You are on page 1of 42

XT925 Assembly A bl M Manual l

Revision: Revision Date: 1.1 10/05/2012

Motorola Confidential Restricted


This document is controlled electronically. All paper copies of this document are uncontrolled.

DOCUMENT AMENDMENT HISTORY Rev 0.1 1.0 0 1.1 Date 08/22/2012 09/27/2012 09/ / 0 10/05/2012 Details Initial draft release. Note that service specific fixtures are not illustrated. Illustrations to be updated on next release Released. e eased Service Se ce fixtures tu es a are e not ot a all illustrated ust ated Updated Acoustic gasket illustrations

Note: Part numbers listed in this document are for operations reference only. The product SBOM takes precedence over any differences.

Motorola Confidential Restricted


This document is controlled electronically. All paper copies of this document are uncontrolled.

Tools and Test Equipment Motorola Part Number


Tweezers, plastic Antistatic Mat kit ---------------4-00-C3-10000 (AMS) 1 4-00-C4-10000 (AMS) 1 4-00-C5-10000 (AMS) 1 4-00-C6-10000 (AMS) 1 4-00-C7-10000 (AMS) 1 4-00-C8-10000 (AMS) 1 4-00-C9-10000 (AMS) 1 0-00-00-30005 (AMS)1
1.

Description p

Application pp
Used during assembly/ disassembly Provides protection from damage to device caused by electrostatic discharge (ESD) Rear Housing screws HSJ bracket and imager bracket screws Earpiece Speaker bracket screws PCB screws Side key flex screws

Torx Plus bit 5IP. Torque setting is 1.1 in/lbs @500RPM Torx Plus bit 5IP. Torque setting is 1.0 in/lbs @500RPM Torx Plus bit 5IP. Torque setting is 0.8 in/lbs @500RPM Torx Plus bit 5IP. Torque setting is 1.0 in/lbs @500RPM Torx Plus bit 5IP. Torque setting is 0.75 in/lbs @350RPM Battery Adhesive Alignment Tool Battery to Rear Housing Press Acoustic Gasket Alignment Camera Lens Press Heat Spreader to PCB Alignment Speaker to Rear Housing Press Display / ITO Flex Press Disassembly tool, plastic with flat and pointed ends (manual opening tool)

Used during assembly/disassembly

To order tooling please visit the AMS online-shop: http://www.online-shop.ams-fl.com

SAFETY CRITICAL

!
TORX Screws (T3, T5, etc.) TORX PLUS Screws (3IP, 5IP, etc.)

Use of Electrostatic Discharge (ESD) prevention equipment where required to avoid damage to susceptible battery protection circuitry during handling and repair processes.

Attention should be paid to the distinction of TORX and TORX PLUS: Do not interchange screws and tools.

Motorola Confidential Restricted


This document is controlled electronically. All paper copies of this document are uncontrolled.

WORKINSTRUCTION

XT925
1.

Assembly

PolySpeaker

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 4

RemoveadhesivelinerfromthePolySpeakerand applytotheRearHousing

Symbols

Attention Operation Verification

MaterialList
Description/Part#
RearHousingSubAssy PolySpeaker

Qty
1 1

2.

Bendtheconnectorperpendiculartothespeaker soitdoesnotgetdamagedduringseating

Tools/Equipment
Description Parameters

3.

Notetherearhousingfeatureswhichalignthe speakerinthehousingpocket.

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925
1.

Assembly

PolySpeaker

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 5

Placespeakerinrearhousingpocket

Symbols

Attention Operation Verification

MaterialList
Description/Part#
RearHousingSubAssy

Qty
1 1

2.

Presstoinsurespeakerisproperlyalignedand seatedinhousing.

PolySpeaker

Tools/Equipment
Description Parameters

3.

PlacetheRearHousingsubassemblyinthe speakertorearhousingpress andactivatefor5s

SpeakertoRear Housingpress

5s

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925
1.

Assembly

SideKeyAssy

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 6

Usingthealignmentpins,laythesidekeybracket onthesidekeyalignmentfixture.

Symbols

Attention Operation Verification

2.

Removethelinerfromthesidekeyflex.

MaterialList
Description/Part#
Sidekey Flex

Qty
1

3.

