You are on page 1of 7

Site Data & Test Report

Circle Strategic Partner Date of Commissioning


Site Name Airtel Site ID Tower company Site ID SACFA ID Site Lat/Long GSM Band for BTS (900/1800) Type (GBT/RTT/RTP/IBS) Type of BTS (Indoor/Outdoor/Tower Top) Name of Infra Provider (Tower Company) Anchor Operator Sharing Opco 1 Sharing Opco 2 Sharing Opco 3 Sharing Opco 4 Trx Configuration (e.g 2/2/2 , ) Site Address
h

City

Signoff :

Project Manager (Bharti)

Project Manager (SP)

Mob Number
Sign Name Date :

Mob Number
Sign Name Date :

217757277.xls.ms_office

BTS, Antenna & Drive Test Data:


Antenna System Details
GSM900/1800 (in case dual band antenna is installed) or GSM900 (incase single GSM900 antenna is installed) Planned Number of TRX's Number of TRX's after Expansions GSM Antenna Type GSM Antenna Quantity Antenna Height (AGL) Azimuth Electrical Downtilt Mechanical Downtilt TMA Site Expanded in - Combined Mode / Uncombined Mode TX Power Remarks(if any) GSM1800(in case saperate 1800 Band antenna is installed) Sector 1 Planned Number of TRX's Number of TRX's after Expansions GSM Antenna Type GSM Antenna Quantity Antenna Height (AGL) Azimuth Electrical Downtilt Mechanical Downtilt TMA TX Power Site Expanded in - Combined Mode / Uncombined Mode Remarks(if any) GSM Feeder GSM Feeder Type Length (m) Measured VSWR Test Pass / Fail Actual Sector 2 Planned Actual Sector 3 Planned Actual Sector 4 Planned Actual Deviation from Planning Sector 1 Actual Sector 2 Planned Actual Sector 3 Planned Actual Sector 4 Planned Actual Deviation from Planning

Annexure No:

Sector/ Cell GSM Cable Return loss, Cable Loss & VSWR Measurements : Sector 1 Sector 2 Sector 3 Sector 4

217757277.xls.ms_office

BTS, Antenna & Drive Test Data:


Mention Yes / No
Labelling done for All BSS and TX equipments Installed For BTS Cabinets For all Cables & Accessories For GSM Antenns

Annexure No:

Attach Drive Test Report (Annexure 2) Signoff :

Yes/No

To be Given within one 7 days of Site RFS

Yes

Project Manager (Bharti) Date :

Project Manager (SP)

Mobile Number

Mobile Number

217757277.xls.ms_office

TRX Addition with New Antenna addition

Site Utilisation Checklist


Pre CELL NAME TRX Configuration ( x+y/ x'+y'/x''+y'' ) Equipped Erlang Antenna Type CARRIED BBH TRAFFIC CELL UTILIZATION HR Traffic% SD Blocking TCH Blocking SD Drop TCH Drop TX Power Remarks (if any) Attach Drive Test Report (Annexure 2) Carried Traffic Cell3 Nbr. Cell1 Sector-1 Post Pre Sector-2 Post Pre Sector-3 Post

Day Day - 3 Day - 2 Day - 1 0 Day+1 Day+2 Day+3

Cell1

Cell2

Nbr. Cell2

Nbr. Cell3

Carried Traffic
Cell1 Cell2 Cell3 Nbr. Cell1 Nbr. Cell2 Nbr. Cell3

1.2

Carried Traffic in Er.

1
0.8

0.6 0.4
0.2

0 Day - 2 Day - 1 0 Day+1 Day+2 Day+3

Week

Post cabex implementation SD/TCH block KPI should show an improvement and SD/TCH drop KPI should not degrade by more than 10% . Measurement period 3 days to be taken out of 5 working days measurement for Pre & Post KPI comparison.

Annexure 2: Drivet Test RxLev & Quality plot plot

Rx Qual - Before

Rx Lev Before

Rx Qual after

Rx Lev After

For Rural Sites , also check the following : (Idle mode Drive test plot and in dedicated mode) Deviation from Planning % age samples with -85 dBm % age samples with -93 dBm Yes/ No Before After