ICC/NEDA Board Approved Projects as of 21 November 2013

Project Title Implementing


Agency
Total Project Cost
(in PhP M)
Funding Source ICC Approval/NEDA Board
Confirmation Dates
Summary
Regions/
Provinces
Project Status
a. Proposed Change in Scope of
the Second Cordillera Highland
Agricultural Resources
Management Project (CHARMP 2)
b. Proposed One-Year Extension of
the Loan Validity Period (OFID
Loan) of the Second Cordillera
Highland Agriculture Resource
Management Project (CHARMP2)
DA 2,942.47 IFAD, ADB, OFID NEDA Board: 18 January
2013
Joint ICC-TB and CC: 2
August 2012
ICC-TB: 21 May 2012
CAR - Abra, Apayao, Benguet, Ifugao,
Kalinga and Mt. Province
Under Implementation.
Jalaur River Multi-Purpose Project,
Stage II
DA 11,212.13 Korea-EDCF NEDA Board: 22 March 2012
ICC-CC: 15 Dec 2011
ICC-TB: 25 Nov 2011
14 Nov 2011
Region VI - Iloilo Under Implementation.
Philippine Rural Development
Program (PRDP)
DA 27,535.33 WB, GEF NEDA Board: 26 June 2013
Joint ICC-TB and CC:08 April
2013
19 February 2013
(deferment)
07 November 2012
(conditional approval)
Nationwide
(All Regions except NCR)
Being processed by DOF
or loan agreement
signing.
SPA being secured from
OP.
Two-Year Extension of the WB-
Assisted Mindanao Rural
Development Project (MRDP) II
DA 7,390.24 World Bank NEDA Board: 29 November
2012
ICC-CC: 2 August 2012
11 May 2012
ICC-TB: 2 August 2012
11 May 2012
3 April 2012
Regions - IX, X, XI, XII, Caraga and
ARMM
Under Implementation.
Adapting to Climate Change
through the Construction of Water
Impounding Facilities in the
Philippines: Pasa Small Reservoir
Irrigation Project (Pasa SRIP)
DA-NIA 1,029.09 KOICA Grant NEDA Board: 18 January
2013
ICC-CC: 22 November 2012
ICC-TB: 21 November 2012
Joint ICC-TB and CC: 7
November 2012
Region II - Isabela Under Implementation.
Malitubog-Maridagao Irrigation
Project, Stage 2
DA-NIA 6,996.62 Local Financing
JICA
(NB -Confirmed)
Proposed for
change in funding
source from ODA
to local financing
NEDA Board: 20 Dec 2010
ICC-CC: 27 Nov 2009
ICC-TB: 12 Oct 2009
25 June 2009
ARMM & Region XII For resubmission for
approval of changes in
project financing.
Casecnan Multi-Purpose Irrigation
and Power Project-Irrigation
Component, Phase II
DA-NIA 7,605.20 Local Financing
China
(NB -Confirmed)
Change in
funding source
from ODA to
Local Financing
(ICC-CC Approved
on 5 August
2013)
NEDA Board: 22 Mar 2012
ICC-CC: 10 Jan 2012
5 August 2013 (change in
financing scheme and cost)
ICC-TB: 25 Nov 2011
Region III (Nueva Ecija and some
portions of Tarlac)
For re-presentation to the
NEDA Board for approval
of the change in cost and
financing.
Umayam River Irrigation Project DA-NIA 1,474.07 Local Financing
China
(NB -Confirmed)
Change in
funding source
from ODA to
Local Financing
(ICC-CC Approved
on 5 August
2013)
NEDA Board: 22 Mar 2012
ICC-CC:
16 December 2013
10 Jan 2012
28 Oct 2011
ICC-TB:
10 December 2013
10 Oct 2011
Region XIII - Agusan del Sur Originally approved by
the NEDA Board on 22
March 2012.
