (white cement : grey cement = 1:1) Considering 100 sft. A. B. Cost of mosaic excluding cost of patent stone: from item No. 23(b)-I Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of cement for neat finish and 1/4 No. mason: Item No. Contractor's profit Overhead expenses VAT (i) Ground floor = Tk. 4,393.55

= Tk. 1,366.37 Total = Tk. 5,759.92 10.00% = Tk. 575.99 4.00% = Tk. 230.40 Tk. 6,566.31 5.00% = Tk. 328.32 Grand total = Tk. 6,894.63 Rate per sft. = Tk. 68.95 Rate per sqm = Tk. 742.18

Say
(ii) (iii ) (iv )

Tk.

742 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 23(c)-I 10 mm thick (finished) silver grey situ mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (white cement : grey cement = 1:1) Considering 100 sft. A. 1. 2. 3. 4. 5. Cost of materials: White cement 62.5 kg. @ Tk. 16.75 Grey cement 1.25 bag @ Tk. 250.00 India Deradun 125 kg. @ Tk. 9.33 Minar stone 1/3 No. @ Tk. 200.00 Cost of patent stone excluding cost of cement for neat finish and 1/4 No. mason. 100 sft. @ Tk. 1,034.41 Cost of labour same as item No. 21(c)-I

Per kg. = Tk. Per bag. = Tk. Per kg. = Tk. each = Tk.

1,046.88 312.50 1,166.25 66.67

Per % sft. = Tk. 1,034.41 Sub-total = Tk. 3,626.71 1,295.00 4,921.71 492.17 196.87 5,610.75 280.54 5,891.29 58.91 634.11

B.

100 sft.

Tk. 1,295.00

Contractor's profit Overhead expenses

(i)

Ground floor

Per % sft. = Tk. Total = Tk. 10.00% = Tk. 4.00% = Tk. Tk. VAT 5.00% = Tk. Grand total = Tk. Rate per sft. = Tk. Rate per sqm = Tk. 634 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk.

Say
(ii) (iii ) (iv )

Tk.

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

3.19 6.38 9.58

ANALYSIS FOR ITEM NO. 23(c)-II 10 mm thick (finished) silver grey situ mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (white cement : grey cement = 1:1) Considering 100 sft. A. B. Cost of mosaic excluding cost of patent stone: from item No. 23 (c)-I Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of cement for neat finish and 1/4 No. mason: Item No. 20 Contractor's profit Overhead expenses VAT (i) Ground floor = Tk. 3,887.30

= Tk. 1,366.37 Total = Tk. 5,253.67 10.00% = Tk. 525.37 4.00% = Tk. 210.15 Tk. 5,989.19 5.00% = Tk. 299.46 Grand total = Tk. 6,288.65 Rate per sft. = Tk. 62.89 Rate per sqm = Tk. 676.95

Say
(ii) (iii ) (iv )

Tk.

677 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 23(d)-I 10 mm thick (finished) silver grey situ mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (white cement : grey cement = 1:1) Considering 100 sft. A. 1. 2. 3. 4. 5. Cost of materials: White cement 62.5 kg. @ Tk. 16.75 Grey cement 1.25 bag @ Tk. 250.00 Pakistani Onix mosaic 125 kg. @ Tk. 9.00 Minar stone 1/3 No. @ Tk. 200.00 Cost of patent stone excluding cost of cement for neat finish and 1/4 No. mason. 100 sft. @ Tk. 1,034.41 Cost of labour Same as item No.21(c)-I

Per kg. = Tk. Per bag. = Tk. Per kg. = Tk. each = Tk.

1,046.88 312.50 1,125.00 66.67

Per % sft. = Tk. 1,034.41 Sub-total = Tk. 3,585.46

B.

100 sft.

Tk. 1,295.00

Contractor's profit Overhead expenses

(i)

Ground floor

Per % sft. = Tk. 1,295.00 Total = Tk. 4,880.46 10.00% = Tk. 488.05 4.00% = Tk. 195.22 Tk. 5,563.73 VAT 5.00% = Tk. 278.19 Grand total = Tk. 5,841.92 Rate per sft. = Tk. 58.42 Rate per sqm = Tk. 628.83 629 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Say
(ii) (iii ) (iv )

Tk.

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 23(d)-II 10 mm thick (finished) silver grey situ mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (white cement : grey cement = 1:1) Considering 100 sft. A. B. Cost of mosaic excluding cost of patent stone: from item No. 23(d)-I Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of cement for neat finish and 1/4 No. mason: Item No. Contractor's profit Overhead expenses VAT (i) Ground floor = Tk. 3,846.05

= Tk. 1,366.37 Total = Tk. 5,212.42 10.00% = Tk. 521.24 4.00% = Tk. 208.50 Tk. 5,942.16 5.00% = Tk. 297.11 Grand total = Tk. 6,239.27 Rate per sft. = Tk. 62.39 Rate per sqm = Tk. 671.57

Say
(ii) (iii ) (iv )

Tk.

672 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 24(a)-I 12 mm thick (finished) silver grey situ mosaic in floor with Indian chips and with glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (white cement : grey cement = 1:1) Considering 100 sft. of work A. 1. 2. 3. 4. 5. 6. Cost of materials: White cement 70 kg. @ Tk. 16.75 Grey cement 1.4 bag @ Tk. 250.00 Indian Deradun 140 kg. @ Tk. 9.33 Minar stone 1/3 No. @ Tk. 200.00 5 x 20 mm glass strip 120 rft. @ Tk. 3.00 Cost of patent stone excluding cost of cement for neat finish and 1/4 No. mason. 100 sft. @ Tk. 1,034.41 Cost of labour same as item No. 21(a)-I Per kg. = Tk. Per bag. = Tk. Per kg. = Tk. each = Tk. Per rft. = Tk. 1,172.50 350.00 1,306.20 66.67 360.00

Per % sft. = Tk. 1,034.41 Sub-Total = Tk. 4,289.78

B.

100 sft.

Tk. 1,482.50

Contractor's profit Overhead expenses

(i)

Ground floor

Per % sft. = Tk. 1,482.50 Total = Tk. 5,772.28 10.00% = Tk. 577.23 4.00% = Tk. 230.89 Tk. 6,580.40 VAT 5.00% = Tk. 329.02 Grand total = Tk. 6,909.42 Rate per sft. = Tk. 69.09 Rate per sqm = Tk. 743.68 744 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Say
(ii) (iii ) (iv )

Tk.

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 24(a)-II 12 mm thick (finished) silver grey situ mosaic in floor with Indian chips and with glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (white cement : grey cement = 1:1) Considering 100 sft. A. B. Cost of mosaic excluding cost of patent stone: from item No. 24(a)-I Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of cement for neat finish and 1/4 No. mason: Item No. Contractor's profit Overhead expenses VAT (i) Ground floor = Tk. 4,737.87

= Tk. 1,366.37 Total = Tk. 6,104.24 10.00% = Tk. 610.42 4.00% = Tk. 244.17 Tk. 6,958.83 5.00% = Tk. 347.94 Grand total = Tk. 7,306.77 Rate per sft. = Tk. 73.07 Rate per sqm = Tk. 786.53

Say
(ii) (iii ) (iv )

Tk.

787 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 24(b)-I 12 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and with glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (white cement : grey cement = 1:1) Considering 100 sft. A. 1. 2. 3. 4. 5. 6. Cost of materials: White cement 70 kg. @ Tk. 16.75 Grey cement 1.4 bags @ Tk. 250.00 Pakistan Onix mosaic 140 kg. @ Tk. 9.00 Minar stone 1/3 No. @ Tk. 200.00 5 x 20 mm glass strip 120 rft. @ Tk. 3.00 Cost of patent stone excluding cost of cement for neat finish and 1/4 No. mason. 100 sft. @ Tk. 1,034.41 Cost of labour same as item No. 22(a)-I

Per kg. = Tk. Per bag. = Tk. Per kg. = Tk. each = Tk. Per rft. = Tk.

1,172.50 350.00 1,260.00 66.67 360.00

Per % sft. = Tk. 1,034.41 Sub-total = Tk. 4,243.58

B.

100 sft.

Tk. 1,482.50

Contractor's profit Overhead expenses

(i)

Ground floor

Per % sft. = Tk. 1,482.50 Total = Tk. 5,726.08 10.00% = Tk. 572.61 4.00% = Tk. 229.04 Tk. 6,527.73 VAT 5.00% = Tk. 326.39 Grand total = Tk. 6,854.12 Rate per sft. = Tk. 68.54 Rate per sqm = Tk. 737.76 738 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Say
(ii) (iii ) (iv )

Tk.

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 24(b)-II 12 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and with glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (white cement : grey cement = 1:1) Considering 100 sft. A. B. Cost of mosaic excluding cost of patent stone: from item No. 24(b)-I Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of cement for neat finish and 1/4 No. mason: Item No. Contractor's profit Overhead expenses VAT (i) Ground floor = Tk. 4,691.67

= Tk. 1,366.37 Total = Tk. 6,058.04 10.00% = Tk. 605.80 4.00% = Tk. 242.32 Tk. 6,906.16 5.00% = Tk. 345.31 Grand total = Tk. 7,251.47 Rate per sft. = Tk. 72.51 Rate per sqm = Tk. 780.50

Say
(ii) (iii ) (iv )

Tk.

781 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 24(c)-I 12 mm thick (finished) silver grey situ mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (white cement : grey cement = 1:1) Considering 100 sft. A. 1. 2. 3. 4. 5. Cost of materials: White cement 70 kg. @ Tk. 16.75 Grey cement 1.4 bag @ Tk. 250.00 Indian Deradun 140 kg. @ Tk. 9.33 Minar stone 1/3 No. @ Tk. 200.00 Cost of patent stone excluding cost of cement for neat finish and 1/4 No. mason. 100 sft. @ Tk. 1,034.41 Cost of labour same as item No. 21(c)-I

Per kg. = Tk. Per bag. = Tk. Per kg. = Tk. each = Tk.

1,172.50 350.00 1,306.20 66.67

Per % sft. = Tk. 1,034.41 Sub-total = Tk. 3,929.78

B.

100 sft.

Tk. 1,295.00

Contractor's profit Overhead expenses

(i)

Ground floor

Per % sft. = Tk. 1,295.00 Total = Tk. 5,224.78 10.00% = Tk. 522.48 4.00% = Tk. 208.99 Tk. 5,956.25 VAT 5.00% = Tk. 297.81 Grand total = Tk. 6,254.06 Rate per sft. = Tk. 62.54 Rate per sqm = Tk. 673.18 673 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Say
(ii) (iii ) (iv )

Tk.

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 24(c)-II 12 mm thick (finished) silver grey situ mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (white cement : grey cement = 1:1) Considering 100 sft. A. B. Cost of mosaic excluding cost of patent stone: from item No. 24(c)-I Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of cement for neat finish and 1/4 No. mason: Item No. Contractor's profit Overhead expenses VAT (i) Ground floor = Tk. 4,190.37

= Tk. 1,366.37 Total = Tk. 5,556.74 10.00% = Tk. 555.67 4.00% = Tk. 222.27 Tk. 6,334.68 5.00% = Tk. 316.73 Grand total = Tk. 6,651.41 Rate per sft. = Tk. 66.51 Rate per sqm = Tk. 715.91

Say
(ii) (iii ) (iv )

Tk.

716 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 24(d)-I 12 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (white cement : grey cement = 1:1) Considering 100 sft. of work Cost of materials: White cement 70 kg. @ Tk. 16.75 Grey cement 1.4 bag @ Tk. 250.00 Pakistani Onix mosaic 140 kg. @ Tk. 9.00 Minar stone 1/3 No. @ Tk. 200.00 Cost of patent stone excluding cost of cement for neat finish and 1/4 No. mason. 100 sft. @ Tk. 1,034.41 Cost of labour same as item No. 22(c)-I

A. 1. 2. 3. 4. 5.

Per kg. = Tk. Per bag. = Tk. Per kg. = Tk. each = Tk.

1,172.50 350.00 1,260.00 66.67

Per % sft. = Tk. 1,034.41 Sub-total = Tk. 3,883.58

B.

100 sft.

Tk. 1,295.00

Contractor's profit Overhead expenses

(i)

Ground floor

Per % sft. = Tk. 1,295.00 Total = Tk. 5,178.58 10.00% = Tk. 517.86 4.00% = Tk. 207.14 Tk. 5,903.58 VAT 5.00% = Tk. 295.18 Grand total = Tk. 6,198.76 Rate per sft. = Tk. 61.99 Rate per sqm = Tk. 667.26 667 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Say
(ii) (iii ) (iv )

Tk.

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 24(d)-II 12 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (white cement : grey cement = 1:1) Considering 100 sft. A. B. Cost of mosaic excluding cost of patent stone: from item No. 24(d)-I Cost of patent stone (1 : 1.5 : 3) with stone chips excluding cost of cement for neat finish and 1/4 No. mason: Item No. Contractor's profit Overhead expenses VAT (i) Ground floor = Tk. 4,144.17

= Tk. 1,366.37 Total = Tk. 5,510.54 10.00% = Tk. 551.05 4.00% = Tk. 220.42 Tk. 6,282.01 5.00% = Tk. 314.10 Grand total = Tk. 6,596.11 Rate per sft. = Tk. 65.96 Rate per sqm = Tk. 709.99

- 51 -

Analysis of Rates of P.W.D. Schedule (10th Edition), 16th October, 2002

Say
(ii) (iii ) (iv )

Tk.

710 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 25(a) 10 mm thick (finished) mosaic on wall with Indian chips: (white cement : grey cement = 9 : 1) Considering 100 sft. A. 1. 2. 3. 4. 5. B. 1. 2. 3. 1. 2. 1. Cost of materials White cement Grey cement Indian Deradun Minar stone 1/2" thick plaster

109 kg. 0.22 bag 125 kg. 1/3 No. 100 sft.

@ @ @ @ @

Tk. Tk. Tk. Tk. Tk.

16.75 250.00 9.33 200.00 6.95

Per kg. = Tk. 1,825.75 Per bag = Tk. 55.00 Per kg. = Tk. 1,166.25 each = Tk. 66.67 Per sft. = Tk. 695.00 Sub-total = Tk. 3,808.67

Cost of labour For mixing, laying, compacting and curing: Head mason 1 No. @ Tk. 180.00 each = Tk. Skilled labour 3/4 No. @ Tk. 120.00 each = Tk. Ordinary labour 1 No. @ Tk. 100.00 each = Tk. Labour charge for cutting mosaic mosaic wall surface with mumic stone: Skilled labour 10 Nos. @ Pumic stone 2.5 Nos. @ For spreading oxalic acid and Ordinary labour 1 No. @ Tk. Tk. Tk. 120.00 140.00 100.00 each = Tk. each = Tk. 180.00 90.00 100.00 1,200.00 350.00

Contractor's profit Overhead expenses

(i)

Ground floor

each = Tk. 100.00 Sub-total = Tk. 2,020.00 Total (A+B) = Tk. 5,828.67 10.00% = Tk. 582.87 4.00% = Tk. 233.15 Tk. 6,644.69 VAT 5.00% = Tk. 332.23 Grand total = Tk. 6,976.92 Rate per sft. = Tk. 69.77 Rate per sqm = Tk. 751.00 751 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Say
(ii) (iii ) (iv )

Tk.

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 25(b) 10 mm thick (finished) mosaic on wall with Pakistani chips: (white cement : grey cement = 9 : 1) Considering 100 sft. A. 1. 2. 3. 4. 5. B. Cost of materials White cement Grey cement Pakistan Onix mosaic Minar stone 1/2" thick plaster Cost of labour Same as item No. 25(a)

109 kg. 0.22 bag 125 kg. 1/3 No. 100 sft.

@ @ @ @ @

Tk. Tk. Tk. Tk. Tk.

16.75 250.00 9.00 200.00 6.95

Per kg. = Tk. 1,825.75 Per bag = Tk. 55.00 Per kg. = Tk. 1,125.00 each = Tk. 66.67 Per sft. = Tk. 695.00 Sub-total = Tk. 3,767.42

100 sft.

Contractor's profit Overhead expenses

(i)

Ground floor

Tk. 2,020.00 Per % sft. = Tk. 2,020.00 Total = Tk. 5,787.42 10.00% = Tk. 578.74 4.00% = Tk. 231.50 Tk. 6,597.66 VAT 5.00% = Tk. 329.88 Grand total = Tk. 6,927.54 Rate per sft. = Tk. 69.28 Rate per sqm = Tk. 745.73 Tk. 746 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Say
(ii) (iii ) (iv )

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 26(a) 10 mm thick (finished) mosaic on wall with Indian chips: (White cement : Grey cement = 1 : 1) Considering 100 sft. of work A. 1. 2. 3. 4. 5. B. 1. 2. 3. 1. 2. 1. Cost of materials White cement Grey cement Indian Deradun Minar stone 1/2" thick plaster 62.5 kg. 1.25 bag 125 kg. 1/3 No. 100 sft. @ @ @ @ @ Tk. Tk. Tk. Tk. Tk. 16.75 250.00 9.33 200.00 6.95 Per kg. = Tk. 1,046.88 Per bag = Tk. 312.50 Per kg. = Tk. 1,166.25 each = Tk. 66.67 Per sft. = Tk. 695.00 Sub-Total = Tk. 3,287.30

Cost of labour For mixing, laying, compacting & Head mason 1 No. @ Tk. 180.00 Skilled labour 3/4 No. @ Tk. 120.00 Ordinary labour 1 No. @ Tk. 100.00 Labour for cutting mosaic wall surface with mumic stone: Skilled labour 10 Nos. @ Pumic stone 2.5 Nos. @ For spreading oxalic acid and Ordinary labour 1 No. @ Tk. Tk. Tk. 120.00 140.00 100.00 each = Tk. each = Tk. each = Tk. each = Tk. each = Tk. 180.00 90.00 100.00 1,200.00 350.00

Contractor's profit Overhead expenses

(i)

Ground floor

each = Tk. 100.00 Sub-total = Tk. 2,020.00 Total (A+B) = Tk. 5,307.30 10.00% = Tk. 530.73 4.00% = Tk. 212.29 Tk. 6,050.32 VAT 5.00% = Tk. 302.52 Grand total = Tk. 6,352.84 Rate per sft. = Tk. 63.53 Rate per sqm = Tk. 683.84 684 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Say
(ii) (iii ) (iv )

Tk.

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 26(b) 10 mm thick (finished) mosaic on wall with Pakistani chips: (White cement : Grey cement = 1 : 1) Considering 100 sft. A. 1. 2. 3. 4. 5. B. Cost of materials: White cement Grey cement Pakistani Onix mosaic Minar stone 1/2" thick plaster Cost of labour same as item No. 26(a)

62.5 kg. 1.25 bag 125 kg. 1/3 No. 100 sft.

@ @ @ @ @

Tk. Tk. Tk. Tk. Tk.

16.75 250.00 9.00 200.00 6.95

Per kg. = Tk. 1,046.88 Per bag = Tk. 312.50 Per kg. = Tk. 1,125.00 each = Tk. 66.67 Per sft. = Tk. 695.00 Sub-total = Tk. 3,246.05

100 sft.

Tk. 2,020.00

Contractor's profit Overhead expenses

(i)

Ground floor

Per % sft. = Tk. 2,020.00 Total (A+B) = Tk. 5,266.05 10.00% = Tk. 526.61 4.00% = Tk. 210.64 Tk. 6,003.30 VAT 5.00% = Tk. 300.17 Grand total = Tk. 6,303.47 Rate per sft. = Tk. 63.03 Rate per sqm = Tk. 678.45 678 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Say
(ii) (iii ) (iv )

Tk.

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 27(a)-I 10 mm thick (finished) coloured mosaic in floor with Indian chips and with glass strip in/c 25 mm thick patent stone with BRICK-CHIPS. Considering 100 sft. A. B. Cost of materials, labour in/c T & P: same as item No. 21(a)-I Add for colour pigment 100 sft. 8 Ibs @ @ Tk. 5,990.58 Tk. 30.00 Per % sft. = Tk. 5,990.58 Per Ib. = Tk. 240.00 Total = Tk. 6,230.58 10.00% = Tk. 623.06 4.00% = Tk. 249.22 Tk. 7,102.86 5.00% = Tk. 355.14 Grand total = Tk. 7,458.00 Rate per sft. = Tk. 74.58 Rate per sqm = Tk. 802.78

Contractor's profit Overhead expenses VAT (i) Ground floor

Say
(ii) (iii ) (iv )

Tk.

