Engineering Projects 1

Client List

Pre-contract & Post-contract Engineering /
Project Management Services



Commissioned, MW
(no. of projects)
Under Implementation, MW
(no. of projects)
Bagasse Based Cogen Power 459.70
(24)
453.80
(28)
Biomass Based Power 56.00
(6)
57.40
(7)
Incidental Cogen Power 9.50
(5)
1.50
(1)
Industrial Captive Power 34.50
(10)
2.00
(1)
Total 556.70
(45)
512.7
(37)
Other Engg. Projects, no. 6
Grand Total 1069.40
(88)



Engineering Projects 2


Client List (contd.)

Commissioned Projects

1. Bagasse Based Cogen Power Projects

Sr.
No.
Client
(Pressure / Temperature Configuration)
Installed
Capacity,
MW
Service Period Status
1. Shamanur Sugars Ltd., Davangere,
Karnataka
(Boiler, 67 kg/cm2 & 490C, 80 TPH,
BHEL make)
(Turbine, 66 kg/cm2 & 485C, 22 MW,
BHEL make)
22.00 1998-2000 Commissioned in
September, 1999
2. Davangere Sugar Co. Ltd., Davangere,
Karnataka
(Boiler, 87 kg/cm2 & 515C, 90 TPH,
TBW make)
(Turbine, 86 kg/cm2 & 510C, 24 MW,
TDPS / Shin Nippon make)
24.00 2002 2004 Commissioned in
March, 2003
3. SCM Sugars Ltd., Maddur, Karnataka
(Boiler, 87 kg/cm2 & 515C, 100 TPH, IJT
make)
(Turbine, 86 kg/cm2 & 510C, 26 MW,
BHEL make)
26.00 2003 2004 Commissioned in
July, 2004
4. Shree Doodhganga Krishna SSKN,
Chikodi, Karnataka
(Boiler, 67 kg/cm2 & 490C, 120 TPH,
WIL make)
(Turbine, 66 kg/cm2 & 485C, 20 MW,
BHEL make)
20.00 2002 -2004 Commissioned in
March, 2004
5. Chhattisgarh State Electricity Board,
Raipur
6.00 2002 2005 Commissioned in
April, 2005
6. Purti Sakhar Karkhana Ltd., Nagpur,
Maharashtra
(Boiler, 67 kg/cm2 & 490C, 80 TPH,
SITSON make)
(Turbine, 66 kg/cm2 & 485C, 22 MW,
TDPS / Shin Nippon make)
22.00 2003 - 2006 Commissioned in
September, 2006


Engineering Projects 3

Client List (contd.)

1. Bagasse Based Cogen Power Projects (contd.)

Sr.
No.
Client
(Pressure / Temperature Configuration)
Installed
Capacity, MW
Service
Period
Status
7. Mula Sahakari Sakhar Karkhana Ltd.,
Sonai, Dist. Ahmednagar, Maharashtra
(Boiler, 67 kg/cm
2
& 495C, 80 TPH, WIL
make)
(Turbine, 16 MW, TDPS make)
16.00 2004 - 2006 Commissioned in
December, 2006
8. Loknete Baburao Patil Sahakari Sakhar
Karkhana Ltd., Mohol, Dist. Solapur
9.00 2006 -2008 Commissioned in
January, 2008
9. Indian Cane Power Ltd., Bagalkot,
Karnataka
(Boiler, 87 kg/cm
2
& 515C, 120 TPH,
Thermax make)
(Turbine, 28 MW, TDPS/ SNM make)
28.00 2006- 2008 Commissioned in
April, 2008
10. Nava Bharat Ferro Alloys Ltd., Samalkot,
Andhra Pradesh
20.00 2006-2009 Commissioned in
March, 2009
11. Yashwantrao Mohite Krishna Sahakari
Sakhar Karkhana Ltd., Karad,
Maharashtra
(Boiler, 87 kg/ cm
2
& 515C, 90 TPH,
Thermax make)
(Turbine, 16 MW, TDPS/ SNM make)
16.00 2008 - 2010 Commissioned in
April, 2010
12. Kranti Sahakari Sakhar Karkhana Ltd.,
Kundal, Dist. Sangli, Maharashtra
(Existing boiler, 45 kg/ cm
2
& 450C, 40
TPH, Thyssen Krupp make)
(Turbine, 8 MW, Siemens)
8.85 2008 - 2010 Commissioned in
February, 2010
13.
Shri Shankar Sahakari Sakhar Karkhana
Ltd., Malshiras, Dist. Solapur,
Maharashtra
(Boiler, 110 kg/ cm
2
& 540
0
C, 100 TPH,
SITSON make)
(Turbine, 20 MW, Triveni make)
20.00 2009 - 2011 Commissioned in
March, 2011
14.
Purna Sahakari Sakhar Karkhana Ltd.,
Basmathnagar, Dist. Hingoli,
Maharashtra
(Boiler, 110 kg/ cm
2
& 540
0
C, 100 TPH,
WIL make)
(Turbine, 18 MW, Siemens make)
18.00 2009 2011 Commissioned in
July, 2011