Proposed changes in
project financing from
China loan to local
financing approved by ICC-
CC on 16 December 2013.
Prepared by NEDA 1/10/2014 Page 1
Project Title Implementing
Agency
Total Project Cost
(in PhP M)
Funding Source ICC Approval/NEDA Board
Confirmation Dates
Summary
Regions/
Provinces
Project Status
National Irrigation Sector
Rehabilitation and Improvement
Project
DA-NIA 4,007.14 JICA NEDA Board:08 Nov 2011
ICC-CC: 20 Sept 2011
8 Sept 2011
ICC-TB: 07 Sept 2011
15 Dec 2010
Regions - I, III, IV, VI, X, XI, XII, and XIII
Provinces of Ilocos, Pangasinan,
Quezon, Palawan, Iloilo, Bukidnon,
Davao del Sur, Sultan Kudarat, and
Agusan del Sur
Under Implementation.
Convergence on Value Chain
Enhancement for Rural Growth
and Empowerment (Project
CONVERGE)
DAR 2036.64 International
Fund for
Agricultural
Development
(IFAD)
NEDA Board: 29 November
2012
ICC-CC: 7 November 2012
ICC-TB: 7 November 2012
3 October 2012
21 May 2012
Regions IX (Zamboanga del Norte,
Zamboanga del Sur, Zamboanga
Sibugay);
- Regions X (Misamis Oriental,
Camiguin, North Bukidnon, South
Bukidnon);
- Caraga (Agusan del Norte, Agusan del
Sur, Surigao del Norte and Surigao del
Sur)
Component A
(Participatory Analysis
and Planning to Link
Smallholder Farmers to
Existing Value Chain
Systems) , which is
funded under the 2013
GAA , is under
implementation.
Italian Assistance to Agrarian
Reform Community Development
Support Program (IARCDSP)
1
DAR 2,518.75 Italy NEDA Board: 20 Dec 2010
ICC-CC: 20 October 2010
ICC-TB: 23 April 2010
Regions - X, XII, ARMM Under Implementation.
Mindanao Sustainable Agrarian
and Agriculture Development
Project
DAR 4,402.73 JICA Joint ICC-CC and TB: 16 Feb
2012 (changes to ICC
approval)
NEDA Board (ad ref): 08 Nov
2011
NEDA Board: 20 Dec 2010
ICC-CC: 04 June 2010
ICC-TB: 10 Dec 2009
Regions - X, XI, and XII
Provinces of Lanao del Norte,
Bukidnon, Compostela Valley, Davao
del Sur, South Cotabato, North
Cotabato and Sultan Kudarat
Under Implementation.
Bridge Construction Project for
Expanded Agrarian Reform
Communities Development-
Umiray Bridge
DAR 798.56 JICA NEDA Board: 22 March 2012
Joint ICC-CC and TB: 16 Feb
2012
Regions - X, XI, and XII
Provinces of Lanao del Norte,
Bukidnon, Compostela Valley, Davao
del Sur, South Cotabato, North
Cotabato and Sultan Kudarat
Under Implementation.
Public Financial Management
Project
DBM 1,290.00 AusAID NEDA Board: 06 June 2011
ICC-CC: 8 Feb 2011
ICC-TB: 15 Dec 2010
Nationwide Under Implementation.
Regional Infrastructure for Growth
Project (RIGP)
DBP 4,700.00 World Bank NEDA Board: 20 Dec 2010
ICC-CC: 27 Nov 2009
ICC-TB: 16 Nov 2009
Nationwide Under Implementation.
Integrated Natural Resources and
Environmental Management
Project (INREMP)
2
DENR 7,244.22 ADB NEDA Board: 22 Mar 2012
ICC-CC: 17 Aug 2011
8 Feb 2011
ICC-TB: 17 Nov 2010
Regions - ARMM, CAR, VII, X Under Implementation.
