Substation Automation and Protection Training

PCM 600 Engineering Work Flow Summary

ABB Power Technologies AB, 2007 2007-09-07 1

Substation Automation and Protection Training

The first way

The FIRST Way..

ABB Power Technologies AB, 2007 2007-09-07 3

Substation Automation and Protection Training

Engineering From Scratch CAP 531

ABB Power Technologies AB, 2007 2007-09-07 4

Substation Automation and Protection Training

Engineering From Scratch SMT

ABB Power Technologies AB, 2007 2007-09-07 5

Substation Automation and Protection Training

Engineering From Scratch PST

ABB Power Technologies AB, 2007 2007-09-07 6

Substation Automation and Protection Training

Engineering From Scratch GDE

ABB Power Technologies AB, 2007 2007-09-07 7

Substation Automation and Protection Training

Engineering From Scratch CCT

ABB Power Technologies AB, 2007 2007-09-07 8

Substation Automation and Protection Training

The second way

The SECOND Way..

ABB Power Technologies AB, 2007 2007-09-07 9

Substation Automation and Protection Training

Engineering Order Specific File PCM 600/Navigator Define the IEDs


YOU DO HAVE : Order Specific File YOU DO NOT HAVE : Pre Config File

Hardware Configuration is automatically entered in CAP 531 by the WIZARD Software library is automatically entered in CAP 531 by the WIZARD

ABB Power Technologies AB, 2007 2007-09-07 10

Substation Automation and Protection Training

Engineering Order Specific File PCM 600/Tools If you have the Order Specific File: The engineering process is similar to the previous one: Design CAP531 configuration Design SMT Define PST settings Design Single Line Diagram Design GOOSE signals

ABB Power Technologies AB, 2007

Advantage: You do not need to have the IED in front of you and run the ONLINE process called Upload Options
2007-09-07 11 Substation Automation and Protection Training

The third way

The 3rd Way (s)..

ABB Power Technologies AB, 2007 2007-09-07 12

Substation Automation and Protection Training

Engineering On-Line Upload all

ANOTHER POSSIBILITY: Create A NEW empty project and upload all information from the IED
2007-09-07 13 Substation Automation and Protection Training

ABB Power Technologies AB, 2007

Engineering Import the PCM 600 Project

Import (decompress) the project file and you will just get all information in one shot!
ABB Power Technologies AB, 2007

2007-09-07 14