You are on page 1of 20

Technical data

Demag DR-Bas rope hoist


Low-headroom monorail hoist
EKDR-Bas 3 - 5 - 10

43349044.eps

220612 enGB

203 736 44

714 IS 813

Design overview

- Explanation of size designations/type assignment

Selection criteria

Selection table

EKDR-Bas 3 low-headroom monorail hoist

EKDR-Bas 5 low-headroom monorail hoist

EKDR-Bas 10 low-headroom monorail hoist

10

EKDR-Bas 3 - 5 - 10 wheel load from deadweight

12

EKDR-Bas 3 - 5 - 10 wheel load from load

14

Key data for hoist drives EKDR-Bas 3 - 5 - 10

15

- Motor dimensions

16

- Modification of conductor cross-sections

16

Key data for cross-travel drives EKDR-Bas 3 - 5 - 10

17

20373644_en.indd/220612

Demag Cranes & Components

Contents

Design overview

EKDR-Bas low-headroom monorail hoist

Cross-travel motor

Electrical equipment cover


with geared limit switch

Electrical enclosure

Hoist motor

Counterweights

4/1 bottom block

Gearbox

43349144.eps

Explanation of size designations/type assignment


E

K DR-Bas 3 -

3,2

4/1 -

380

CC

50

F6 5/20 300 1400 45


Rail head width
Track gauge [mm]

Remarks
EZDR-Bas only
EZDR-Bas only

Flange width of the girder [mm]


Max. cross-travel speed [m/min]
Creep lifting 1:6 (pole-changing)
Frequency [Hz]
Electrical equipment code 1)
Operating voltage [V] 380 V ; 415 V
Demag Cranes & Components

Lifting speed in [m/min]


Motor type: Z = MH-Bas; cylindrical rotor
Hook path in [m]
2/1; 4/1 reeving
Load capacity in [t]
Range 3; 5; 10
Demag rope hoist
F = Foot-mounted hoist
K = Low-headroom monorail hoist

20373644_en.indd/220612

U = Standard-headroom monorail hoist


Z = Double-rail crab
E = Electric travel trolley

1) CC code
NC code

with control system.


without control system

Selection criteria

The size of the hoist is determined by the load


spectrum, average operating time per working day,
load capacity and reeving.

1. What are the operating conditions?


2. What is the specified safe working load?

5. Do the loads need to be lifted and lowered with


great accuracy?

3. To what height must the load be lifted?

6. Is horizontal load travel necessary?

4. What is the required lifting speed?

7. How is the hoist to be controlled?

The load spectrum


(in most cases estimated) can be evaluated according to the definitions below:
The group is determined by the load spectrum and operating time.

Hoist units which are usually subject to very small


loads and in exceptional cases only to maximum
loads.

Load spectrum

Load capacity

1 Light

Small partial load


Small dead load

Operating time
2 Medium

Average operating time per working day in hours

Light

2-4

4-8

8-16

more than 16

Medium

1-2

2-4

4-8

8-16

Heavy

0,5-1

1-2

2-4

4-8

Very heavy

Group of mechanisms to

Load capacity

Hoist units which are usually subject to small loads


but rather often to maximum loads.

Large partial load


Medium partial load
Medium dead load
Operating time

3 Heavy

Load capacity

Hoist units which are usually subject to medium loads


but frequently to maximum loads.

Group of mechanisms
to FEM/ISO

1Am/M4

0,25-0,5

0,5-1

1-2

2-4

FEM

1Am

2m

3m

4m

ISO

M4

M5

M6

M7

2m/M5

Reeving arrangement

3m/M6

4m/M7

1Am/M4

2m/M5

2/1

3m/M6

4m/M7

4/1

Range

Load capacity in t

DR-Bas 3

1,6

1,25

3,2

2,5

DR-Bas 5

3,2

2,5

1,6

6,3

3,2

DR-Bas 10

6,3

3,2

12,5

10

6,3

Heavy dead load

Hoist units which are usually subject to maximum or


almost maximum loads.
Load capacity

Very heavy dead load

Operating time

The average operating time per working day is estimated or calculated as follows:
Operating time/
day =
Operating time/
day =

2 average hook path no. of cycles/hour working


time/day

60 hoist speed
2 3 20 8
60 6

= 2,66 hours

For the medium load spectrum and an average daily operating time of 2,66 hours,
the table above shows group 2m. For a load capacity of 5 t and 4/1 rope reeving,
the following table indicates hoist size DR-Bas 5 - 5.