Additional Financing for the World
Bank-assisted Second Land
Administration and Management
Project
DENR 2,681.40 World Bank NEDA Board: 18 Sept 2012
Joint ICC-CC and TB:
2 August 2012
CAR, Regions
I, II, III, IV A,
IVB, V, VI, VII, VIII, IX, X,
XI, XII, XIII
Being processed for loan
agreement signing.
SPA being secured from
OP.
School Building Project for Basic
Education
DepEd 960 AusAID NEDA Board: 20 Dec 2010
ICC-CC: 19 Aug 2010
ICC-TB: 12 Aug 2010
Tentative list of priority cities and
provinces:
- Region III (Bulacan, San Jose del
Monte City, Nueva Ecija, Cabanatuan
City, Pampanga, Angeles City, San
Fernando City, Tarlac, Zambales)
- Region IVA (Antipolo, Batangas,
Batangas City, Laguna, Lipa City,
Tanauan City, Rizal, Quezon, Cavite,
Cavite City, Dasmarinas City
Under Implementation.
Basic Education Sector
Transformation (BEST)
DepEd 9,419.00 AusAID NEDA Board: 26 June 2013
Joint ICC-TB and CC: 08 April
2013

NCR, V, VI, VII, VIII, and X Subsidiary arrangement
under discussion between
AusAID and DepEd.
Public-Private Partnership for
School Infrastructure Project
DepEd 9,891.83 Public-Private
Partnership (PPP)
NEDA Board: 19 Dec 2011
ICC-CC: 22 Nov 2011
ICC-TB: 9 Nov 2011
Region I (Ilocos Norte, Ilocos Sur, La
Union, Pangasinan I and Pangasinan II)
Region III (Bulacan, Zambales, Tarlac,
Bataan, Pampanga, Nueva Ecija and
Aurora)
Region IV-A (Batangas, Cavite, Laguna,
Quezon and Rizal)
Under Implementation.
Prepared by NEDA 1/10/2014 Page 2
Project Title Implementing
Agency
Total Project Cost
(in PhP M)
Funding Source ICC Approval/NEDA Board
Confirmation Dates
Summary
Regions/
Provinces
Project Status
Public-Private Partnership for
School Infrastructure Project,
Phase II
DepEd 13,140.28 Public-Private
Partnership (PPP)
NEDA Board: 29 November
2012
ICC-CC: 22 November 2012
ICC-TB: 22 November 2012

Region I, Region II, Region III, Region IV-
B, Region V, Region VI, Region VII,
Region VIII, Region IX, Region X, Region
XI, Region XII, Caraga
Under Implementation.
Basic Education Assistance for
Muslim Mindanao/DepEd
DepEd 3,927.00 AusAID NEDA Board: 18 Sept 2012
22 March 2012
ICC-CC: 17 Aug 2011
ICC-TB:22 July 2011
ARMM - Basilan, Lanao del Sur, Tawi-
Tawi, Sulu, Maguindanao, Lamitan City
and Marawi City
Grant agreement signed.
Austrian-Assisted BFP Capability
Building Program for Selected
Priority Areas
DILG-BFP 1,530.88 Austria (Mixed
Export and
Commercial
Loan)
NEDA Board (ad ref): 26 Oct
2011
NEDA Board: 20 April 2010
ICC-CC: 13 April 2010
9 Oct 2008
ICC-TB: 25 Sept 2008
Nationwide
(All Regions)
*for Region IV B - only Oriental
Mindoro is covered
Under Implementation.
Market Transformation through
Introduction of Energy Efficient
Electric Vehicles Project (formerly
Market Transformation through
Introduction of Energy Efficient
Electric Tricycle (E-Trike)Project)
DOE 21,672.00 ADB, CTF NEDA Board:
21 November 2013
(reported as Matters Arising)
26 June 2013
ICC-CC (ad ref): 03 December
2012
ICC-TB (ad ref): 03 December
2012
NEDA Board: 22 March 2012
ICC-CC: 16 Feb 2012
ICC-TB: 25 Nov 2011
Regions III, IV-B, VI, XI, NCR, other
regions to be identified
Under implementation.
