You are on page 1of 4

Balance External Development Works at Anantnag Station Yard on on Qazigund-

Baramulla New BG Rail Line Project.


BOQ Rate
Sl no Description of Item Unit BOQ Qty. BOQ Amount Ref:
Item (in Rs.)
SCHEDULE A: Quoted rete 0% Above
SUB HEAD NO-1: EARTH WORK
Earth work in excavation by mechanical
means (Hydraulic excavator) / manual
means in foundation trenches or drains (not
exceeding 1.5 m in width or 10 sqm on plan)
DSR-2007
1 including dressing of sides and ramming of
2.8, Page 64
bottoms, lift upto 1.5 m, including getting out
the excavated soil and disposal of surplus
excavated soil as directed, within a lead of
50 m.
All kinds of soil. cum 103.40 61.00 6,307.40 2.8.1
SUB HEAD NO-2: WATER SUPPLY

Concealed pipe including painting with anti


2 corrosive bitumastic paint, cutting chases metre 144.75 3.30 477.68 18.11.1
and making good the wall. 15mm dia NB

SUB HEAD NO-3: BRICK WORK & FINISHING -


Brick work with F.P.S. bricks of class
designation 75 in foundation and plinth
4 cum 2293.40 25.00 57,335.00 6.1.1, P-99
in:Cement mortar 1:4 (1 cement : 4 coarse
sand)
12 mm cement plaster finished with a floating
13.7.2, Page-
5 coat of neat cement of mix :1:4 (1 cement: 4 sqm 97.90 225.00 22,027.50
201
fine sand)

Providing and laying Ceramic glazed floor


tiles 300x300 mm (thickness to be specified
by the manufacturer) of 1st quality
conforming to IS : 15622 of approved make
in colours such as White, Ivory, Grey, Fume 11.37, Page-
6 sqm 598.65 3.30 1,975.55
Red Brown, laid on 20 mm thick Cement 177
Mortar 1:4 (1 Cement : 4 Coarse sand)
including pointing the joints with white
cement and matching pigment etc.,
complete.

Providing and fixing Ist quality ceramic


glazed wall tiles conforming to IS : 15622
(thickness to be specified by the
manufacture ) of approved make in all
colours, shades except burgundy, bottle
green, black of any size as approved by
11.36, Page-
7 Engineer-in-Charge in skirting, risers of steps sqm 556.60 7.00 3,896.20
177
and dados over 12 mm thick bed of cement
Mortar 1:3 (1 cement : 3 coarse sand) and
jointing with grey cement slurry @ 3.3kg per
sqm including pointing in white cement
mixed with pigment of matching shade
complete.

Painting with synthetic enamel paint of


approved brand and manufacture to give an 13.61, Page
8 sqm 35.35 36.00 1,272.60
even shade : Two or more coats on new 206
work
SUB HEAD NO-7: CEMENT CONCRETE -
Providing and laying in position cement
concrete of specified grade excluding the
cost of centering and shuttering - All work up
to plinth level :
1:2:4 (1 cement : 2 coarse sand : 4 graded
9 cum 3257.45 15.20 49,513.24 4.1.3, Page-79
stone aggregate 20 mm nominal size)

1:4:8 (1 Cement : 4 coarse sand : 8 graded


10 cum 2449.00 16.00 39,184.00 4.1.8, Page-79
stone aggregate 40 mm nominal size).

25865598.xls Page 1 of 4
BOQ Rate
Sl no Description of Item Unit BOQ Qty. BOQ Amount Ref:
Item (in Rs.)

Providing and laying in position machine


batched, machine mixed and machine
vibrated design mix cement concrete of
specified grade for reinforced cement
concrete work including pumping of concrete
to site of laying but excluding the cost of
centering, shuttering, finishing and
reinforcement. including Admixtures in
cum 4147.40 0.20 829.48 5.33, Page-93
recommended proportions as per IS 9103 to
accelerate, retard setting of concrete,
improve workability without impairing
strength and durability as per direction of
Engineer-in-charge. M-25 grade reinforced
cement concrete by using 410kg. of cement
per cum of concrete. All work up to floor V
level.

Centering and shuttering including strutting,


propping etc. and removal of form for : sqm. 187.35 2.00 374.70 5.9.5, Page-89
Shelves (Cast in situ)
Providing and laying 60 mm thick factory
made cement concrete interlocking paver
block of M-30 Grade made by block making
machine with strong vibratory compaction &
of approved size & design/shape laid in
11 required colour & pattern over including the sqm. 632.50 67.50 42,693.75 NS Item
base of 50 mm thick compacted bed of
coarse , filling the joints with coarse sand
etc. all complete as per direction of Engineer
In Charge

Note :
(1) The sand used shall be slightly moist and
the moisture content shall be about 4% by
weight.
(2) After laying the paver block, the top
surface shall be vibrated to final level and
sweep the extra sand over the blocks into
the joints and vibrate into place.
(3) The shape and size shall be approved by
the Engineer-in-charge.
(4) The payment shall be made on laid area
basis, without deducting joints if any.
However the width of the joint should not be
more than specified.

Earth work in filling in embankment with


contractor’s own earth of approved quality
obtained from approved quarry outside Rly
limits including excavation, loading into
contractor’s vehicles, leading to site of
embankment, unloading, spreading in layers,
12 breaking clods, levelling, mechanical cum 90.00 250.00 22,500.00
compaction, sectioning to profile and
dressing of slopes and surfaces, bunding at
top, with all lead and lifts, labour, tools, plant,
dag-belling etc, complete as per MORTH
specifications for mechanical compaction
and as directed by the Engineer-in-charge.

i) The rate quoted includes all charges for


obtaining earth, royality, seigniorage and
other taxes, etc.
ii) Before starting the work Bushes, Shrubs
and Jungle are to be cleared and the rate
quoted is deemed to include such cost.
iii) The payment shall be made on cross-
sectional area basis after compaction.
iv) The rate includes mechanical compaction
as per specifications.