Engineering Projects 4

Client List (Contd.)

1. Bagasse Based Cogen Power Projects (contd.)

Sr.
No.
Client
(Pressure / Temperature Configuration)
Installed
Capacity,
MW
Service Period Status
15.
Hindustan Petroleum Corporation Ltd.,
Lauria, Bihar
EPC Contract to IJT
(Boiler, 110 TPH, 110 Kg/cm
2
, 540
0
C)
(Turbine, 20 MW, DEC, Siemens make)
20.00 2009 - 2012 Commissioned in
January, 2012
16.
Hindustan Petroleum Corporation Ltd.,
Sugauli, Bihar
EPC Contract to WIL
(Boiler, 110 TPH, 110 Kg/cm
2
, 540
0
C)
(Turbine, 20 MW, DEC, Siemens make)
20.00 2009 - 2012 Commissioned in
January, 2012
17.
Shri Dudhganga Vedganga Sahakari
Sakhar Karkhana Ltd., Bidri, Dist.
Kolhapur, Maharashtra
(Boiler, 87 ata , 515
0
C & 120 TPH, IJT
make )
(Turbine , 20 MW, Siemens make)
20.00 2009 - 2012 Commissioned in
February, 2012
18.
Kisanveer Satara Sahakari Sakhar
Karkhana Ltd., Bhuinj, Tal. Wai, Dist.
Satara, Maharashtra
(Boiler, 87 ata , 515
0
C & 120 TPH,
Thyssen Krupp make)
(Turbine , 22 MW, SITSON / Siemens)
22.00 2009 - 2012 Commissioned in
February, 2012
19.
NSL Sugars Ltd., Alland
EPC Contract to IJT
(Boiler, 110 ata, 540
0
C & 135 TPH, IJT
make )
(Turbine , 35 MW, IJT / Siemens)
35.00 2010 2012 Commissioned in
March, 2012
20. Athani Farmers Sugar Factory Ltd.,
Athani, Karnataka
(Boiler, 87 kg/cm2 & 515C, 130 TPH,
CVL make)
(Turbine, 24 MW, Siemens make)
24.00 2010 - 2012 Commissioned in
November, 2012
21.
Kranti Sahakari Sakhar Karkhana Ltd.,
Kundal (Ph II)
(Boiler, 50 TPH, 45 kg/cm
2
& 460
0
C,
Thermax make)
(Turbine 10 MW back pressure, Siemens
make)
10.85 2011 2013 Commissioned in
January, 2013


Engineering Projects 5


Client List (Contd.)