Modernization of the Philippine
Orthopedic Center
DOH 5,607.79 Public-Private
Partnership (PPP)
NEDA Board:
21 November 2013
(reasonableness of ROR)
18 Sept 2012
30 May 2012
Joint ICC-CC and TB:
04 October 2013 (approved
change in 11 May 2012
NCR Proposed changes to the
original NEDA Board
approval of 18 September
2012 confirmed by the
NEDA Board on 21
November 2013.
Development Objective
Agreement between the Republic
of the Philippines and the United
States of America on Family Health
Improved
DOH 8,940.62 USAID NEDA Board: 18 Sept 2012
30 May 2012
ICC-CC Ad Ref: 23 May2012
ICC-TB: 21 May 2012
Nationwide Under Implementation.
USAID and DOH jointly
launched new projects
under the program.
New Bohol (Panglao) Airport
Construction and Sustainable
Environment Protection Project
DOTC 7,440.29 JICA NEDA Board: 4 Sept 2012
Joint ICC-CC and TB : 2 Aug
2012
Region VII
Bohol
Under Implementation.
Puerto Princesa Airport
Development Project
DOTC 4,461.40 Korea-EDCF NEDA Board:
21 November 2013
(proposed changes)
19 Dec 2011
ICC-CC: 28 Nov 2011
ICC-TB: 25 Nov 2011
Region IV-B - Palawan Under Implementation.
Proposed changes to
scope and reallocation of
funds confirmed by the
NEDA Board on 21
November 2013.
Shift in Financing for the
Laguindingan Airport Development
Project-Air Navigational
Facilities/Equipment Component
from Nordic Investment Bank to
Korean Exim Bank
DOTC 755.24 Korean EXIM
Bank / Korea-
EDCF
NEDA Board: 20 Dec 2010
ICC-CC: 28 Jan 2010
ICC-TB: 28 Jan 2010
Region X - Misamis Oriental Under Implementation.
Land Transportation Office
Infrastructure and Information
System
DOTC 11,434.08 Local Financing NEDA Board: 22 March 2012
ICC-CC: 21 March 2012
16 Feb 2012
ICC-TB: 31 Jan 2012
Nationwide For re-bidding.
MRT 3 Capacity Expansion Project DOTC 8,633.64 Local Financing NEDA Board: 4 Sept 2012
Joint ICC-CC and TB: 2 Aug
2012
NCR Undergoing bidding
process (post-
qualification).
Bicol International Airport Project DOTC 4,798.62 Local Financing NEDA Board: 04 Sept 2012
Joint ICC-CC and TB: 12 July
2012
ICC-CC: 3 July 2012
ICC-TB: 18 June 2012
Region V - Albay Airside civil works
ongoing.
Consultancy services
awarded.
Prepared by NEDA 1/10/2014 Page 3
Project Title Implementing
Agency
Total Project Cost
(in PhP M)
Funding Source ICC Approval/NEDA Board
Confirmation Dates
Summary
Regions/
Provinces
Project Status
Tacloban Airport Redevelopment
Project
DOTC 2,120.00 Local Financing NEDA Board: 29 November
2012
ICC-CC: 7 November 2012
ICC-TB: 7 November 2012
3 October 2012
Region VIII - Tacloban City, Leyte Part of the rehabilitation/
reconstruction plan. Site
location (i.e., whether to
use old site or move to
new one) for DOTC
evaluation.
LRT Line 2 East Extension Project DOTC 9,759.31 Local Financing
and ODA
NEDA Board: 04 Sept 2012
(confirmed ICC approval)
30 May 2012
(deferred)
Joint ICC-CC and TB: 11 May
2012
NCR, Region IV-A Loan was made effective
on 22 November 2013.