803 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 27(a)-II 10 mm thick (finished) coloured mosaic in floor with Indian chips and with glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS. Considering 100 sft. A. B. Cost of materials, labour in/c T & P: same as item No. 21(a)Add for colour 100 sft. 8 Ibs @ @ Tk. 6,322.54 Tk. 30.00 Per % sft. = Tk. 6,322.54 Per Ib. = Tk. 240.00 Total = Tk. 6,562.54 10.00% = Tk. 656.25 4.00% = Tk. 262.50 Tk. 7,481.29 5.00% = Tk. 374.06 Grand total = Tk. 7,855.35 Rate per sft. = Tk. 78.55 Rate per sqm = Tk. 845.51

Contractor's profit Overhead expenses VAT (i) Ground floor

Say
(ii) (iii ) (iv )

Tk.

846 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 27(b)-I 10 mm thick (finished) coloured mosaic in floor with Pakistani chips and with glass strip in/c 25 mm thick patent stone with BRICK-CHIPS. Considering 100 sft. A. B. Cost of materials, labour in/c T & P: same as item No. 21(b)-I Add for colour 100 sft. 8 Ibs @ @ Tk. 5,949.33 Tk. 30.00 Per % sft. = Tk. 5,949.33 Per Ib. = Tk. 240.00 Total = Tk. 6,189.33 10.00% = Tk. 618.93 4.00% = Tk. 247.57 Tk. 7,055.83 5.00% = Tk. 352.79 Grand total = Tk. 7,408.62 Rate per sft. = Tk. 74.09 Rate per sqm = Tk. 797.50

Contractor's profit Overhead expenses VAT (i) Ground floor

Say
(ii) (iii ) (iv )

Tk.

798 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 27(b)-II 10 mm thick (finished) coloured mosaic in floor with Pakistani chips and with glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS. Considering 100 sft. A. B. Cost of materials, labour in/c T & P: same as item No. 21(b)100 sft. @ II Add for colour 8 Ibs @

Tk. 6,281.29 Tk. 30.00

Contractor's profit Overhead expenses VAT (i) Ground floor

Per % sft. = Tk. 6,281.29 Per Ib. = Tk. 240.00 Total = Tk. 6,521.29 10.00% = Tk. 652.13 4.00% = Tk. 260.85 Tk. 7,434.27 5.00% = Tk. 371.71 Grand total = Tk. 7,805.98 Rate per sft. = Tk. 78.06 Rate per sqm = Tk. 840.24

Say
(ii) (iii ) (iv )

Tk.

840 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 27(c)-I 10 mm thick (finished) coloured mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS. Considering 100 sft A. B. Cost of materials, labour in/c T & P: same as item No. 21(c)-I Add for colour pigment 100 sft. 8 Ibs @ @ Tk. 5,443.08 Tk. 30.00 Per % sft. = Tk. Per Ib. = Tk. Total = Tk. 10.00% = Tk. 4.00% = Tk. Tk. 5.00% = Tk. Grand total = Tk. Rate per sft. = Tk. Rate per sqm = Tk. 5,443.08 240.00 5,683.08 568.31 227.32 6,478.71 323.94 6,802.65 68.03 732.27

Contractor's profit Overhead expenses VAT (i) Ground floor

Say
(ii) (iii ) (iv )

Tk.

732 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 27(c)-II 10 mm thick (finished) coloured mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS. Considering 100 sft. 100 sft of of work Cost of materials, labour in/c T & P: same as item No. 21(c)-II Add for colour 100 sft. 8 Ibs @ @ Tk. 5,775.04 Tk. 30.00 Per % sft. = Tk. 5,775.04 Per Ib. = Tk. 240.00 Total = Tk. 6,015.04 10.00% = Tk. 601.50 4.00% = Tk. 240.60 Tk. 6,857.14 5.00% = Tk. 342.86 Grand total = Tk. 7,200.00 Rate per sft. = Tk. 72.00 Rate per sqm = Tk. 775.01

A. B.

Contractor's profit Overhead expenses VAT (i) Ground floor

Say
(ii) (iii ) (iv )

Tk.

775 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 27(d)-I 10 mm thick (finished) coloured mosaic in floor with Pakistani chips and without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS. Considering 100 sft. of work A. Cost of materials, labour in/c T & P: same as item No. 21(d)-I B. Add for colour

100 sft. 8 Ibs

@ @

Tk. 5,401.83 Tk. 30.00

Contractor's profit Overhead expenses VAT (i) Ground floor

Per % sft. = Tk. Per Ib. = Tk. Total = Tk. 10.00% = Tk. 4.00% = Tk. Tk. 5.00% = Tk. Grand total = Tk. Rate per sft. = Tk. Rate per sqm = Tk.

5,401.83 240.00 5,641.83 564.18 225.67 6,431.68 321.58 6,753.26 67.53 726.89

Say
(ii) (iii ) (iv )

Tk.

727 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 27(d)-II 10 mm thick (finished) coloured mosaic in floor with Pakistani chips and without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS. Considering 100 sft. of work A. Cost of materials, labour in/c T & P: same as item No. 21(d)B. Add for colour 100 sft. 8 Ibs @ @ Tk. 5,733.79 Tk. 30.00 Per % sft. = Tk. Per Ib. = Tk. Total = Tk. 10.00% = Tk. 4.00% = Tk. Tk. 5.00% = Tk. Grand total = Tk. Rate per sft. = Tk. Rate per sqm = Tk. 5,733.79 240.00 5,973.79 597.38 238.95 6,810.12 340.51 7,150.63 71.51 769.73

Contractor's profit Overhead expenses VAT (i) Ground floor

Say
(ii) (iii ) (iv )

Tk.

770 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 28(a)-I 12 mm thick (finished) coloured mosaic in floor with Indian chips and with glass strip in/c 25 mm thick patent stone with BRICK-CHIPS. Considering 100 sft. A. B. Cost of materials, labour in/c T & P: Same as item No. 22(a)100 sft. @ I Add for colour 8 Ibs @ pigment

Tk. 6,430.28 Tk. 30.00

Contractor's profit Overhead expenses VAT (i) Ground floor

Per sft. = Tk. Per Ib. = Tk. Total = Tk. 10.00% = Tk. 4.00% = Tk. Tk. 5.00% = Tk. Grand total = Tk. Rate per sft. = Tk. Rate per sqm = Tk.

6,430.28 240.00 6,670.28 667.03 266.81 7,604.12 380.21 7,984.33 79.84 859.40

Say
(ii) (iii ) (iv )

Tk.

859 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 28(a)-II 12 mm thick (finished) coloured mosaic in floor with Indian chips and with glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS. Considering 100 sft. A. B. Cost of materials, labour in/c T & P: same as item No. 22(a)100 sft. @ II Add for colour 8 Ibs @

Tk. 6,762.24 Tk. 30.00

Contractor's profit Overhead expenses VAT (i) Ground floor

Per sft. = Tk. Per Ib. = Tk. Total = Tk. 10.00% = Tk. 4.00% = Tk. Tk. 5.00% = Tk. Grand total = Tk. Rate per sft. = Tk. Rate per sqm = Tk.

6,762.24 240.00 7,002.24 700.22 280.09 7,982.55 399.13 8,381.68 83.82 902.24

Say
(ii) (iii ) (iv )

Tk.

902 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 28(b)-I 12 mm thick (finished) coloured mosaic in floor with Pakistani chips and with glass strip in/c 25 mm thick patent stone with BRICK-CHIPS. Considering 100 sft. A. B. Cost of materials, labour in/c T & P: same as item No. 22(b)-I Add for colour 100 sft. 8 Ibs @ @ Tk. 6,384.08 Tk. 30.00 Per % sft. = Tk. Per Ib. = Tk. Total = Tk. 10.00% = Tk. 4.00% = Tk. Tk. 5.00% = Tk. Grand total = Tk. Rate per sft. = Tk. Rate per sqm = Tk. 6,384.08 240.00 6,624.08 662.41 264.96 7,551.45 377.57 7,929.02 79.29 853.48

Contractor's profit Overhead expenses VAT (i) Ground floor

Say
(ii) (iii ) (iv )

Tk.

853 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 28(b)-II 12 mm thick (finished) coloured mosaic in floor with Pakistani chips and with glass strip in/c 25 mm thick patent stone (1: 1.5 : 3) with STONE-CHIPS. Considering 100 sft. of work Cost of materials, labour in/c T & P: same as item No. 22(b)Add for colour 100 sft. 8 Ibs @ @ Tk. 6,716.04 Tk. 30.00 Per % sft. = Tk. 6,716.04 Per Ib. = Tk. 240.00 Total = Tk. 6,956.04 10.00% = Tk. 695.60 4.00% = Tk. 278.24 Tk. 7,929.88 5.00% = Tk. 396.49 Grand total = Tk. 8,326.37 Rate per sft. = Tk. 83.26 Rate per sqm = Tk. 896.21

A. B.

Contractor's profit Overhead expenses VAT (i) Ground floor

Say
(ii) (iii ) (iv )

Tk.

896 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 28(c)-I

- 52 -

Analysis of Rates of P.W.D. Schedule (10th Edition), 16th October, 2002

12 mm thick (finished) coloured mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS. Considering 100 sft. A. B. Cost of materials, labour in/c T & P: same as item No. 22(c)-I Add for colour 100 sft. 8 Ibs @ @ Tk. 5,882.78 Tk. 30.00 Per % sft. = Tk. Per Ib. = Tk. Total = Tk. 10.00% = Tk. 4.00% = Tk. Tk. 5.00% = Tk. Grand total = Tk. Rate per sft. = Tk. Rate per sqm = Tk. 5,882.78 240.00 6,122.78 612.28 244.91 6,979.97 349.00 7,328.97 73.29 788.89

Contractor's profit Overhead expenses VAT (i) Ground floor

Say
(ii) (iii ) (iv )

Tk.

789 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 28(c)-II 12 mm thick (finished) coloured mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone (1 : 1.5: 3) with STONE-CHIPS. Considering 100 sft. of work Cost of materials, labour in/c T & P: same as item No. 22(c)-II Add for colour 100 sft. 8 Ibs @ @ Tk. 6,214.74 Tk. 30.00 Per % sft. = Tk. 6,214.74 Per Ib. = Tk. 240.00 Total = Tk. 6,454.74 10.00% = Tk. 645.47 4.00% = Tk. 258.19 Tk. 7,358.40 5.00% = Tk. 367.92 Grand total = Tk. 7,726.32 Rate per sft. = Tk. 77.26 Rate per sqm = Tk. 831.63

A. B.

Contractor's profit Overhead expenses VAT (i) Ground floor

Say
(ii) (iii ) (iv )

Tk.

832 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 28(d)-I 12 mm thick (finished) coloured mosaic in floor with Pakistani chips and without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS. Considering 100 sft. A. B. Cost of materials, labour in/c T & same as item No. 22(d)-I Add for colour 100 sft. 8 Ibs @ @ Tk. 5,836.58 Tk. 30.00 Per % sft. = Tk. Per Ib. = Tk. Total = Tk. 10.00% = Tk. 4.00% = Tk. Tk. 5.00% = Tk. Grand total = Tk. Rate per sft. = Tk. Rate per sqm = Tk. 5,836.58 240.00 6,076.58 607.66 243.06 6,927.30 346.37 7,273.67 72.74 782.97

Contractor's profit Overhead expenses VAT (i) Ground floor

Say
(ii) (iii ) (iv )

Tk.

783 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 28(d)-II 12 mm thick (finished) coloured mosaic in floor with Pakistani chips and without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS. Considering 100 sft. of work Cost of materials, labour in/c T & same as item No. 22(d)Add for colour 100 sft. 8 Ibs @ @ Tk. 6,168.54 Tk. 30.00 Per % sft. = Tk. Per Ib. = Tk. Total = Tk. 10.00% = Tk. 4.00% = Tk. Tk. 5.00% = Tk. Grand total = Tk. Rate per sft. = Tk. Rate per sqm = Tk. 6,168.54 240.00 6,408.54 640.85 256.34 7,305.73 365.29 7,671.02 76.71 825.71

A. B.

Contractor's profit Overhead expenses VAT (i) Ground floor

Say
(ii) (iii ) (iv )

Tk.

826 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 29(a) 10 mm thick (finished) coloured mosaic on wall with Indian chips Considering 100 sft. A. B. Cost of materials, labour in/c T & P: same as item No. 25(a) Add for colour 100 sft. 8 Ibs @ @ Tk. 5,828.67 Tk. 30.00 Per % sft. = Tk. Per Ib. = Tk. Total = Tk. 10.00% = Tk. 4.00% = Tk. Tk. 5.00% = Tk. Grand total = Tk. Rate per sft. = Tk. Rate per sqm = Tk. 5,828.67 240.00 6,068.67 606.87 242.75 6,918.29 345.91 7,264.20 72.64 781.90

Contractor's profit Overhead expenses VAT (i) Ground floor

Say
(ii) (iii ) (iv )

Tk.

782 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 29(b) 10mm thick (finished) coloured mosaic on wall with Pakistani chips Considering 100 sft. of work A. B. Cost of materials, labour in/c T & P: same as item No. 25(b) Add for colour 100 sft. 8 Ibs @ @ Tk. 5,787.42 Tk. 30.00 Per % sft. = Tk. 5,787.42 Per Ib. = Tk. 240.00 Total = Tk. 6,027.42 10.00% = Tk. 602.74 4.00% = Tk. 241.10 Tk. 6,871.26 5.00% = Tk. 343.56 Grand total = Tk. 7,214.82 Rate per sft. = Tk. 72.15 Rate per sqm = Tk. 776.62

Contractor's profit Overhead expenses VAT (i) Ground floor

Say
(ii) (iii ) (iv )

Tk.

777 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 30(a) 200 x 200 x 20 mm (finished) mosaic terrazo tiles flooring with Indian chips Considering 100 sft. A. a) 1. 2. 3. b) 1. 2. 3. c) 1. 2. 3. Cost of materials Sand-cement mortar base (3:1): Grey cement for 4.25 bags @ mortar & slury Sand (F.M.1.2) 7 cft. @ Sand (F.M. 2.5) 7 cft. @ Bottom of the tiles: sand - cement Grey cement Sand (F.M. 1.2) Sand (F.M. 2.5) Top of the tiles: White cement Grey cement Indian Deradun 1.33 bags @ 1.67 cft. @ 1.67 cft. @ 112.5 kg. @ 0.25 bags @ 125 kg. @

Tk. 250.00 Tk. 990.00 Tk. 1,330.00 Tk. 250.00 Tk. 990.00 Tk. 1,330.00 Tk. Tk. Tk. 16.75 250.00 9.33

Per kg = Tk. Per % cft. = Tk. Per % cft. = Tk. Per bag = Tk. Per % cft. = Tk. Per % cft. = Tk.

1,062.50 69.30 93.10 332.50 16.53 22.21

B. Labour charges and others Charges for mosaic tiles a) Hire charges & setting up machine 1. 1 day 2. Machine operator 3/4 No. 3. Foreman 1/4 No. b) Labour for laying 1. Mosaic head mistry 1/2 No. 2. Mosaic mistry 1/2 No. 3. Ordinary labour 1/2 No. c) Labour for curing: Ordinary labour after 1. 2. d) 1. 2. 3. 4. e) f) g) 1. 1 No. 1/4 No.

Per kg. = Tk. 1,884.38 Per bag = Tk. 62.50 Per kg. = Tk. 1,166.25 Sub-total = Tk. 4,709.27

@ @ @ @ @ @

Tk. Tk. Tk. Tk. Tk. Tk.

70.00 160.00 250.00 180.00 150.00 100.00

Per day = Tk. each = Tk.

70.00 120.00

each = Tk. each = Tk. each = Tk.

90.00 75.00 50.00

Ordinary labour after Mosaic cutting Hire charge of 1 No. @ Machine operator 1 No. @ Helper/skilled 1 No. @ Ordinary labour 1 No. @ Pumic stone 3 Nos. @ Minar stone 1/3 No. @ Labour for spreading acid & washing: Skilled labour 1/2 No. @

@ @

Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk.

100.00 100.00 70.00 160.00 120.00 100.00 140.00 200.00 120.00

each = Tk. each = Tk. Per day = Tk. each = Tk. Per day = Tk. each = Tk. each = Tk. each = Tk.

100.00 25.00 70.00 160.00 120.00 100.00 420.00 66.67

Contractor's profit Overhead expenses VAT (i) Ground floor

each = Tk. 60.00 Sub-total = Tk. 1,526.67 Total (A+B) = Tk. 6,235.94 10.00% = Tk. 623.59 4.00% = Tk. 249.44 Tk. 7,108.97 5.00% = Tk. 355.45 Grand total = Tk. 7,464.42 Rate per sft. = Tk. 74.64 Rate per sqm = Tk. 803.42

Say
(ii) (iii ) (iv )

Tk.

803 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 30(b) 200 x 200 x 20 mm (finished) mosaic terrazo tiles flooring with Pakistani chips. Considering 100 sft. 1. 2. 3. Cost of materials& labour: same as item Less cost of Indian (deradun) 100 sft. @ @ @ Tk. 6,235.94 Tk. Tk. 9.33 9.00 Per % sft. = Tk. Per kg. 6,235.94

-120 kg. Add cost of Pakistani (Onix) mosaic 120 kg.

= Tk. (1,119.60)

Contractor's profit Overhead expenses VAT (i) Ground floor Say ,


(ii) (iii ) (iv )

Per kg. = Tk. 1,080.00 Total = Tk. 6,196.34 10.00% = Tk. 619.63 4.00% = Tk. 247.85 Tk. 7,063.82 5.00% = Tk. 353.19 Grand total = Tk. 7,417.01 Rate per sft. = Tk. 74.17 Rate per sqm = Tk. 798.37

Tk.

798 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 30(c) Machine made pre-polished double layer terraazo tiles: 10" x 10" Silver mixed. Considering 100 sft. of work 1. 2. a) b) c) d) 3 a) b) c) d) 4. Cost of 10" x 10" size silver mixed double layer terrazo 100 sft. @ Tk. 42.79 Material cost for laying on 25 mm thick sand-cement Cement 2 bag. @ Tk. 250.00 Sand (F.M. 1.2) 10 cft. @ Tk. 990.00 White cement 1.8 kg. @ Tk. 16.75 Marble dust / 1.8 kg. @ Tk. 12.00 Labour for laying Head mason 1 No. @ Tk. 180.00 Mason 3 Nos. @ Tk. 150.00 Ordinary labour 5 Nos. @ Tk. 100.00 Local carriage, storage and sundries Machine charge for 100 sft. @ Tk. 100.00 cutting tiles Contractor's profit Overhead expenses Per sft. = Tk. Per bag = Tk. Per % cft = Tk. Per kg. = Tk. Per kg. = Tk. 4,279.00 500.00 99.00 30.15 21.60

(i)

Ground floor

each = Tk. 180.00 each = Tk. 450.00 each = Tk. 500.00 L.S. = Tk. 50.00 Per % sft. = Tk. 100.00 Sub-total = Tk. 6,209.75 10.00% = Tk. 620.98 4.00% = Tk. 248.39 Tk. 7,079.12 VAT 5.00% = Tk. 353.96 Grand total = Tk. 7,433.08 Rate per sft. = Tk. 74.33 Rate per sqm = Tk. 800.09 800 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Say
(ii) (iii ) (iv )

Tk.

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 30(d) Machine made pre-polished double layer terraazo tiles: 10" x 10" White special Considering 100 sft. 1. 2. Cost of terrazo tiles work excluding cost of terrazo tiles: same as item No. Cost of 10" x 10" size special double layer = Tk. 100 sft. @ Tk. 53.24 1,930.75

Contractor's profit Overhead expenses VAT (i) Ground floor

Per sft. = Tk. 5,324.00 Total = Tk. 7,254.75 10.00% = Tk. 725.48 4.00% = Tk. 290.19 Tk. 8,270.42 5.00% = Tk. 413.52 Grand total = Tk. 8,683.94 Rate per sft. = Tk. 86.84 Rate per sqm = Tk. 934.75

Say
(ii) (iii ) (iv )

Tk.