1. Bagasse Based Cogen Power Projects (contd.)

Sr.
No.
Client
(Pressure / Temperature Configuration)
Installed
Capacity,
MW
Service Period Status
22.
Lakshmi Sugar Mills Co. Ltd., Bijnor
(Boiler, 110 ata, 540
0
C & 110 TPH,
Thermax make )
(Turbine , 20 MW, Thermax / Siemens)
20.00 2011 2013 Commissioned in
February, 2013
23.
Ashok Sahakari Sakhar Karkhana Ltd.,
Ashoknagar, Dist. Ahmednagar,
Maharashtra
(Boiler, 87 Kg/cm
2
, 515
0
C, 80 TPH,
SITSON make )
(Turbine, 15 MW, Triveni make)

17.00 2010 2013 Commissioned in
November, 2013
24.
Mahatma Sugar & Power Ltd., Nagpur
(Boiler, 80 TPH, 86 kg/cm
2
& 515
0
C , IJT
make)
(Turbine 15 MW DEC , Siemens make)

15.00 2010 2013 Commissioned in
November, 2013

Sub-total (1)
459.70




2. Biomass Based Power Projects

Sr.
No.
Client
(Pressure / Temperature Configuration)
Installed
Capacity, MW
Service
Period
Status
25.

Armstrong Energy Pvt. Ltd., Nasik,
Maharashtra
(Boiler, 67 kg/ cm
2
& 490C, 40 TPH,
SITSON make)
(Turbine, 6 MW, Sokeo make)
6.00 2006 - 2008 Commissioned in
March, 2008
26. Yash Agro Energy Pvt. Ltd., Nagpur,
Maharashtra
(Boiler, 87 kg/ cm
2
& 515C, 40 TPH, CVL
make)
(Turbine, 8 MW, Siemens make)
8.00 2006 - 2008 Commissioned in
October, 2008


Engineering Projects 6


Client List (Contd.)

2. Biomass Based Power Projects (contd.)

Sr.
No.
Client
(Pressure / Temperature Configuration)
Installed
Capacity, MW
Service
Period
Status
27. Usher Agro Ltd., Mathura, Uttar Pradesh
(Boiler, 33 kg/ cm
2
& 380C, 8 TPH, CBL
make) (Turbine, 900 KW)
1.00 2007 - 2008 Commissioned in
November, 2008
28. Sathyam Power Pvt. Ltd., Mumbai
(Merta) EPC Contract to WIL
(Boiler, 67 kg/ cm
2
& 485C, 50 TPH)
(Turbine, 10 MW, Siemens make)
10.00 2009 - 2011 Commissioned in
March, 2011
29. Usher Eco Power Ltd., Mathura, Uttar
Pradesh
(Boiler, 87 kg/ cm
2
& 515C, 80 TPH, CBL
make)
(Turbine, 16 MW, Siemens make)
16.00 2010 - 2012 Commissioned in
April, 2012
30. Greta Energy Ltd., Mul MIDC,
Chandrapur, Maharashtra
(Boiler, 87 ata, 515
0
C & 70 TPH, CVL
make)
(Turbine, 15 MW, Siemens)
15.00 2010 2012 Commissioned in
November, 2012
Sub-total (2) 56.00




Engineering Projects 7

Client List (Contd.)

3. Incidental Cogen Power Projects

Sr.
No.
Client
(Pressure / Temperature Configuration)
Installed
Capacity,
MW
Service Period Status
31. Kisanveer Satara Sahakari Sakhar
Karkhana Ltd., Dist. Satara, Maharashtra
(Phase I)
2.00 2005-2006 Commissioned in
March, 2006
32. Kukadi Sahakari Sakhar Karkhana Ltd.,
Pimpalgaon Pisa, Tal. Shrigonda, Dist.
Ahmednagar
2.00 2005 - 2007 Commissioned in
March, 2007
33. Purna Sahakari Sakhar Karkhana Ltd.,
Basmathnagar, Dist. Hingoli,
Maharashtra
1.50 2005 2007 Commissioned in
March, 2007
34. Sharad Sahakari Sakhar Karkhana Ltd.,
Dist. Kolhapur, Maharashtra
2.00 2006 2008 Commissioned in
January, 2008
35. Shree Narmada Khand Udyog Sahakari
Mandli Ltd., Narmada, Gujarat
(Electrical Evacuation / Distribution
System)
2.00 2013 till date Commissioned in
November, 2013
Sub-total (3) 9.50



Engineering Projects 8

Client List (Contd.)