Mactan-Cebu International Airport
New Passenger Terminal Project
DOTC 17,520.72 Public-Private
Partnership (PPP)
NEDA Board:
21 November 2013 (changes
in original approval)
29 November 2012
ICC-CC: 5 August 2013
22 November 2012
ICC-TB: 22 November 2012

Region VII - Cebu Proposed changes to the
orignal NEDA Board
approval of 29 November
2012 confirmed by the
NEDA Board on 21
November 2013.
Under bidding process.
Contactless Automatic Fare
Collection System (AFCS) Project
DOTC 1,721.99 Public-Private
Partnership (PPP)
NEDA Board: 29 November
2012
ICC-CC: 22 November 2012
ICC-TB: 22 November 2012

NCR Undergoing bidding
process.
LRT Line 1 South Extension Project DOTC-LRTA 64,915.43 JICA - PPP NEDA Board: 22 March 2012
21 November 2013 (changes
in original approval)
ICC-CC: 21 March 2012
13 Dec 2006
ICC-TB: 27 Feb 2012
26 Oct 2006
Region IV-A and NCR Proposed changes to the
orignal NEDA Board
approval of 22 March
2012 confirmed by the
NEDA Board on 21
November 2013.
JICA loan was made
effective on 22 November
2013.
Philippine Ports and Coast Guard
Capability Development Project
DOTC-PCG 5,913.74 France NEDA Board:
21 November 2013
(reported as Matters Arising)
26 June 2013
Joint ICC-TB and CC: 08 April
2013
19 February 2013

Nationwide NEDA Board confirmed
compliance of DOTC to
NEDA Board directives
during its 21 November
2013.
Acquisition of Multi-Role Response
Vessels (MRRV)
DOTC-PCG 9,267.00 JICA NEDA Board: 29 November
2012
ICC-CC: 2 August 2012
ICC-TB: 2 August 2012
18 June 2012
Nationwide Being processed for loan
effectivity.
Road Improvement and
Institutional Development Project
DPWH 6,241.07 ADB NEDA Board: 17 May 2011
ICC-CC: 31 March 2011
8 Feb 2011
ICC-TB: 15 Dec 2010
Nationwide Under Implementation.
JICA-Assisted Road Upgrading and
Asset Preservation Project
DPWH 34,156.62 JICA NEDA Board: 20 Dec 2010
ICC-CC: 13 April 2010
ICC-TB: 23 March 2010
- Region I (Ilocos, La Union)
- Region III (Nueva Ecija)
- Region IV-A (Aurora, Batangas,
Laguna, Mindoro)
- Region V (Catanduanes, Camarines
Sur)
- Region XI (Davao)
- Caraga (Surigao, Agusan del Norte)
Under Implementation.
Flood Risk Management Project in
Cagayan River
DPWH 5,369.06 JICA Joint ICC-CC and TB: 16 Feb
2012 (changes to ICC
approval)
NEDA Board: 08 Nov 2011
ICC-CC: 20 Sept 2011
8 Feb 2011
ICC-TB: 07 Sept 2011
15 Dec 2010
Regions - II (Cagayan), IV-A (Cavite), X
(Misamis Oriental)
Under Implementation.
Central Luzon Link Expressway
(CLLex) Phase I
DPWH 14,937.00 JICA Joint ICC-CC and TB:
16 Feb 2012 (reconfirm
changes to ICC approval)
NEDA Board: 08 Nov 2011
ICC-CC: 28 Oct 2011
ICC-TB: 15 Oct 2010
Region III
Tarlac and Nueva Ecija
Under Implementation.
