You are on page 1of 6

Piloting and Anchoring Learning objectives: Know the terminology used to describe a naval ships tactical characteristics.

. Apply proper procedures in the use of advance and transfer to determine turn bearings during precision piloting. Apply correct procedures in setting up the approach plot for anchoring. Know the terminology associated with precision anchoring. Precise class of ship within a particular type Angle of turn is the horizontal angle through which the ship swings in executing a turn, measured from a ships original course to its final course. All of the above data as well as acceleration/ deceleration rates can be found in the ships tactical data folder. Turntables are contained in the ships tactical folder. They contain turning characteristics for the ship for various rudder and speed changes.

All of the above data as well as acceleration/ deceleration rates can be found in the ships tactical data folder. Turn tables are contained in the ships tactical folder. They contain turning characteristics for the ship for various rudder and speed changes. Example: Speed: 15 kts Angle of Turn 15 o 30 o 45 o 60 o Advance 180 230 270 310 Transfer 18 30 60 110

Use of advance and transfer during piloting: A navigator of a medium-sized vessel has laid down an intended track on a chart to negotiate a 50 degree bend in a narrow river channel. If the ships rudder were not put over until it reached the intersection of the old and new track directions, the turning diameter of the

ship might cause it to go aground on the left side of the channel. At the very least, it would be far to the left of the intended track. Obviously, the navigator should recommend a point on the old track, called the turning point, at which the ship should put its rudder over, taking its turning circle into account, so that the ship will come out of the turn on its new track leg. Step One: Calculate advance and transfer table for the speed and amount of rudder to be used. In our example, we will use a speed of 15 kts and a rudder angle of 50 degrees. Because their is no value for 50 degrees on the table we must interpolate: Angle of Turn 45 o 50 o 60 o Advance 270 310 Transfer 60 110

5/15 * (310-270) = 13; 270+13=283 yards 5/15 * (110-60)= 17; 60+17=77 yards Step Two: Plot transfer by drawing a dashed line parallel to the original track at a distance equal to the calculated table value. The intersection of the dashed transfer line and the new track indicates the point at which the turn should be completed (Point B). Step Three: Plot advance by laying out its distance from Point B back down the transfer line. Point C in our diagram indicates the advance. Step Four: Plot the turning point by drawing a perpendicular from the point indicating the advance to the old track. Point D represents the turning point. Step Five: To complete the plot, a suitable object to be used as a marker for a turn bearing is identified. A line will be drawn from the turning point toward this object in order to provide an indication of the time to turn. When the appropriate bearing to the object is reached, the rudder will be put over. It is desirable that this object be as close to 90 degrees from the turning point. It is important to note that this turn was plotted for a 15 degree rudder angle and a speed of 15 kts; a change in either speed or rudder will cause the advance, transfer and turning point to differ. Moreover, the advance and transfer tables are for zero wind and current, so the navigator must take these factors into account.

Anchoring is one of the most critical evolutions that a navigator is involved with; it will draw upon all of their piloting skills and involve many members of the crew. There are four stages of this important evolution: 1) Selection, 2) Plotting, 3) Execution, and 4) Post-anchoring procedures. Selection of an anchorage Higher authority assigns an anchorage position in most cases. Naval ships submit a Port Visit Request (PVST) or Logistic Requirement (LOGREQ) message requesting an anchorage assignment, which is provided by a local port authority. If the area of the anchorage is not within the jurisdiction of a local port authority, it will be assigned by the Senior Officer Present Afloat (SOPA), or if a ship is steaming independently, the navigator will select an anchorage with the Commanding Officers approval. In any case the following conditions should always apply to an anchorage insofar as possible: The anchorage should be at a position sheltered from the effects of strong winds and current. The bottom should be good holding ground, such as mud or sand vice rocks or reef. The water depth should be neither too shallow, hazarding the ship, nor too deep, risking dragging the anchor. The position should be free from such hazards to the anchor such as fish traps, buoys and cables. The position should be free from such hazards to navigation as shoals and sandbars. There should be a suitable number of landmarks, day marks and lighted navigation aids available for fixing the ships position both by day and by night. If boat runs ashore are to be made, the anchorage chosen should be in close proximity to the intended landing. Colored anchorage circles of various sizes for different ship sizes can be found on charts provided by the National Ocean Service. These circle are lettered and numbered which allows for specific anchorage assignments. Foreign charts often have anchorages marked as well. Amplifying information on possible anchorage sites can be obtained from the applicable volume of the Coast Pilots for U.S. waters, from the proper volume of the Enroute Sailing Guide for foreign waters, and from the Fleet Guide for ports in both foreign and domestic waters frequented by U.S Navy warships.

