You are on page 1of 17

1

/
1
1
/
2
0
1
4
1
/
1
2
/
2
0
1
4
1
/
1
3
/
2
0
1
4
1
/
1
4
/
2
0
1
4
1
/
1
5
/
2
0
1
4
1
/
1
6
/
2
0
1
4
1
/
1
7
/
2
0
1
4
1
/
1
8
/
2
0
1
4
1
/
1
9
/
2
0
1
4
1
/
2
0
/
2
0
1
4
1
/
2
1
/
2
0
1
4
1
/
2
2
/
2
0
1
4
1
/
2
3
/
2
0
1
4
1
/
2
4
/
2
0
1
4
1
/
2
5
/
2
0
1
4
1
/
2
6
/
2
0
1
4
1
/
2
7
/
2
0
1
4
1
/
2
8
/
2
0
1
4
1
/
2
9
/
2
0
1
4
1
/
3
0
/
2
0
1
4
1
/
3
1
/
2
0
1
4
SAT SUN MON TUE WED THU FRI SAT SUN MON TUE WED THU FRI SAT SUN MON TUE WED THU FRI
11
5 SA Steel Structure installation
100%
6 Installation of SA 100%
15 Installation of Outdoor 110KV CT and termination 100%
14 Installation of steel support inside MH-1&MH-3(TR1) 100%
95%
4 Relay final setting 40%
0% 3 TR1 T&C
17 Installation gas analyess 100%
Installation the remaining missing materials which arrived
to site
18 100%
Electrical Activities
S
L
.
#
ACTIVITIES
Previous This Week Next Week
ACTUAL %
Electrical and Mechanical Works during Shutdown
1 Control Cable Termination in new & old control room 85%
TR1 Installation 2
100%
Vacumming & Oil Filtiration 100%
100%
Power Cable Pullig between New SWGR to OLD SWGR 8
10
16 Bushing CT T&C 100%
13 Make circulating for transformer oil 80%
7 Make earhting for three SA 100%
12 Filling TR1 by oil 100%
9 Make termination for 33KV power cable of TR1 3%
Power Cable Pullig SWG1 TO TR1
Notes:
1- Regarding the remaining control, Port. & Comm. Panels is: 2- Works during Shutdown:
1)MOSAIC 1-8 (Pending, under review) 1)Tr1 Relay&Control 7)Existing 33KV SWG Refurbrishment
2)AMR 1&2 (Not TIT Scope) 2)Tr2 Relay&Control 8)Testing & Commissioning
3)Tarsnducer 1-3 (Its included in the SWG Panels) 3)Tr1 Installation
4)SCADA 1&2 (Under Supplierreview) 4)Tr1 110KV Power cables Termination
5)RTU 1&2(Under Supplierreview) 5)Tr2 Installation
6)SOE 1&2 (Under Supplier review) 6)Tr2 110KV Power cables Termination
25 Control Cables Pulling for TR2 0%
19 Cleaning the PVC pipe between SWG new and SWG old 100%
20 Fabrication of Supports 100%
21 Installation of Supports for TR1
Installation the remaining missing materials which arrived
to site
18 100%
ACTUAL
(TIT) SITE MANAGER SEC ELECTRICAL ENGINEER SEC SITE MANAGER
PLAN
ENGR. Saber Farghali
ENGR. S.PRAKASH
Eng. S.Parkash
ENGR. ABDULRAHMAN ROSTOM
24 Installation of Supports 0%
I.Water Deluge System
II. Fire Alarm System
22 Installation of Main Pipe (Lower Ring and Upper Ring) 3%
23 Installation of Branch Pipe (Lower Ring and Upper Ring) 0%
15%
Electrical Activities
Remarks
Electrical and Mechanical Works during Shutdown
SEC SITE MANAGER