Prepared by NEDA 1/10/2014 Page 4
Project Title Implementing
Agency
Total Project Cost
(in PhP M)
Funding Source ICC Approval/NEDA Board
Confirmation Dates
Summary
Regions/
Provinces
Project Status
Pasig-Marikina River Channel
Improvement Project, Phase III
DPWH 7,545.16 JICA Joint ICC-CC and TB:
16 Feb 2012 (reconfirm
changes to ICC approval)
NEDA Board: 08 Nov 2011
ICC-CC: 20 Sept 2011
ICC-TB: 07 Sept 2011
NCR Under Implementation.
Arterial Road Bypass Project
(Plaridel Bypass Road), Phase II
DPWH 3,341.00 JICA Joint ICC-CC and TB: 16 Feb
2012 (reconfirm changes to
ICC approval)NEDA Board:
08 Nov 2011
ICC-CC: 28 Oct 2011
ICC-TB: 22 June 2011
Region III
Bulacan
Under Implementation.
Proposed Change in Scope of the
Post-Ondoy and Pepeng Short-
Term Infrastructure Rehabilitation
Project (POPSTIRP)
DPWH 6,479.00 JICA NEDA Board: 26 June 2013
Joint ICCTB and CC: 19
February 2013
ICC-TB: 21 November 2012

NCR, CAR, I, II, III, IV-A and IV-B Under Implementation.
Pasig-Marikina River Channel
Improvement Project, Phase II
DPWH 5,541.51 JICA NEDA Board: 26 June 2013
Joint ICCTB and CC: 19
February 2013
ICC-TB: 21 November 2012

NCR/ Pasig City and Marikina City Under Implementation.
Samar Pacific Coastal Road
(Resubmission Due to Change in
Cost and Scope of Works)
DPWH 1,031.92 Korea-EDCF NEDA Board: 22 March 2012
ICC-CC: 16 Feb 2012
ICC-TB:
03 June 2013 (change in
scope)
31 Jan 2012
Region VIII - Samar Being processed for loan
effectivity.
Baler-Casiguran Road
Improvement Project
DPWH 1,664.20 Korea-EDCF NEDA Board: 22 March 2012
ICC-CC: 16 Feb 2012
ICC-TB: 31 Jan 2012
ICC Secretariat Review: 4
weeks
Region III - Aurora Originally approved by
the NEDA Board on 22
March 2012.
For ICC revalidation /
approval of DPWH-
proposed revisions on the
project. Awaiting
submission from the
DPWH of revised
proposal.
Albay West Coast Road Project DPWH 1,142.48 Local Financing NEDA Board: 29 November
2012
ICC-CC: 7 November 2012
ICC-TB: 7 November 2012

Region V - Albay Per 25 July 2013 DPWH
letter to DOF, the
Department opted for
local financing instead of
KEXIM.
5 Billion Flood Control Projects DPWH 5,000.00 Local Financing NEDA Board: 04 Sept 2012
ICC-CC: 15 August 2012
ICC-TB: 15 August 2012
NCR, Bulacan Under Implementation.
National Roads Bridge
Replacement Project
DPWH 8,399.33 Local Financing or
ODA depending
on OP decision
NEDA Board: 4 Sept 2012
(approval) and 30 May 2012
ICC-CC: 11 May 2012
ICC-TB: 03 April 2012
Regions - CAR, I, II, III, IV-A, IV-B, V, VI,
VII, VIII, IX, X, XI, XII, Caraga
Internal GOP discussions
on financing.
DPWH Bridge Construction
Acceleration Project for Calamity-
Stricken Areas Phase II
DPWH 6,115.51 Local Financing or
ODA depending
on OP decision
NEDA Board: 04 Sept 2012
(approval) and
30 May 2012
ICC-CC: 11 May 2012
ICC-TB: 3 April 2012
Regions - CAR, I, II, III, IV-A, IV-B, V, VI,
VII, VIII, IX, X, XI, XII, Caraga, ARMM
Internal GOP discussions
on financing.