25865598.xls Page 2 of 4
BOQ Rate
Sl no Description of Item Unit BOQ Qty. BOQ Amount Ref:
Item (in Rs.)

Painting runways/ taxi track/ apron marking


with adequate no. of coats to give uniform
finish with road marking paint of superior DSR-
13 make as approved by the engineer-in-charge 2007:16.47
ie. Cleaning the surface of all dirt, scales, oil, Page 247
grease and other foreign material etc. and
lining out complete.

Old work (One or more coats) sqm 43.10 0.00 -

18.49.1, Page-:
Correction No-I:
Providing and fixing CP brass bib cock of
118/SE/(S&S)
14 approved quality conforming to IS :8931; 15 each 313.10 3.00 939.30
IEEI/CS-DSR-
mm Nominal Bore
2007/66; Dated
13-03-2008

Providing and fixing precast Kerb stone RM N.S. Item


(Konkrete make or of equivalent make) of
size 300x300x150 in M-20 cement concrete
and setting in position with cement concrete
1:2:4 (1 cement : 2 coarse sand : 4 graded
stone aggreate 12.5mm nominal size) of 400
mm wide and 75 mm thick including cost of
15 excavtion etc with all contractors material, 165.00 70.00 11,550.00
labour, transportation, lead & lift etc.
Complete including cost of incident charges
for successful completion of work and as
directed by Engineer-in-charge at site.
NOTE:-
(1) The thickness shall be 150 mm.

15 Precast 400x500 drain cover RM 715.00 0.00 -


TOTAL OF SCHEDULE A : 260,876.39
100% OF SCHEDULE A : Quoted Rate 0% Above 260,876.39
SCHEDULE B: Quoted rete 0% Above
DSR STEEL ITEM -
Reinforcement for R.C.C. work including
straightening, cutting, bending, placing in 5.22.3, Page-
kg 42.70 6.00 256.20
position and binding all complete. Cold 92
twisted bars
Fencing with GI barbed wire. 9.38 kg per
100m (minimum); Payment to be made per 16.18.1, Page-
17 metre 8.45 4,480.00 37,856.00
metre cost of total length of barbed wire 242
used.
Steel work welded in built up sections/
framed work including cutting, hoisting, fixing
18 in position and applying a priming coat of 10.25
approved steel primer using structural steel
etc. as required.

In gratings, frames, guard bar, ladder, 10.25.2, Page


kg 51.20 400.00 20,480.00
railings, brackets, gates and similar works. 166
TOTAL OF SCHEDULE B : 58,592.20
GRAND TOTAL 319,468.59

25865598.xls Page 3 of 4
Balance External Development Works at Anantnag Station Yard on
on Qazigund-Baramulla New BG Rail Line Project.
BOQ Rate
Sl no Description of Item Unit BOQ Qty. BOQ Amount
Item (in Rs.)
SCHEDULE A: Quoted rete 0% Above
SUB HEAD NO-1: EARTH WORK
1 Earth work in excavation
All kinds of soil. cum 103.40 61.00 6,307.40
SUB HEAD NO-2: WATER SUPPLY
2 GI Pipe 25mm dia NB metre 179.65 - -
3 GI Pipe 15mm dia NB metre 144.75 3.30 477.68
SUB HEAD NO-3: BRICK WORK & FINISHING
4 Brick work . cum 2293.40 25.00 57,335.00
5 12 mm cement plaster sqm 97.90 225.00 22,027.50
Providing and laying Ceramic glazed floor
6 sqm 598.65 3.30 1,975.55
tiles
Providing and fixing Ist quality ceramic
7 sqm 556.60 7.00 3,896.20
glazed wall tiles.
8 Painting with synthetic enamel paint. sqm 35.35 36.00 1,272.60
SUB HEAD NO-7: CEMENT CONCRETE
9 1:2:4 Concrete cum 3257.45 15.20 49,513.24
10 1:4:8 concrete cum 2449.00 16.00 39,184.00
M-25 Concrete cum 4147.40 0.20 829.48
Shuttering of shelves. sqm. 187.35 2.00 374.70
Providing and laying 60 mm thick factory
11 made cement concrete interlocking paver sqm. 632.50 67.50 42,693.75
block.
12 Earth work in filling. cum 90.00 250.00 22,500.00
13 Providing and fixing CP brass bib cock. each 313.10 3.00 939.30
14 Providing and fixing precast Kerb stone. RM 165.00 70.00 11,550.00
15 Precast 400x500 drain cover RM 275.00 - -
TOTAL OF SCHEDULE A : 260,876.39
100% OF SCHEDULE A : Quoted Rate 0% Above 365,226.95
SCHEDULE B: Quoted rete 0% Above
DSR STEEL ITEM -
Reinforcement for R.C.C. work including
straightening, cutting, bending, placing in
kg 42.70 6.00 256.20
position and binding all complete. Cold
twisted bars
Fencing with GI barbed wire. 9.38 kg per
17 metre 8.45 4,480.00 37,856.00
100m.
18 Steel work welded in built up sections kg 51.20 400.00 20,480.00
TOTAL OF SCHEDULE B : 58,592.20
100% OF SCHEDULE B : Quoted Rate 0% Above 84,958.69
GRAND TOTAL 450,185.64