ENGR. ABDULRAHMAN ROSTOM
AL TOUKHI COMPANY FOR INDUSTRY, TRADING AND CONTRACTING
REINFORCEMENT OF AL SWAMALLAH 110/33KV S/S (MAKKAH NORTH 380/110/13.8KV BSP)
SUMMARIZED DAILY PROGRESS REPORT
AS OF 21 JANUARY 2014
ACTIVITY
ID
ACTIVITY NAME
DAYS OF
COMPLETI
ON
ACTUAL
DAYS
PASSED
33KV
SWITCHG
001
PANEL CHECK / LOOP CHECK 44 31
002
MCB TEST 6 7
003
AUXILIARY RELAY TEST 6 14
004
CURRENT TRANSFORMER TEST 6 2
005
METER TEST 4 4
006
CIRCUIT BREAKER INSULATION RESISTANCE TEST 2 3
007
CIRCUIT BREAKER TIMING TEST 3 1
008
CONTACT RESISTANCE TEST (B/B, B.EARTH,CB) 4 1
009
VT TEST 2 2
010
SCHEME CHECK 12 12
011
DCP/SDB INSULATION RESISTANCE TEST 1 1
012
DCP/SDB CONTACT RESISTANCE TEST 1 1
013
MCCB TEST 2 2
014
CT LOOP TEST 4 4
015
AC LOOP TEST 2
016
BUSBAR RELAY FINAL SETTING 6 1
017
VT LOOP TEST 2
018
CT PRIMARY INJECTION 2
019
BUSBAR STABILITY TEST
020
MAIN RELAY ACCEPTANCE TEST
021
SUPERVISION TEST 5
022
DC LOOP TEST 3
023
FUNCTION TEST 6
024
TRIP TEST 4
025
SWITCHGEAR HIGH VOLTAGE TEST 3
026
CABLE HIGH VOLTAGE TEST 2
POWER
TRANSFO
001
TR LCP 20% MCB 1 1
002
MECHANICAL CHECK AND VISUAL INSPECTION
003
TRANSFORMER TURNS RATIO
004
CAPACITANCE AND TAN DELTA OF WINDING
005
CAPACITANCE AND TAN DELTA OF BUSHING
006
MAGNETIZING CURRENT TEST (NO LOAD CURRENT TEST)
007
VECTOR GROUP TEST
008
SHORT CIRCUIT TEST (IMPEDANCE TEST)
009
WINDING RESISTANCE TEST - H.V. SIDE
010
WINDING RESISTANCE TEST - L.V. SIDE
011
INSULATION RESISTANCE TEST
012
I.R. TEST OF TRAFO WINDING - POLARIZATION INDEX
013
I.R. TEST OF MAIN CORE AND CORE FRAME
014
ZERO SEQUENCE IMPEDANCE MEASUREMENT
015
MAGNETIC BALANCE TEST
016
TESTING OF FANS
017
CALIBRATION OF OIL AND WINDING TEMP SENSORS 1 1
018
WDG TEMP CALIBRATION BY SEC. INJECTION (HV WDG) 1 1
019
WDG TEMP CALIBRATION BY SEC. INJECTION (LV WDG) 1 1
020
SUPERVISION EQUIPMENT FUNCTIONAL CHECKS
021
H.V. EXCITATION MEASUREMENT (PH TO N)
022
L.V. EXCITATION MEASUREMENT (PH TO N)
023
OIL DIELECTRIC STRENGTH 1 1
024
ON LOAD TAP CHANGER TEST
025
OLTC MDU CONTACT CHECK
RELAY
AND
001
PANEL CHECK / LOOP CHECK 20 7
002
MCB TEST 3 3
003
AUXILIARY RELAY TEST 6 7
004 DIGITAL METER TEST
1 1
005 TR DIFFL PROTECTION RELAY TEST
006 METROSIL INSTALLATION AND TESTING
007 TR PROT SCHEME CHECK
3 3
008 LOAD SHEDDING CHECK
6 1
009
TR PROT RELAY TEST (MFAC) 2 2
010
AC LOOP CHECK 2
011
DC LOOP CHECK 2
012
MAIN RELAY ACCEPTANCE TEST 6
013
RELAY PANEL FUNCTION TEST 6
014 TR O/C RELAY TEST
AL TOUKHI COMPANY FOR INDUSTRY, TRADING AND CONTRACTING
REINFORCEMENT OF AL SWAMALLAH 110/33KV S/S (MAKKAH NORTH 380/110/13.8KV BSP)
QTY TO BE
TESTED