935 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

6. GLAZED TILES AND MARBLE STONE WORK


ANALYSIS FOR ITEM NO. 31(a) Marble stone flooring with 20 mm thick De Carrara / Ariston / Venus marble stone (Italy) Considering 100 ( 10'-0" x 10'-0" ) sft. of work A. 1. 2. 3. 4. 5. B. 1. 2. 3. 4. C. 1. 2. D. 1. 2. 3. Cost of materials 20 mm thick marble 100 sft. @ White cement 4 kg. @ Grey cement for sand cement mortar base 3.64 bag @ Sand (F.M. 1.2) 4.16 cft. @ Sand (F.M. 2.5) 4.16 cft. @

Tk. Tk.

440.00 16.75

Per sft = Tk. 44,000.00 Per kg. = Tk. 67.00 Per bag. = Tk. 910.00 Per % cft. = Tk. 41.18 Per % cft. = Tk. 55.33 Sub-total = Tk. 45,073.51

Tk. 250.00 Tk. 990.00 Tk. 1,330.00

Cost for cutting, shaping, tools and plants etc. Hire charge of cutting and shaping machine in/c cutting disc. 1 day Foreman 1 No. Machine operator 1 No. Helper 1 No. Labour cost for Mason Helper @ @ @ @ Tk. 1,025.00 Tk. 250.00 Tk. 160.00 Tk. 120.00

Per day = Tk. 1,025.00 each = Tk. 250.00 each = Tk. 160.00 each = Tk. 120.00 Sub-total = Tk. 1,555.00 each = Tk. 825.00 each = Tk. 240.00 Sub-total = Tk. 1,065.00

5.5 Nos. @ 2.0 Nos. @

Tk. Tk.

150.00 120.00

Polishing Hire charge of marble polishing machine in/c polishing stone 2.5 days @ Operator 2.5 Nos. @ Helper 2.5 Nos. @ Tk. 290.00 Per day = Tk. 725.00 Tk. 160.00 each = Tk. 400.00 Tk. 120.00 each = Tk. 300.00 Sub-total = Tk. 2,730.00 Total (A+B+C+D) = Tk. 50,423.51 Contractor's profit 10.00% = Tk. 5,042.35 Overhead expenses 4.00% = Tk. 2,016.94 Tk. 57,482.80 VAT 5.00% = Tk. 2,874.14 Grand total = Tk. 60,356.94 Rate per sft. = Tk. 603.57 Rate per sqm = Tk. 6,496.83 Tk. 6,497 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

(i)

Ground floor

Say
(ii) (iii ) (iv )

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 31(b) Marble stone flooring with 18 mm thick De Carrara / Ariston / Venus marble stone (Italy) Considering 100 ( 10'-0" x 10'-0" ) sft. A. Cost of marble works: same as item No. 31(a) Less cost of 20 mm thick marble stone 18 mm thick marble 100 sft. @ Tk. 400.00 = Tk. 50,423.51 = Tk. (44,000.00) Total = Tk. 6,423.51 Per sft. = Tk. 40,000 Sub-total = Tk. 46,423.51 10.00% = Tk. 4,642.35 4.00% = Tk. 1,856.94 Tk. 52,922.80 5.00% = Tk. 2,646.14 Grand total = Tk. 55,568.94 Rate per sft. = Tk. 555.69 Rate per sqm = Tk. 5,981.45

B.

Contractor's profit Overhead expenses VAT (i) Ground floor Say ,


(ii) (iii ) (iv )

Tk.

5,981 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 31(c) Machine made pre-polished re-constituted homogeneous natural marble slab: 13" x 13" size Italian

Travertino.
Considering 100 sft. 1. 2. a) b) c) d) 3. a) b) c) d) 4. Cost of 13" x 13" size machine made pre-polished marble slab: Italian 100 sft. @ Tk. 101.00 Material cost for laying on 25mm thick sand-cement Cement 2 bag. @ Sand (F.M. 1.2) 10 cft. @ White cement 1.8 kg. @ Marble dust / 1.8 kg. @ Labour for laying Head mason 1 No. @ Mason 3 Nos. @ Ordinary labour 5 Nos. @ local carriage, storage and sundries Machine charge for 100 sft. @ Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. 250.00 990.00 16.75 12.00 180.00 150.00 100.00 100.00

Per sft. = Tk. 10,100.00 Per bag = Tk. Per % cft = Tk. Per kg. = Tk. Per kg. = Tk. each each each L.S. Per % sft. Sub-total 10.00% 4.00% 500.00 99.00 30.15 21.60

Contractor's profit Overhead expenses

(i)

Ground floor

= Tk. 180.00 = Tk. 450.00 = Tk. 500.00 = Tk. 50.00 = Tk. 100.00 = Tk. 12,030.75 = Tk. 1,203.08 = Tk. 481.23 Tk. 13,715.06 VAT 5.00% = Tk. 685.75 Grand total = Tk. 14,400.81 Rate per sft. = Tk. 144.01 Rate per sqm = Tk. 1,550.12 1,550 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Say
(ii) (iii ) (iv )

Tk.

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 32 Marble stone flooring with 16 mm thick De Carrara / Ariston / Venus marble stone (Italy) Considering 100 sft. A. B. Cost of marble works excluding cost of marble stone: from item 31(b) = Tk. 6,423.51 16 mm thick marble 100 sft. @ Tk. 360.00 Per sft. = Tk. 36,000 Sub-total = Tk. 42,423.51 Contractor's profit 10.00% = Tk. 4,242.35 Overhead expenses 4.00% = Tk. 1,696.94 Tk. 48,362.80 VAT 5.00% = Tk. 2,418.14 Grand total = Tk. 50,780.94 Rate per sft. = Tk. Ground floor 507.81 Rate per sqm = Tk. 5,466.07 Say
(ii) (iii ) (iv )

(i)

Tk.

5,466 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 33 Marble stone on walls with 12 mm thick De Carrara / Ariston / Venus stone (Italy) Considering 100 sft.. A. 1. 2. 3. 4. 5. B. 1. 2. 3. 4. C. 1. 2. Cost of materials 12 mm thick marble stone Grey cement Sand (F.M. 1.2) Sand (F.M. 2.5) White cement

100 sft. 1.7 bag 2.08 cft. 2.08 cft. 4 kg.

@ @ @ @ @

Tk. 310.00 Tk. 250.00 Tk. 990.00 Tk. 1,330.00 Tk. 16.75

Cost for cutting, shaping, tools and plants etc. Hire charge of cutting and shaping machine in/c cutting 1 day @ Tk. 1,025.00 Foreman 1 No. @ Tk. 250.00 Machine operator 1 No. @ Tk. 160.00 Helper 1 No. @ Tk. 120.00 Labour cost for Mason Helper

Per sft. = Tk. 31,000.00 Per bag = Tk. 425.00 Per % cft. = Tk. 20.59 Per % cft. = Tk. 27.66 Per kg. = Tk. 67.00 Sub-total = Tk. 31,540.25

Per day = Tk. 1,025.00 each = Tk. 250.00 each = Tk. 160.00 each = Tk. 120.00 Sub-total = Tk. 1,555.00 each = Tk. each = Tk. 825.00 240.00

5.5 Nos. @ 2 Nos. @

Tk. Tk.

150.00 120.00

- 53 -

Analysis of Rates of P.W.D. Schedule (10th Edition), 16th October, 2002

3. D. 1. 2. 3.

Scaffolding

100 sft.

Tk.

3.00

Per sft. = Tk. 300.00 Sub-total = Tk. 1,365.00

Polishing Hire charge of marble polishing machine in/c polishing stone 2.5 days @ Machine operator 2.5 Nos. @ Helper 2.5 Nos. @

(i)

Ground floor

Tk. 290.00 Per day = Tk. 725.00 Tk. 160.00 each = Tk. 400.00 Tk. 120.00 each = Tk. 300.00 Sub-total = Tk. 3,330.00 Total (A+B+C+D) = Tk. 37,790.25 Contractor's profit 10.00% = Tk. 3,779.03 Overhead expenses 4.00% = Tk. 1,511.61 Tk. 43,080.89 VAT 5.00% = Tk. 2,154.04 Grand total = Tk. 45,234.93 Rate per sft. = Tk. 452.35 Rate per sqm = Tk. 4,869.10 Tk. 4,869 .00 Per sqm.
Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Say
(ii) (iii ) (iv )

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 34 Marble stone FLOORING with 20 mm thick grey / coloured marble stone (India / Pakistan) Considering 100 sft. of work A. B. Cost of marble works excluding cost of marble stone: from 20 mm thick coloured marble stone 100 sft. @ Tk. 300.00 = Tk. 6,423.51

Contractor's profit Overhead expenses VAT (i) Ground floor Say ,


(ii) (iii ) (iv )

Per sft. = Tk. 30,000 Sub-total = Tk. 36,423.51 10.00% = Tk. 3,642.35 4.00% = Tk. 1,456.94 Tk. 41,522.80 5.00% = Tk. 2,076.14 Grand total = Tk. 43,598.94 Rate per sft. = Tk. 435.99 Rate per sqm = Tk. 4,693.00

Tk.

4,693 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 35 Marble stone on WALL with 20 mm thick grey / coloured marble stone (India / Pakistan) Considering 100 sft. of work A. Cost of marble works on walls: same as item No. 33 Less cost of marble stone Add cost of 20 mm thick colored marble stone 100 sft. @ Tk. = Tk. 37,790.25 = Tk. (31,000.00) Total = Tk. 6,790.25

B.

300.00

Contractor's profit Overhead expenses VAT (i) Ground floor

Per sft. = Tk. 30,000.00 Sub-total = Tk. 36,790.25 10.00% = Tk. 3,679.03 4.00% = Tk. 1,471.61 Tk. 41,940.89 5.00% = Tk. 2,097.04 Grand total = Tk. 44,037.93 Rate per sft. = Tk. 440.38 Rate per sqm = Tk. 4,740.25

Say ,
(ii) (iii ) (iv )

Tk.

4,740 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 36 Supplying, fitting and fixing glazed WALL tiles on cement mortar base (3:1):

Laying cost on walls excluding cost of glazed tiles.


Considering 100 sft. of work Cost of materials for base with 3/4'' (av.) thick cement mortar: (3:1): Cement 1.87 bags @ Sand (F.M. 1.2) 7.03 cft. @ White cement 3.60 kg. @ Labour cost: Head mason 2.00 Nos. @ Mason 2.00 Nos. @ Skilled labour 3.00 Nos. @ Ordinary labour 3.00 Nos. @ local carriage, sundries, T & P & washing Tk. Tk. Tk. Tk. Tk. Tk. Tk. 250.00 990.00 16.75 180.00 150.00 120.00 100.00 Per bag = Tk. Per % cft. = Tk. Per kg. = Tk. 467.50 69.60 60.30

A. 1 2. 3. B. 1. 2. 3. 4. 5.

each = Tk. 360.00 each = Tk. 300.00 each = Tk. 360.00 each = Tk. 300.00 L.S. = Tk. 100.000 Total = Tk. 2,017.40 Laying cost per % sft. = Tk. 2,017.40

(i) (a )

Ground floor White glazed tiles of different sizes Considering 100 sft.

1. 2.

Cost of tiles Laying cost

100 sft. 100 sft.

@ @

Tk. 36.00 Add wastage Tk. 2,017.40

Contractor's profit Overhead expenses VAT

Per sft. = Tk. 3,600.00 5% = Tk. 180.00 Per % sft. = Tk. 2,017.40 Total = Tk. 5,797.40 10.00% = Tk. 579.74 4.00% = Tk. 231.90 Tk. 6,609.04 5.00% = Tk. 330.45 Grand total = Tk. 6,939.49 Rate per sft. = Tk. 69.39 Rate per sqm = Tk. 746.91

Say

Tk.

747 .00 Per sqm.

(b )

Coloured galazed wall tiles of different sizes Considering 100 sft. of work

1. 2.

Cost of tiles Laying cost

100 sft. 100 sft.

@ @

Tk. 40.00 Add wastage Tk. 2,017.40

Contractor's profit Overhead expenses VAT

Per sft. = Tk. 5% = Tk. Per % sft. = Tk. Total = Tk. 10.00% = Tk. 4.00% = Tk. Tk. 5.00% = Tk. Grand total = Tk. Rate per sft. = Tk. Rate per sqm = Tk.

4,000.00 200.00 2,017.40 6,217.40 621.74 248.70 7,087.84 354.39 7,442.23 74.42 801.06

Say (c ) Special design glazed coloured wall Considering 100 sft. of work 1. 2. Cost of tiles Laying cost 100 sft. 100 sft. @ @

Tk.

801 .00 Per sqm.

Tk. 42.00 Add wastage Tk. 2,017.40

Contractor's profit Overhead expenses VAT

Per sft. = Tk. 4,200.00 5% = Tk. 210.00 Per % sft. = Tk. 2,017.40 Total = Tk. 6,427.40 10.00% = Tk. 642.74 4.00% = Tk. 257.10 Tk. 7,327.24 5.00% = Tk. 366.36 Grand total = Tk. 7,693.60 Rate per sft. = Tk. 76.94 Rate per sqm = Tk. 828.18

Say
(ii) (iii ) (iv )

Tk.

828 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 37

Supplying, fitting and fixing glazed FLOOR tiles on cement mortar base (2:1):

Laying cost on FLOOR excluding cost of glazed tiles.


Considering 100 sft. A. 1. 2. 3. B. 1. 2. 3. 4. 5. Cost of materialsfor base with 3/4'' (av) thick cement mortar (2:1): Cement 2.50 bags @ Sand (F.M. 1.2) 6.25 cft. @ White cement 3.60 kg. @ Labour Cost : Head mason 2 Nos. @ Mason 2 Nos. @ Skilled labour 3 Nos. @ Ordinary labour 3 Nos. @ local carriage, sundries, T & P Tk. Tk. Tk. Tk. Tk. Tk. Tk. 250.00 990.00 16.75 180.00 150.00 120.00 100.00 Per bag. = Tk. Per % cft. = Tk. Per kg. = Tk. 625.00 61.88 60.30

each = Tk. 360.00 each = Tk. 300.00 each = Tk. 360.00 each = Tk. 300.00 L.S. = Tk. 100.00 Total = Tk. 2,167.18 Cost per % sft. = Tk. 2,167.18

(i)

Ground floor

a)

White glazed floor tiles of different sizes Considering 100 sft.

1. 2.

Cost of tiles Laying cost

100 sft. 100 sft.

@ @

Tk.

38.00

Tk. 2,167.18

A d

Contractor's profit Overhead expenses VAT

Per sft. = Tk. 3,800.00 5% = Tk. 190.00 Per % sft. = Tk. 2,167.18 Total = Tk. 6,157.18 10.00% = Tk. 615.72 4.00% = Tk. 246.29 Tk. 7,019.19 5.00% = Tk. 350.96 Grand total = Tk. 7,370.15 Rate per sft. = Tk. 73.70 Rate per sqm = Tk. 793.31

Say , b) Coloured glazed floor tiles of different sizes Considering 100 sft. 1. 2. Cost of tiles Laying cost 100 sft. 100 sft. @ @

Tk.

793 .00 Per sqm.

Tk. 42.00 Add wastage Tk. 2,167.18

Contractor's profit Overhead expenses VAT

Per sft. = Tk. 5% = Tk. Per % sft. = Tk. Total = Tk. 10.00% = Tk. 4.00% = Tk. Tk. 5.00% = Tk. Grand total = Tk. Rate per sft. = Tk. Rate per sqm = Tk.

4,200.00 210.00 2,167.18 6,577.18 657.72 263.09 7,497.99 374.90 7,872.89 78.73 847.45

Say c) Special design coloured glazed floor tiles Considering 100 sft. 1. 2. Cost of tiles Laying cost 100 sft. 100 sft. @ @

Tk.

847 .00 Per sqm.

Tk. 45.00 Add wastage Tk. 2,167.18

Contractor's profit Overhead expenses VAT

Per sft. = Tk. 5% = Tk. Per % sft. = Tk. Total = Tk. 10.00% = Tk. 4.00% = Tk. Tk. 5.00% = Tk. Grand total = Tk. Rate per sft. = Tk. Rate per sqm = Tk.

4,500.00 225.00 2,167.18 6,892.18 689.22 275.69 7,857.09 392.85 8,249.94 82.50 888.03

Say

Tk.

888 .00 Per sqm.

(ii) (iii ) (iv )

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

Per sqm Per sqm Per sqm

= = =

Tk. Tk. Tk.

3.19 6.38 9.58

ANALYSIS FOR ITEM NO. 38 - I Supplying, fitting and fixing unglazed Homogeneous floor tiles on cement mortar base (2:1): Cost for laying floor tiles: Same as item

No. 37

Per % sft. = Tk. 2,167.18

(i) a)

For Ground floor GP (Homogeneous) 305 x 305 mm floor tiles Considering 100 sft.

1. 2.

Cost of tiles Laying cost

100 sft. 100 sft.

@ @

Tk. 48.00 Add wastage Tk. 2,167.18

Contractor's profit Overhead expenses VAT

Per sft. = Tk. 5% = Tk. Per % sft. = Tk. Total = Tk. 10.00% = Tk. 4.00% = Tk. Tk. 5.00% = Tk. Grand total = Tk. Rate per sft. = Tk. Rate per sqm = Tk.

4,800.00 240.00 2,167.18 7,207.18 720.72 288.29 8,216.19 410.81 8,627.00 86.27 928.61

Say , b)

Tk.

929 .00 Per sqm.

GP (Homogeneous) 400 x 400 mm floor tiles Considering 100 sft. work

1. 2.

Cost of tiles Laying cost

100 sft. 100 sft.

@ @

Tk. 54.00 Add wastage Tk. 2,167.18

Contractor's profit Overhead expenses VAT

Per sft. = Tk. 5% = Tk. Per % sft. = Tk. Total = Tk. 10.00% = Tk. 4.00% = Tk. Tk. 5.00% = Tk. Grand total = Tk. Rate per sft. = Tk. Rate per sqm = Tk.

5,400.00 270.00 2,167.18 7,837.18 783.72 313.49 8,934.39 446.72 9,381.11 93.81 1,009.77

Say
(ii) (iii ) (iv )

Tk.

1,010 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 38 - II Supplying, fitting and fixing Mirror polished floor tiles on cement mortar base (2:1): Cost for laying floor tiles: Same as item

Per % sft. = Tk. 2,167.18

(i)

For Ground floor GP (Mirror polished) 300 x 300 mm floor tiles Considering 100 sft.

a)

1. 2.

Cost of tiles Laying cost

100 sft. 100 sft.

@ @

Tk. 88.00 Add wastage Tk. 2,167.18

Contractor's profit Overhead expenses VAT

Per sft. = Tk. 8,800.00 5% = Tk. 440.00 Per % sft. = Tk. 2,167.18 Total = Tk. 11,407.18 10.00% = Tk. 1,140.72 4.00% = Tk. 456.29 Tk. 13,004.19 5.00% = Tk. 650.21 Grand total = Tk. 13,654.40 Rate per sft. = Tk. 136.54 Rate per sqm = Tk. 1,469.72

Say b)

Tk.

1,470 .00 Per sqm.

GP (Mirror polished) 396 x 396 mm floor tiles Considering 100 sft. work

1. 2.

Cost of tiles Laying cost

100 sft. 100 sft.

@ @

Tk. 103.50 Add wastage Tk. 2,167.18

Contractor's profit Overhead expenses VAT

Per sft. = Tk. 10,350.00 5% = Tk. 517.50 Per % sft. = Tk. 2,167.18 Total = Tk. 13,034.68 10.00% = Tk. 1,303.47 4.00% = Tk. 521.39 Tk. 14,859.54 5.00% = Tk. 742.98 Grand total = Tk. 15,602.52 Rate per sft. = Tk. 156.03 Rate per sqm = Tk. 1,679.51

Say ,

Tk.