Demag Cranes & Components

4 Very heavy

5t
Medium from table
6 m/min
1 m/min
4/1
3m
20
8 hours

20373644_en.indd/220612

Operating time

Example
Load capacity
Load spectrum
Hoist speed
Creep lifting speed
Reeving
Average hook path
No. of cycles/hour
Working time/day

Selection table

Range

Group of mechanisms

Load capacity

Hook path

Hoist speed v

[t]

[m]

[m/min]

FEM

ISO

1Am

M4

2m

M5

1,6

3m

M6

1,25

4m

M7

1Am

M4

2m

M5

3,2

3m

M6

2,5

4m

M7

1Am

M4

3,2

2m

M5

2,5

3m

M6

4m

M7

1,6

Hoist motor

2/1

DR-Bas 3

10/1,6
12; 20; 30

MH-Bas 112A
12/2

4/1
5/0,8
6; 10; 15

6/1

MH-Bas 112A

2/1

DR-Bas 5

10/1,6
12; 20; 30

12/2

MH-Bas 132A

4/1
1Am

M4

6,3

2m

M5

3m

M6

4m

M7

3,2

1Am

M4

6,3

2m

M5

3m

M6

4m

M7

3,2

1Am

M4

12,5

2m

M5

10

3m

M6

4m

M7

6,3

5/0,8
6; 10; 15

6/1

MH-Bas 132A

2/1

12; 20; 30

10/1,6

MH-Bas 160A

4/1
4/0,6
6; 10; 15

5/0,8

MH-Bas 160A

20373644_en.indd/220612

Demag Cranes & Components

DR-Bas 10

8/1,2

EKDR-Bas 3 low-headroom monorail hoist

450
b

467
79

374

376
2/1: 792

4/1: 640,5

181,5

165

379

L 25

m2
n2
Hook travel
m4
n4

R4

R3

R1

30

R2

159
43349244.epss

Demag Cranes & Components

20373644_en.indd/220612

159

Travel wheel
Dimensions in [mm]

EKDR-Bas 3

Symbol

H12

H20

110 - 400

45

100

10

L27

30

H30

i
L27
43349344.eps

Rope hoist
Dimensions in [mm]

EKDR-Bas 3

Symbol

H12

H20

H30

110 - 400

L25

727-b/2

m2

144

256,5

396,5

m4

23

135

275,5

n2

168

280,5

421

n4

84

140

210

590,5

815,5

1095,5

Counterweights
Type

Drum

Reeving

20373644_en.indd/220612

Demag Cranes & Components

2/1

H12

EKDR-Bas 3

H20

H30

4/1

Quantity of plates

Flange width

Quantity of plates

Flange width

(in pairs)

[mm]

(in pairs)

[mm]

200 - 350

200 - 250

350 - 400

251 - 400

200 - 400

200 - 250

251 - 400

200 - 400

200 - 250

251 - 400

EKDR-Bas 5 low-headroom monorail hoist

506,5
473

171,5

448

389,5

430

4/1: 705,5
2/1: 855

195

84

L25
m2
n2
Hook travel
m4
n4

R4

R3

R1

33

R2

160
43349444.eps

Demag Cranes & Components

=
R

20373644_en.indd/220612

=
160

Travel wheel
Dimensions in [mm]

EKDR-Bas 5

Symbol

H12

H20

110 - 400

52

125

10

L27

33

H30

i
L27
43349344.eps

Rope hoist
Dimensions in [mm]