Plotting the anchorage The following terms apply to the anchor plot: Approach track - This is the track along which the ship must proceed in order to proceed to the anchorage. Its length will vary from 2,000 yards or more for a large ship, to 1,000 yards for a ship the size of a Navy destroyer or smaller. Under most circumstances, it should never be shorter than 1,000 yards. Head bearing - If at all possible, the navigator will select an approach track such that a navigational aid will lie directly on the approach track if it were extended to the navigational aid selected. This bearing should remain constant if the ship is on track during the approach. Letting-go circle - This is a circle drawn around the intended position of the anchor at the center of the berth with a radius equal to the horizontal difference from the hawse pipe to the pelorus. Letting-go bearing (drop bearing) - This is a predetermined bearing drawn from the intersection of the letting-go circle with the approach track to a convenient landmark or navigational aid, generally selected near the beam. Range circles - These are preplotted semicircles of varying radii centered on the center of the anchorage, drawn so the arcs are centered on the approach track. Each is labeled with the distance from that arc to the 10 letting-go circle. These arcs are normally drawn at 100-yard intervals measured outward from the letting-go circle to 1,000 yards, and at ranges of 1,200, 1,500, and 2,000 yards thereafter. Swing circle - This is a circle centered at the position of the anchor, with a radius equal to the sum of the ships length plus the length of the chain let out. Drag circle - This is a circle centered at the final calculated position of the anchor, with a radius equal to the sum of the hawse pipe to pelorus distance and the final length of chain let out. All subsequent fixes should fall within the limits of the drag circle. Example: Suppose that a ship having 300 ft of total length and a hawse pipe to pelorus distance of 150 ft has been directed to anchor. Step One: First, an estimated swing circle is plotted to ensure the area around the anchorage is safe. Step Two: The approach track is selected and plotted based on the available objects for a head bearing, taking into account the wind and currents in the area. In our example, we have a northerly wind and negligible current. Step Three: The intended track leading up to the final approach is laid down, with care being taken to allow for the proper length of the approach track. Step Four: The ship will approach the anchorage from the southwest. The advance and transfer for the 60-degree turn onto the approach track are obtained, and the turning point is located. A turn bearing is then plotted from the turning point. Step Five: To complete the plot, the letting-go circle is drawn, with a radius equal to the 50-yard hawse pipe to pelorus distance. The letting-go bearing then is constructed using an appropriate navy aid such as the stack shown in our example. Finally, range circle arcs are drawn and labeled, centered on the middle of the anchorage, with radii measured in increments as described in the definition section. The final plot is shown below:

Executing the anchorage: When executing the anchorage, the navigators objectives are to keep the ship as close to the approach track as possible, and to have all of the headway off the ship when the hawse pipe is directly over the center of the anchorage. The navigator will take constant fixes and make course and speed recommendations throughout the evolution. Step One: With 1,000 yards to go, most ships are usually slowed to a speed of five to seven kts. Step Two: Depending upon wind and current, the engines should be stopped when 300 yards from the letting-go circle, and the anchor detail should be instructed to stand by. As the vessel draws near the drop circle, engines are normally reversed so as to have all remaining headway off the ship as it passes over the letting-go circle. Step Three: When the pelorus is at the letting-go bearing, the word Let go the anchor is passed to the anchor detail, and the anchor is dropped. Step Four: As the anchor is let go, the navigator calls for an immediate round of bearings and marks the ships head. After the resulting fix is plotted, a line is extended from it in the direction of th e ships head, and the hawse pipe to pelorus distance is laid off along the line, thus plotting the position of the anchor at the moment it was let go. If all goes well, the anchor will be placed within 50 yards of the center of the anchorage.

Post-anchoring procedures Step One: After the anchor has been let go, chain is let out or veered until a length or scope of chain five to seven times the water depth is reached. At this point, the chain is secured and the engines are backed, causing the flukes of the anchor to dig into the bottom, thereby setting the anchor. Step Two: The navigator will take another round of bearings, record ships head, and note the direction the chain is tending. With this information, the navigator plots another fix and recomputes the position of the anchor by lying off the distance plus the scope of chain in the direction the chain is tending. This second calculation of the position of the anchor chain is necessary because the chain may have been dragged during the process of setting the anchor. Step Three: After the anchors final position has been determined, the swing circle is drawn using the anchors computed position as the center and the sum of the ships length plus the scope of the chain let out as the radius. Step Four: If no obstructions are found to be within the swing circle, the navigator will then draw the drag circle using a radius equal to the sum of the hawse pipe to the pelorus plus the scope of the anchor chain let out. All subsequent fixes should fall within the drag circle; if they do not, the anchor should be considered to be dragging.

Step Five: After plotting the drag circle, the navigator selects several lighted aids to navigation that are suitable for use in obtaining fixes by day or night, and he enters them in the Bearing Book for use by the anchor bearing watch. This watch is charged with obtaining and recording in the Bearing Book a round of bearings to the objects designated by the navigator at least once every 15 minutes, and plotting the resulting fix on the chart (the area of the chart where the fixes are plotted will be covered by a piece of clear plastic in order to save the chart from excessive wear). If a fix falls outside the drag circle, another is taken immediately, and if the second fix falls outside the drag circle the anchor is considered to be dragging and all appropriate personnel are notified. The importance of the anchor watch cannot be overemphasized as failure to recognize when the anchor is dragging or changes in navigation considerations (such as wind, currents, or other ships) can cause the ship to go aground or to strike a hazard.

You might also like