1,680 .00 Per sqm.

c)

GP (Mirror polished) 300 x 600 mm floor tiles Considering 100 sft.

1. 2.

Cost of tiles Laying cost

100 sft. 100 sft.

@ @

Tk. 115.00 Add wastage Tk. 2,167.18

Contractor's profit Overhead expenses VAT

Per sft. = Tk. 11,500.00 5% = Tk. 575.00 Per % sft. = Tk. 2,167.18 Total = Tk. 14,242.18 10.00% = Tk. 1,424.22 4.00% = Tk. 569.69 Tk. 16,236.09 5.00% = Tk. 811.80 Grand total = Tk. 17,047.89 Rate per sft. = Tk. 170.48 Rate per sqm = Tk. 1,835.05

Say , d) GP 305 x 305 mm floor (stair) tiles Considering 100 sft. work 1. 2. Cost of tiles Laying cost 100 sft. 100 sft. @ @

Tk.

1,835 .00 Per sqm.

Tk. 60.00 Add wastage Tk. 2,167.18

Contractor's profit Overhead expenses VAT

Per sft. = Tk. 5% = Tk. Per % sft. = Tk. Total = Tk. 10.00% = Tk. 4.00% = Tk. Tk. 5.00% = Tk. Grand total = Tk. Rate per sft. = Tk. Rate per sqm = Tk.

6,000.00 300.00 2,167.18 8,467.18 846.72 338.69 9,652.59 482.63 10,135.22 101.35 1,090.93

Say ,
(ii) (iii ) (iv )

Tk.

1,091 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 38 - III Supplying, fitting and fixing acid-proof floor tiles on cement mortar base (2:1): Cost for laying floor tiles: Same as item Per % sft. = Tk. 2,167.18

(i) a)

For Ground floor 140 x 140 x 8.5 mm acid proof floor tiles

Considering 100 sft. 1. 2. Cost of tiles Laying cost 100 sft. 100 sft. @ @ Tk. 90.00 Add wastage Tk. 2,167.18 Per sft. = Tk. 9,000.00 5% = Tk. 450.00 Per % sft. = Tk. 2,167.18 Total = Tk. 11,617.18 10.00% = Tk. 1,161.72 4.00% = Tk. 464.69 Tk. 13,243.59 5.00% = Tk. 662.18 Grand total = Tk. 13,905.77 Rate per sft. = Tk. 139.06 Rate per sqm = Tk. 1,496.84

Contractor's profit Overhead expenses VAT

Say , b) 100 x 100 x 8.5 mm acid proof floor tiles Considering 100 sft. 1. 2. Cost of tiles Laying cost 100 sft. 100 sft. @ @

Tk.

1,497 .00 Per sqm.

Tk. 96.00 Add wastage Tk. 2,167.18

Contractor's profit Overhead expenses VAT

Per sft. = Tk. 9,600.00 5% = Tk. 480.00 Per % sft. = Tk. 2,167.18 Total = Tk. 12,247.18 10.00% = Tk. 1,224.72 4.00% = Tk. 489.89 Tk. 13,961.79 5.00% = Tk. 698.09 Grand total = Tk. 14,659.88 Rate per sft. = Tk. 146.60 Rate per sqm = Tk. 1,578.00

Say
(ii) (iii ) (iv )

Tk.

1,578 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 39(a) (a) Supplying, fitting and fixing homogeneous quartz floor tiles on cement mortar base (3:1): Considering 100 sft. A. Cost of materials for base with 3/4'' (av.) thick cement mortar: (3:1): 1 Cement 1.87 bags @ Tk. 250.00 2. Sand (F.M. 1.2) 7.03 cft. @ Tk. 990.00 3. White cement 3.60 kg. @ Tk. 16.75 B. Labour cost: 1. Head mason 2.00 Nos. @ Tk. 180.00 2. Mason 2.00 Nos. @ Tk. 150.00 3. Skilled labour 3.00 Nos. @ Tk. 120.00 4. Ordinary labour 3.00 Nos. @ Tk. 100.00 local carriage, sundries, T & P & washing 5.

Per bag = Tk. Per % cft. = Tk. Per kg. = Tk. each = Tk. each = Tk. each = Tk. each = Tk. L.S. = Tk.

467.50 69.60 60.30 360.00 300.00 360.00 300.00 100.000

- 54 -

Analysis of Rates of P.W.D. Schedule (10th Edition), 16th October, 2002

C.

Cost of Tiles Add wastage

### sft.

Tk.

50.00

Sub-Total = Tk. 2,017.40 Per sft. = Tk. 5,000.00 5% = Tk. 250.00 Total = Tk. 7,267.40 10.00% = Tk. 726.74 4.00% = Tk. 290.70 Tk. 8,284.84 5.00% = Tk. 414.24 Grand total = Tk. 8,699.08 Rate per sft. = Tk. 86.99 Rate per sqm = Tk. 936.36

Contractor's profit Overhead expenses VAT

(i)
(ii) (iii ) (iv )

For Ground floor

Say ,

Tk.

936 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

(b) Supplying, fitting and fixing homogeneous embossed floor tiles on cement mortar base (3:1): Considering 100 sft A. Cost of materials for base with 3/4'' (av.) thick cement mortar: (3:1): 1 2. 3. B. 1. 2. 3. 4. 5. C. Cement 1.87 bags @ Sand (F.M. 1.2) 7.03 cft. @ White cement 3.60 kg. @ Labour cost: Head mason 2.00 Nos. @ Mason 2.00 Nos. @ Skilled labour 3.00 Nos. @ Ordinary labour 3.00 Nos. @ local carriage, sundries, T & P & washing Cost of Tiles Add wastage ### sft. @ Tk. Tk. Tk. Tk. Tk. Tk. Tk. 250.00 990.00 16.75 180.00 150.00 120.00 100.00 Per bag = Tk. Per % cft. = Tk. Per kg. = Tk. 467.50 69.60 60.30

Tk.

60.00

each = Tk. 360.00 each = Tk. 300.00 each = Tk. 360.00 each = Tk. 300.00 L.S. = Tk. 100.000 Sub-Total = Tk. 2,017.40 Per sft. = Tk. 6,000.00 5% = Tk. 300.00 Total = Tk. 8,317.40 10.00% = Tk. 831.74 4.00% = Tk. 332.70 Tk. 9,481.84 5.00% = Tk. 474.09 Grand total = Tk. 9,955.93 Rate per sft. = Tk. 99.56 Rate per sqm = Tk. 1,071.66

Contractor's profit Overhead expenses VAT

(i)
(ii) (iii ) (iv )

For Ground floor

Say ,

Tk.

1,072 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for each addl. floor for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) Add for each addl. floor for 10th floor and above (@ 0.75 No. lab per % sft.)

ANALYSIS FOR ITEM NO. 40

Supplying, fitting and fixing 300 x 300 mm / 400 x 400 mm size of special quality fibreous floor tiles (foreign

made) on cement mortar base (3:1):


Considering 100 sft. of work A. 1 2. 3. B. 1. 2. 3. 4. 5. C. Cost of materials for base with 3/4'' (av.) thick cement mortar: (3:1): Cement 1.87 bags @ Sand (F.M. 1.2) 7.03 cft. @ White cement 3.60 kg. @ Labour cost: Head mason 2.00 Nos. @ Mason 2.00 Nos. @ Skilled labour 3.00 Nos. @ Ordinary labour 3.00 Nos. @ local carriage, sundries, T & P & washing Cost of Tiles Add wastage ### sft. @ Tk. Tk. Tk. Tk. Tk. Tk. Tk. 250.00 990.00 16.75 180.00 150.00 120.00 100.00 Per bag = Tk. Per % cft. = Tk. Per kg. = Tk. 467.50 69.60 60.30

Tk.

75.00

each = Tk. 360.00 each = Tk. 300.00 each = Tk. 360.00 each = Tk. 300.00 L.S. = Tk. 100.00 Sub-Total = Tk. 2,017.40 Per sft. = Tk. 7,500.00 5% = Tk. 375.00 Total = Tk. 9,892.40 10.00% = Tk. 989.24 4.00% = Tk. 395.70 Tk. 11,277.34 5.00% = Tk. 563.87 Grand total = Tk. 11,841.21 Rate per sft. = Tk. 118.41 Rate per sqm = Tk. 1,274.57

Contractor's profit Overhead expenses VAT

(i) (ii ) (iii ) (iv )

For Ground floor

Say ,

Tk.

1,275 .00 Per sqm.


Per sqm Per sqm Per sqm = = = Tk. Tk. Tk. 3.19 6.38 9.58

Add for each addl. floor upto 5th floor (@ 0.25 No. lab per % sft.) in/c Add for 6th floor to 9th floor (@ 0.5 No. lab per % sft.) in/c charges Add for 10th floor and above (@ 0.75 No. lab per % sft.) in/c charges

- 55 -

PWD Schedule of Rates: 16th October, 2002 (10th Edition)

A. BUILDING WORKS
1. EARTH WORKS, MASS CONCRETE, DPC & PLINTH FILLING
Item No. 1. Description of items Unit Earth work in excavation in all kinds of soil for foundation trenches in/c. layout, providing center lines, bench-mark pillars, leveling, ramming and preparing the base, fixing bamboo spikes & marking layout with chalk powder, providing necessary tools and plants, protecting and maintaining the trench dry etc., stacking the excavated earth at a safe distance of upto 60 m lead, removing the spoils etc. all complete as per direction of engineer-in-charge (Excluding the cost of bench mark pillars). Excavation upto 1.50 m depth and 60 m lead in/c checking levels and stacking the earth. cum Extra rate for each additional 1 m depth beyond 1.5 m and upto 60 m lead in/c checking levels and stacking the earth. cum Extra rate for each 30 m additional lead beyond 60 m in/c checking levels and stacking the earth. cum Extra rate for earth work in excavation in foundation trenches, protected by palisading and de-watering/bailing-out water up to 1.5 m depth and 60 m lead. (condition of the soil must be supported by sub-soil investigation report and approved by concerned S.E. before commencing the excavation work) cum Extra rate for earth work in excavation in foundation trenches, protected by palisading and de-watering/bailing-out water for depth exceeding 1.5 m (condition of the soil must be supported by sub-soil investigation report and approved by concerned S.E. before commencing the excavation work). cum One layer of brick flat soling in foundation or in floor with lst class or picked jhama bricks in/c preparation of bed and filling the interstices with local sand, leveling in/c the supply of water, electricity and other charges and costs of tools and plants etc. all complete as per direction of the engineer-in-charge. sqm One layer of Herring bone bond brick soling -dosqm Brick on end edging -doMass concrete (1:3:6) in foundation or floor with cement, sand (F.M.1.2) and picked jhama chips including breaking chips, screening, mixing, laying, compacting to levels and curing for at least 7 days in/c the supply of water, electricity and other charges and costs of tools and plants etc. all complete in/c as per direction of engineer-in-charge cum Mass concrete in foundation (1:3:6) with brick chips & local sand of F.M. 1.2 Mass concrete in floor (1:3:6) with brick chips & local sand of F.M. 1.2 cum Mass concrete (1:2:4) in foundation or floor with cement, sand(F.M.1.2) and picked jhama chips including breaking chips, screening, mixing, laying, compacting to levels and curing for at least 7 days in/c the supply of water, electricity and other charges and costs of tools and plants etc. all complete in/c as per direction of engineer-in-charge. Mass concrete in foundation (1:2:4) with brick chips & local sand of F.M. 1.2 cum Tk. Tk. 3,167.00 3,012.00 rm Unit Rate

(a) (b) (c) (d)

Tk. Tk. Tk.

63.00 13.00 5.00

Tk.

244.00

(e)

Tk.

423.00

2.(a)

Tk. Tk. Tk.

151.00 242.00 38.00

(b) (c) 3.(a)

(i) (ii) 3.(b)

(i)

Tk.

3,801.00

ahsan/aqa

(31)

PWD Schedule of Rates: 16th October, 2002 (10th Edition)

Item No. (ii) 4.

Description of items Unit Unit Rate Mass concrete in floor (1:2:4) with brick chips & local sand of F.M. 1.2 cum Tk. 3,646.00 75 mm thick damp proof course (1:1.5:3) in cement concrete with cement, sand (F.M. 1.2) and picked jhama or stone chips in/c. breaking chips, screening, centring, shuttering, casting, curing and finished with a coat of bitumen in/c the supply of water, electricity and other charges and costs of tools and plants etc. all complete in/c as per direction of the engineer-in-charge. 75 mm or 3" thick damp proof course (1:1.5:3) with brick chips and 50% Sylhet sand (F.M. 2.5) & 50% local sand (F.M. 1.2) 75 mm or 3" thick damp proof course (1:1.5:3) with Sylhet sand (F.M. 2.5) and stone chips. Sand filling in foundation trenches and plinth with fine local sand having minimum F.M. 0.80 in 150 mm layers including leveling, watering and consolidating each layer up to finished level etc. all complete as per direction of the engineer-in-charge. Sand filling in foundation trenches and plinth with coarse sand having min. F.M. 1.20 in 150 mm layers including leveling, watering and consolidating each layer up to finished level (to be used when required as per design supplied by the design office only) etc. all complete as per direction of the engineer-in-charge. Sand filling in foundation trenches and plinth with coarse sand having min. F.M 2.50 in 150 mm layers including leveling , watering and consolidating each layer up to finished level (to be use as pre-requirement of design office only) etc. all complete as per direction of the engineer-in-charge. 3/4" down graded picked jhama chips khoa consilidation in foundation, mixing the same with best quality local sand (F.M. 1.5) in khoa : sand (3:2) proportion in/c breaking & screening chips, laying & spreading in 6" layers uniformly, compacting mannually the same upto the desired mark as suggested by design engineer, spreading water etc. all complete as per direction of the engineerin-charge. Earth filling in foundation trenches and plinth in 150 mm layer with earth available within 90 m of the building site, watering, leveling and consolidating each layer up to finished level etc. all complete as per direction of the engineer-incharge.

(a) (b) 5(a)

sqm sqm

Tk. Tk.

475.00 566.00

cum

Tk.

385.00

(b)

cum

Tk.

586.00

(c)

cum

Tk.

773.00

(d)

cum

Tk.

1,674.00

6.

cum

Tk.

65.00

2. SITE IMPROVEMENTS
7. Site improvement / earth filling in foundation trenches and plinth in 150 mm layers with carted earth carried by truck or any other means loading & unloading at both ends to be supplied at the contractors own cost in/c. leveling, watering and consolidating including local carriage each layer up to finished level. in/c cost of water & test (carried from beyond 300 m) etc. all complete as per direction of the engineer-in-charge. For Dhaka Metropolitan area For Narayangonj District For Chittagong Metropolitan Area cum cum cum Tk. Tk. Tk. 220.00 213.00 198.00

(a) (b) (c)

ahsan/aqa

(32)

PWD Schedule of Rates: 16th October, 2002 (10th Edition)

Item No. (d)

Description of items For all districts except Dhaka & Chittagong Metropolitan Area & Narayangonj district

Unit cum

Unit Rate Tk. 190.00

3. BRICK WORK & FANCY SCREEN WORK


8. Brick work with 1st class bricks in cement mortar (1:6) in foundation and plinth, filling the joints/interstices fully with mortar racking out the joints, cleaning and soaking the bricks at least for 24 hours before use and curing at least for 7 days etc. all complete (F.M. of sand 1.2) including cost of water, electricity & other charges as per direction of the engineer-in-charge. Brick walls of width one brick or one and a half brick length with 1st class bricks in cement mortar (1:6) in super structure in/c raking out joints, filling the interstices with mortar, cleaning and soaking the bricks at least for 24 hours before use and washing of sand, necessary scaffolding, curing at least for 7 days etc. all complete including cost of water, electricity & other charges (measurement to given as 250 mm width for one brick length and 375 mm for one brick and a half brick length) (F.M. of sand 1.2 ) as per direction of engineer-in-charge. Ground floor Add for each additional floor up to 5th floor Add for each additional floor from 6th floor up to 9th floor cum cum Tk. Tk. Tk. Tk. 2,517.00 52.36 73.30 83.77

cum

Tk.

2,380.00

9.

(a) (b) (c) (d) 10.

cum Add for each additional floor 10th floor & above cum Brick work with lst class bricks in cement mortar (1:4) in exterior walls in/c filling the interstices with mortar, raking out joints, cleaning and socking the bricks at least for 24 hours before use and washing of sand, necessary scaffolding, curing at least for 7days etc. all complete (F.M. of sand 1.2) including cost of water, electricity & other charges (measurement to given as 250 mm width for one brick length and 375 mm for one brick and a half brick length). (F.M. of sand 1.2) as per direction of the engineer-in-charge. Ground Floor Add for each additional floor up to 5th floor Add for each additional floor from 6th floor up to 9th floor Add for each additional floor for10th floor & above Exposed brick work (for exterior wall without outside plaster) with special quality sorted out 1st class bricks, very carefully laid in cement mortar (1:4)) in superstructure with uniform width and depth joints, true to vertical and horizontal lines in/c raking out joints scaffolding, soaking the bricks at least for 24 hours before use, washing & screening of sand. Curing at least for 7 days and high class flush pointing with cement mortar (1:1) (payment will not be made unless the brick is found to be water proof) (F.M. of sand 1.2) including cost of water, electicity & other charges etc all complete as per direction of the engineer-incharge. Ground floor Add for each additional floor up to 5th floor Add for each additional floor from 6th floor up to 9th floor Add for each additional floor for10th floor & above cum cum cum cum cum cum cum cum

(a) (b) (c) (d) 11.

Tk. Tk. Tk. Tk.

2,724.00 52.36 73.30 83.77

(a) (b) (c) (d)

Tk. Tk. Tk. Tk.

3,131.00 52.36 73.30 83.77

ahsan/aqa

(33)

PWD Schedule of Rates: 16th October, 2002 (10th Edition)

Item No. 12(a)

Description of items Brick work with 10 holes machine made bricks of approved size (9.5" x 4.5" x 2.75") having uniform colour carefully laid in cement mortar (1:4) in superstructure with uniform width and depth joints, true to vertical and horizontal lines in/c raking out joints, filling the interstices with mortar, cleaning and soaking bricks at least for 24 hours before use and washing & screening of sand, necessary scaffolding, curing at least for 7 days and pointing with cement mortar (1:2) (F.M. of sand 1.2) including cost of water, electricity & other charges etc. complete as per direction of the engineer-in-charge. Ground floor Add for each additional floor up to 5th floor Add for each additional floor from 6th floor up to 9th floor Add for each additional floor for 10th floor & above Brick work with 9.5" x 4.5" x 2.75" size machine made solid klinker facing bricks (1:4) -do- doGround floor Add for each additional floor up to 5th floor Add for each additional floor from 6th floor up to 9th floor Add for each additional floor for 10th floor & above Brick work with 9.5" x 4.5" x 2.75" size 10 hole machine made Rockface/textured klinker facing bricks (1:4) -do - -do Ground floor Add for each additional floor up to 5th floor Add for each additional floor from 6th floor up to 9th floor Add for each additional floor for 10th floor & above Brick work with 9.5" x 4.5" x 2.75" size 3 hole machine made reinforced klinker facing bricks (1:4) -do- -doGround floor Add for each additional floor up to 5th floor Add for each additional floor from 6th floor up to 9th floor Add for each additional floor for 10th floor & above Extra brick-work rate over the rate of ground floor (or any floor as the case may be) for each additional meter free height of brick wall beyond 4 m from the respective floor in auditorium, godown, overhead water tank etc. as description of the item No.in 9, 10, 11 & 12. Extra rate shall be admissible only when both sides of wall is uninterruptedly free beyond 4.00 meter) including cost of water, electricity & other charges etc. all complete as per direction of the engineer-incharge.

Unit

Unit Rate

(i) (ii) (iii) (iv) 12.(b) (i) (ii) (iii) (iv) 12(c) (i) (ii) (iii) (iv) 12(d) (i) (ii) (iii) (iv) 13.

cum cum cum cum

Tk. Tk. Tk. Tk.