Proposed Restructuring of the
Bridge Construction and
Replacement Project
DPWH 4,970.36 Local Financing or
ODA depending
on OP decision
NEDA Board: 4 Sept 2012
30 May 2012
ICC-CC: 23 May 2012
11 May 2012
ICC-TB: 03 April 2012
Nationwide
(All regions except NCR and ARMM)
Internal GOP discussions
on financing.
Daang Hari SLEX Link Road Project
3
DPWH 1,956.04 PPP-BTO NEDA Board: 18 Jul 2011
17 May 2011
ICC-CC: 29 Nov 2011
(changes to ICC approval)
17 Jun 2011
29 April 2011
ICC TB: 09 Jun 2011
27 April 2011
Region IV-A Under Implementation.
NAIA Expressway Phase II Project DPWH 15,860.53 Public-Private
Partnership (PPP)
NEDA Board: 30 May 2012
ICC-CC: 17 June 2011
21 May 2012
Joint ICC-CC and TB:
11 May 2012
NCR Under Implementation.
Prepared by NEDA 1/10/2014 Page 5
Project Title Implementing
Agency
Total Project Cost
(in PhP M)
Funding Source ICC Approval/NEDA Board
Confirmation Dates
Summary
Regions/
Provinces
Project Status
NLEX-SLEX Connector Road Project DPWH 25,555.99 Public-Private
Partnership (PPP)
NEDA Board:
11 September 2013 (ad
referendum approval of
change in 18 January 2013
NEDA Board approval)
18 January 2013
(confirmation of ICC
approval)
Joint ICC-CC and TB: 7
November 2012
ICC-TB: 3 October 2012

NCR NEDA Board approved ad
referendum on 11
September 2013 the
amendments to the 18
January 2013 NEDA Board
approval.
Cavite-Laguna Expressway (CALAX)
Project
DPWH 35,425.84 Public-Private
Partnership (PPP)
5 August 2013: ICC-CC
approved the change in the
mode of financing of the
project to pure PPP
18 July 2013: ICC TB noted
that DPWH will implement
the project under pure PPP
scheme
NEDA Board: 26 June 2013
(confirmation of sole PPP
financing)
18 January 2013
(confirmation of ICC
approval) and 29 November
2012 (deferred)
Joint ICC-TB and CC: 22
November 2012 and 12 July
2012
Region IV-A (Cavite - Laguna) Originally approved by
the NEDA Board on 18
January 2013. DPWH
presented the change in
financing mode of the
project to the NEDA
Board, as Other Matters,
on 26 June 2013.
Proposed changes and
bidding parameters
approved by the NEDA
Board on 21 November
2013.
Under bidding process.
Proposed Change in Scope, Cost
and Extension of the Mindanao
Roads Improvement Project
DPWH 3,907.70 Saudi Fund NEDA Board: 4 Sept 2012
ICC-CC: 3 July 2012
ICC-TB: 21 May 2012
ARMM Under Implementation.
Integrated Disaster Risk Reduction
and Climate Change Adaptation
Measures in Low Lying Areas of
Pampanga
DPWH and DepEd 4,214.86 Korea-EDCF NEDA Board: 22 March 2012
ICC-CC:
05 August 2013
10 Jan 2012
27 Nov 2009
ICC-TB: 8 Dec 2011
7 Sept 2011
20 Nov 2009
Region III - Pampanga Proposed change in cost
with no change in scope
confirmed by the NEDA
Board on 21 November
2013.
Being processed for loan
effectivity.
KALAHI-CIDDS National
Community-Driven Development
Project
DSWD 81,900.00 World Bank, ADB NEDA Board: 18 January
2013
Joint ICC-CC and TB: 7
November 2012
ICC-TB: 3 October 2012
Nationwide
(All regions except NCR and ARMM)
Being processed for loan
agreement signing.
Metro Manila Wastewater
Management Project
LBP 17,043.67 World Bank NEDA Board: 17 May 2011
ICC-CC: 07 Dec 2010
ICC-TB: 3 Sept 2010
ICC Secretariat Review: 4
wks
NCR Under Implementation.