Carefullyalignthesidekeyflextothebracketusing thethreealignmentholes. Usingthealignmentpins,placetheporonpad assemblyoverthesidekeyflex. Tools/Equipment


Description Parameters

4.

5.

Removethelinerfromtheporonpadsandverify thatthepadsareproperlyseated

SideKeyFlex alignmentfixture

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925
1.

Assembly

SideKeyAssy

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 7

Assemblythepowerbuttoninthehousingpocket.

Symbols

Attention Operation Verification

MaterialList
Description/Part# Qty
1 1

2.

Assemblethepowerkeyinthehousingpocket

Sidekey Flex RearHousingassembly

Tools/Equipment 3. Assemblethesidekeyflexassemblybyaligningtothe3screws bosses


Description Parameters
0.75+0.1in.lb 350+10RPM

3IPDriver

4.

UsingaIP3driver,assembly3screwsintheorderillustrated

1 3

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925
1.

Assembly

HeadsetJackAssy

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 8

Byaligningagainsttheedgeofthebottomwallof theheadsetjackpocket,placetheheadsetjack adhesivestripinthepocket.

Symbols

Attention Operation Verification

MaterialList
Description/Part#
HeadsetJackAdhesive HeadsetJack

Qty
1 1 1

2.

Assembletheheadsetjackinthepocketofthe housing.

HeadsetJackseal

Tools/Equipment
Description Parameters

3. 4.

DONOTpressdirectlyoncontacts
PlasticTweezers

Pressdownonheadsetjackforgoodadhesion.

5. 6.

Carefullyplacesealoverheadsetjack Inspectthatthereisnodamageorwrinklesonseal.

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925
1.

Assembly

CameraLens

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 9

RemoveCameralensfromadhesiveliner

Symbols

Attention Operation Verification

MaterialList
Description/Part#
RearHousingAssembly

Qty
1 1

2.

Alignthecameralensinthehousingpocket.

CameraLens

3.

Avoiddirectcontacttoinsidelenswindows Tools/Equipment
Description Parameters

4.

PlacehousingassemblyinCameralensfixtureandpressfor5 seconds.

PlasticTweezers CameraLensPress 5s

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925
1.

Assembly

Proximitygrommet

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 10

Alignproximitygrommetoveremitterandreceiversensorsofthe audioflexassembly.

Symbols

Attention Operation Verification

MaterialList
Description/Part#
Audioflexassy Proximitygrommet

Qty
1 1

2.

InspectthatgrommetisfullyseatedonPCB.

Tools/Equipment
Description Parameters

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925
1.

Assembly

AudioFlexassy

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 11

Removetheaudioflexlinerfromthehousing.Ifreusinghousing, insurenewadhesiveisplaced.

Symbols

Attention Operation Verification

MaterialList
Description/Part#
Audioflexassy Fronthousingassy

Qty
1 1

2. 3.

Cleanproximitypocketwithairgun. Verifythatnoforeignmaterialsareonmesh Tools/Equipment


Description Parameters

4.

Placeearpiecespeakerinearpiecepocket.Usethescrewbassesand housingpocketforalignment

Align

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925
1.

Assembly

AudioFlexassy

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 12

Removetheaudioflexliner.

Symbols

Attention Operation Verification

MaterialList
Description/Part#
Audioflexassy FrontHousingAssy

Qty
1 1

2.

Adhereflextofronthousingassemblybyaligningtoetched markings.

Tools/Equipment
Description
Audioflexpress fixture

Parameters

5s

3.

Placeassemblyinaudioflexpressfixtureandpressfor5seconds

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925
1. 2.

Assembly

CameraFlex

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page:

LifttheZIFdoor Removethecameralenslinerandcleancamerapocketwithionized air BendtheflexinaZform. NOTE:Donotbenditfromthetipofthepins

Symbols

Attention Operation Verification

3. 4.

MaterialList
Description/Part#
Cameraflexassy FrontHousingAssy

Qty
1 1 1

5.

InsertthecameraflexintotheZIFconnectoruntilthelinemarkeris alignedwiththeconnector

Kapton tape

Tools/Equipment
Description Parameters

6.

ClosetheZIFdoor

7. 8.

Verifythatthelinemarkerisalignedwiththeconnector PlacekaptontapeovertheZIFconnector

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925
1.