4,657.00 52.36 73.30 83.77

cum cum cum cum

Tk. Tk. Tk. Tk.

4,318.00 52.36 73.30 83.77

cum cum cum cum

Tk. Tk. Tk. Tk.

4,918.00 52.36 73.30 83.77

cum cum cum cum

Tk. Tk. Tk. Tk.

4,787.00 52.36 73.30 83.77

cum

Tk.

54.00

ahsan/aqa

(34)

PWD Schedule of Rates: 16th October, 2002 (10th Edition)

Item No. 14.(a)

Description of items Providing brick work for 200 x 100 mm facing in superstructure with 200 x 100 x 50 mm machine made klinker hard pressed facing bricks of approved quality in cement mortar (1:4), in/c. racking out joints, cutting the bricks to requiredsize wherever necessary in/c high class recessed pointing, cleaning and soaking the bricks at least for 24 hours before use and washing & screening of sand, necessary scaffolding, curing at least for 7 days for all floors up to 4th floor (F.M. of sand 1.2) including cost of water, electricity & other charges etc. all complete as per direction of engineer-in- charge(100 x 200 mm face should be placed for facing). Ground floor Add for each additional floor up to 5th floor Add for each additional floor from 6th floor up to 9th floor Add for each additional floor for 10th floor & above Providing brick work in facing for 200 x 50 mm in supertucture with 200 x 50 x 50 mm machine made hard pressed klinker facing bricks of approved quality pressed with 20 mm thick cement mortar (1:4) 10 mm thick cement mortar in adjacent sites in/c racking out joints and cutting the bricks to required sizes wherever necessary with high class recessed pointing, cleaning and soaking the bricks for at least 24 hours before use and washing of sand necessary scaffolding, curing at least for 7days for all floors up to 4th floor (F.M. of sand 1.2) including cost of water, electicity & other charges etc. all complete as per direction of engineer-in- charge. Ground floor Add for each additional floor up to 5th floor Add for each additional floor from 6th floor up to 9th floor Add for each additional floor for 10th floor & above Providing brick work for 200 x 62 mm facing in superstructure with 200 x 62 x 25 mm machine made hard pressed klinker facing strips of approved quality pressed with 20 mm thick cement mortar (3:1) adjacent side wall, column, drop wall etc. and racking out joints, cutting the bricks to required sizes wherever necessary with high class recessed pointing, cleaning and soaking the bricks at least for 24 hours before use washing & screening of sand. and necessary scaffoldings, curing at least 7 days (F.M. of sand 1.2) including cost of water, electricity & other charges etc. all complete as per direction of the engineer-in-charge. Ground floor Add for each additional floor up to 5th floor Add for each additional floor from 6th floor up to 9th floor Add for each additional floor for 10th floor & above 125 mm brick work with 1st class bricks in cement mortar (1:6) and making bond with connected walls in/c necessary scaffolding, raking out joints, cleaning and soaking the bricks for at least 24 hours before use and washing of sand curing at least for 7 days in all floors (F.M. of sand 1.2) including cost of water, electricity & other charges etc. all complete as per direction of the engineer-in-charge. Ground floor

Unit

Unit Rate

(i) (ii) (iii) (iv) 14 (b)

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

680.00 9.58 12.77 15.96

(i) (ii) (iii) (iv) 14 (c)

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

811.00 9.58 12.77 15.96

(i) (ii) (iii) (iv) 15 (a)

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

1,415.00 9.58 12.77 15.96

(i)

sqm

Tk.

360.00

ahsan/aqa

(35)

PWD Schedule of Rates: 16th October, 2002 (10th Edition)

Item No. (ii) (iii) (iv) 15 (b) (i) (ii) (iii) (iv) 15 (c)

Description of items Add for each additional floor up to 5th floor Add for each additional floor from 6th floor up to 9th floor Add for each additional floor for 10th floor & above 125 mm thick brick work with 1st class bricks in cement mortar (1:4) -doGround floor Add for each additional floor up to 5th floor Add for each additional floor from 6th floor up to 9th floor

Unit sqm sqm sqm

Unit Rate Tk. Tk. Tk. 9.58 12.77 15.96

sqm sqm

Tk. Tk. Tk. Tk.

383.00 9.58 12.77 15.96

sqm Add for each additional floor for 10th floor & above sqm Providing 125 mm thick (Partition wall) in superstructure brick work (1:4) in cement mortar with 10 hole machine made ceramic bricks of approved size having uniform colour, carefully laid in cement mortar (2:1) and depth joints true to vertical and horizontal lines in/c. racking out joints, filling the interstices with same mortar, making bond with connected walls, cleaning, soaking brick at least 24 hours and washing of sand, curing 7 days in all floors, (F.M. of sand 1.2) including cost of water, electricity & other charges as per direction of the engineerin-charge. Ground floor Add for each additional floor up to 5th floor Add for each additional floor from 6th floor up to 9th floor Add for each additional floor for 10th floor & above Fancy screen work with different size hollow machine made design blocks with uniform colour, carefully laid in coloured cement mortar (1:3) in all floors in wall with uniform mortar joints, true to vertical and horizontal line in/c racking out joints, cleaning and soaking the blocks for minimum 24 hours before use in/c washing & screening of sand, scaffolding, curing etc. complete in all respect in/c supply of all necessary materials (F.M. of sand 1.2) in/c cost of water, electricity & other charges as per direction of the engineer-in-charge. With design block No. 3 (MCW) size: 4" x 4" x 4" Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above With design block No. 2 (MCW) size: 6.5" x 4.75" x 4" Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with design block No. 20 (MCW) size: 6``x 6``x4 Ground floor sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm

(i) (ii) (iii) (iv) 16

Tk. Tk. Tk. Tk.

643.00 9.58 12.77 15.96

(a) (i) (ii) (iii) (iv) (b) (i) (ii) (iii) (iv) (c) (i)

Tk. Tk. Tk. Tk.

1,425.00 9.58 12.77 15.96

Tk. Tk. Tk. Tk. Tk.

1,001.00 9.58 12.77 15.96 1,072.00

ahsan/aqa

(36)

PWD Schedule of Rates: 16th October, 2002 (10th Edition)

Item No. (ii) (iii) (iv) 17.

Description of items Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above Klinker paving bricks work in floor/ pavement with machine made pressed bricks of approved quality in cement mortar (1:4) on minimum 12 mm thick cement mortar (1:4) in/c raking out joints, cutting the bricks to required size soaking the same 24 hours before use wherever necessary in/c high class flush pointing in cement mortar (1:2), cleaning, curing at least for 7 days etc. in/c washing and screening of sand, cost of water, electricity & other charges complete and standard practice (F. M. of sand 1.2) as per direction of the engineer-incharge. 100 mm thick brick on edge pavement with 200 x 100 x 50 mm

Unit sqm sqm sqm

Unit Rate Tk. Tk. Tk. 9.58 12.77 15.96

(a) (b) (c) 18 (a)

sqm 50 mm thick flat brick pavement with 200 x 100 x 50 mm klinker paving bricks in 1:4 cement sand mortar having 200 x 100 mm face at top 50 mm thick brick pavement with 200 x 50 x 5 mm klinker facing bricks 115 mm thick brick pavement/flooring with lst class brick on edge in cement mortar (1:4) on minimum 12 mm thick cement mortar (4:1) in/c cutting the bricks as per requirement, cleaning and racking out joints, finishing with flush pointing with cement mortar (2:1) and curing for at least 7 days etc. in/c cost of water, washing and screening of sand (F.M. 1.2), electricity & other charges complete and standard practice as per direction of the engineer-in-charge. -do- with 10 hole machine made ceramic bricks. sqm sqm

Tk. Tk. Tk.

1,109.00 660.00 772.00

sqm sqm

Tk. Tk.

427.00 676.00

18(b)

4. FLOORING AND FLOOR FINISH


19 75 mm thick cement concrete (1:3:6) with cement in flooring best quality coarse sand & 19 mm down graded picked chips in/c breaking chips, screening, mixing, laying, compacting, washing and screening of sand of F.M 1.2 and curing at least for 7 days etc. in/c cost of water, electricity & other charges all complete as per direction of the engineer-in-charge. 25 mm thick artificial patent stone (1:2:4) flooring with cement, best quality coarse sand (50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.5 and 50% best local sand of FM 1.2) & 12 mm down well graded brick chips in/c breaking chips, screening, laying the concrete in alternate panels, compacting and finishing the top with neat cement and curing at least 7 days in all floors in/c cost of water, electricity & other charges all floors as per direction of the engineer-incharge. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above -do- 38 mm thick with 12 mm down graded brick chips Ground floor Add for each additional floor upto 5th floor sqm sqm Tk. Tk. 200.00 9.58 sqm sqm sqm sqm Tk. Tk. Tk. Tk. 154.00 9.58 12.77 15.96

sqm

Tk.

261.00

20 (a)

(i) (ii) (iii) (iv) b (i) (ii)

ahsan/aqa

(37)

PWD Schedule of Rates: 16th October, 2002 (10th Edition)

Item No. (iii) (iv) c (i) (ii) (iii) (iv) d (i) (ii) (iii) (iv) (e)

Description of items Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above -do- 25 mm thick with 12 mm down well graded crushed stone chips Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above -do- 38 mm thick with 12 mm down well graded crushed stone chips Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 25 mm thick artificial patent stone (1:1.5:3) flooring with cement, best quality coarse sand (50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.5 and 50% best local sand of FM 1.2 & 12 mm down well graded stone chips in/c breaking chips, screening, laying the concrete in alternate panels, compacting and finishing the top with neat cement and curing at least 7 days in all floors in/c cost of water, electricity & other charges all floors as per direction of the engineer-incharge. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 38 mm thick artificial patent stone (1:1.5:3) - do - - do Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above

Unit sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm

Unit Rate Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. 12.77 15.96 186.00 9.58 12.77 15.96 248.00 9.58 12.77 15.96

(i) (ii) (iii) (iv) (f) (i) (ii) (iii) (iv)

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

197.00 9.58 12.77 15.96

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

264.00 9.58 12.77 15.96

5. MOSAIC WORK
21. 10 mm thick finished and 12 mm laying thickness situ mosaic work on floor with one part of 10 mm machine crushed well graded dust free and properly washed marble chips and one part of mixture containing white cement and grey cement in proportion (9:1) in/c. preparation of mix. and laying the same over minimum 25 mm thick artificial patent stone flooring in/c making suitable panel, compacting, curing at least for 7 days, cutting with pumic stone (No.40, No. 80, No.120)/cutting with mosaic machine and finishing with Minar stone & spreading oxalic acid in/c breaking brick chips, screening, washing mosaic chips and supply of all necessary materials& water, eletricity & other charges in all respect with cement as per direction of the engineer-in-charge.

ahsan/aqa

(38)

PWD Schedule of Rates: 16th October, 2002 (10th Edition)

Item No. (a)-i (i) (ii) (iii) (iv) (a)-ii

Description of items Unit 10 mm thick (finished) mosaic in floor with Indian chips & glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White cement : Grey cement = 9 : 1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick (finished) mosaic in floor with Indian chips & glass strip in/c 25 mm thick patent stone (1:1.5:3) with STONE-CHIPS: (White cement : Grey cement = 9 : 1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick (finished) mosaic in floor with Pakistani chips & glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White cement : Grey cement = 9 : 1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick (finished) mosaic in floor with Pakistani chips & glass strip in/c 25 mm thick patent stone (1:1.5:3) with STONE-CHIPS: (White cement : Grey cement = 9 : 1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick mosaic in floor with Indian chips & without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White cement : Grey cement = 9 : 1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick (finished) mosaic in floor with Indian chips & without glass strip in/c 25 mm thick patent stone (1:1.5:3) with STONE-CHIPS: (White cement : Grey cement = 9 : 1) Ground floor Add for each additional floor upto 5th floor sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm

Unit Rate

Tk. Tk. Tk. Tk.

751.00 3.19 6.38 9.58

(i) (ii) (iii) (iv) (b)-i (i) (ii) (iii) (iv) (b)-ii

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

815.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

767.00 3.19 6.38 9.58

(i) (ii) (iii) (iv) (c)-i (i) (ii) (iii) (iv) (c)-ii

Tk. Tk. Tk. Tk.

809.00 3.19 6.38 9.58

Tk. Tk. Tk. Tk.

701.00 3.19 6.38 9.58

(i) (ii)

Tk. Tk.

744.00 3.19

ahsan/aqa

(39)

PWD Schedule of Rates: 16th October, 2002 (10th Edition)

Item No. (iii) (iv) (d)-i (i) (ii) (iii) (iv) (d)-ii

Description of items Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick mosaic in floor with Pakistani chips & without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White cement : Grey cement = 9 : 1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick mosaic in floor with Pakistani chips & without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (White cement : Grey cement = 9 : 1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 12 mm thick finished and laying thickness 14.5 mm cast in situ mosaic work in floor with one part of 10 mm machine crushed well graded dust free and properly washed marble chips and one part of mixture containing white cemet and grey cement in proprtion (9:1) in/c preparation of mix. and laying the same over minimum 25 mm thick artificial patent stone flooring in/c making suitable panel, compacting, curing at least for 7 days, cutting with pumic stone (No. 40, No. 80, No.120)/ mosaic cutting machine and finishing with Minar stone in/c breaking brick chips screening, spreading oxalic acid, washing mosaic chips and supply of all necessary materials & water, electicity & other charges in all respect. as per direction of the engineer-in-charge. 12 mm thick (finished) mosaic in floor with Indian chips & glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White cement : Grey cement = 9 : 1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 12 mm thick (finished) mosaic in floor with Indian chips & glass strip in/c 25 mm thick patent stone (1:1.5:3) with STONE-CHIPS: (White cement : Grey cement = 9 : 1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above

Unit sqm sqm

Unit Rate Tk. Tk. 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

696.00 3.19 6.38 9.58

(i) (ii) (iii) (iv) 22.

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

739.00 3.19 6.38 9.58

(a)-i

(i) (ii) (iii) (iv) (a)-ii

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

829.00 3.19 6.38 9.58

(i) (ii) (iii) (iv)

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

871.00 3.19 6.38 9.58

ahsan/aqa

(40)

PWD Schedule of Rates: 16th October, 2002 (10th Edition)

Item No. (b)-i (i) (ii) (iii) (iv) (b)-ii

Description of items 12 mm thick (finished) mosaic in floor with Pakistani chips & glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White cement : Grey cement = 9 : 1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 12 mm thick (finished) mosaic in floor with Pakistani chips & glass strip in/c 25 mm thick patent stone (1:1.5:3) with STONE-CHIPS: (White cement : Grey cement = 9 : 1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 12 mm thick mosaic in floor with Indian chips & without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White cement : Grey cement = 9 : 1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 12 mm thick (finished) mosaic in floor with Indian chips & without glass strip in/c 25 mm thick patent stone (1:1.5:3) with STONE-CHIPS: (White cement : Grey cement = 9 : 1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 12 mm thick (finished) mosaic in floor with Pakistani chips & without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White cement : Grey cement = 9 : 1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 12 mm thick (finished) mosaic in floor with Pakistani chips & without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (White cement : Grey cement = 9 : 1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above

Unit

Unit Rate

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

823.00 3.19 6.38 9.58

(i) (ii) (iii) (iv) (c)-i

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

865.00 3.19 6.38 9.58

(i) (ii) (iii) (iv) (c)-ii (i) (ii) (iii) (iv) (d)-i

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

758.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

801.00 3.19 6.38 9.58

(i) (ii) (iii) (iv) (d)-ii

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

752.00 3.19 6.38 9.58

(i) (ii) (iii) (iv)

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

795.00 3.19 6.38 9.58

ahsan/aqa

(41)

PWD Schedule of Rates: 16th October, 2002 (10th Edition)

Item No. 23.

Description of items Unit 10 mm thick finished laying thickness 12.5 mm silver grey situ mosaic work on floor with one part of 10 mm machine crushed well graded, dust free and properly washed marble chips and one part of mixture containing white cement and grey cement in proportion (1:1) in/c preparation of mix.and laying the same over minimum 25 mm thick artificial patent stone flooring in/c making suitable panel, compacting, curing at least for 7 days, cutting with pumic stone (No.40, No.80, No.120) and finishing with Minar stone in/c breaking brick chips, screening, washing mosaic chips and supply of all necessary materials in/c & water, electicity & other charges in all respect as per direction of the engineer-incharge. 10 mm thick (finished) silver grey situ mosaic in floor with Indian chips and with glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White cement : Grey cement = 1:1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick (finished) silver grey situ mosaic in floor with Indian chips and with glass strip in/c 25mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (White cement : Grey cement = 1:1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and with glass strip in/c 25mm thick patent stone with BRICK-CHIPS: (White cement : Grey cement = 1:1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and with glass strip in/c 25mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (White cement : Grey cement = 1:1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick (finished) silver grey situ mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White cement : Grey cement = 1:1) Ground floor Add for each additional floor upto 5th floor sqm sqm sqm sqm sqm sqm sqm sqm

Unit Rate

(a)-i

(i) (ii) (iii) (iv) (a)-ii

Tk. Tk. Tk. Tk.

705.00 3.19 6.38 9.58

(i) (ii) (iii) (iv) (b)-i

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

747.00 3.19 6.38 9.58

(i) (ii) (iii) (iv) (b)-ii

Tk. Tk. Tk. Tk.

699.00 3.19 6.38 9.58

(i) (ii) (iii) (iv) (c)-i

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

742.00 3.19 6.38 9.58

(i) (ii)

sqm sqm

Tk. Tk.

634.00 3.19

ahsan/aqa

(42)

PWD Schedule of Rates: 16th October, 2002 (10th Edition)

Item No. (iii) (iv) (c)-ii

Description of items Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick (finished) silver grey situ mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONECHIPS: (White cement : Grey cement = 1:1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick (finished) silver grey situ mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White cement : Grey cement = 1:1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick (finished) silver grey situ mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONECHIPS: (White cement : Grey cement = 1:1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 12 mm thick finished laying thickness 14.5 mm silver grey cast in situ mosaic work in floor with one part of 10 mm machine crushed well graded dust free and properly washed marble chips and one part of mixture containing white cement dust free and properly washed marble chips and and one part of mixture containing white cement and grey with cement in proportion (1:1) in/c. preparaition of mix. and laying the same over minimum 25 mm thick artificial patent stone flooring in/c making suitable panels, compacting, curing at least for 7 days, cutting with pumic stone (No.40. No.80, No.120) and finishing with Minar stone in /c breaking brick chips, screening, washing mosaic chips and supply of all necessary materials & water, electicity & other charges in all respect as per direction of the engineer-in-charge. 12 mm thick (finished) silver grey situ mosaic in floor with Indian chips and with glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White cement : Grey cement = 1:1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor

Unit sqm sqm

Unit Rate Tk. Tk. 6.38 9.58

(i) (ii) (iii) (iv) (d)-i

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

677.00 3.19 6.38 9.58

(i) (ii) (iii) (iv) (d)-ii

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

629.00 3.19 6.38 9.58

(i) (ii) (iii) (iv) 24

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

672.00 3.19 6.38 9.58

(a)-i

(i) (ii) (iii)

sqm sqm sqm

Tk. Tk. Tk.

744.00 3.19 6.38

ahsan/aqa

(43)

PWD Schedule of Rates: 16th October, 2002 (10th Edition)

Item No. (iv) (a)-ii

Description of items Add for 10th floor and above

Unit

Unit Rate Tk. 9.58

(i) (ii) (iii) (iv) (b)-i

sqm 12 mm thick (finished) silver grey situ mosaic in floor with Indian chips and with glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (White cement : Grey cement = 1:1) Ground floor sqm Add for each additional floor upto 5th floor sqm Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 12 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and with glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White cement : Grey cement = 1:1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 12 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and with glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS: (White cement : Grey cement = 1:1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 12 mm thick (finished) silver grey situ mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White cement : Grey cement = 1:1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 12 mm thick (finished) silver grey situ mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONECHIPS: (White cement : Grey cement = 1:1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 12 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS: (White cement : Grey cement = 1:1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above sqm sqm sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

787.00 3.19 6.38 9.58

(i) (ii) (iii) (iv) (b)-ii

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

738.00 3.19 6.38 9.58

(i) (ii) (iii) (iv) (c)-i

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

781.00 3.19 6.38 9.58

(i) (ii) (iii) (iv) (c)-ii (i) (ii) (iii) (iv) (d)-i

Tk. Tk. Tk. Tk.

