You are on page 1of 12

Microwave ATP folder for UFONE Project

ACCEPTANCE TEST DATA SHEET


FOR
PASOLINK NEO (STM-1)/XPIC SYSTEM

PROJECT NAME:
STATION NAME:
STATION ID:
OPPOSITE STATION NAME:
OPPOSITE STATION ID:

APPROVED BY: ___________________

NAME

SIGNATURE

DATE

__________________ _______________________ _____________

PROVIDED BY: ____________________

Microwave ATP folder for UFONE Project

NAME

SIGNATURE

DATE

__________________ _______________________ _____________

Microwave ATP folder for UFONE Project

ATP Summary
S.No.

Test Items

01

Visual check

02

Software Version Check for IDU/ODU

03

Meter Reading

04

Transmitter output power

05

Transmit RF Output Frequency


Measurement

06

Receive Level

07

FE/NE Loop back Test

08

BER Measurement

09

Alarm Operation

10

Manual Switch-Over for STM-1/XPIC(1+1)

11

Switch-Over for STM-1/XPIC(1+1) via


software

12

TX Power (On/Off)

13

EOW check

14

CW On/Off

15

2M tributary Output Waveform


observation

16

Installation check A

17

Installation check B

18

Link Budget

Ok/Not Ok

Date

Initial

Microwave ATP folder for UFONE Project

The attached documents inspection


BOQ
Site Inventory report for AIMS
The drawing of site layout and floor plan
Tools for the ATP available

Pass
Pass
Pass
Pass

Fail
Fail
Fail
Fail

Not Run
Not Run
Not Run
Not Run

Zapped
Zapped
Zapped
Zapped

The final inspection


No equipment alarm:

Pass

Fail

Not Run

Zapped

No environmental alarm:

Pass

Fail

Not Run

Zapped

No communication active alarm:

Pass

Fail

Not Run

Zapped

Site is cleaned & tidy

Pass

Fail

Not Run

Zapped

Site is secured:

Pass

Fail

Not Run

Zapped

Comment:

Microwave ATP folder for UFONE Project

Installation Checklist
Site B ID
Site Name
Part I: IDU
T01 Rack Installed
T02 Tightness of rack screws

Pass

Fail

Not Run

Zapped

T03 Rack Grounded

Pass

Fail

Not Run

Zapped

T04 IF cable connector Tightness

Pass

Fail

Not Run

Zapped

T05 Power cable Laying (Laying route)

Pass

Fail

Not Run

Zapped

T06 Power cable Terminating tightness (Labeled)

Pass

Fail

Not Run

Zapped

T07 Signal cable Laying (Laying route)

Pass

Fail

Not Run

Zapped

T08 Patching & Punching (using Proper Tools)

Pass

Fail

Not Run

Zapped

T09 PCM cable check (All E1s patched & Labeled)

Pass

Fail

Not Run

Zapped

T10 Pre-Patching (All E1s, The Input)

Pass

Fail

Not Run

Zapped

T11 Post-Patching (The output)

Pass

Fail

Not Run

Zapped

T12 IDU grounded on DC Grounding Bar

Pass

Fail

Not Run

Zapped

T13 Circuit Breakers of proper rating installed(5-

Pass

Fail

Not Run

Zapped

10Amp)
T14 IF Cable Fixed with Tie-wraps

Pass

Fail

Not Run

Zapped

T15 Surge Arrestor (if applicable)

Pass

Fail

Not Run

Zapped

Pass

Fail

Not Run

Zapped

T16 Surge Arrestor Grounded (if applicable)


T17 NMS cable installed (if applicable)
T18 LVBD by pass (Only for Indoor)
Part II: ODU/Antenna
T01 Mount Installed

Pass

Fail

Not Run

Zapped

T02 Antenna struts (if applicable)