Assembly

FlexBracketassy

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page:

PlaceKaptontapeoverearpiecespeaker

Symbols

Attention Operation Verification

2.

Alignthebracketoverthelefthook

MaterialList
Description/Part#
Flexbracket

Qty
1 1 1

3.

Alignthebracketoverthescrewbosses

FrontHousingAssy Kapton tape

4.

Latchthesecondhook

Tools/Equipment
Description Parameters
0.8inlbs @500RPM

IP3torquedriver

5.

Inspectthelefthookisnotbentormisaligned

NG
6. Attachtwoscrewstobracketwithtorquesettingof0.8inlbs

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925

Assembly

Battery

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 15

This symbol indicates SAFETY CRITICAL.

Symbols

Failure to adhere to Safety Critical Note(s) may increase risk of rupture, burning, or failure to function safely when used by the customer!
Attention Operation Verification SAFETY CRITICAL

MaterialList
Description/Part#
Battery

Ensure Battery and its insulation are not damaged (eg. scratched, dented, punctured) prior to and throughout assembly assembly.

Qty
1

1.

Placethebatteryintothebatteryadhesivealignmentfixture, withtheflexp positionedinthelowerright g corner Tools/Equipment


Description
BatteryAdhesive Alignment

SAFETY CRITICAL

Parameters

Handle battery pack with care. If dropped to the floor, it may be internally damaged and must be scrapped.

NA

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925
1.

Assembly

Battery

GlobalDoc# RegionalDoc#
SAFETY CRITICAL

Revision

1.1

Date

10/05/12

Page: 16

PlacetheRearBatteryAdhesiveinbattery adhesivealignmentfixture.

Symbols

Ensure Battery and its insulation are not damaged (eg. scratched, dented, punctured) prior to and throughout assembly.

Attention Operation Verification

MaterialList 2. Applyfingerpressuretowettheadhesive tothebattery.


Description/Part#
Battery RearAdhesive

Qty
1 1

3.

Removetheclearadhesivecarrier

Tools/Equipment 4. FoldtheSideRemovalTabsaroundthe edgeofthebatteryandapplypressureto wettheadhesive


Description
BatteryAdhesive Alignment

Parameters

NA

SAFETY CRITICAL

Handle battery pack with care. If dropped to the floor, it may be internally y damaged g and must be scrapped.

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925

Assembly

Battery

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 17

!
1. Removetheadhesivelinerfromthebattery

SAFETY CRITICAL

Ensure Battery and its insulation are not damaged (eg. scratched, dented, punctured) prior to and throughout assembly.

Symbols

Attention Operation Verification

MaterialList
Description/Part#
RearHousingSubAssy

Qty
1 1

2 2.

PlacethebatteryintotheRearHousing Housing,aligningthe bottomleftcornerfirst

Battery

3.

PlacetheRearHousingSubAssyinbatterytorear housingpressandactivatepressfor5s

SAFETY CRITICAL

Handle battery pack with care. If dropped to the floor, it may be internally damaged and must be scrapped.

Tools/Equipment
Description
BatterytoRear housingPress

Parameters

50Nfor5s

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925

Assembly

Labels

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 18

Symbols 1. BlowoffallconnectorswithIonizedAirGun (Battery,ZIFs,Loudspeaker,CardReaders,uUSB, andHDMI)

WDL
Attention Operation Verification

MaterialList 2. PlaceWaterDetectLabelsinhighlightedregions
Description/Part#
PCB

Qty
1 2 1 1

3 3.

AssembleAPCapShieldbytoeinginalongtheedge andthensnappingtheCapoverthebaseshield

WaterDetectLabel APCapShield QCLabel

Description

Parameters

IonizedAirGun

NA

WDL

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925
1.

Assembly

HeatSpreader

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 19

PlacePCBontoheatspreadertoPCBAlignment fixture PeeloffsmalllinerfromtheHeatSpreaderand aligntothebottom2pinsofthefixture

Symbols

2.

Attention Operation Verification

MaterialList
Description/Part#
PCB HeatSpreader

Qty
1 1

Tools/Equipment
Description
HeatSpreaderto PCBAlignment

Parameters

NA

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925
1.