673.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

716.00 3.19 6.38 9.58

(i) (ii) (iii) (iv)

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

667.00 3.19 6.38 9.58

ahsan/aqa

(44)

PWD Schedule of Rates: 16th October, 2002 (10th Edition)

Item No. (d)-ii

(i) (ii) (iii) (iv) 25

Description of items 12 mm thick (finished) silver grey situ mosaic in floor with Pakistani chips and without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONECHIPS: (White cement : Grey cement = 1:1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick finished and laying thickness 12.5 mm situ mosaic work on wall with one part of 10 mm machine crushed well graded dust free and properly washed marle chips and one part of mixture containing white cement and grey cement in proportion (9:1) including preparation of mix.and laying the same on 12 mm thick cement plaster (1:4) to wall, compacting, curing at least for 7 days, cutting with pumic stone (No. 40, No. 80, No.120) including finishing the corners and edges and also finishing with Minar stone and supplying all necessary materials in & water, electicity & other charges in all respect as per direction of the engineer-in-charge. 10 mm thick (finished) mosaic on wall with Indian chips: (White cement : Grey cement = 9 : 1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick (finished) mosaic on wall with Pakistani chips: (White cement : Grey cement = 9 : 1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick finished laying thickness silver grey situ mosaic work on wall with one part of 10 mm machine crushed well graded, dust free and properly washed marble chips and one part of mixture containing white cement and grey cement in proportion (1:1) including preparation of mix. and laying the same on 12 mm thick cement plaster (1:4) to wall, compacting, curing at least for 7 days, cutting with pumic stone (No. 40, No. 80, No 120) including finishing the corners and edges and also finishing with Minar stone and supplying all necessary materials in & water, electicity & other charges in all respect as per direction of the engineer-in-charge 10 mm thick (finished) mosaic on wall with Indian chips: (White cement : Grey cement = 1 : 1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above

Unit

Unit Rate

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

710.00 3.19 6.38 9.58

a (i) (ii) (iii) (iv) b (i) (ii) (iii) (iv) 26

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

751.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

746.00 3.19 6.38 9.58

a (i) (ii) (iii) (iv)

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

684.00 3.19 6.38 9.58

ahsan/aqa

(45)

PWD Schedule of Rates: 16th October, 2002 (10th Edition)

Item No. b (i) (ii) (iii) (iv) 27

Description of items 10 mm thick (finished) mosaic on wall with Pakistani chips: (White cement : Grey cement = 1 : 1) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick finished laid in 12.5 mm thickness coloured situ mosaic work with one part of 10 mm machine crushed well graded, dust free and properly washed marble chips and one part of mixture containing white and grey cement in proprtion (1:9) and necessary quantity of approved colouring materials including preparation of mix and laying the same over min 25 mm thick artificial patent stone flooring in proportion (1:2:4) in/c making suitable panel, compacting, curjing at least for 7 days, cutting with pumic stone (No.40, No. 80, No.120) and finishing with Minar stone in/c breaking brick chips, screening, washing mosaic chips and supply of all necessary materials in all respects & water, electicity & other charges in all respect as per direction of the engineer-in-charge. 10 mm thick (finished) coloured mosaic in floor with Indian chips and with glass strip in/c 25 mm thick patent stone with BRICK-CHIPS. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick (finished) coloured mosaic in floor with Indian chips and with glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick (finished) coloured mosaic in floor with Pakistani chips and with glass strip in/c 25 mm thick patent stone (1:2:4) with BRICK-CHIPS. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick (finished) coloured mosaic in floor with Pakistani chips and with glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above

Unit

Unit Rate

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

678.00 3.19 6.38 9.58

a-i (i) (ii) (iii) (iv) a-ii

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

803.00 3.19 6.38 9.58

(i) (ii) (iii) (iv) b-i (i) (ii) (iii) (iv) b-ii (i) (ii) (iii) (iv)

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

846.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

798.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

840.00 3.19 6.38 9.58

ahsan/aqa

(46)

PWD Schedule of Rates: 16th October, 2002 (10th Edition)

Item No. c-i (i) (ii) (iii) (iv) c-ii (i) (ii) (iii) (iv) d-i (i) (ii) (iii) (iv) d-ii

Description of items 10 mm thick (finished) coloured mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone (1:2:4) with BRICK-CHIPS. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick (finished) coloured mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick (finished) coloured mosaic in floor with Pakistani chips and without glass strip in/c 25 mm thick patent stone (1:2:4) with BRICK-CHIPS. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick (finished) coloured mosaic in floor with Pakistani chips and without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 12 mm thick finished and laying thickness 14 mm coloured situ mosaic with one part of 10 mm machine crushed well graded, dust free and properly washed marble chips and one part of mixture containing white cement & grey cement in proportion (9:1) and necessary quantity of approved colouring materials in/c preparation of mix. and laying the same over minimum 25 mm thick artficial patent stone flooring in/c making suitable panel, compacting, curing at least for 7 days, cutting with pumic stone (No. 40, No.80, No.120) and finishing with Minar stone including breaking brick chips, screening, washing mosaic chips and supply of all necessary materials in all respects & water, electricity & other charges in all respect as per direction of the engineer-in-charge. 12 mm thick (finished) coloured mosaic in floor with Indian chips and with glass strip in/c 25 mm thick patent stone with BRICK-CHIPS. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above

Unit

Unit Rate

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

732.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

775.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

727.00 3.19 6.38 9.58

(i) (ii) (iii) (iv) 28

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

770.00 3.19 6.38 9.58

a-i (i) (ii) (iii) (iv)

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

859.00 3.19 6.38 9.58

ahsan/aqa

(47)

PWD Schedule of Rates: 16th October, 2002 (10th Edition)

Item No. a-ii

Description of items 12 mm thick (finished) coloured mosaic in floor with Indian chips and with glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 12 mm thick (finished) coloured mosaic in floor with Pakistani chips and with glass strip in/c 25 mm thick patent stone with BRICK-CHIPS. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 12 mm thick (finished) coloured mosaic in floor with Pakistani chips and with glass strip in/c 25 mm thick patent stone (1: 1.5 : 3) with STONE-CHIPS. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 12 mm thick (finished) coloured mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 12 mm thick (finished) coloured mosaic in floor with Indian chips and without glass strip in/c 25 mm thick patent stone (1 : 1.5: 3) with STONE-CHIPS. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 12 mm thick (finished) coloured mosaic in floor with Pakistani chips and without glass strip in/c 25 mm thick patent stone with BRICK-CHIPS. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 12 mm thick (finished) coloured mosaic in floor with Pakistani chips and without glass strip in/c 25 mm thick patent stone (1 : 1.5 : 3) with STONE-CHIPS.

Unit

Unit Rate

(i) (ii) (iii) (iv) b-i (i) (ii) (iii) (iv) b-ii (i) (ii) (iii) (iv) c-i (i) (ii) (iii) (iv) c-ii

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

902.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

853.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

896.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

789.00 3.19 6.38 9.58

(i) (ii) (iii) (iv) d-i (i) (ii) (iii) (iv) d-ii

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

832.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

783.00 3.19 6.38 9.58

ahsan/aqa

(48)

PWD Schedule of Rates: 16th October, 2002 (10th Edition)

Item No. (i) (ii) (iii) (iv) 29

Description of items Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick finished and laying thickness 12.5 mm coloured situ mosaic on walls with one part of 10 mm machine crushed well graded, dust free and properly washed marble chips and one part of nixture containing white cement and grey cement in proprtion (9:1) and necessary quantity of approved colouring materials including preparation of mix and laying the same on 12 mm thick cement plaster (1:4) to walks icluding compacting, curing at least for 7 days, cutting with pumic stone (No. 40, No. 80, No. 120) including finishing the corners and edges and also finishing with Minar stone and supply of all necessary matirals etc. & water, electicity & other charges complete in all respect as per direction of the engineer-in-charge. 10 mm thick (finished) coloured mosaic on wall with Indian chips Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick (finished) coloured mosaic on wall with Pakistani chips Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 200 x 200 x 20 mm mosaic terrazzo tiles flooring having 10 mm thick finished mosaic top with one part of 10 mm machine crushed well graded dust free and properly washed marble chips and one part of mixture containing white cement and grey cement and supply of all necessary materials etc. & water, electicity & other charges complete in all respect as per direction of the engineerin-charge. in proprtion (9:1) including preparation of mix. machine pressed on 12 mm thick cement mortar base (1:2) including preparing the base, setting the tiles on 40 mm thick cement morter/slurry (lime & surki) base in proportion of (1:3) compacting, cutting with pumic stone (No. 40, No. 80, No. 120) and finishing the corners and edges and also finishing with minar stone in/c screening, washing mosaic chips and supply of all necessary materials etc. & water, electricity & other charges complete in all respect as per direction of the engineer-in-charge. 200 x 200 x 20 mm(finished) mosaic terrazo tiles flooring with Indian chips Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 200 x 200 x 20 mm (finished) mosaic terrazo tiles flooring with Pakistani chips. Ground floor

Unit sqm sqm sqm sqm

Unit Rate Tk. Tk. Tk. Tk. 826.00 3.19 6.38 9.58

(a) (i) (ii) (iii) (iv) (b) (i) (ii) (iii) (iv) 30

sqm sqm sqm sqm sqm sqm sqm sqm

Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk.

782.00 3.19 6.38 9.58 777.00 3.19 6.38 9.58

(a) (i) (ii) (iii) (iv) (b) (i)

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

803.00 3.19 6.38 9.58

sqm

Tk.

798.00

ahsan/aqa

(49)

PWD Schedule of Rates: 16th October, 2002 (10th Edition)

Item No. (ii) (iii) (iv) (c) (i) (ii) (iii) (iv) (d) (i) (ii) (iii) (iv)

Description of items Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above Machine made pre-polished double layer terraazo tiles: 10" x 10" Silver mixed. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above Machine made pre-polished double layer terraazo tiles: 10" x 10" White special Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above

Unit sqm sqm sqm

Unit Rate Tk. Tk. Tk. 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

800.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

935.00 3.19 6.38 9.58

6. GLAZED TILES & MARBLE STONE WORK


31 Marble stone flooring with 20 mm /18 mm thick De carrara/Ariston/Venous marble stone (Italy) of approved quality, texture & size over 25 mm thick cement mortar (1:2) with cement in/c. placing cement slurry below the stone, cutting the marble stone to desired size, grinding and finishig the edges, setting in position in proper level filling the gaps with white cement and colouring pigments including supplying all neccessary equipments/materials and finishing the top by pumic stone and necessary auxiliary materials & water, electicity & other charges complete in all respect as per direction of the engineer-in-charge. 20 mm thick Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 18 mm thick Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above Machine made prepolished reconstituted homogenious natura marble slab 325 x 325 mm Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above sqm sqm sqm sqm Tk. Tk. Tk. Tk. 1,550.00 3.19 6.38 9.58 sqm sqm sqm sqm Tk. Tk. Tk. Tk. 5,981.00 3.19 6.38 9.58 sqm sqm sqm sqm Tk. Tk. Tk. Tk. 6,497.00 3.19 6.38 9.58

(a) (i) (ii) (iii) (iv) (b) (i) (ii) (iii) (iv) (c) (i) (ii) (iii) (iv)

ahsan/aqa

(50)

PWD Schedule of Rates: 16th October, 2002 (10th Edition)

Item No. 32

Description of items Marble stone flooring with 16 mm thick De carrara/Ariston/Venous marble stone (Italy) of approved quality/texture & size over 25 mm thick cement mortar (1:2) with cement in/c. placing cement slurry below the stone, cutting the marble stone to desired size, grinding and finishing the edges, setting on position in proper level filling the gaps with white cement and colouring pigments including supplying all necessary equipments/ matersials and finishing the top by pumic stone and necessary auxiliary materials & water, electicity & other charges complete in all respect as per direction of the engineer-in-charge. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above Supplying and setting 12 mm thick De carrara/Ariston/Venous marble stone (Italy) of approved quality/texture & size on wall over 12 mm thick cement mortar (1:2) with cement in/c. cutting the marble stone to desired size, grinding and finishing the edges, setting on position keeping correct horizontal and vertical alignment filling the joints with white cement and colouring pigments including supplying all necessary equipments/ matersials and finishing the top by pumic stone and necessary auxiliary materials& water, electicity & other charges complete in all respect as per direction of the engineer-in-charge. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above Marble stone flooring with 20 mm thick grey/coloured marble stone (India/Pakistan) of apprjoved quality, texture & size over 25 mm thick cement mortar (1:2) with cement in/c placing cement slurry below the stone, cutting the marble stone to desired size, grinding, polishing and finishing the edges setting in position in proper level, filling the gaps with white cement and colouring pigments including supplying all necessary equipments/materials and finishing the top by pumic stone and necessary auxiliary materials & water, electicity & other charges all complete in all respect as per direction of the engineer-in-charge. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above Sypplying and setting 20 mm thick grey/coloured marble stone (India/Pakistan) of apporoved quality, textured & size on walls over 12 mm thhick cement mortar (1:2) with cement including cutting and grinding the marble stone slab/tile setting in position keeping horizontal and vertical alignment correct, filling the joints with white cement, cutting and grinding the top surface, finishing etc in/c. water, electicity & other charges complete in all respect.as per direction of the engineer-in-charge. Ground floor Add for each additional floor upto 5th floor

Unit

Unit Rate

(i) (ii) (iii) (iv) 33

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

5,466.00 3.19 6.38 9.58

(i) (ii) (iii) (iv) 34

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

4,869.00 3.19 6.38 9.58

(i) (ii) (iii) (iv) 35

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

4,693.00 3.19 6.38 9.58

(i) (ii)

sqm sqm

Tk. Tk.

4,740.00 3.19

ahsan/aqa

(51)

PWD Schedule of Rates: 16th October, 2002 (10th Edition)

Item No. (iii) (iv) 36

Description of items Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above Supplying, fitting and fixing glazed wall tiles (Local made) with on 20 mm thick cement mortar (1:3) base with cement and raking out the joints with white cement includig cutting, laying & hire charge of machine and finishing with care etc. in/c water, electicity & other charges complere all respect as per direction of the engineer-in-charge. Ground floor White wall tiles of different sizes Coloured wall tiles of different sizes Special design coloured wall tiles Add for each additional floor upto 5th floor for items Add for each additional floor from 6th floor to 9th floor for items Add for each additional floor for 10th floor and abovefor items Supplying, fitting and fixing glazed floor tiles (Local made) with cement mortar (1:3) base and raking out the joints with white cement including cutting and laying the tiles in proper way and finishing with care etc. all complete as per direction of the engineer-in-charge. Ground floor White floor tiles of different sizes Coloured floor tiles of different sizes Special design coloured floor tiles Add for each additional floor upto 5th floor for items I(a)-(i) Add for each additional floor from 6th floor to 9th floor for items I(a)-(i) Add for each additional floor for 10th floor and abovefor items I(a)-(i) Supplying, fitting and fixing unglazed homogeneous floor tiles (local made) on 20 mm thick cement mortar (1:2) base and raking out the joints with white cement and coloured pigment including cutting and laying tiles in proper way and finishing with care etc, all complete as per direction of the engineer-in-charge. Ground floor GP (Homogeneous) 305 x 305 mm floor tiles GP (Homogeneous) 400 x 400 mm floor tiles Add for each additional floor upto 5th floor for items I(a)-(i) Add for each additional floor from 6th floor to 9th floor for items I(a)-(i) Add for each additional floor for 10th floor and abovefor items I(a)-(i) Supplying, fitting and fixing mirror polished floor tiles (local made) on 20 mm thick cement mortar (1:2) base and raking out the joints with white cement and coloured pigment including cutting and laying tiles in proper way and finishing with care etc, all complete as per direction of the engineer-in-charge.

Unit sqm sqm

Unit Rate Tk. Tk. 6.38 9.58

(i) (a) (b) (c) (ii) (iii) (iv) 37

sqm sqm sqm sqm sqm sqm

Tk. Tk. Tk. Tk. Tk. Tk.

747.00 801.00 828.00 3.19 6.38 9.58

(i) (a) (b) (c) (ii). (iii) (iv) 38-I

sqm sqm sqm sqm sqm sqm

Tk. Tk. Tk. Tk. Tk. Tk.

793.00 847.00 888.00 3.19 6.38 9.58

(i) (a) (b) (ii) (iii) (iv) 38-II

sqm sqm sqm sqm sqm

Tk. Tk. Tk. Tk. Tk.

929.00 1,010.00 3.19 6.38 9.58

ahsan/aqa

(52)

PWD Schedule of Rates: 16th October, 2002 (10th Edition)

Item No. (i) (a) (b) (c) (d) (ii) (iii) (iv) 38-III

Description of items Ground floor GP (Mirror polished) 300 x 300 mm floor tiles GP (Mirror polished) 396 x 396 mm floor tiles GP (Mirror polished) 300 x 600 mm floor tiles GP 305 x 305 mm floor (stair) tiles Add for each additional floor upto 5th floor for items Add for each additional floor from 6th floor to 9th floor for items Add for each additional floor for 10th floor and abovefor items Supplying, fitting and fixing acid proof floor tiles (local made) on 20 mm thick cement mortar (1:2) base and raking out the joints with white cement and coloured pigment including cutting and laying tiles in proper way and finishing with care etc, all complete as per direction of the engineer-in-charge. Ground floor 140 x 140 x 8.5 mm BISF acid proof 100 x 100 x 8.5 mm BISF acid proof Add for each additional floor upto 5th floor for items Add for each additional floor from 6th floor to 9th floor for items Add for each additional floor for 10th floor and abovefor items Supplying, fitting and fixing homogeneous quartz floor tiles (Local made) on 20 mm thick cement mortar (1:2) base and racking out the joints with white cement including cutting and laying the tiles in proper way and finishing with care etc. all complete as per direction of the engineer-in-charge. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for each additional floor for 10th floor and above Supplying, fitting and fixing homogeneous embossed (non-skid) floor tiles (Local made) on 20 mm thick cement mortar (1:2) base and racking out the joints with white cement including cutting and laying the tiles in proper way and finishing with care etc. all complete as per direction of the engineer-in-charge. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for each additional floor for 10th floor and above Supplying, fitting and fixing (300 x 300 mm/400 x 400 mm) special quality fibrous floor tiles (foreign made) on 20 mm thick cement mortar (1:2) base and racking out the joints with white cement and coloured pigment including cutting and laying tiles in proper way and finishing with care etc. all complete as per directing of the engineer-in-charge. Ground floor Add for each additional floor upto 5th floor

Unit sqm sqm sqm sqm sqm sqm sqm

Unit Rate Tk. Tk. Tk. Tk. Tk. Tk. Tk. 1,470.00 1,680.00 1,835.00 1,091.00 3.19 6.38 9.58

(i) (a) (b) (ii) (iii) (iv) 39(a)

sqm sqm sqm sqm sqm

Tk. Tk. Tk. Tk. Tk.

1,497.00 1,578.00 3.19 6.38 9.58

i) ii) iii) iv) 39(b)

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

936.00 3.19 6.38 9.58

i) ii) iii) iv) 40

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

1,072.00 3.19 6.38 9.58

i) ii)

sqm sqm (53)

Tk. Tk.