4. Industrial Captive Power Projects

Sr.
No.
Client
(Pressure / Temperature Configuration)
Installed
Capacity,
MW
Service Period Status
36. Pudumjee Pulp & Paper Mills Ltd., Pune,
Maharashtra
(Boiler, 22 kg/ cm
2
, 340C, 20 TPH,
SITSON make)
(Turbine, 0.7 MW, imported)
1.50 2002-2004 Commissioned in
2004
37. Rajaram Maize Products, Rajnandgaon,
Chhattisgarh
1.00 2002- 2004 Commissioned in
2004
38. Shri Mahavir Ferro Alloys Private Ltd.,
Dist. Sundargarh, Orissa
12.00 2005 2007 Commissioned in
2007
39. Hospet Ispat Ltd., Dist. Koppal,
Karnataka
5.00 2005 2006 -
40. The Bombay Dyeing Manufacturing
Company Ltd., Ranjangaon, Dist. Pune
LP boiler 2007 08 Commissioned in
August, 2008
41. Parag Milk & Milk Products Pvt. Ltd.,
Manchar, Dist. Pune, Maharashtra
(Boiler, 45 kg/ cm
2
& 440C, 22 TPH, Par
Boiler make)
(Turbine, 2 MW, Anama make)
2.00 2007 - 2009 Commissioned in
March, 2009
42. Gharda Chemicals Ltd., Lote, Dist.
Ratnagiri, Maharashtra
(Boiler, 67 kg/ cm
2
& 490C, 40 TPH,
CVPL make)
(Turbine, 4 MW, TRIVENI make)
4.00 2008 - 2010 Commissioned in
October, 2010
43. Usher Agro Ltd., Mathura
(Boiler, 10 Kg/ cm
2
)
LP boiler 2008 2010 Commissioned in
2010
44. Nath Industrial Chemicals Ltd., Vapi

2.00 2010 2012 Commissioned in
September, 2012
45. NOCIL Limited, Mumbai

7.00 2010 2012 Commissioned in
October, 2012
Sub-total (4) 34.50
Total (1+2+3+4) 556.70


Engineering Projects 9

Client List (contd.)

Under Implementation Projects

1. Bagasse Based Cogen Power Projects

Sr.
No.
Client
(Pressure / Temperature Configuration)
Installed
Capacity,
MW
Service Period Status
46.
The West Coast Paper Mills Ltd., Dandeli,
Uttar Kannada, Karnataka
7.50 2002 2004 Abandoned
47.
Dr. Babasaheb Ambedkar Sahakari
Sakhar Karkhana Ltd., Osmanabad
(Boiler, 50 TPH Travelling Grate, 87
kg/cm
2
, 515
0
C, Meru make)
(Turbine, 10 MW Double Extraction Cum
Condensing, Triveni make)

10.00 2011 till date Expected to be
commissioned by
December, 2013
48.
Kisanveer Khandala Sahakari Sakhar
Udyog, Khandala
EPC Contract to Uttam Energy
(Boiler, 60 TPH, 87 Kg/cm (g), 515
0
C)
(Turbine, 9.5 MW)
9.50 2012 till date
Expected to be
commissioned by
October, 2014
49. Shri Malaprabha SSKL
Mugutkhan Hubli 591 153
Dist. Belgaum
22.00 2010 till date Expected to be
commissioned by
October, 2015
50.
Sahakar Shiromani Vasantrao Kale
Sahakari Sakhar Karkhana Ltd.,
Chandrabhaganagar
(Boiler, 2 X 50 TPH Travelling Grate, 87
kg/cm2, 515
0
C, SITSON make )
(Turbine, 8 MW Double Extraction cum
Condensing & 10 MW Bleed cum Back
Pressure, SITSON make)
18.00 2012 till date Expected to be
commissioned by
October, 2014

Engineering Projects 10

Client List (contd.)