Assembly

HeatSpreader

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 20

PresstheHeatSpreaderontothePCBby smoothingoutthesurfacebyhand

Symbols

Attention Operation Verification

2.

Peelawaythecarrierliner

MaterialList
Description/Part#
PCB HeatSpreader

3.

VerifythatthereareNOcreasesorlargebubblesin theheatspreader

Qty
1 1

(NOTE:Anythingbiggerthanhalfafingernailshouldbe consideredlarge)

Tools/Equipment
Description
HeatSpreaderto PCBAlignment

Parameters

NA

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925
1.

Assembly

PadsandTapes

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 21

PlacetheAudioconnectorpadinfrontoftheAudio ZIFconnector

Symbols

Attention Operation Verification

2.

PlacetheDisplayConnectorMylarTapeinfrontof thedisplayZIFconnector

MaterialList
Description/Part# Qty
1 1 1 1

3.

Place1Kaptontapeoverthelargeweldedspring contactneartheshield

PCB AudioConnectorPad

4.

RemoveprotectivetapefromtheBatteryReceptacle

Mylar Kapton

#1

#2

#3

Tools/Equipment
Description Parameters

Tweezers

NA

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925
1.

Assembly

HDMI/EMUGrommets (topside/bottomside)

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 22

PlacetheTopConnectorGrommetaroundthe connectorsonthepopulatedsideofthePCB

Symbols

Attention Operation Verification

2.

PlacetheSDCardGrommetaroundtheSDCard SlotonthePCBasshown

MaterialList
Description/Part#
PCB TopConnectorGrommet SDCardGrommet

Qty
1 1 1

Tools/Equipment
Description Parameters

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925

Assembly

SecondaryMicGrommet

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 23

Symbols 1. PlacetheSecondaryMicGrommetovertheport openingonthePCBMic


Attention Operation Verification

MaterialList 2. VerifythattheGrommetrestsflushagainstthe componentandtheportisvisible


Description/Part#
RearHousing SecondaryMicGrommet

Qty
1 1

Tools/Equipment
Description Parameters

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925

Assembly

AcousticGasket

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 24

Symbols 1. PlacetheAcousticGasketinacousticgasket alignmentfixturebyaligningtothefixtureposts

Attention Operation Verification

MaterialList
Description/Part#
PCBSubAssy AcousticGasket

Qty
1 1

2.

DropthePCBintoacousticgasketalignmentfixture andapplylightpressuretoactivatetheadhesive Tools/Equipment


Description
AcousticGasket Alignment

Parameters

NA

3.

Removetheadhesivelinerfromthetopofthe AcousticGasket

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925

Assembly

SIMDoor

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 25

Symbols

Attention Operation Verification

1.

AligntheDummySIMDoorTrayand assembletotheSIMcardslot,slidingin untilitstops

MaterialList
Description/Part#
PCB DummySIMTray

Qty
1 1

Tools/Equipment

SAFETY CRITICAL

Inspect the PCB to ensure spring contacts are not bent inward where they could interfere, cut, or crush sides of the battery.

Description

Parameters

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925

Assembly

PCBtoRear

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 26

Symbols 1. FoldtheSideKeyFlexandFPRFlexclearofthePCB landingarea


Attention Operation Verification

2.

LaytheRearHousingonaflatsurfaceandroutethe BatteryFlexthroughtheslotinthePCB

MaterialList
Description/Part#
RearHousingSubAssy

Qty
1 1 1

3 3.

ToethePCBagainstthesidewalloftherear housingbeingcarefultoaligntheconnectorswith theIOports

PCB DummySIMTray

4.

gthePCB, ,pull p lightly g yontheBattery y Afterseating Flextopulltheserviceloopthrough

!
1. 2. 3.

SAFETY CRITICAL Ensure surfaces around battery are free of foreign material Align g battery y flex with PCB opening p g Do not pinch battery or flex

Tools/Equipment
Description Parameters

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925

Assembly

PCBScrews

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 27

Symbols 1. Drivethe6x5IPscrewsat1.0inlbstosecurethe PCB

Follow the screw sequence shown


Attention Operation Verification

MaterialList

4 2 6 3 1

Description/Part#
XCVRSubAssy PCBScrews

Qty
1 6

Tools/Equipment

5
Description Parameters

5IPTorqueDriver

1.0inlbs

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925
1.