EKDR-Bas 5

Symbol

H12

H20

H30

110 - 400

l25

794-b/2

m2

151

268

m4

37,8

133

416
276

n2

174

291

436

n4

87

145,5

218

619,5

854,5

1149,5

Counterweights
Type

Drum

Reeving

20373644_en.indd/220612

Demag Cranes & Components

2/1

H12

EKDR-Bas 5

H20

H30

4/1

Quantity of plates

Flange width

Quantity of plates

Flange width

(in pairs)

[mm]

(in pairs)

[mm]

200 - 400

200 - 250

251 - 400

110 - 130

110 - 150

131 - 310

151 - 320

311 - 400

321 - 400

110 - 200

110 - 150

201 - 350

151 - 270

351 - 400

271 - 400

EKDR-Bas 10 low-headroom monorail hoist

631
b

535,5

212,5

570

547

546,5

4/1: 927
2/1: 1097

221

81,4

L25

m2
n2
Hook travel
m4
n4

R4

R3

R1

59

R2

182
43349544.eps

10

Demag Cranes & Components

=
R

20373644_en.indd/220612

182

Travel wheel
Dimensions in [mm]

EKDR-Bas 10

Symbol

H12

H20

116 - 400

59

160

11

L27

H30

37,5

i
L27
43349344.eps

Rope hoist
Dimensions in [mm]

EKDR-Bas 10

Symbol

H12

H20

116 - 400

l25

874,5-b/2

H30

m2

162,5

292,5

m4

33

163,5

457,5
325

n2

195

325

488

n4

97,5

162,5

244

769

1029

1359

Counterweights
Type

Drum

Reeving

20373644_en.indd/220612

Demag Cranes & Components

2/1

H12

EKDR-Bas 10

H20

H30

4/1

Quantity of plates

Flange width

Quantity of plates

Flange width

(in pairs)

[mm]

(in pairs)

[mm]

110 - 200

110 - 200

201 - 370

201 - 299

371 - 400

300 - 400

110 - 250

110 - 220

251 - 400

221 - 380

381 - 400

110 - 250

110 - 250

251 - 400

251 - 400

11

EKDR-Bas 3 - 5 - 10 wheel load from deadweight

2/1 reeving
Size

Hook path

Flange width

[m]

[mm]

R1
[kg]

R2
[kg]

R3
[kg]

200

50

130

300

48

133

400

29

200

12

EKDR-Bas 3

20

30

12

EKDR-Bas 5

20

30

12

EKDR-Bas 10

20

Deadweight
without bottom
block

Bottom block

R4
[kg]

[kg]

[kg]

156

60

398

160

57

398

142

170

35

375

45

139

171

55

410

300

45

139

172

55

410

400

44

140

172

55

410

200

35

158

196

44

433

300

39

155

191

48

433

400

41

153

189

50

433

200

45

225

285

57

612

300

51

219

278

64

612

400

53

217

274

68

612

200

36

240

319

48

644

300

46

230

306

62

644

400

34

233

309

45

622

200

43

264

361

59

727

300

52

255

350

71

727

400

40

257

352

55

705

200

120

354

459

156

1089

300

117

357

463

152

1089

400

72

379

492

93

1037

200

104

388

509

137

1139

300

109

383

503

144

1139

400

68

402

527

89

1087

200

86

431

572

114

1203

300

101

417

552

134

1203

400

65

431

571

86

1151

27

32

62

12

20373644_en.indd/220612

Demag Cranes & Components

30

Wheel loads from deadweight

4/1 reeving
Size

Hook path

Flange width

[m]

[mm]

R1
[kg]

R2
[kg]

R3
[kg]

200

59

134

300

32

151

400

37

200

EKDR-Bas 3

10

15

EKDR-Bas 5

10

15

EKDR-Bas 10

10

Deadweight
without bottom
block

Bottom block

R4
[kg]

[kg]

[kg]