1. Bagasse Based Cogen Power Projects (contd.)

Sr.
No.
Client
(Pressure / Temperature Configuration)
Installed
Capacity,
MW
Service Period Status
51.
Shri Vithal Sahakari Sakhar Karkhana
Ltd., Venunagar
(Boiler, 1X125 TPH Bagasse Fired,
Travelling Grate, 87 kg/ cm
2
, 515
0
C,
ISGEC make)
(Turbine, 19.8 MW Bleed Cum Back
Pressure, Triveni make)

19.80 2012 till date Expected to be
commissioned by
October, 2014
52.
M. S. Patil Sugars Ltd., Solapur
EPC Contract to IJT
(Boiler, 130 TPH, 110 Kg/cm (g), 545
0
C)
(Turbine, 25 MW)

25.00 2012 till date
Expected to be
commissioned by
October, 2015
53.
Sahakarmaharshi Bhausaheb Thorat
Sahakari Sakhar Karkhana Ltd.,
Ahmednagar
(Boiler, 100 TPH Travelling Grate, 87
Kg/cm
2
, 520
0
C)
(Turbines, 8 MW Double Extraction cum
Condensing &
16 MW Bleed Cum Back Pressure)

28.00 2012 till date
Expected to be
commissioned by
October, 2015
54.
Cane Agro Energy (India) Ltd., Sangli
25.00 2012 till date
Expected to be
commissioned by
October, 2017
55.
Tarini Sugars & Distilleries Ltd., Parbhani
15.00 2013 till date
Expected to be
commissioned by
October, 2015
56.
Baliraja Sakhar Karkhana Ltd., Parbhani
(Project management services for sugar
& cogen power plant at Latur)
18.00 2013 till date
Expected to be
commissioned by
October, 2014



Engineering Projects 11

Client List (contd.)

1. Bagasse Based Cogen Power Projects (contd.)

Sr.
No.
Client
(Pressure / Temperature Configuration)
Installed
Capacity,
MW
Service Period Status
57.
Shraddha Energy And Infraprojects Pvt.
Ltd., Pune
(Project management services for sugar
& cogen power plant at Jalna)
12.00 2013 till date
Expected to be
commissioned by
October, 2014
58.
Sant Muktai Sugar & Energy Ltd., Pune
(Project management services for sugar
& cogen power plant at Jalna)
12.00 2013 till date
Expected to be
commissioned by
October, 2015
59.
Swaraj India Agro Ltd., Satara
(Engineering & project management
services for sugar & cogen power plant
at Phaltan)
22.00 2013 till date
Expected to be
commissioned by
October, 2014
60.
Shri Balaji Sugars & Chemicals Pvt. Ltd.,
Mudhol
(Engineering & project management
services for sugar & cogen power plant
at Yaragal village, Dist. Bijapur)
21.00 2013 till date
Expected to be
commissioned by
October, 2014
61.
Parag Agro Foods And Allied Products
Pvt. Ltd., Mumbai
(Engineering & project management
services for sugar & cogen power plant)
18.00 2013 till date
Expected to be
commissioned by
September, 2015


Engineering Projects 12


Client List (Contd.)

1. Bagasse Based Cogen Power Projects (contd.)

Sr.
No.
Client
(Pressure / Temperature Configuration)
Installed
Capacity,
MW
Service Period Status
62.
Tamil Nadu Generation and Distribution
Corporation Ltd, Chennai, Tamil Nadu
(BOOT project on EPC Contract to WIL at
The Dharmapuri District Co-op. Sugar Mills
Ltd., Palacode )
(Boiler, 60 TPH, 87 Kg/ cm
2
, 515
0
C)
(Turbine, 12 MW DEC, Triveni make )

12 2010 till date Expected to be
commissioned by
October, 2014
63.
Tamil Nadu Generation and Distribution
Corporation Ltd, Chennai, Tamil Nadu
(BOOT project on EPC Contract to WIL at
The Salem Co-op. Sugar Mills Ltd.,
Mohanur)
(Boiler, 80 TPH, 87 Kg/ cm
2
, 515
0
C)
(Turbine, 15 MW DEC, Triveni make )

15 2010 till date Expected to be
commissioned by
October, 2014
64.
Tamil Nadu Generation and Distribution
Corporation Ltd, Chennai, Tamil Nadu
(BOOT project on EPC Contract to WIL at
The Kallakurichi Co-op. Sugar Mills Ltd.,
Moongilthuraipattu )
(Boiler, 80 TPH, 87 Kg/ cm
2
, 515
0
C)
(Turbine, 15 MW DEC, Triveni make )

