Plant Name Report Period kWp Issued by Verified by Approved by Addressed to Executive Code / Chapter Date Status Delay (months) 95% 0% 0% 5% 1 On Date Delay In Progress Planning 1. April On date 0 18 0 0 1 1. April Planning 0 2 2.
Plant Name Report Period kWp Issued by Verified by Approved by Addressed to Executive Code / Chapter Date Status Delay (months) 95% 0% 0% 5% 1 On Date Delay In Progress Planning 1. April On date 0 18 0 0 1 1. April Planning 0 2 2.
Plant Name Report Period kWp Issued by Verified by Approved by Addressed to Executive Code / Chapter Date Status Delay (months) 95% 0% 0% 5% 1 On Date Delay In Progress Planning 1. April On date 0 18 0 0 1 1. April Planning 0 2 2.
Issued by Verified by Approved by Addressed to Executive Code/Chapter Date Status Delay (months) 95% 0% 0% 5% 1 On Date Delay In Progress Planning 1.1 April On date 0 18 0 0 1 1.2 April On date 0 1.3 April Planning 0 2 2.1 FIELD SUB-SYSTEM May On date 0 2.2 D.C. CONNECTIONS INVERTER WIRING May On date 0 2.3 LV A.C. CONNECTIONS May On date 0 2.4 Mv A.C. CONNECTIONS May On date 0 2.5 TRANSFORMER AND INVERTERS BOXES May On date 0 2.6 ELECTRICAL CUBICLES May On date 0 2.7 COUNTERS May On date 0 2.8 INVERTER May On date 0 2.9 GROUNDING SYSTEM May On date 0 2.10 SURVEILLANCE SYSTEM May On date 0 2.11 May On date 0 3 3.1 May On date 0 3.2 May On date 0 3.3 May On date 0 3.4 May On date 0 3.5 May On date 0 Code tasks 1.3 Some vegetation need to be removed, Planned to 20-05-2014 List of overdue tasks awaiting completion: Delayed tasks (Maintenance plan short name) Maintenance plan code Expected date Modules' surface cleaning ---- week 24 WEATHER STATION AND DATA CENTRE ANTIRODHENT FENCE WATER DRAINEGE SYSTEM VEGETATION ACCESS ROAD GROUND AND FENCE MAINTENANCE METALLIC ELEMENT SENSORS AND COMMUNICATION MODULES ELECTRICAL EQUIPMENT Preventive maintenace is being performed according to planning, the washing of the modules is delayed because of the weather and the warranty works that will be carried out. Maintenance plan short name Notes FIXED STRUCTURES Level of compliance with maintenance plans: Modules' surface cleaning planned to be performed on Week 24 Other - Elaboration Date SC AWRR SUN 115 SRL May 2014 Vasco Vieira Marcu Nicolae Extra Report Preventive Maintenance Status Report Marcu Nicolae Periodic Report x PM.Status.Pufesti.APR-MAY.2014 Pufeti PV Plant APR - MAY 2014 Plant Ppeak 1.584,00 Report References - - 95% 0% 0% 5% Execution Rate On Date Delay In Progress Planning PT007-OEM-FRM09/01/05.13 Page 1/2 Plant Name Report Period kWp Issued by Verified by Approved by Addressed to Other - Elaboration Date SC AWRR SUN 115 SRL May 2014 Vasco Vieira Marcu Nicolae Extra Report Preventive Maintenance Status Report Marcu Nicolae Periodic Report x PM.Status.Pufesti.APR-MAY.2014 Pufeti PV Plant APR - MAY 2014 Plant Ppeak 1.584,00 Report References - - 5 6 7 8 9 10 11 12 13 14 15 Maintenance plan code Start date Status Frequency Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 1 1.2 28/04/2014 On date SM 1.3 29/04/2014 Planning SM 2 2.1 01/05/2014 On date SM 2.2 01/05/2014 On date SM 2.3 05/05/2014 On date SM 2.4 05/05/2014 On date SM 2.5 05/05/2014 On date SM 2.6 05/05/2014 On date SM 2.7 05/05/2014 On date SM 2.8 05/01/2014 On date SM 2.9 05/01/2014 On date SM 2.10 05/01/2014 On date SM 2.11 05/01/2014 On date SM 2.12 05/01/2014 On date SM 3 3.1 20/05/2014 On date SM 3.2 07/05/2014 On date SM 3.3 07/05/2014 On date SM 3.4 20/05/2014 On date SM 3.5 07/05/2014 On date TM Notes Index Date Revision reason A.1 5/12/2014 Marcu Nicolae O&M quarterly preventive maintenance status M-Once every month; W-Once every week; D-Every day; As Required-Whenever needed and reasonably justified Revision record Issued by TA-Once every three years; A-Once every year; SM-Once every six months; TM-Once every three months; Annual maintenance plan (running, on-going and planned): Subtitles 1 Planning 2 On date 4 In progress 3 Delay PT007-OEM-FRM09/01/05.13 Page 2/2