Assembly

SideKeyFlex

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 28

RemovetheSideKeyadhesivelinerandmatetheZIF connectorfortheSideKeyFlex Verifythattheflextailispulledtightandthegoldmark onthePCBisinlinewiththewingoftheSideKeyFlex WipetheflexinwardtowardstheConnectorto activatetheadhesive PlaceKaptontapeoverthetailoftheSideKeyFlexto securethepositiononthePCB

Symbols

2.

Attention Operation Verification

MaterialList
Description/Part#
XCVRSubAssy

3.

Qty
1 1

4 4.

AudioZIFKapton Tape

Tools/Equipment
Description Parameters

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925
1. 2.

Assembly

PolySpeakerCover

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 29

ConnectthePolyspeakerconnectortothePCB PlacethePolySpeakerCaptothePCBbyaligning totheedgeoftheshield

Symbols

Attention Operation Verification

MaterialList
Description/Part#
XCVRSubAssy PolySpeakerCap

Qty
1 1

3.

Usingthespeakertorearhousingpress,pressthe speakerfor5s

Tools/Equipment
Description
Speakertorear housingPress

Parameters

5s

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925
1.

Assembly

MainImager

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 30

CleartheZIFconnectorandRearHousingImager pocketwithIonizedAirGuntopreparefor assembly

Symbols

Attention Operation Verification

2.

MatetheMainImagerFlexwiththeZIFconnection onthePCBasshown VerifytheFlexisfullyinsertedbyinspectingthe alignmentmarksonthePCB

MaterialList
Description/Part#
XCVRSubAssy MainImager

Qty
1 1 1

3.

PulltheImagerbacktoremovetheprotectiveliner andthenreturnforwardtodroptheimagerinto theRearHousingpocket

AudioZIFKapton Tape

4.

PlaceZIFKaptontapeoverthematedconnection verifythedoorhasbeenlatched

Tools/Equipment
Description Parameters

IonizedAirGun Tweezers

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925

Assembly

MainImagerBracket

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 31

Symbols

1.

DroptheImagerBracketdownovertheMain Imagerkeepingthehookatthetopandscrew holesatthebottom

Attention Operation Verification

MaterialList
Description/Part#
XCVRSubAssy ImagerBracket

Qty
1 1

2.

HooktheImager g Brackettothetop phookinthe RearHousing

Tools/Equipment
Description Parameters

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925
1.

Assembly

HeadsetJackBracket

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 32

RemovetheadhesivelinerandaligntheHSJFlexto thehighlightededgesoftheHSJBracket

Symbols

Attention Operation Verification

2.

MatetheZIFconnectorfortheHSJFlex

MaterialList
Description/Part#
XCVRSubAssy HSJBracket HSJFlex

3.

LowertheHSJBracketintotheXCVRSubAssy, pressdownuntilthelefthooksnapswiththeRear Housing

Qty
1 1 1

Tools/Equipment
Description Parameters

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925
1.

Assembly

BracketScrews

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 33

Drive2x5IPPCBScrewsfortheMainImagerBracketat1.0inlbs

Symbols

2.

Drive2x5IPPCBScrewsfortheHSJBracketat1.0inlbs

Attention Operation Verification

MaterialList
Description/Part#
XCVRSubAssy PCBScrews

Qty
1 4

2
Tools/Equipment
Description Parameters

5IPTorqueDriver

1.0inlbs

1 4 3

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925

Assembly

PrimaryMicGrommet

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 34

Symbols

Attention Operation Verification

MaterialList 1. AssemblethePrimaryMicGrommettothePCBby aligningtothePCBscrewhead


Description/Part#
XCVRSubAssy PrimaryMicGrommet

Qty
1 1

Tools/Equipment
Description Parameters

2.

VerifythattheMicPortisvisiblethrough theportopening

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925

Assembly

ZIFLatchKaptonTapes

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 35

Symbols 1. PlaceKaptontapeovertheHeadsetJackZIF connectorwhenclosed

Attention Operation Verification

MaterialList
Description/Part#
XCVRSubAssy Kapton

Qty
1 2

2.