15 2010 till date Expected to be
commissioned by
October, 2014
65.
Tamil Nadu Generation and Distribution
Corporation Ltd, Chennai, Tamil Nadu
(BOOT project on EPC Contract to WIL at
The Vellore Co-op. Sugar Mills Ltd., Vellore
(Boiler, 80 TPH, 87 Kg/ cm
2
, 515
0
C)
(Turbine, 15 MW DEC, Triveni make )

15 2010 till date Expected to be
commissioned by
October, 2014
66.
Tamil Nadu Generation and Distribution
Corporation Ltd, Chennai, Tamil Nadu
(BOOT project on EPC Contract to WIL at
Chengalrayan Co-op. Sugar Mills Ltd.,
Periyasevalai)
(Boiler, 90 TPH, 110 Kg/ cm
2
, 545
0
C)
(Turbine, 18 MW DEC, Triveni make )

18 2010 till date Expected to be
commissioned by
October, 2014

Engineering Projects 13

Client List (Contd.)

1. Bagasse Based Cogen Power Projects (contd.)

Sr.
No.
Client
(Pressure / Temperature Configuration)
Installed
Capacity,
MW
Service Period Status
67.
Tamil Nadu Generation and Distribution
Corporation Ltd, Chennai, Tamil Nadu
(BOOT project on EPC Contract to WIL at
The National Co-op. Sugar Mills Ltd.,
Mettupatti)
(Boiler, 80 TPH, 87 Kg/ cm
2
, 515
0
C)
(Turbine, 15 MW DEC, Triveni make )

15 2010 till date Expected to be
commissioned by
October, 2014
68.
Tamil Nadu Generation and Distribution
Corporation Ltd, Chennai, Tamil Nadu
(BOOT project on EPC Contract to WIL at
M.R. Krishnamurthy Co-op. Sugar Mills Ltd.,
Sethiathope)
(Boiler, 80 TPH, 87 Kg/ cm
2
, 515
0
C)
(Turbine, 15 MW DEC, Triveni make )

15 2010 till date Expected to be
commissioned by
October, 2014
69.
Tamil Nadu Generation and Distribution
Corporation Ltd, Chennai, Tamil Nadu
(BOOT project on EPC Contract to WIL at
Subramaniya Siva Co-op. Sugar Mills Ltd.,
Gopalapuram)
(Boiler, 80 TPH, 87 Kg/cm
2
, 515
0
C)
(Turbine, 15 MW DEC, Triveni make )

15 2010 till date Expected to be
commissioned by
October, 2014
70.
Tamil Nadu Generation and Distribution
Corporation Ltd, Chennai, Tamil Nadu
(BOOT project on EPC Contract to WIL at
The Cheyyar Co-op. Sugar Mills Ltd.,
Perumbalai)
(Boiler, 80 TPH, 87 Kg/cm
2
, 515
0
C)
(Turbine, 15 MW DEC, Triveni make )
15 2010 till date Expected to be
commissioned by
October, 2014
71.
Tamil Nadu Generation and Distribution
Corporation Ltd, Chennai, Tamil Nadu
(BOOT project on EPC Contract to WIL at
Arignar Anna Sugar Mills Ltd., Kurungulam)
(Boiler, 80 TPH, 87 Kg/cm
2
, 515
0
C)
(Turbine, 15 MW DEC, Triveni make )
15 2010 till date Expected to be
commissioned by
October, 2014


Engineering Projects 14

Client List (Contd.)

1. Bagasse Based Cogen Power Projects (contd.)

Sr.
No.
Client
(Pressure / Temperature Configuration)
Installed
Capacity,
MW
Service Period Status
72.
Tamil Nadu Generation and Distribution
Corporation Ltd, Chennai, Tamil Nadu
(BOOT project on EPC Contract to WIL at
Perambalur Sugar Mills Ltd., Eraiyur)
(Boiler, 90 TPH, 110 Kg/cm
2
, 545
0
C)
(Turbine, 18 MW DEC, Triveni make )

18 2010 till date Expected to be
commissioned by
October, 2014
73.
Tamil Nadu Generation and Distribution
Corporation Ltd, Chennai, Tamil Nadu
(BOOT project on EPC Contract to WIL at
Kallakurichi - II Co-op. Sugar Mills Ltd.,
Kachirayapalayam)
(Boiler, 80 TPH, 87 Kg/cm
2
, 515
0
C)
(Turbine, 15 MW DEC, Triveni make )

15 2010 till date Expected to be
commissioned by
October, 2014
Sub-total (1)
358.80







Engineering Projects 15

Client List (Contd.)