162

71

426

182

39

403

146

176

44

403

56

146

177

68

447

300

31

161

194

38

425

400

37

155

187

45

425

200

50

170

202

59

481

300

29

180

215

34

459

400

37

173

206

44

459

200

45

237

297

57

635

300

28

244

305

36

613

400

38

234

293

48

613

200

34

259

337

44

674

300

46

247

321

60

674

400

35

249

323

45

652

200

38

287

388

52

765

300

50

276

372

67

765

400

40

276

373

54

743

200

26

455

581

33

1095

300

60

421

537

77

1095

400

76

405

516

97

1095

200

102

430

548

130

1210

300

51

458

583

66

1158

400

72

437

557

92

1158

200

78

489

624

99

1289

300

100

467

596

127

1289

400

66

478

610

84

1237

29

51

129

20373644_en.indd/220612

Demag Cranes & Components

15

Wheel loads from deadweight

13

EKDR-Bas 3 - 5 - 10 wheel load from load

Size

Reeving

2/1
EKDR-Bas 3
4/1

2/1
EKDR-Bas 5
4/1

2/1
EKDR-Bas 10
4/1

Drum
length

Unit

R1

R2

R3

R4

R1

R2

R3

R4

Top

Top

Top

Top

Bottom

Bottom

Bottom

Bottom

H12
H20

37,1%

37,1%

12,9%

12,9%

22,9%

22,9%

27,1%

27,1%

40,8%

40,8%

9,2%

9,2%

23,5%

23,5%

26,5%

26,5%

H30

42,5%

42,5%

7,5%

7,5%

23,3%

23,3%

26,7%

26,7%

H12

27,0%

27,0%

23,0%

23,0%

19,9%

19,9%

30,1%

30,1%

H20

33,3%

33,3%

16,7%

16,7%

24,7%

24,7%

25,3%

25,3%

H30

37,3%

37,3%

12,7%

12,7%

27,7%

27,7%

22,3%

22,3%

H12

37,4%

37,4%

12,6%

12,6%

23,3%

23,3%

26,7%

26,7%

H20

40,8%

40,8%

9,2%

9,2%

25,1%

25,1%

24,9%

24,9%

H30

43,1%

43,1%

6,9%

6,9%

24,1%

24,1%

25,9%

25,9%

H12

28,1%

28,1%

21,9%

21,9%

21,0%

21,0%

29,0%

29,0%

H20

32,8%

32,8%

17,2%

17,2%

24,2%

24,2%

25,8%

25,8%

H30

40,2%

40,2%

9,8%

9,8%

30,7%

30,7%

19,3%

19,3%

H12

35,7%

35,7%

14,3%

14,3%

23,0%

23,0%

27,0%

27,0%

H20

39,6%

39,6%

10,4%

10,4%

23,8%

23,8%

26,2%

26,2%

H30

41,8%

41,8%

8,2%

8,2%

24,5%

24,5%

25,5%

25,5%

H12

27,1%

27,1%

22,9%

22,9%

20,8%

20,8%

29,2%

29,2%

H20

32,9%

32,9%

17,1%

17,1%

25,0%

25,0%

25,0%

25,0%

H30

37,0%

37,0%

13,0%

13,0%

28,0%

28,0%

22,0%

22,0%

- All data in % of the load capacity in bottom/top hook position.

14

20373644_en.indd/220612

Demag Cranes & Components

- The bottom block weight is assigned to the load as a share (%).

Key data for hoist drives EKDR-Bas 3 - 5 - 10


Design is in accordance with the VDE regulations and the FEM design rules to meet the high demands made on electric hoists.