1,275.00 3.19

ahsan/aqa

PWD Schedule of Rates: 16th October, 2002 (10th Edition)

Item No. iii) iv)

Description of items Add for each additional floor from 6th floor to 9th floor Add for each additional floor for 10th floor and above

Unit sqm sqm

Unit Rate Tk. Tk. 6.38 9.58

ahsan/aqa

(54)

SHORT FORM OF PWD SCHEDULE OF RATES, 16TH OCTOBER, 2002 (10TH EDITION)

ANNEXURE - A

DETAIL DESCRIPTION OF THE ITEMS CORRESPOND TO THE RESPECTIVE ITEM IN THE SCHEDULE OF RATES

SHORT FORM OF SCHEDULE


A. BUILDING WORKS 1. EARTH WORKS, MASS CONCRETE, DPC & PLINTH FILLING
Item No. 1. (a) Description of items Earth work in excavation in all kinds of soil for foundation trenches Excavation upto 1.50 m depth and 60 m lead in/c checking levels and stacking the earth. (b) Extra rate for each additional 1 m depth beyond 1.5 m and upto 60 m lead in/c checking levels and stacking the earth. (c) Extra rate for each 30 m additional lead beyond 60 m in/c checking levels and stacking the earth. (d) Extra rate for earth work in excavation in foundation trenches, protected by palisading and de-watering/bailing-out water up to 1.5 m depth and 60 m lead. Extra rate for earth work in excavation in foundation trenches, protected by palisading and de-watering/bailing-out water for depth exceeding 1.5 m One layer of brick flat soling in foundation or in floor with lst class or picked jhama bricks One layer of Herring bone bond brick soling Brick on end edging Mass concrete (1:3:6) in foundation or floor with cement, sand (F.M.1.2) and picked jhama chips Mass concrete in foundation (1:3:6) with brick chips & local sand of F.M. 1.2 Mass concrete in floor (1:3:6) with brick chips & local sand of F.M. 1.2 Mass concrete (1:2:4) in foundation or floor with cement, sand(F.M.1.2) and picked jhama chips cum cum Tk. Tk. 3,167.00 3,012.00 cum Tk. 5.00 cum Tk. 13.00 Unit Unit Rate

cum

Tk.

63.00

cum cum sqm sqm rm

Tk. Tk. Tk. Tk. Tk.

244.00 423.00 151.00 242.00 38.00

(e) 2.(a) (b) (c) 3.(a) (i) (ii) 3.(b) (i) (ii) 4. (a) (b) 5(a)

Mass concrete in foundation (1:2:4) with brick chips & local sand of F.M. 1.2 cum Mass concrete in floor (1:2:4) with brick chips & local sand of F.M. 1.2 cum 75 mm thick damp proof course (1:1.5:3) in cement concrete with cement, sand (F.M. 1.2) and picked jhama or stone chips 75 mm or 3" thick damp proof course (1:1.5:3) with brick chips and 50% Sylhet sand (F.M. 2.5) & 50% local sand (F.M. 1.2) sqm 75 mm or 3" thick damp proof course (1:1.5:3) with Sylhet sand (F.M. 2.5) and stone chips. sqm Sand filling in foundation trenches and plinth with fine local sand having minimum F.M. 0.80 in 150 mm layers cum

Tk. Tk.

3,801.00 3,646.00

Tk. Tk. Tk.

475.00 566.00 385.00

ahsan/aqa

(164)

SHORT FORM OF PWD SCHEDULE OF RATES, 16TH OCTOBER, 2002 (10TH EDITION)

ANNEXURE - A

DETAIL DESCRIPTION OF THE ITEMS CORRESPOND TO THE RESPECTIVE ITEM IN THE SCHEDULE OF RATES

Item No. (b) (c) (d)

Description of items Sand filling in foundation trenches and plinth with coarse sand having min. F.M. 1.20 in 150 mm layers. Sand filling in foundation trenches and plinth with coarse sand having min. F.M 2.50 in 150 mm layers 3/4" down graded picked jhama chips khoa consilidation in foundation, mixing the same with best quality local sand (F.M. 1.5) in khoa : sand (3:2) proportion. Earth filling in foundation trenches and plinth in 150 mm layer with earth available within 90 m of the building site.

Unit cum cum

Unit Rate Tk. Tk. 586.00 773.00

cum cum

Tk. Tk.

1,674.00 65.00

6.

2. SITE IMPROVEMENTS
7. (a) (b) (c) (d) Site improvement / earth filling in foundation trenches and plinth in 150 mm layers with carted earth carried by truck or any other means. For Dhaka Metropolitan area For Narayangonj District For Chittagong Metropolitan Area For all districts except Dhaka & Chittagong Metropolitan Area & Narayangonj district cum cum cum cum Tk. Tk. Tk. Tk. 220.00 213.00 198.00 190.00

3. BRICK WORK & FANCY SCREEN WORK


8. 9. (a) (b) (c) (d) 10. (a) (b) (c) (d) 11. Brick work with 1st class bricks in cement mortar (1:6) in foundation and plinth. Brick walls of width one brick or one and a half brick length with 1st class bricks in cement mortar (1:6) in super structure Ground floor Add for each additional floor up to 5th floor Add for each additional floor from 6th floor up to 9th floor Add for each additional floor 10th floor & above Brick work with lst class bricks in cement mortar (1:4) in exterior walls Ground Floor Add for each additional floor up to 5th floor Add for each additional floor from 6th floor up to 9th floor Add for each additional floor for10th floor & above Exposed brick work (for exterior wall without outside plaster) with special quality sorted out 1st class bricks, very carefully laid in cement mortar (1:4)) in superstructure. Ground floor cum cum cum cum Tk. Tk. Tk. Tk. 2,517.00 52.36 73.30 83.77 cum Tk. 2,380.00

cum cum cum cum

Tk. Tk. Tk. Tk.

2,724.00 52.36 73.30 83.77

(a)

cum

Tk.

3,131.00

ahsan/aqa

(165)

SHORT FORM OF PWD SCHEDULE OF RATES, 16TH OCTOBER, 2002 (10TH EDITION)

ANNEXURE - A

DETAIL DESCRIPTION OF THE ITEMS CORRESPOND TO THE RESPECTIVE ITEM IN THE SCHEDULE OF RATES

Item No. (b) (c) (d) 12(a)

Description of items Add for each additional floor up to 5th floor Add for each additional floor from 6th floor up to 9th floor Add for each additional floor for10th floor & above Brick work with 10 holes machine made bricks of approved size (9.5" x 4.5" x 2.75") having uniform colour carefully laid in cement mortar (1:4) in superstructure Ground floor Add for each additional floor up to 5th floor Add for each additional floor from 6th floor up to 9th floor Add for each additional floor for 10th floor & above Brick work with 9.5" x 4.5" x 2.75" size machine made solid klinker facing bricks (1:4) -do- doGround floor Add for each additional floor up to 5th floor Add for each additional floor from 6th floor up to 9th floor Add for each additional floor for 10th floor & above Brick work with 9.5" x 4.5" x 2.75" size 10 hole machine made Rockface/textured klinker facing bricks (1:4) -do - -do Ground floor Add for each additional floor up to 5th floor Add for each additional floor from 6th floor up to 9th floor Add for each additional floor for 10th floor & above Brick work with 9.5" x 4.5" x 2.75" size 3 hole machine made reinforced klinker facing bricks (1:4) -do- -doGround floor Add for each additional floor up to 5th floor Add for each additional floor from 6th floor up to 9th floor Add for each additional floor for 10th floor & above Extra brick-work rate over the rate of ground floor (or any floor as the case may be) for each additional meter free height of brick wall beyond 4 m from the respective floor in auditorium, Godown, overhead water tank etc. as description of the item No.in 9, 10, 11 & 12. Providing brick work for 200 x 100 mm facing in superstructure with 200 x 100 x 50 mm machine made klinker hard pressed facing bricks. Ground floor Add for each additional floor up to 5th floor Add for each additional floor from 6th floor up to 9th floor Add for each additional floor for 10th floor & above

Unit Unit Rate cum Tk. 52.36 cum Tk. 73.30 cum Tk. 83.77

(i) (ii) (iii) (iv) 12.(b) (i) (ii) (iii) (iv) 12(c) (i) (ii) (iii) (iv) 12(d) (i) (ii) (iii) (iv) 13.

cum cum cum cum

Tk. Tk. Tk. Tk.

4,657.00 52.36 73.30 83.77

cum cum cum cum

Tk. Tk. Tk. Tk.

4,318.00 52.36 73.30 83.77

cum cum cum cum

Tk. Tk. Tk. Tk.

4,918.00 52.36 73.30 83.77

cum cum cum cum

Tk. Tk. Tk. Tk.

4,787.00 52.36 73.30 83.77

cum

Tk.

54.00

14.(a) (i) (ii) (iii) (iv)

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

680.00 9.58 12.77 15.96

ahsan/aqa

(166)

SHORT FORM OF PWD SCHEDULE OF RATES, 16TH OCTOBER, 2002 (10TH EDITION)

ANNEXURE - A

DETAIL DESCRIPTION OF THE ITEMS CORRESPOND TO THE RESPECTIVE ITEM IN THE SCHEDULE OF RATES

Item No. 14 (b) (i) (ii) (iii) (iv) 14 (c) (i) (ii) (iii) (iv) 15 (a) (i) (ii) (iii) (iv) 15 (b) (i) (ii) (iii) (iv) 15 (c) (i) (ii) (iii) (iv) 16 (a) (i) (ii) (iii) (iv) (b) (i) (ii) (iii)

Description of items Providing brick work in facing for 200 x 50 mm in supertucture with 200 x 50 x 50 mm machine made hard pressed klinker facing bricks. Ground floor Add for each additional floor up to 5th floor Add for each additional floor from 6th floor up to 9th floor Add for each additional floor for 10th floor & above Providing brick work for 200 x 62 mm facing in superstructure with 200 x 62 x 25 mm machine made hard pressed klinker facing strips. Ground floor Add for each additional floor up to 5th floor Add for each additional floor from 6th floor up to 9th floor Add for each additional floor for 10th floor & above 125 mm brick work with 1st class bricks in cement mortar (1:6) Ground floor Add for each additional floor up to 5th floor Add for each additional floor from 6th floor up to 9th floor Add for each additional floor for 10th floor & above 125 mm thick brick work with 1st class bricks in cement mortar (1:4) -doGround floor Add for each additional floor up to 5th floor Add for each additional floor from 6th floor up to 9th floor Add for each additional floor for 10th floor & above Providing 125 mm thick (Partition wall) in superstructure brick work (1:4) in cement mortar with 10 hole machine made ceramic bricks. Ground floor Add for each additional floor up to 5th floor Add for each additional floor from 6th floor up to 9th floor Add for each additional floor for 10th floor & above Fancy screen work with different size hollow machine made design blocks With design block No. 3 (MCW) size: 4" x 4" x 4" Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above With design block No. 2 (MCW) size: 6.5" x 4.75" x 4" Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor

Unit

Unit Rate

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

811.00 9.58 12.77 15.96

sqm sqm sqm sqm sqm sqm sqm sqm

Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk.

1,415.00 9.58 12.77 15.96 360.00 9.58 12.77 15.96

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

383.00 9.58 12.77 15.96

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

643.00 9.58 12.77 15.96

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

1,425.00 9.58 12.77 15.96

sqm sqm sqm

Tk. Tk. Tk.

1,001.00 9.58 12.77

ahsan/aqa

(167)

SHORT FORM OF PWD SCHEDULE OF RATES, 16TH OCTOBER, 2002 (10TH EDITION)

ANNEXURE - A

DETAIL DESCRIPTION OF THE ITEMS CORRESPOND TO THE RESPECTIVE ITEM IN THE SCHEDULE OF RATES

Item No. (iv) (c) (i) (ii) (iii) (iv) 17.

Description of items Add for 10th floor and above with design block No. 20 (MCW) size: 6``x 6``x4 Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above Klinker paving bricks work in floor/ pavement with machine made pressed bricks of approved quality in cement mortar (1:4) on minimum 12 mm thick cement mortar (1:4) 100 mm thick brick on edge pavement with 200 x 100 x 50 mm

Unit sqm sqm sqm sqm sqm

Unit Rate Tk. Tk. Tk. Tk. Tk. 15.96 1,072.00 9.58 12.77 15.96

(a) (b) (c) 18 (a) 18(b)

sqm 50 mm thick flat brick pavement with 200 x 100 x 50 mm klinker paving bricks in 1:4 cement sand mortar having 200 x 100 mm face at top 50 mm thick brick pavement with 200 x 50 x 5 mm klinker facing bricks 115 mm thick brick pavement/flooring with lst class brick on edge in cement mortar (1:4) on minimum 12 mm thick cement mortar (4:1) -do- with 10 hole machine made ceramic bricks. sqm sqm sqm sqm

Tk. Tk. Tk. Tk. Tk.

1,109.00 660.00 772.00 427.00 676.00

4. FLOORING AND FLOOR FINISH


19 20 (a) (i) (ii) (iii) (iv) b (i) (ii) (iii) (iv) c (i) (ii) (iii) (iv) d 75 mm thick cement concrete (1:3:6) with cement in flooring best quality coarse sand & 19 mm down graded picked chips 25 mm thick artificial patent stone (1:2:4) flooring with cement, best quality coarse sand (50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.5 and 50% best local sand of FM 1.2) & 12 mm down well graded brick chips. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above -do- 38 mm thick with 12 mm down graded brick chips Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above -do- 25 mm thick with 12 mm down well graded crushed stone chips Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above -do- 38 mm thick with 12 mm down well graded crushed stone chips sqm sqm sqm sqm Tk. Tk. Tk. Tk. 186.00 9.58 12.77 15.96 sqm sqm sqm sqm Tk. Tk. Tk. Tk. 200.00 9.58 12.77 15.96 sqm Tk. 261.00

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

154.00 9.58 12.77 15.96

ahsan/aqa

(168)

SHORT FORM OF PWD SCHEDULE OF RATES, 16TH OCTOBER, 2002 (10TH EDITION)

ANNEXURE - A

DETAIL DESCRIPTION OF THE ITEMS CORRESPOND TO THE RESPECTIVE ITEM IN THE SCHEDULE OF RATES

Item No. (i) (ii) (iii) (iv) (e) (i) (ii) (iii) (iv) (f) (i) (ii) (iii) (iv)

Description of items Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 25 mm thick artificial patent stone (1:1.5:3) flooring with cement , best quality coarse sand (50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.5 and 50% best local sand of FM 1.2 & 12 mm down well graded stone chips Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 38 mm thick artificial patent stone (1:1.5:3) - do - - do Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above

Unit sqm sqm sqm sqm

Unit Rate Tk. Tk. Tk. Tk. 248.00 9.58 12.77 15.96

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

197.00 9.58 12.77 15.96

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

264.00 9.58 12.77 15.96

5. MOSAIC WORK
21. 10 mm thick finished and 12 mm laying thickness situ mosaic work on minimum 25 mm thick artificial patent stone flooring with cement, sand and brick chips in proportion (1:2:4) with Indian (Indian, Deradun) origin marble chips and suitable panel by 5 mm thick and 20 mm deep glass divider Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above on patent stone of cement : sand : stone chip (1:1.5:3) - do Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with Paksitani origin marble chips and suitable panel by 5 mm thick and 20 mm deep glass dividers. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor sqm sqm sqm Tk. Tk. Tk. 767.00 3.19 6.38 sqm sqm sqm sqm Tk. Tk. Tk. Tk. 815.00 3.19 6.38 9.58 sqm sqm sqm sqm Tk. Tk. Tk. Tk. 751.00 3.19 6.38 9.58

(a)-i (i) (ii) (iii) (iv) (a)-ii (i) (ii) (iii) (iv) (b)-i (i) (ii) (iii)

ahsan/aqa

(169)

SHORT FORM OF PWD SCHEDULE OF RATES, 16TH OCTOBER, 2002 (10TH EDITION)

ANNEXURE - A

DETAIL DESCRIPTION OF THE ITEMS CORRESPOND TO THE RESPECTIVE ITEM IN THE SCHEDULE OF RATES

Item No. (iv) (b)-ii (i) (ii) (iii) (iv) (c)-i (i) (ii) (iii) (iv) (c)-ii (i) (ii) (iii) (iv) (d)-i (i) (ii) (iii) (iv) (d)-ii (i) (ii) (iii) (iv) 22.

Description of items Add for 10th floor and above on patent stone of cement : sand : stone chip (1:1.5:3) - do Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with Indian origin marble chips without glass dividers Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above on patent stone of cement : sand : stone chip (1:1.5:3) do--- do ---Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with pakistani origin marble chips without glass divider Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above on patent stone of cement : sand : stone chip (1:1.5:3) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 12 mm thick finished and laying thickness 14.5 mm cast in situ mosaic work on minimum 25 mm thick artificial patent stone flooring in propotion (1:2:4) cement, sand, brick chips i with Indian (Indian, Deradun) origin marble chips and making suitable panel by 5 x 20 mm deep glass dividers Ground floor Add for each additional floor upto 5th floor - do - do -

Unit sqm sqm sqm sqm sqm

Unit Rate Tk. Tk. Tk. Tk. Tk. 9.58 809.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

701.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

744.00 3.19 6.38 9.58

sqm sqm sqm sqm sqm sqm sqm sqm

Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk.

696.00 3.19 6.38 9.58 739.00 3.19 6.38 9.58

(a)-i (i) (ii)

sqm sqm

Tk. Tk.

829.00 3.19

ahsan/aqa

(170)

SHORT FORM OF PWD SCHEDULE OF RATES, 16TH OCTOBER, 2002 (10TH EDITION)

ANNEXURE - A

DETAIL DESCRIPTION OF THE ITEMS CORRESPOND TO THE RESPECTIVE ITEM IN THE SCHEDULE OF RATES

Item No. (iii) (iv) (a)-ii (i) (ii) (iii) (iv) (b)-i (i) (ii) (iii) (iv) (b)-ii (i) (ii) (iii) (iv) (c)-i (i) (ii) (iii) (iv) (c)-ii (i) (ii) (iii) (iv) (d)-i (i) (ii) (iii) (iv) (d)-ii (i) (ii) (iii) (iv)

Description of items Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above on patent stone of cement : sand : stone chip (1:1.5:3) - do Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with pakistani origin marble chips and suitable panel by 5 mm x 20 mm deep glass dividers. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above on patent stone of cement : sand : stone chip (1:1.5:3) - do Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with Indian (Indian, Deradun) origin marble chips without glass dividers Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above on patent stone cement : sand : stone chip (1:1.5:3) - do Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with pakistani origin marble chips without glass divider Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above on patent stone of cement : sand : stone chip (1:1.5:3) - do Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above - do - do - do -

Unit sqm sqm

Unit Rate Tk. Tk. 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

871.00 3.19 6.38 9.58

sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm - do sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm

Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk.

823.00 3.19 6.38 9.58 865.00 3.19 6.38 9.58 758.00 3.19 6.38 9.58 801.00 3.19 6.38 9.58 752.00 3.19 6.38 9.58 795.00 3.19 6.38 9.58

ahsan/aqa

(171)

SHORT FORM OF PWD SCHEDULE OF RATES, 16TH OCTOBER, 2002 (10TH EDITION)

ANNEXURE - A

DETAIL DESCRIPTION OF THE ITEMS CORRESPOND TO THE RESPECTIVE ITEM IN THE SCHEDULE OF RATES

Item No. 23.

(a)-i (i) (ii) (iii) (iv) (a)-ii (i) (ii) (iii) (iv) (b)-i (i) (ii) (iii) (iv) (b)-ii (i) (ii) (iii) (iv) (c)-i (i) (ii) (iii) (iv) (c)-ii (i) (ii) (iii) (iv) (d)-i

Description of items Unit 10 mm thick finished laying thickness 12.5 mm silver grey situ mosaic work on 25 mm thick artificial patent stone flooring with cemet, sand and brick chips in prportion (1:2:4) with Indian (Indian, Deradun) origin marble chips and suitable panel by 5mm thick and 20mm deep glass dividers. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above on patent stone of cement : sand : stone chip (1:1.5:3) - do Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with pakistani origin marble chips and suitable panel by 5 mm thick and 20 mm deep glass dividers. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above on patent stone of cement : sand : stone chip (1:1.5:3) - do Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with Indian (Indian , Deradun) origin marble chips without glass dividers Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above on patent stone of cement : sand : stone chip (1:1.5:3) - do Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with Pakistani mosaic origin marble chips without glass divider - do sqm sqm sqm sqm sqm sqm sqm sqm - do sqm sqm sqm sqm sqm sqm sqm sqm - do sqm sqm sqm sqm sqm sqm sqm sqm

Unit Rate

Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk.