2. Biomass Based Power Projects

Sr.
No.
Client
(Pressure / Temperature Configuration)
Installed
Capacity, MW
Service
Period
Status
74. Abellon Clean Energy Ltd., Ahmedabad
(Boiler, 67 ata, 460
0
C & 45 TPH,
Thermodyne make )
(Turbine , 9.9 MW, Triveni)
9.90 2011 till
date
Expected to be
commissioned by
March, 2014
75. GMT Mining & Power Pvt. Ltd., Nagpur
(Boiler, 87 ata, 515
0
C & 45 TPH, Thermax
make )
(Turbine , 10 MW DEC, Siemens make)
10.00 2011 till
date
Expected to be
commissioned by
October, 2014
76. Usher Agro Ltd., Mathura, Uttar Pradesh

1.00 2012 till
date
Expected to be
commissioned by
October, 2014
77. Alwar Power Company Pvt. Ltd., Alwar,
Rajasthan
EPC Contract to WIL
(Boiler, 67 kg/cm2 & 485C, 35 TPH)
(Turbine, 7.5 MW)
7.50 2011 till
date
Expected to be
commissioned by
October, 2015
78. Suryachambal Power Ltd., Mumbai
(Khatoli)
10.00 2010 till date Expected to be
commissioned by
October, 2015
79. Usher Agro Ltd., Buxar 1.00 2012 till
date
Expected to be
commissioned by
December, 2014
80. Usher Eco Power Ltd., Chhata, Mathura,
Phase II
18.00 2012 till
date
Expected to be
commissioned by
June, 2015
Sub-total (2) 57.40



Engineering Projects 16

Client List (Contd.)


3. Incidental Cogen Power Projects

Sr.
No.
Client
(Pressure / Temperature Configuration)
Installed
Capacity,
MW
Service Period Status
81. Pd. Dr. Vitthalrao Vikhe Patil Sahakari
Sakhar Karkhana Ltd., Pravaranagar,
Maharashtra
1.50 2007 2008 Abandoned
Sub-total (3) 1.50



4. Industrial Captive Power Projects

Sr.
No.
Client
(Pressure / Temperature Configuration)
Installed
Capacity,
MW
Service Period Status
82. Tilaknagar Industries Ltd., Ahmednagar 2.00 2007 2008 Abandoned
Sub-total (4) -
Total (1+2+3+4) 419.70







Engineering Projects 17

Client List (contd.)

Other Projects


Sr.
No.
Client

Services Rendered Service
Period
Status
83. Usher Agro Ltd.,
Mathura
LP boiler installation 2012 till
date
Expected to be
commissioned by
April, 2014
84.
Lipi Boilers Ltd., Pune

Project management services for
piping stress analysis work at
cogen power plant at Nira Bhima
sskl, Indapur, Dist. Pune
2013 till
date
Expected to be
completed by
December, 2013
85.
Vasantrao Dada Patil
Sahakari Sakhar
Karkhana Ltd., Satana,
Nasik

Techno-commercial /
administrative due diligence &
performance evaluation of sugar
modernization & cogen power
plant
2013
Completed
86.
Shree Khedut Sahakari
Khand Udyog Mandli
Ltd., Bardoli, Surat

Cogen power plant layout 2013
Completed
87.
Energyexcel llp,
London

Review of modification options to
allow biomass furnace to comply
with GSK Health & Safety
requirements
2013
Completed
88.
Continental India Ltd.,
Meerut

Engineering & project
management services for boiler
installation at Meerut factory
2013 till
date
Expected to be
commissioned by
February, 2014