EKDR-Bas 3: Main lifting F6


Motor size

No. of
poles

12

Hoist speed

CDF

Starts/h

[kW]

[rpm]

0,6

20

450

5/0,8; 6/1

3,7

40

Hoist speed

Rated current IN and


start-up current IA for
50 Hz
380 - 415 V

cos

cos

IN [A]

IA [A]

160

5,3

10,6

0,3

0,48

2790

80

7,9

50,56

0,86

0,87

CDF

Starts/h

cos

cos

[kW]

[rpm]

1,0

20

465

5/0,8; 6/1

5,8

40

2820

Hoist speed

CDF

[kW]

[rpm]

1,6

20

465

9,8

40

2820

10/1,6;
12/2;

MH-Bas 112A - 12/2


2

EKDR-Bas 5: Main lifting F6


Motor size

No. of
poles

12

10/1,6;

Rated current IN and


start-up current IA for
50 Hz
380 - 415 V
IN [A]

IA [A]

160

7,7

17,40

0,35

0,54

80

11,9

74,73

0,93

0,81

12/2;

MH-Bas 132A - 12/2


2

EKDR-Bas 10: Main lifting F6


Motor size

No. of
poles

12

8,0/1,3

Starts/h

Rated current IN and


start-up current IA for
50 Hz
380 - 415 V

cos

cos

IN [A]

IA [A]

160

12,5

28,5

0,31

0,47

80

21,5

130,01

0,81

0,76

10/1,6

MH-Bas 160A - 12/2

4,4/0,6
2

5/0,8

Required supply cable conductor cross-sections and fuse links


Motor size

Mains connection delay fuse for 50 Hz


1)

Supply lines for 5% voltage drop U and start-up current IA for 50 Hz 2)

20373644_en.indd/220612

Demag Cranes & Components

380 V

380 V (U 20 V)

[A]

[mm]

[m]

MH-Bas 112A - 12/2

32

54

MH-Bas 132A - 12/2

32

53

MH-Bas 160A - 12/2

50

36

1) Fuse links also apply in conjunction with a cross-travel motor.


2) The lengths of the supply lines are calculated on the basis of an earth-loop impedance of 200 m.

15

Motor dimensions
Motor size

Dimensions [mm]

MH-Bas 112A - 12/2

MH-Bas 132A - 12/2

MH-Bas 160A - 12/2

109,2

119,7

148,7

109,2

119,7

148,7

439

514,5

533

55

76

90

Weight [kg]

Modification of conductor
cross-sections

Example for calculating the cross-sections Q of the conductors of cables exceeding the length indicated in the table:

Required cross section =

Known cross-section required length


Known cable length

4 mm 70 m
54 m

= 5,2 mm

16

20373644_en.indd/220612

Demag Cranes & Components

Selected cross section = 6 mm

Key data for cross-travel drives EKDR-Bas 3 - 5 - 10


Design is in accordance with the VDE regulations and the FEM design rules to meet the high demands made on electric hoists.

Motor size

No. of
poles

Travel
speed

8
MT-Bas 80A - 8/2

cos

cos

IA [A]

0,40

0,93

0,55

0,7

230

0,96

3,57

0,74

0,89

705

400

0,50

1,4

0,5

0,69

40

2855

200

1,40

5,56

0,67

0,88

0,18

20

720

380

1,00

3,2

0,48

0,76

0,75

40

2855

190

1,86

9,39

0,81

0,88

CDF

Inertia
factor
FI = 2,0

Rated current IN and


start-up current IA for
50 Hz
380 - 415 V

[kW]

[rpm]

C/h

IN [A]

0,06

20

705

460

0,25

40

2815

0,09

20

0,37

5/20
2
8

MT-BAS 80B - 8/2

5/20
2
8

MT-BAS 90A - 8/2

5/20

20373644_en.indd/220612

Demag Cranes & Components

17

18

20373644_en.indd/220612

Demag Cranes & Components

Notes

20373644_en.indd/220612

Demag Cranes & Components

Notes

19

The current addresses of the sales offices and the subsidiaries and agencies worldwide
can be found on the Demag Cranes & Components homepage at
www.demagcranes.com/Contact

Reproduction in whole or in part only with prior consent of Demag Cranes & Components

Subject to change. Not liable for errors or omissions.

You might also like