PlaceKaptontapeoverthesidekeyflexZIF connectorwhenclosed

Tools/Equipment
Description Parameters

Tweezers

NA

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925
1.

Assembly

FrontHousing

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 36

BeforeassemblingtheFrontHousing,performthe followinginspection: CheckforanyliftoftheadhesivefortheDisplay/ITO Flex;applypressuretorewetifnecessary Pullbackthelinerandinspectthedisplayglassfor cracks

Symbols

Attention Operation Verification

MaterialList
Description/Part#
FrontHousing

Qty
1

CheckthattheFrontHousing gBracketisassembled Tools/Equipment


Description Parameters

2.RemovethekaptontapefrombehindtheDisplayFlex

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925
1.

Assembly

InternalIMEI

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 37

AttheXCVRAssemblystation,placeCustomerIMEI LabelontheFrontHousingasshown(pocketinplastic)

Symbols

Attention Operation Verification

MaterialList
Description/Part#
FrontHousing XCVRAssy PreprintedIMEILabel

Qty
1 1 1

Tools/Equipment
Description Parameters

IMEILABEL

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925
1.

Assembly

FrontHsgtoXCVR

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 38

FliptheDisplayFlex180degreesbackandinsertthe flexuntilthewhitelineistotheedgeoftheZIF connector

Symbols

Attention Operation Verification

2.

ClosetheZIFConnectorLatchDoor

MaterialList
Description/Part#
XCVRSubAssy FrontHousingSubAssy

Qty
1 1

Tools/Equipment
Description Parameters

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925
1.

Assembly

FrontHsgtoXCVR

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 39

FliptheAudioFlex180degreesbackand inserttheflexuntilthewhitelineisto theedgeoftheZIFconnector

Symbols

Attention Operation Verification

2.

ClosetheZIFConnectorLatchDoor

MaterialList
Description/Part# Qty
1 1 1 1

3.

PlaceKaptontapeovertheAudioZIF Connectortoverifythattheflexisfully insertedandthelatchdoorhasbeen closed

XCVRSubAssy FrontHousingSubAssy AudioZIFKapton Tape DisplayZIFKapton Tape

4.

p tape p over PlaceKapton theDisplayZIFFlexandConnectorto verifythattheflexisfullyinserted,the latchdoorhasbeenclosed,andtheflex willnotbackout

Tools/Equipment
Description Parameters

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925

Assembly

BatteryConnection

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 40

Symbols 1. MatetheBatteryFlexConnectortothePCBby toeinginthetopoftheconnectorandsnapping down

Attention Operation Verification

MaterialList
Description/Part#
RearHousingSubAssy

Qty
1

Tools/Equipment
Description Parameters

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925

Assembly

Hook&Slide

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 41

Symbols

Attention Operation Verification

1.

WiththeFrontHousingshiftedslightlyabovethe XCVRSide,dropthesidehookfeaturesintothe openpockets

MaterialList
Description/Part#
XCVRSubAssy

Qty
1 1

2 2.

ChecktheperimetertoverifytheFrontHousingis seatedagainsttheXCVRsRearHousing,

HSJBezelRing

3.

PlacetheFrontHousingdownonthebench pp y glight g p pressureontheRearHousing g applying Tools/Equipment

4.

DroptheHSJBezelontotheRearHousingandalign ittotheopening

Description

Parameters

5.

HoldingtheFrontHousinginplaceonthebench, applylightpressuredownontheRearHousing,and slidetheRearHousingintoassembledposition

6.

Thefinalassemblyshouldappearflusharoundthe perimeter

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

WORKINSTRUCTION

XT925
1.

Assembly

RearBaseScrews

GlobalDoc# RegionalDoc#

Revision

1.1

Date

10/05/12

Page: 42

Drive2x5IPBaseScrewsat1.1inlbs

Symbols

Attention Operation Verification

MaterialList
Description/Part#
VanquishAssy BaseScrews

Qty
1 2

Tools/Equipment
Description Parameters

5IPTorqueDriver

1.1inlbs

MotorolaMobilityConfidentialRestricted
Thisdocumentiscontrolled electronically.Allpapercopiesofthisdocumentareuncontrolled unlessstampedcontrolledandissuedbyProductConfigurationManagement.

TemplateRevC

You might also like