Plant Name

Report Period kWp


Issued by
Verified by
Approved by
Addressed to
Executive
Code/Chapter Date Status
Delay
(months)
95% 0% 0% 5%
1 On Date Delay In Progress Planning
1.1 April On date 0 18 0 0 1
1.2 April On date 0
1.3 April Planning 0
2
2.1 FIELD SUB-SYSTEM May On date 0
2.2 D.C. CONNECTIONS INVERTER WIRING May On date 0
2.3 LV A.C. CONNECTIONS May On date 0
2.4 Mv A.C. CONNECTIONS May On date 0
2.5 TRANSFORMER AND INVERTERS BOXES May On date 0
2.6 ELECTRICAL CUBICLES May On date 0
2.7 COUNTERS May On date 0
2.8 INVERTER May On date 0
2.9 GROUNDING SYSTEM May On date 0
2.10 SURVEILLANCE SYSTEM May On date 0
2.11 May On date 0
3
3.1 May On date 0
3.2 May On date 0
3.3 May On date 0
3.4 May On date 0
3.5 May On date 0
Code tasks
1.3
Some vegetation need to be removed,
Planned to 20-05-2014
List of overdue tasks awaiting completion:
Delayed tasks (Maintenance plan short name) Maintenance plan code Expected date
Modules' surface cleaning ---- week 24
WEATHER STATION AND DATA CENTRE
ANTIRODHENT
FENCE
WATER DRAINEGE SYSTEM
VEGETATION
ACCESS ROAD
GROUND AND FENCE MAINTENANCE
METALLIC ELEMENT
SENSORS AND COMMUNICATION
MODULES
ELECTRICAL EQUIPMENT
Preventive maintenace is being performed according to planning, the washing of the modules is delayed because of the weather and the warranty works that will be carried out.
Maintenance plan short name Notes
FIXED STRUCTURES
Level of compliance with maintenance plans:
Modules' surface cleaning planned to
be performed on Week 24
Other -
Elaboration Date
SC AWRR SUN 115 SRL May 2014
Vasco Vieira
Marcu Nicolae Extra Report
Preventive Maintenance Status Report
Marcu Nicolae Periodic Report x PM.Status.Pufesti.APR-MAY.2014
Pufeti PV Plant
APR - MAY 2014 Plant Ppeak 1.584,00
Report References
- -
95%
0% 0%
5%
Execution Rate
On Date
Delay
In Progress
Planning
PT007-OEM-FRM09/01/05.13 Page 1/2
Plant Name
Report Period kWp
Issued by
Verified by
Approved by
Addressed to
Other -
Elaboration Date
SC AWRR SUN 115 SRL May 2014
Vasco Vieira
Marcu Nicolae Extra Report
Preventive Maintenance Status Report
Marcu Nicolae Periodic Report x PM.Status.Pufesti.APR-MAY.2014
Pufeti PV Plant
APR - MAY 2014 Plant Ppeak 1.584,00
Report References
- -
5 6 7 8 9 10 11 12 13 14 15
Maintenance plan
code
Start date Status Frequency Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14
1
1.2 28/04/2014 On date SM
1.3 29/04/2014 Planning SM
2
2.1 01/05/2014 On date SM
2.2 01/05/2014 On date SM
2.3 05/05/2014 On date SM
2.4 05/05/2014 On date SM
2.5 05/05/2014 On date SM
2.6 05/05/2014 On date SM
2.7 05/05/2014 On date SM
2.8 05/01/2014 On date SM
2.9 05/01/2014 On date SM
2.10 05/01/2014 On date SM
2.11 05/01/2014 On date SM
2.12 05/01/2014 On date SM
3
3.1 20/05/2014 On date SM
3.2 07/05/2014 On date SM
3.3 07/05/2014 On date SM
3.4 20/05/2014 On date SM
3.5 07/05/2014 On date TM
Notes
Index Date Revision reason
A.1 5/12/2014 Marcu Nicolae
O&M quarterly preventive maintenance status
M-Once every month; W-Once every week; D-Every day; As Required-Whenever needed and reasonably justified
Revision record
Issued by
TA-Once every three years; A-Once every year; SM-Once every six months; TM-Once every three months;
Annual maintenance plan (running, on-going and planned):
Subtitles 1 Planning 2 On date 4 In progress 3 Delay
PT007-OEM-FRM09/01/05.13 Page 2/2