FINISHED
QTY
REMAINING
QTY
%
COMPLETION
24 24 0 100.0%
288 288 0 100.0%
262 262 0 100.0%
22 22 0 100.0%
21 21 0 100.0%
19 19 0 100.0%
19 19 0 100.0%
22 22 0 100.0%
4 4 0 100.0%
22 22 0 100.0%
2 2 0 100.0%
2 2 0 100.0%
17 17 0 100.0%
20 20 0 100.0%
n/a 100.0%
6 6 0 100.0%
4 4 0 100.0%
n/a 98.0%
98.0%
n/a
22
n/a
n/a
n/a
n/a
n/a
n/a 100.0%
1 1 0 100.0%
1 1 0 100.0%
1 1 0 100.0%
1 1 0 100.0%
8 8 0 100.0%
61 61 0 100.0%
217 217 0 100.0%
2 2 0 100.0%
2 2 0 100.0%
n/a 50.0%
n/a 95.0%
8 2 6 60.0%
6 6 0 100.0%
n/a 40.0%
n/a
n/a 50.0%
n/a
8 4 4 50.0%
REMARKS
done
done
done
done
done
done
done
done
done
done
done
done
done
done
done
done
done
will continue once CSD Eng come back
will continue once CSD Eng come back
to be tested with SEC CSD
to be tested with SEC CSD
to be tested with SEC CSD
to be tested with SEC CSD
to be tested with SEC CSD
to be tested with SEC CSD
to be tested with SEC CSD
done
done
done
done
done
done
done
done
done
done
ON-GOING
REMAINING WORKS WILL BE DURING SHUTDOWN
REMAINING WORKS WILL BE DURING SHUTDOWN
done
STOPPED. MISSING MATERIALS.
to be tested with SEC CSD
STOPPED. SOME ISSUES FOR CLARIFICATION.
to be tested with SEC CSD
SEC-WOA CONTRACT # 21031092/00
SAT SUN MON TUE WED THU FRI SAT SUN MON TUE
7/12 8/12 9/12 10/12 11/12 12/12 13/12 14/12 15/12 16/12 17/12
A Makkah North 380/110/13.8kV BSP
Civil Works Remaining @ Al- Sawamlah S/S.
scheduled
actual
scheduled
actual
scheduled
actual
scheduled
actual
scheduled
actual
scheduled
actual
scheduled
actual
scheduled
actual
scheduled
actual
scheduled
actual
scheduled
actual
A.1.13 finishing works
A.1.12 Rcc for remaining duct banks and manhole # 4
A.1.8 fixing of rail
A.1.9 pouring of dyke wall and transformer foundation
A.1.10 water prrofing for walls
A.1.11 Back filling around transformer
A.1.7 form work and steel fixing for dyke wall and transformer foundation
A.1.3 Lean concret
A.1.4 water proofing and screed
A.1.5 form work and steel fixing for raft
A.1.6 pouring of raft foundation
Transformer # 1
A.1.1 Removing of gravel , Rail and other steel structure
A.1.2 Demolish of existing transformer and excavation
(3-WEEKS SCHEDULE)
PROJECT : CONSTRUCTION OF 380/110/13.8KV MAKKAH NORTH BSP
Contractor : Al Toukhi Company for Ind., Trading & Contracting.
Sl. No. ACTIVITIES
Last week This week
A.1.13 finishing works
WED THU FRI SAT SUN MON TUE WED THU FRI
18/12 19/12 20/12 21/12 22/12 23/12 24/12 25/12 26/12 27/12
DONE
DONE
DONE
DONE
DONE
DONE
DONE
DONE
DONE
DONE
DONE
DONE
DONE
DONE
REMARKS
(3-WEEKS SCHEDULE)
Date31/12/2013
This week Next week