705.00 3.19 6.38 9.58 747.00 3.19 6.38 9.58

Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk.

699.00 3.19 6.38 9.58 742.00 3.19 6.38 9.58

Tk. Tk. Tk. Tk.

634.00 3.19 6.38 9.58

Tk. Tk. Tk. Tk.

677.00 3.19 6.38 9.58

ahsan/aqa

(172)

SHORT FORM OF PWD SCHEDULE OF RATES, 16TH OCTOBER, 2002 (10TH EDITION)

ANNEXURE - A

DETAIL DESCRIPTION OF THE ITEMS CORRESPOND TO THE RESPECTIVE ITEM IN THE SCHEDULE OF RATES

Item No. (i) (ii) (iii) (iv) (d)-ii (i) (ii) (iii) (iv) 24 (a)-i (i) (ii) (iii) (iv) (a)-ii (i) (ii) (iii) (iv) (b)-i (i) (ii) (iii) (iv) (b)-ii (i) (ii) (iii) (iv) (c)-i (i)

Description of items Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above on patent stone of cement : sand : stone chip (1:1.5:3) - do Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 12 mm thick finished laying thickness 14.5 mm silver grey cast in situ mosaic work on 25 mm thick artificial patent stone flooring in proportion(1:2:4) cement, sand and brick chips with Indian (Indian, Deradun) origin marble chips and suitable panel by 5 mm thick and 20 mm deep glass dividers Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above on patent stone of cement : sand : stone chip (1:1.5:3) - do Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with pakistani origin marble chips and suitable panel by 5 mm thick and 20 mm deep glass dividers. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above on patent stone of cement : sand : stone chip (1:1.5:3) - do Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with Indian (Indian, Deradun) origin marble chips without glass dividers. Ground floor - do - do - do -

Unit sqm sqm sqm sqm

Unit Rate Tk. Tk. Tk. Tk. 629.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

672.00 3.19 6.38 9.58

sqm sqm sqm sqm sqm sqm sqm sqm

Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk.

744.00 3.19 6.38 9.58 787.00 3.19 6.38 9.58

sqm sqm sqm sqm sqm sqm sqm sqm sqm

Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk.

738.00 3.19 6.38 9.58 781.00 3.19 6.38 9.58 673.00

ahsan/aqa

(173)

SHORT FORM OF PWD SCHEDULE OF RATES, 16TH OCTOBER, 2002 (10TH EDITION)

ANNEXURE - A

DETAIL DESCRIPTION OF THE ITEMS CORRESPOND TO THE RESPECTIVE ITEM IN THE SCHEDULE OF RATES

Item No. (ii) (iii) (iv) (c)-ii (i) (ii) (iii) (iv) (d)-i (i) (ii) (iii) (iv) (d)-ii (i) (ii) (iii) (iv) 25 a (i) (ii) (iii) (iv) b (i) (ii) (iii) (iv) 26 a (i) (ii) (iii) (iv)

Description of items Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above on patent stone cement : sand : stone chip (1:1.5:3) - do Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with pakistani origin marble chips without glass dividers Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above on patent stone cement : sand : stone chip (1:1.5:3) - do Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick finished and laying thickness 12.5 mm situ mosaic work on wall on 12 mm thick cement plaster (1:4) to wall. with Indian ( Indian, Deradun) origin marble chips Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with Pakistani origin marble chips Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 10 mm thick finished laying thickness silver grey situ mosaic work on wall on 12 mm thick cement plaster (1:4) to wall. with Indian ( Indian , Deradun) origin marble chips Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above - do - do -

Unit sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm sqm

Unit Rate Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk. 3.19 6.38 9.58 716.00 3.19 6.38 9.58 667.00 3.19 6.38 9.58 710.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

751.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

746.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

684.00 3.19 6.38 9.58

ahsan/aqa

(174)

SHORT FORM OF PWD SCHEDULE OF RATES, 16TH OCTOBER, 2002 (10TH EDITION)

ANNEXURE - A

DETAIL DESCRIPTION OF THE ITEMS CORRESPOND TO THE RESPECTIVE ITEM IN THE SCHEDULE OF RATES

Item No. b (i) (ii) (iii) (iv) 27

Description of items with pakistan origin marble chips Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor

Unit sqm sqm

Unit Rate Tk. Tk. Tk. Tk. 678.00 3.19 6.38 9.58

sqm sqm Add for 10th floor and above 10 mm thick finished and laid in 12.5 mm thickness coloured situ mosaic work with one part of 10 mm machine crushed well graded, dust free and properly washed marble chips and one part of mixture containing white and grey cement in proprtion (1:9) and necessary quantity of approved colouring materials including preparation of mix and laying the same over min 25 mm thick artificial patent stone flooring in proportion (1:2:4) in/c making suitable panel, compacting, curjing at least for 7 days, cutting with pumic stone (No.40.No.80, No.120) and finishing with Minar stone in/c breaking brick chips, screening, washing mosaic chips and supply of all necessary materials in all respects & water, electicity & other charges in all respect as per direction of the engineer-in-charge. with Indian (Indian, Deradun) origin marble chips and suitable panel by 5 mm thick and 20 mm deep glass dividers .in/c 25 mm thick patent stone (1:2:4) with brick chips Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with Indian( Indian , Deradun) origin marble chips and suitable panel by 5mm thick and 20 mm deep glass dividers .in/c 25 mm thick patent stone (1:1,5:3) with brick chips Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with pakistan origin marble chipsand suitable panel by 5mm thick and 20 mm deep glass dividers in/c 25 mm thick patent stone (1:2:4) with brick chips. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with pakistan origin marble chipsand suitable panel by 5mm thick and 20 mm deep glass dividers in/c 25 mm thick patent stone (1:1.5:3) with brick chips. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor sqm sqm sqm sqm

a-i

(i) (ii) (iii) (iv) a-ii

Tk. Tk. Tk. Tk.

803.00 3.19 6.38 9.58

(i) (ii) (iii) (iv) b-i (i) (ii) (iii) (iv) b-ii (i) (ii) (iii)

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

846.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

798.00 3.19 6.38 9.58

sqm sqm sqm

Tk. Tk. Tk.

840.00 3.19 6.38

ahsan/aqa

(175)

SHORT FORM OF PWD SCHEDULE OF RATES, 16TH OCTOBER, 2002 (10TH EDITION)

ANNEXURE - A

DETAIL DESCRIPTION OF THE ITEMS CORRESPOND TO THE RESPECTIVE ITEM IN THE SCHEDULE OF RATES

Item No. (iv) c-i (i) (ii) (iii) (iv) c-ii (i) (ii) (iii) (iv) d-i (i) (ii) (iii) (iv) d-ii (i) (ii) (iii) (iv) 28 a-i (i) (ii) (iii) (iv) a-ii

Description of items Add for 10th floor and above with Indian ( Indian, Deradun) origin marble chips and without glass dividersin/c 25 mm thick patent stone (1:2:4) with brick chips. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with Indian ( Indian, Deradun) origin marble chips and without glass dividersin/c 25 mm thick patent stone (1:1:5:3) with brick chips. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with pakistani origin marble chips and without glass divider in/c 25 mm thick patent stone (1:2:4) with brick chips. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with pakistani origin marble chips and without glass divider in/c 25 mm thick patent stone (1:1.5:3) with brick chips. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 12 mm thick finished and laying thickness 14 mm coloured situ mosaic on minimum 25 mm thick artficial patent stone flooring on proportion (1:2:4). 12 mm thick (finished) coloured mosaic in floor with Indian chips and with glass strip in/c 25 mm thick patent stone with BRICK-CHIPS. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with Indian (Indian, Deradun) origin marble chips and suitable panel by 5 mm thick and 20 mm deep glass dividers .in/c 25 mm thick patent stone (1:1.5:3) with brick chips Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor

Unit sqm

Unit Rate Tk. 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

732.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

775.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

727.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

770.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

859.00 3.19 6.38 9.58

(i) (ii) (iii)

sqm sqm sqm

Tk. Tk. Tk.

902.00 3.19 6.38

ahsan/aqa

(176)

SHORT FORM OF PWD SCHEDULE OF RATES, 16TH OCTOBER, 2002 (10TH EDITION)

ANNEXURE - A

DETAIL DESCRIPTION OF THE ITEMS CORRESPOND TO THE RESPECTIVE ITEM IN THE SCHEDULE OF RATES

Item No. (iv) b-i (i) (ii) (iii) (iv) b-ii (i) (ii) (iii) (iv) c-i (i) (ii) (iii) (iv) c-ii (i) (ii) (iii) (iv) d-i (i) (ii) (iii) (iv) d-ii (i) (ii) (iii) (iv)

Description of items Add for 10th floor and above with pakistan origin marble chipsand suitable panel by 5mm thick and 20 mm deep glass dividers in/c 25 mm thick patent stone (1:2:4) with brick chips. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with pakistan origin marble chipsand suitable panel by 5mm thick and 20 mm deep glass dividers in/c 25 mm thick patent stone (1:1.5:3) with brick chips. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with Indian (Indian, Deradun) origin marble chips and without glass dividers in/c 25 mm thick patent stone (1:2:4) with brick chips. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with Indian (Indian, Deradun) origin marble chips and without glass dividers in/c 25 mm thick patent stone (1:1.5:3) with brick chips. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with pakistani origin marble chips and without glass divider in/c 25 mm thick patent stone (1:2:4) with brick chips. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with pakistani origin marble chips and without glass divider in/c 25 mm thick patent stone (1:1.5:3) with brick chips. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above

Unit sqm

Unit Rate Tk. 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

853.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

896.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

789.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

832.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

783.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

826.00 3.19 6.38 9.58

ahsan/aqa

(177)

SHORT FORM OF PWD SCHEDULE OF RATES, 16TH OCTOBER, 2002 (10TH EDITION)

ANNEXURE - A

DETAIL DESCRIPTION OF THE ITEMS CORRESPOND TO THE RESPECTIVE ITEM IN THE SCHEDULE OF RATES

Item No. 29 (a) (i) (ii) (iii) (iv) (b) (i) (ii) (iii) (iv) 30 (a) (i) (ii) (iii) (iv) (b) (i) (ii) (iii) (iv) (c) (i) (ii) (iii) (iv) (d) (i) (ii) (iii) (iv) 31 (a) (i)

Description of items Unit 10 mm thick finished and laying thickness 12.5 mm coloured situ mosaic on walls over 12 mm thick cement plaster (1:4) with Indian (Indian, Deradun) origin marble chips Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with pakistani origin marble chips Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 200 x 200 x 20 mm mosaic terrazzo tiles flooring having 10 mm thick finished mosaic top with Indian (Indian, Deradun) origin marble chips Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above with pakistani origin marble chips Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above Machine made per-polished double layer terraazo tiles (Conpac production): 10" x 10" silver mixed. Ground floor Add for each additional floor upto 5th floor sqm sqm sqm sqm sqm sqm sqm sqm

Unit Rate

sqm sqm sqm sqm sqm sqm sqm sqm

Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk.

782.00 3.19 6.38 9.58 777.00 3.19 6.38 9.58

Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk.

803.00 3.19 6.38 9.58 798.00 3.19 6.38 9.58

sqm

Tk. Tk. Tk. Tk. Tk. Tk. Tk. Tk.

800.00 3.19 6.38 9.58 935.00 3.19 6.38 9.58

sqm Add for each additional floor from 6th floor to 9th floor sqm Add for 10th floor and above sqm 250 x 250 mm machine mad pre-polished doble layer white special -do- doGround floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above sqm sqm sqm sqm

6. MARBLE WORK
Marble stone flooring with 20 mm /18 mm thick De carrara/Ariston/Venous marble stone (Italy) of approved quality, texture & size over 25 mm thick cement mortar (1:2) 20 mm thick Ground floor sqm Tk. 6,497.00

ahsan/aqa

(178)

SHORT FORM OF PWD SCHEDULE OF RATES, 16TH OCTOBER, 2002 (10TH EDITION)

ANNEXURE - A

DETAIL DESCRIPTION OF THE ITEMS CORRESPOND TO THE RESPECTIVE ITEM IN THE SCHEDULE OF RATES

Item No. (ii) (iii) (iv) (b) (i) (ii) (iii) (iv) (c) (i) (ii) (iii) (iv) 32 (i) (ii) (iii) (iv) 33 (i) (ii) (iii) (iv) 34 (i) (ii) (iii) (iv) 35 (i) (ii) (iii)

Description of items Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above 18 mm thick Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above Machine made prepolished reconstituted homogenious natura marble slab 325 x 325 mm Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above Marble stone flooring with 16 mm thick De carrara/Ariston/Venous marble stone (Italy) of approved quality/texture & size over 25 mm thick cement mortar (1:2) with cement Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above Supplying and setting 12 mm thick De carrara/Ariston/Venous marble stone (Italy) of approved quality/texture & size on wall over 12 mm thick cement mortar (1:2) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above Marble stone flooring with 20 mm thick grey/coloured marble stone (India/Pakistan) of apprjoved quality, texture & size over 25 mm thick cement mortar (1:2) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for 10th floor and above Sypplying and setting 20 mm thick grey/coloured marble stone (India/Pakistan) of apporoved quality, textured & size on walls over 12 mm thhick cement mortar (1:2) Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor

Unit sqm sqm sqm sqm sqm sqm sqm

Unit Rate Tk. Tk. Tk. Tk. Tk. Tk. Tk. 3.19 6.38 9.58 5,981.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

1,550.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

5,466.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

4,869.00 3.19 6.38 9.58

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

4,693.00 3.19 6.38 9.58

sqm sqm sqm

Tk. Tk. Tk.

4,740.00 3.19 6.38

ahsan/aqa

(179)

SHORT FORM OF PWD SCHEDULE OF RATES, 16TH OCTOBER, 2002 (10TH EDITION)

ANNEXURE - A

DETAIL DESCRIPTION OF THE ITEMS CORRESPOND TO THE RESPECTIVE ITEM IN THE SCHEDULE OF RATES

Item No. (iv) 36

Description of items Add for 10th floor and above

Unit sqm

Unit Rate Tk. 9.58

7. GLAZED TILES
Supplying, fitting and fixing glazed wall tiles (Local made) with on 20 mm thick cement mortar (1:3) base with cement and raking out the joints with white cement includig cutting, laying & hire charge of machine and finishing with care etc. in/c water, electicity & other charges complere all respect as per direction of the engineer-in-charge. Ground floor White wall tiles of different sizes Coloured wall tiles of different sizes Special design coloured wall tiles Add for each additional floor upto 5th floor for items Add for each additional floor from 6th floor to 9th floor for items Add for each additional floor for 10th floor and abovefor items Supplying, fitting and fixing glazed floor tiles (Local made) with cement mortar (1:3) base and raking out the joints with white cement including cutting and laying the tiles in proper way and finishing with care etc. all complete as per direction of the engineer-in-charge. Ground floor White floor tiles of different sizes Coloured floor tiles of different sizes Special design coloured floor tiles Add for each additional floor upto 5th floor for items I(a)-(i) Add for each additional floor from 6th floor to 9th floor for items I(a)-(i) Add for each additional floor for 10th floor and abovefor items I(a)-(i) Supplying, fitting and fixing unglazed homogeneous floor tiles (local made) on 20 mm thick cement mortar (1:2) base and raking out the joints with white cement and coloured pigment including cutting and laying tiles in proper way and finishing with care etc, all complete as per direction of the engineer-in-charge. Ground floor GP (Homogeneous) 305 x 305 mm floor tiles GP (Homogeneous) 400 x 400 mm floor tiles Add for each additional floor upto 5th floor for items I(a)-(i) Add for each additional floor from 6th floor to 9th floor for items I(a)-(i) Add for each additional floor for 10th floor and abovefor items I(a)-(i) Supplying, fitting and fixing mirror polished floor tiles (local made) on 20 mm thick cement mortar (1:2) base and raking out the joints with white cement and coloured pigment including cutting and laying tiles in proper way and finishing with care etc, all complete as per direction of the engineer-in-charge. Ground floor sqm sqm sqm sqm sqm Tk. Tk. Tk. Tk. Tk. 929.00 1,010.00 3.19 6.38 9.58 sqm sqm sqm sqm sqm sqm Tk. Tk. Tk. Tk. Tk. Tk. 793.00 847.00 888.00 3.19 6.38 9.58 sqm sqm sqm sqm sqm sqm Tk. Tk. Tk. Tk. Tk. Tk. 747.00 801.00 828.00 3.19 6.38 9.58

(i) (a) (b) (c) (ii) (iii) (iv) 37

(i) (a) (b) (c) (ii). (iii) (iv) 38-I

(i) (a) (b) (ii) (iii) (iv) 38-II

(i)

ahsan/aqa

(180)

SHORT FORM OF PWD SCHEDULE OF RATES, 16TH OCTOBER, 2002 (10TH EDITION)

ANNEXURE - A

DETAIL DESCRIPTION OF THE ITEMS CORRESPOND TO THE RESPECTIVE ITEM IN THE SCHEDULE OF RATES

Item No. (a) (b) (c) (d) (ii) (iii) (iv) 38-III

Description of items GP (Mirror polished) 300 x 300 mm floor tiles GP (Mirror polished) 396 x 396 mm floor tiles GP (Mirror polished) 300 x 600 mm floor tiles GP 305 x 305 mm floor (stair) tiles Add for each additional floor upto 5th floor for items Add for each additional floor from 6th floor to 9th floor for items Add for each additional floor for 10th floor and abovefor items Supplying, fitting and fixing acid proof floor tiles (local made) on 20 mm thick cement mortar (1:2) base and raking out the joints with white cement and coloured pigment including cutting and laying tiles in proper way and finishing with care etc, all complete as per direction of the engineer-in-charge. Ground floor 140 x 140 x 8.5 mm BISF acid proof 100 x 100 x 8.5 mm BISF acid proof Add for each additional floor upto 5th floor for items Add for each additional floor from 6th floor to 9th floor for items Add for each additional floor for 10th floor and abovefor items Supplying, fitting and fixing homogeneous quartz floor tiles (Local made) on 20 mm thick cement mortar (1:2) base and racking out the joints with white cement including cutting and laying the tiles in proper way and finishing with care etc. all complete as per direction of the engineer-in-charge. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for each additional floor for 10th floor and above Supplying, fitting and fixing homogeneous embossed (non-skid) floor tiles (Local made) on 20 mm thick cement mortar (1:2) base and racking out the joints with white cement including cutting and laying the tiles in proper way and finishing with care etc. all complete as per direction of the engineer-in-charge. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor Add for each additional floor for 10th floor and above Supplying, fitting and fixing (300 x 300 mm/400 x 400 mm) special quality fibrous floor tiles (foreign made) on 20 mm thick cement mortar (1:2) base and racking out the joints with white cement and coloured pigment including cutting and laying tiles in proper way and finishing with care etc. all complete as per directing of the engineer-in-charge. Ground floor Add for each additional floor upto 5th floor Add for each additional floor from 6th floor to 9th floor

Unit sqm sqm sqm sqm sqm sqm sqm

Unit Rate Tk. Tk. Tk. Tk. Tk. Tk. Tk. 1,470.00 1,680.00 1,835.00 1,091.00 3.19 6.38 9.58

(i) (a) (b) (ii) (iii) (iv) 39(a)

sqm sqm sqm sqm sqm

Tk. Tk. Tk. Tk. Tk.

1,497.00 1,578.00 3.19 6.38 9.58

i) ii) iii) iv) 39(b)

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

936.00 3.19 6.38 9.58

i) ii) iii) iv) 40

sqm sqm sqm sqm

Tk. Tk. Tk. Tk.

1,072.00 3.19 6.38 9.58

i) ii) iii)

sqm sqm sqm

Tk. Tk. Tk.

1,275.00 3.19 6.38

ahsan/aqa

(181)

SHORT FORM OF PWD SCHEDULE OF RATES, 16TH OCTOBER, 2002 (10TH EDITION)

ANNEXURE - A

DETAIL DESCRIPTION OF THE ITEMS CORRESPOND TO THE RESPECTIVE ITEM IN THE SCHEDULE OF RATES

Item No. iv)

Description of items Add for each additional floor for 10th floor and above

Unit sqm

Unit Rate Tk. 9.58

ahsan/aqa