Pass

Fail

Not Run

Zapped

T03 Tightness of fixing bracket

Pass

Fail

Not Run

Zapped

T04 IF Cable Connector Tightness and Water Proof

Pass

Fail

Not Run

Zapped

T05 Hybrid Circuit Tightness

Pass

Fail

Not Run

Zapped

T06 Antenna Water drain hole Detaches rubber cap

Pass

Fail

Not Run

Zapped

T07 IF cable Routing

Pass

Fail

Not Run

Zapped

T08 Mount Galvanized

Pass

Fail

Not Run

Zapped

T09 Dish Or Mount can be easily panned

Pass

Fail

Not Run

Zapped

T10 IF cable fixed with metal Band

Pass

Fail

Not Run

Zapped

T11 IF cable passed through Gland BTS Pit and

Pass

Fail

Not Run

Zapped

Pass

Fail

Not Run

Zapped

Pass

Fail

Not Run

Zapped

and drain hole must be at bottom

sealed
T12 ODU Grounded to Ground Bar with standard
ground cable
T13 Grounding Kits installed(at 3 different points)

Microwave ATP folder for UFONE Project

Installation Checklist
Site B ID
Site Name
Part I: IDU
T01 Rack Installed
T02 Tightness of rack screws

Pass

Fail

Not Run

Zapped

T03 Rack Grounded

Pass

Fail

Not Run

Zapped

T04 IF cable connector Tightness

Pass

Fail

Not Run

Zapped

T05 Power cable Laying (Laying route)

Pass

Fail

Not Run

Zapped

T06 Power cable Terminating tightness (Labeled)

Pass

Fail

Not Run

Zapped

T07 Signal cable Laying (Laying route)

Pass

Fail

Not Run

Zapped

T08 Patching & Punching (using Proper Tools)

Pass

Fail

Not Run

Zapped

T09 PCM cable check (All E1s patched & Labeled)

Pass

Fail

Not Run

Zapped

T10 Pre-Patching (All E1s, The Input)

Pass

Fail

Not Run

Zapped

T11 Post-Patching (The output)

Pass

Fail

Not Run

Zapped

T12 IDU grounded on DC Grounding Bar

Pass

Fail

Not Run

Zapped

T13 Circuit Breakers of proper rating installed(5-

Pass

Fail

Not Run

Zapped

T14 IF Cable Fixed with Tie-wraps

Pass

Fail

Not Run

Zapped

T15 Surge Arrestor (if applicable)

Pass

Fail

Not Run

Zapped

Pass

Fail

Not Run

Zapped

10Amp)

T16 Surge Arrestor Grounded (if applicable)


T17 NMS cable installed (if applicable)
T18 LVBD by pass (Only for Indoor)
Part II: ODU/Antenna
T01 Mount Installed

Pass

Fail

Not Run

Zapped

T02 Antenna struts (if applicable)

Pass

Fail

Not Run

Zapped

T03 Tightness of fixing bracket

Pass

Fail

Not Run

Zapped

T04 IF Cable Connector Tightness and Water Proof

Pass

Fail

Not Run

Zapped

T05 Hybrid Circuit Tightness

Pass

Fail

Not Run

Zapped

T06 Antenna Water drain hole Detaches rubber cap

Pass

Fail

Not Run

Zapped

T07 IF cable Routing

Pass

Fail

Not Run

Zapped

T08 Mount Galvanized

Pass

Fail

Not Run

Zapped

T09 Dish Or Mount can be easily panned

Pass

Fail

Not Run

Zapped

T10 IF cable fixed with metal Band

Pass

Fail

Not Run

Zapped

T11 IF cable passed through Gland BTS Pit and

Pass

Fail

Not Run

Zapped

Pass

Fail

Not Run

Zapped

Pass

Fail

Not Run

Zapped

and drain hole must be at bottom

sealed
T12 ODU Grounded to Ground Bar with standard
ground cable
T13 Grounding Kits installed(at 3 different points)

Microwave ATP folder for UFONE Project

Appendix 1

Visual Check

Specification : Check only


Installation Type:

Remarks
Outdoor

Indoor

Antenna Type :
Test Item
Antenna system
Serial number
Diameter
Height (AGL)
Polarization
ODU Type :
Test Item
ODU
Serial number
Physical Installation
IDU Type:
Test Item
IDU
Serial number
Physical Installation

No.1

No.2

Remarks

No.1

No.2

Remarks

No.1

No.2

Remarks

Appendix 2 Software Version Checking(ROM/RAM) for ODU/IDU


Test Item
ODU s/w Version(RAM)
IDU s/w Version(ROM)

Site A Name:

Site B Name:

Remarks

Microwave ATP folder for UFONE Project

Appendix 3

Meter Reading

Specification : Reference only


Monitoring Voltage
Test Item

Allowable Range

Transmitter Power

Appendix 4
1.