Additional Financing for the
Laguna de Bay Institutional
Strengthening and Community
Participation Project
LLDA 634 World Bank NEDA Board: 20 Dec 2010
ICC-CC: 28 Jan 2010
Laguna de bay Region:
Laguna, Rizal, parts of Batangas,
Cavite, and NCR (Pasig, Pasay, Quezon,
Manila, Muntinlipa, Marikina,
Caloocan, Pateros, Taguig)
Under Implementation.
Strengthening of Angat Dam and
Dike Project
Package 1 = Strengthening Works
Package 2 = Instrumentation
(Flood Forecasting and Warning
System for dam Operation)
Package 3 = Consultancy Services
MWSS 5,719.90 Local Financing NEDA Board: 04 Sept 2012
ICC-CC: 22 May 2012 (ad
referendum)
ICC-TB: 21 May 2012
Region III - Bulacan Invitation to Bid was
postponed.
Prepared by NEDA 1/10/2014 Page 6
Project Title Implementing
Agency
Total Project Cost
(in PhP M)
Funding Source ICC Approval/NEDA Board
Confirmation Dates
Summary
Regions/
Provinces
Project Status
Rehabilitation, Operation and
Maintenance of the Angat Hydro
Electric Power Plant (AHEPP)
Auxiliary Turbines 4 and 5 through
PPP Project
MWSS 1,155.18 Public-Private
Partnership (PPP)
NEDA Board: 29 November
2012
ICC-CC: 7 November 2012
ICC-TB: 7 November 2012

Region III - Bulacan For re-issuance of ITPB.
Capacity Recovery and Uprating of
Agus 6 Hydroelectric Power Units
1 and 2
NPC 2,598.17 Bid Plus Financing
and Onlending by
the NG
NEDA Board (change in
financing): 4 Sept 2012
NEDA Board: 22 March 2012
ICC-CC: 3 Jul 2012
19 August 2010
19 March 2007
13 Dec 2006
Joint ICC-CC and TB: 19
March 2007
ICC-TB: 12 August 2010
24 Aug 2006
Region X - Iligan City Under bidding.
MRT 7 Project DOTC-ULC 62,698.02 Public-Private
Partnership (PPP)
NEDA Board:
21 November 2013
Joint ICC-CC and TB:
08 April 2013
NCR Issuance of Performance
Undertaking approved by
the NEDA Board on 21
November 2013.
LRT Line 1 North Extension -
Common Station
DOTC 1,399.65 Local Financing NEDA Board:
21 November 2013
ICC-CC: 05 August 2013
ICC-TB: 18 July 2013
NCR Approved by the NEDA
Board on 21 November
2013.
Development of Transport System
Terminals at FTI and PRA under
PPP
DOTC 7,747.44 Public-Private
Partnership (PPP)
NEDA Board:
21 November 2013
ICC-CC: 05 August 2013
ICC-TB: 18 July 2013
NCR Approved by the NEDA
Board on 21 November
2013.
Bulacan Bulk Water Supply Project
(BBWSP)
MWSS 24,435.24 Public-Private
Partnership (PPP)
NEDA Board:
21 November 2013Joint ICC-
CC and TB:
04 October 2013
Region III - Bulacan Approved by the NEDA
Board on 21 November
2013.
Proposed Re-allocation of Loan
Proceeds to Private Sector
Hospitals of the Credit for Better
Health Care Project
DBP 1,540.00 ADB NEDA Board:
21 November 2013 (noted
changes in project scope)
ICC-CC: 05 August 2013
ICC-TB: 31 July 2013
Nationwide (except NCR) Proposed reallocation of
loan proceeds approved
by the NEDA Board on 21
November 2013.
GRAND TOTAL 725,421.90
NO. OF PROJS 71
Prepared by NEDA 1/10/2014 Page 7