600-FKM (FYP1-LB /Rev.

0)

FAKULTI KEJURUTERAAN MEKANIKAL


UNIVERSITI TEKNOLOGI MARA

mee
(Record all

LOG BOOK
FINAL YEAR PROJECT PROGRESS REPORT

PROJECT TITLE
STUDY AND PROPOSE AN IMPROVEMENT OF MAINTENANCE ACTIVITIES
FOR AIR CONDITIONING SYSTEM AT
HOSPITAL UNIVERSITI SAINS MALAYSIA (HUSM),
KUBANG KERIAN, KELANTAN

NADIA BINTI ZAHARI


IC NO: 890504035950
STUDENT ID: 2010879104

SEMESTER 02 SESSION 2013

600-FKM (FYP1-LB /Rev.0)

FINAL YEAR PROJECT


BACHELOR ENGINEERING (HONS) MECHANICAL

STUDENT INFORMATION
Semester/Session: 8/2013

Student Name: NADIA BINTI ZAHARI

UiTM ID. : 2010879104

IC No. : 890504035950

Email : nadiazahari2@gmail.com

No Tel/HP : 013-3704589

Hostel Address : 2B-04-47(A), Kolej Mawar

Project Title:
STUDY AND PROPOSE AN IMPROVEMENT OF MAINTENANCE ACTIVITIES
FOR AIR CONDITIONING SYSTEM AT
HOSPITAL UNIVERSITI SAINS MALAYSIA (HUSM),
KUBANG KERIAN, KELANTAN

Supervisor(s):
Hj. Razali Hassan
019 - 221 6417

Prepared by: Haji Razali Hassan, Coordinator FYP1

600-FKM (FYP1-LB /Rev.0)

MEETING DATE BETWEEN STUDENT AND SUPERVISOR


Freq
.

Week

Meeting
Date

Summary of Discussion

Supervisor
Signature

Prepared by: Haji Razali Hassan, Coordinator FYP1

Prepared by: Haji Razali Hassan, Coordinator FYP1

FINAL YEAR PROJECT


SCHEDULE16151413121110987654321ACTIVITY1.2.3.4.5.6.7.8.9.10.11.12.13.14.15
.10.11.12.

600-FKM (FYP1-LB /Rev.0)

600-FKM (FYP1-LB /Rev.0)

WEEKLY ACTIVITIES RECORD


DATE: ___/___/2013

Prepared by: Haji Razali Hassan, Coordinator FYP1

600-FKM (FYP1-LB /Rev.0)

Prepared by: Haji Razali Hassan, Coordinator FYP1

600-FKM (FYP1-LB /Rev.0)

Progresss Report No. : 1 / 2 / 3 / 4 / 5 / 6

Week No: ___________

Date

: ___/____/ 2013

PLANNING:

STATUS:

ACTION PLAN:

Describe the activities that you have been


planned for this week

(Describe the latest status of your


project progress)

(Describe the steps you should take


to achieve your goals)

Prepared by:
Signature of Student:

Date Received:
Signature of Supervisor:

______________________
Students Name:

_____________________
Name:

Prepared by: Haji Razali Hassan, Coordinator FYP1

600-FKM (FYP1-LB /Rev.0)

Appendix 1.0
THE POSSIBLE RECORD IN LOG BOOK

Sketches/doodling
Customer needs/requirements
Class notes
Project objectives
Meeting notes
Action Items
Half-baked Ideas
Math calculations
Work-in-progress
Design alternatives

Vendor notes
Research findings
Sources of ideas
Evaluation of data/results
Design reviews
Decision criteria
Design process
Rationale for decisions
Project reflections
Professional development

The possible question you can ask and answer after several project activities such as
Meeting
What were the main outcomes of the meeting?
Was the meeting productive, and why?
What are your personal action items before the next meeting?
Is the team heading in the right direction?
Brainstorming
Which ideas seem more feasible, and why?
Are there enough good ideas?
How could better ideas be developed based on this session?
Engineering Analysis
What were the governing equations?
What were the most important findings?
What do the results mean and how should they be applied?
Visualization
What are the major features/discoveries and why are these significant?
What was learned about the problem or solution possibilities?
What problems were resolved and what still needs to be addressed?
How does this piece integrate with the whole?
Searching
What key information did I find? How does it help achieve the project objectives?
Are there other sources that should be pursued?
What new questions were generated?
Refer to www.engr.mun.ca/~sbruneau/teaching/.../logbookinstructions.pdf

Prepared by: Haji Razali Hassan, Coordinator FYP1