No.2

13GHz(+21dBm1.5 dB) 23GHz


(+19dBm1.5 dB): Normal

dBm

dBm

13GHz (+21dBm to +1dBm),


23GHz (+19dBm to -1dBm):
Additional AT

dBm

dBm

Transmitter Output Power

Site Name

Test Item

Monitoring Voltage

TX Power
2.

No.1

Converted Transmit Output Power(dBm)


V

dbm

Site Name

Test Item

Monitoring Voltage

TX Power

Converted Transmit Output Power(dBm)


V

Appendix 5

dbm

Transmit RF Output Frequency Measurement.

Specification : Check only

Test Item
TX/RX Frequency

Frequency CH
Site Name:

Site Name:

CH No. :

CH No. :

TX Frequency :
RX Frequency

TX Frequency :
RX Frequency:

Remarks

Microwave ATP folder for UFONE Project

Appendix 6

Receiving Level

Specification : Check only


1. Site Name :
Test Item

AGC (Voltage)

RX Level

Converted Actual
Receiving Level (dBm)

Remarks

dBm

2. Site Name :
Test Item

AGC (Voltage)

RX Level

Appendix 7

Remarks

dBm

FE/NE Loop back Test (BER)

Test Item

Time

FE Loop back

5 Minutes

NE Loop back

5 Minutes

Appendix 8

Converted Actual
Receiving Level (dBm)

Site Name

Site Name

BER Measurement

Specification : 1 x 10-9 or less

Bit Error Rate

Test Item

Time

BER Test

24 Hours

Site Name:

Site Name:

Microwave ATP folder for UFONE Project

Appendix 9 Alarm Operation


Alarm Condition
Input data stream is lost

Alarm Initiated
INPUTLOSS

LED Indication on IDU


TX ALM

AIS(all logic 1) is received

AIS RCVD

BER is worse than pretest value

BER ALM

RX ALM

MAINT ALM

MAINT

Equipment is set to following


conditions:
-Maintenance condition
-FE loopback control condition
- NE loopback control condition
-MOD CW condition
-MUTE(TX output power)condition
-AIS condition

Appendix 10 Manual Switch-over for STM-1/XPIC(1+1)


Specification : Check only
Test Item
Manual Switch-over
(ODU No.1 -> ODU No.2)
Manual Switch-over
(ODU No.2 -> ODU No.1)

Site Name :

Site Name :

Remarks

Microwave ATP folder for UFONE Project

Appendix 11

Switch-over for STM-1/XPIC(1+1) via software

Specification : Check only


Test Item

Site Name :

Site Name :

Remarks

Site Name :

Power Mute 1

Remarks:

Power Mute 2

TX Switch-over
(No.1 to No.2)
TX Switch-over
(No.2 to No.1)
RX Switch-over
(No.1 to No.2)
RX Switch-over
(No.2 to No.1)

Appendix 12

TX Power On/Off

Specification : Check only


Test Item

Appendix 13

Site Name :

EOW Check

Specification : Check only

Test Item
EOW ON (IDU 1)
EOW ON (IDU 2)

Site Name :

Site Name :

Remarks:

Microwave ATP folder for UFONE Project

Appendix 14

CW On/Off

Specification : Check only


Test Item
CW ON (IDU 1)
CW ON (IDU 2)

Appendix 15

Site Name :

Site Name :

Remarks:

2M tributary Output Waveform observation

Specification : Check only


Test Item
Output Waveform
observation

Specification:

Site Name :

Remarks:

ITU-T G.703

OK / Not OK

OK / Not OK